Back to bathroom remodel contractors
Stapleton Construction Dba Revival Const
- Based in
- Oakland
- On San Francisco permits
- Aug 2016 to Apr 2018
- Last 24 months
- 0 permits filed
9 permits since 2000: 6 completed, 3 never finaled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 9 days from filing to permit and 388 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2017 | Never finaled issued Jul 2017, no final | 290 Rutledge St | interior remodel of existing single family dwelling. replace front door, 2 new windows, remodel kitchen and 2 baths.Details
interior remodel of existing single family dwelling. replace front door, 2 new windows, remodel kitchen and 2 baths. | $100,000 |
| May 31, 2017 | Completed final sign-off Feb 2019 | 187 Crescent Av | add interior stair from basement to main level. replace existing interior stair, replace existing rear sidewalk stair in-kind. new laundry & storage in basemenent. new hvac. remodel kitchen, bathroom & master bedroomDetails
add interior stair from basement to main level. replace existing interior stair, replace existing rear sidewalk stair in-kind. new laundry & storage in basemenent. new hvac. remodel kitchen, bathroom & master bedroom | $250,000 |
| Mar 30, 2017 | Completed final sign-off Sep 2017 | 181 College Av | interior renovation of extg 1 story addition at rear of house. work not visible from street and no additional square footage added. work includes minor layout changes. renovated kitchen and one bathroom. also new foundation work and interior finish fixture upgrades.Details
interior renovation of extg 1 story addition at rear of house. work not visible from street and no additional square footage added. work includes minor layout changes. renovated kitchen and one bathroom. also new foundation work and interior finish fixture upgrades. | $95,000 |