Mark Cavagnero

License
C19521
Look the license up with the state
Listed as
architect, designer, engineer
Firm
Mark Cavagnero Associates
Based in
San Francisco
On San Francisco permits
Sep 2006 to Aug 2026

77 permits since 2000 (architect on 73 permits, engineer on 3 permits, designer on 1 permit): 46 completed, 15 in progress, 8 never finaled, 8 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 11, 2026In progress
filed Aug 2026, not yet issued
125 03rd Stconstruct permanent tnent on 4/f to be fire sprinkled and alarmed. new lighting and receptacles for temp event lighting. no change to (e) roof drainage.
Details
Permit
202608116405
Status
triage
Filed
Aug 11, 2026
Declared cost
$4,217,680
Address
125 03rd St

construct permanent tnent on 4/f to be fire sprinkled and alarmed. new lighting and receptacles for temp event lighting. no change to (e) roof drainage.

Open the permit page

$4,217,680
Jul 29, 2026In progress
issued Aug 2026
77 Harriet Stadministrative permit to establish occupancy load as follow up to dbi site 202212168587 (an ab-004 city priority project)
Details
Permit
202607295767
Status
issued
Filed
Jul 29, 2026
Permit issued
Aug 3, 2026
Address
77 Harriet St

administrative permit to establish occupancy load as follow up to dbi site 202212168587 (an ab-004 city priority project)

Open the permit page

Jun 4, 2026In progress
issued Aug 2026
235 Stockton StSingular Builders(n) interior build-out. will consist of (n) custom millwork island , (n) food service equipment, new mechanical exhaust system and fire suppression system, new interior finishes, flour, paint and tile, new non load bearing, furring partition, revised fin/life safety/information, revise fire alarm
Details
Permit
202606042500
Status
issued
Filed
Jun 4, 2026
Permit issued
Aug 19, 2026
Declared cost
$1,030,000
Address
235 Stockton St

(n) interior build-out. will consist of (n) custom millwork island , (n) food service equipment, new mechanical exhaust system and fire suppression system, new interior finishes, flour, paint and tile, new non load bearing, furring partition, revised fin/life safety/information, revise fire alarm

Open the permit page

$1,030,000
Mar 20, 2026In progress
issued May 2026
2001 37th AvReprohaus Corpnon-electric sign within campus; sign name as: st. ignatius college preparatory
Details
Permit
202603208000
Status
issued
Filed
Mar 20, 2026
Permit issued
May 26, 2026
Declared cost
$3,000
Address
2001 37th Av

non-electric sign within campus; sign name as: st. ignatius college preparatory

Open the permit page

$3,000
Feb 23, 2026In progress
issued Mar 2026
1045 Sansome StSingular Buildersinterior tenant improvement of level 3 at 1045 sansome st. includes new non-load bearing partitions and floor finishes. no changes to existing exterior facade, elevator, or exit stairs. hvac, electrical, plumbing and fire protection work to be permited by contractor.
Details
Permit
202602236299
Status
issued
Filed
Feb 23, 2026
Permit issued
Mar 19, 2026
Declared cost
$250,000
Address
1045 Sansome St

interior tenant improvement of level 3 at 1045 sansome st. includes new non-load bearing partitions and floor finishes. no changes to existing exterior facade, elevator, or exit stairs. hvac, electrical, plumbing and fire protection work to be permited by contractor.

Open the permit page

$250,000
Jan 21, 2026In progress
filed Jan 2026, not yet issued
2000 Marin StClark Construction Group Ca Lpproj-26-2627 mou: erect new 1 story type iib & iiib fuel station.
Details
Permit
202512041033
Status
triage
Filed
Jan 21, 2026
Declared cost
$850,000
Address
2000 Marin St

proj-26-2627 mou: erect new 1 story type iib & iiib fuel station.

