Block 1313, lot 029
1100 El Camino Del Mar
- City’s use
- Commercial Retail
- Built
- 1900
- Lot
- 4,880,701 sq ft
- Zoning
- P
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 5, 2025 | In progress issued Sep 2025 | 1100 El Camino Del Mar | Patrick Uniacke | concrete slab on piers with 42 in perimeter wall for sf irish famine memorial plazaDetails
concrete slab on piers with 42 in perimeter wall for sf irish famine memorial plaza | $75,000 |
| Jun 6, 2022 | Never finaled issued Jun 2022, no final | 100 34th Av | R L H Fire Protection Inc | tenant improvement to hoefer gallery: 5 (e) pendents to remain; relocate fire pendents, add 2 pendent sprinklers. ref pa 202204212736Details
tenant improvement to hoefer gallery: 5 (e) pendents to remain; relocate fire pendents, add 2 pendent sprinklers. ref pa 202204212736 | $2,000 |
| Apr 21, 2022 | Completed final sign-off Nov 2022 | 100 34th Av | Hathaway Dinwiddie Co. | demolition of (e) millwork, carpet, gyp bd ceiling (existing framing to remain for reuse), light fixtures, mech linear diffusers and ceiling mounted devices. remove (e) layer of gyp bd and plywood backing, from (e) metal stud framing scheduled for reuse. scope of new work will include galleryDetails
demolition of (e) millwork, carpet, gyp bd ceiling (existing framing to remain for reuse), light fixtures, mech linear diffusers and ceiling mounted devices. remove (e) layer of gyp bd and plywood backing, from (e) metal stud framing scheduled for reuse. scope of new work will include gallery | $494,797 |
| May 31, 2018 | Completed final sign-off Jun 2019 | 100 34th Av | H C I Systems Inc | add one new audio/visual device per client request. n/a for maherDetails
add one new audio/visual device per client request. n/a for maher | |
| Jul 19, 2017 | Completed final sign-off Feb 2018 | 100 34th Av | H C I Systems Inc | as-built fire alarm system per ref pa #2017-0517-6844. n/a maher ordinanceDetails
as-built fire alarm system per ref pa #2017-0517-6844. n/a maher ordinance | |
| May 17, 2017 | Completed final sign-off Feb 2018 | 100 34th Av | H C I Systems Inc | replacement of (e) simplex fire alarm system to edwards est3 utilizing (e) location. installation of (n) documentation cabinet in fire control rm. replacement of all (e) initiating devices (detectors, manual stations & modules). replacement of (e) notification devices. (n) power supply installation.Details
replacement of (e) simplex fire alarm system to edwards est3 utilizing (e) location. installation of (n) documentation cabinet in fire control rm. replacement of all (e) initiating devices (detectors, manual stations & modules). replacement of (e) notification devices. (n) power supply installation. | $143,000 |
| Oct 31, 2013 | Completed final sign-off Feb 2014 | 100 34th Av | Johnson Controls Fire | fire alarm tenant improvement. 2 new speaker strobes and new vesda detection system.Details
fire alarm tenant improvement. 2 new speaker strobes and new vesda detection system. | $5,500 |
| Sep 12, 2013 | Completed final sign-off Oct 2013 | 100 34th Av | Ayoob & Peery Plumbing Co Inc | 1st floor-relocate fire sprinkler heads per tenant improvements-7 relocated, ref #2013.0410.4221Details
1st floor-relocate fire sprinkler heads per tenant improvements-7 relocated, ref #2013.0410.4221 | $3,600 |
| Apr 11, 2013 | Completed final sign-off Feb 2014 | 100 34th Av | Swinerton Builders | barrier removal/ada upgrade to existing men's & women's restrooms. the work includes selective demo of (e) toilets, partitions, and reconfiguring restrooms to accomodate a compliant handicap stalls. therew will be replacement of the existing drinking fountain to an ada compliant unit.Details
barrier removal/ada upgrade to existing men's & women's restrooms. the work includes selective demo of (e) toilets, partitions, and reconfiguring restrooms to accomodate a compliant handicap stalls. therew will be replacement of the existing drinking fountain to an ada compliant unit. | $50,000 |
| Apr 10, 2013 | Completed final sign-off May 2014 | 100 34th Av | Swinerton Builders | interior remodel of existing art gallery, selective demo of (e) wall and ceiling, frame new wall & add new lighting fixtures, electrical, fire alarm work, modify (e) fire sprinklers & hvac ductwork, new drywall and flooring systems.Details
interior remodel of existing art gallery, selective demo of (e) wall and ceiling, frame new wall & add new lighting fixtures, electrical, fire alarm work, modify (e) fire sprinklers & hvac ductwork, new drywall and flooring systems. | $585,000 |
| Sep 19, 2012 | Completed final sign-off Nov 2012 | 100 34th Av | Swinerton Builders | construct temporary walls and plywood floor protection of an existing art gallery. temp wall includes a viewing window & one (1) doubled door unit.Details
construct temporary walls and plywood floor protection of an existing art gallery. temp wall includes a viewing window & one (1) doubled door unit. | $15,000 |
| Oct 6, 2011 | Completed final sign-off Jan 2013 | 100 34th Av | voluntary accessibility upgrade at parking area.Details
voluntary accessibility upgrade at parking area. | $25,000 | |
| Sep 7, 2011 | Completed final sign-off Jun 2013 | 90 34th Av | remodel of (e) restrooms to comply w/ ada. remodel of main entrances on both restrooms. remodel of both women's and men's restroom, drinking fountain and roof repair, new wall and floor finishesDetails
remodel of (e) restrooms to comply w/ ada. remodel of main entrances on both restrooms. remodel of both women's and men's restroom, drinking fountain and roof repair, new wall and floor finishes | $70,000 | |
| Mar 11, 2011 | Never finaled issued Oct 2011, no final | 90 34th Av | new address assignment for restroomDetails
new address assignment for restroom | ||
| May 2, 2007 | Completed final sign-off Jun 2007 | 100 34th Av | Pacific Coast Trane Service Co. | replacement of (e) chiller like in kind. actual work being done in an alternate building on the property not in the historic portion.Details
replacement of (e) chiller like in kind. actual work being done in an alternate building on the property not in the historic portion. | $180,000 |
| Feb 5, 2002 | Expired or cancelled expired Jun 2002 | 300 34th Av | San Francisco Fire Protection | install fire suppression system at g/fl locationDetails
install fire suppression system at g/fl location | $2,000 |
| Nov 28, 2001 | Expired or cancelled expired Mar 2002 | 300 34th Av | San Francisco Fire Protection | installation of a fire suppression sytem over kchn equipmentDetails
installation of a fire suppression sytem over kchn equipment | $2,000 |
| Aug 19, 2000 | Expired or cancelled withdrawn Jul 2001 | 300 34th Av | gradingDetails
grading | $10,000 | |
| Jun 19, 2000 | Expired or cancelled expired Oct 2000 | 300 34th Av | renew 9725482,9717160,Details
renew 9725482,9717160, | ||
| Jun 19, 2000 | Expired or cancelled expired Feb 2001 | 300 34th Av | gradingDetails
grading | $10,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.