Superbuilt
- Based in
- San Francisco
- On San Francisco permits
- Apr 2026 to Sep 2026
- Last 24 months
- 5 permits filed
5 permits since 2000: 1 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2026 | In progress issued Sep 2026 | 160 Richland Av | add doors and windows to shed, self elect to repair and reinforce structure of shed, no added occupiable space add electrical outlets and light, rot repair per uif. no work @ front structure.Details
add doors and windows to shed, self elect to repair and reinforce structure of shed, no added occupiable space add electrical outlets and light, rot repair per uif. no work @ front structure. | $20,000 |
| Sep 25, 2026 | In progress issued Oct 2026 | 226 Rutledge St | remodel of front and rear facades with new design, windows and siding. remodel of existing 1st floor entry. new interior spiral stair to connect 1st and 2nd floors. no added square footage. relocate heat pump condensing unit to roof. replace (e) water heater with heat pump water heater.Details
remodel of front and rear facades with new design, windows and siding. remodel of existing 1st floor entry. new interior spiral stair to connect 1st and 2nd floors. no added square footage. relocate heat pump condensing unit to roof. replace (e) water heater with heat pump water heater. | $75,000 |
| Sep 18, 2026 | In progress issued Sep 2026 | 160 Richland Av | increase opening in dining room, replace window at side and rear in kind, replace (e) water heater for lower floor unit.Details
increase opening in dining room, replace window at side and rear in kind, replace (e) water heater for lower floor unit. | $28,000 |
| Jul 20, 2026 | In progress issued Jul 2026 | 2773 Clay St | add (2) new windows at east side elevation . windows not visible from street. replace (4) light fixtures in dining room, living room and kitchenDetails
add (2) new windows at east side elevation . windows not visible from street. replace (4) light fixtures in dining room, living room and kitchen | $18,000 |
| Apr 10, 2026 | Completed final sign-off Jul 2026 | 932 Goettingen St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $15,000 |