Open the permit page

$850,000
Sep 18, 2025Completed
final sign-off Nov 2025
77 Bruton StToms Metal Specialists Dba: Toms Weldingnew metal mesh railing at e) concrete patios on seven seas av & mid blocl alley frontages, no interior modification, work in within property line
Details
Permit
202509185591
Status
complete
Filed
Sep 18, 2025
Permit issued
Sep 18, 2025
Final sign-off
Nov 18, 2025
Declared cost
$49,500
Address
77 Bruton St

new metal mesh railing at e) concrete patios on seven seas av & mid blocl alley frontages, no interior modification, work in within property line

Open the permit page

$49,500
Aug 21, 2025Completed
final sign-off Aug 2025
2 Lake StPlant Construction Co, Lpadministrative permit to document ab-005 equivalency associated with pre-school occupancy and exiting from the 4th story. ref. permit #202202097657
Details
Permit
202508213625
Status
complete
Filed
Aug 21, 2025
Permit issued
Aug 21, 2025
Final sign-off
Aug 22, 2025
Address
2 Lake St

administrative permit to document ab-005 equivalency associated with pre-school occupancy and exiting from the 4th story. ref. permit #202202097657

Open the permit page

Jul 23, 2025Completed
final sign-off Sep 2025
2 Lake StPlant Construction Co, Lprestoration of the e) lake st exteior arch
Details
Permit
202507231446
Status
complete
Filed
Jul 23, 2025
Permit issued
Aug 12, 2025
Final sign-off
Sep 30, 2025
Declared cost
$10,000
Address
2 Lake St

restoration of the e) lake st exteior arch

Open the permit page

$10,000
Jul 9, 2025In progress
issued Nov 2025
1687 Market StBuild Group Inc.demolish (e) 3 story type v retail building.
Details
Permit
202506138711
Status
issued
Filed
Jul 9, 2025
Permit issued
Nov 18, 2025
Declared cost
$300,000
Address
1687 Market St

demolish (e) 3 story type v retail building.

Open the permit page

$300,000
Feb 27, 2025Completed
final sign-off Dec 2025
2 Lake StPlant Construction Co, Lpinstallation of exterior building lighting at the temple house facade on lake st & the sanctuary facade facing the interior courtyard
Details
Permit
202502271264
Status
complete
Filed
Feb 27, 2025
Permit issued
Mar 14, 2025
Final sign-off
Dec 2, 2025
Declared cost
$15,000
Address
2 Lake St

installation of exterior building lighting at the temple house facade on lake st & the sanctuary facade facing the interior courtyard

Open the permit page

$15,000
Feb 11, 2025In progress
issued Nov 2025
1687 Market StBuild Group Inc.mayors directive 13-01: construction of a 17-story type i-a, 94 units of 100% affordable housing. 17 total stories of occupancy including 2 basements providing both dwelling units and art community colaboration spaces.
Details
Permit
202412035997
Status
issued
Filed
Feb 11, 2025
Permit issued
Nov 7, 2025
Declared cost
$70,205,789
Address
1687 Market St

mayors directive 13-01: construction of a 17-story type i-a, 94 units of 100% affordable housing. 17 total stories of occupancy including 2 basements providing both dwelling units and art community colaboration spaces.

Open the permit page

$70,205,789
Jan 31, 2025Completed
final sign-off Oct 2025
2 Lake StPlant Construction Co, Lpdeferred food service permit#: 202202097657 add2;
Details
Permit
202501319496
Status
complete
Filed
Jan 31, 2025
Permit issued
Feb 7, 2025
Final sign-off
Oct 2, 2025
Address
2 Lake St

deferred food service permit#: 202202097657 add2;

Open the permit page

Aug 13, 2024Expired or cancelled
withdrawn Sep 2024
2 Lake StPlant Construction Co, Lprevision to pa# 202202097657-s2. to include 2 new exterior light wells @ level 1. reduce level 2 court yard size. add planters & tree wells @ court yard / light wells. redesign level 1 office suite & associated mepf changes.
Details
Permit
202408138496
Status
withdrawn
Filed
Aug 13, 2024
Address
2 Lake St

revision to pa# 202202097657-s2. to include 2 new exterior light wells @ level 1. reduce level 2 court yard size. add planters & tree wells @ court yard / light wells. redesign level 1 office suite & associated mepf changes.

Open the permit page

Jul 30, 2024Completed
final sign-off Jun 2025
55 Music Concourse DrC C I Commercial Construction & Improvrenovation of (e) cafe shop facility, removal of part of (e) ceilings. replace (e) equipment, relocation of (e) light fixtures and mechanical hvac.
Details
Permit
202407307608
Status
complete
Filed
Jul 30, 2024
Permit issued
Sep 20, 2024
Final sign-off
Jun 13, 2025
Declared cost
$218,191
Address
55 Music Concourse Dr

renovation of (e) cafe shop facility, removal of part of (e) ceilings. replace (e) equipment, relocation of (e) light fixtures and mechanical hvac.

Open the permit page

$218,191
May 1, 2024Completed
final sign-off Jan 2025
2001 37th AvDevcon Constructionpartial interior non structural demo only per ab017
Details
Permit
202405011161
Status
complete
Filed
May 1, 2024
Permit issued
May 16, 2024
Final sign-off
Jan 28, 2025
Declared cost
$45,000
Address
2001 37th Av

partial interior non structural demo only per ab017

Open the permit page

$45,000
Feb 23, 2024Completed
final sign-off Jul 2024
77 Harriet StSwinerton Builderspriority processing ab-004*** to demolish a type v, 1-story recreation building. (new construction under pa# 202212168587)
Details
Permit
202402236444
Status
complete
Filed
Feb 23, 2024
Permit issued
Apr 3, 2024
Final sign-off
Jul 24, 2024
Declared cost
$230,200
Address
77 Harriet St

priority processing ab-004*** to demolish a type v, 1-story recreation building. (new construction under pa# 202212168587)

Open the permit page

$230,200
Dec 15, 2023In progress
filed Dec 2023, not yet issued
0 Situs To Be AssignedClark Construction Group Ca Lpproj-23-0553. erect new auto shop building for the sfpuc water department. building includes vehicle repair bays, paint booths, carpentry shop, and employee areas including lockers, break room, and office areas. auto shop building is 1 of 6 buildings on the new sfwd campus at 2000 marin st.
Details
Permit
202312152632
Status
approved
Filed
Dec 15, 2023
Declared cost
$23,800,000
Address
0 Situs To Be Assigned

proj-23-0553. erect new auto shop building for the sfpuc water department. building includes vehicle repair bays, paint booths, carpentry shop, and employee areas including lockers, break room, and office areas. auto shop building is 1 of 6 buildings on the new sfwd campus at 2000 marin st.

Open the permit page

$23,800,000
Dec 15, 2023In progress
filed Dec 2023, not yet issued
0 Situs To Be AssignedClark Construction Group Ca Lpproj-23-0550. erect new meter kiosk for sfpuc water department. building is for storing meters for distribution to the public by appointment only. meter kiosk is 1 of 6 bldg on new sfwd campus at 2000 marin st.
Details
Permit
202312152622
Status
approved
Filed
Dec 15, 2023
Declared cost
$700,000
Address
0 Situs To Be Assigned

proj-23-0550. erect new meter kiosk for sfpuc water department. building is for storing meters for distribution to the public by appointment only. meter kiosk is 1 of 6 bldg on new sfwd campus at 2000 marin st.

Open the permit page

$700,000
Dec 15, 2023In progress
filed Dec 2023, not yet issued
0 Situs To Be AssignedClark Construction Group Ca Lpproj-23-0551. erect new parking garage for sfpuc water department. parking garage includes electrical room serving the garage building & fire pump room & domestic water pump room serving entire campus. parking garage is 1 of 6 bldg on new sfwd campus at 2000 marin st.
Details
Permit
202312152623
Status
approved
Filed
Dec 15, 2023
Declared cost
$38,100,000
Address
0 Situs To Be Assigned

proj-23-0551. erect new parking garage for sfpuc water department. parking garage includes electrical room serving the garage building & fire pump room & domestic water pump room serving entire campus. parking garage is 1 of 6 bldg on new sfwd campus at 2000 marin st.

Open the permit page

$38,100,000
Dec 15, 2023In progress
filed Dec 2023, not yet issued
0 Situs To Be AssignedClark Construction Group Ca Lpproj-23-0558. erect new warehouse building for sfpuc water department. bldg includes regular height and high piled storage, meter shop, fabrication shop and employee support area including lockers, break room, and office areas. warehouse bldg is 1 of 6 bldgs on the new sfwd campus at 2000 marin st.
Details
Permit
202312152635
Status
approved
Filed
Dec 15, 2023
Declared cost
$20,900,000
Address
0 Situs To Be Assigned

proj-23-0558. erect new warehouse building for sfpuc water department. bldg includes regular height and high piled storage, meter shop, fabrication shop and employee support area including lockers, break room, and office areas. warehouse bldg is 1 of 6 bldgs on the new sfwd campus at 2000 marin st.

Open the permit page

$20,900,000
Dec 15, 2023In progress
filed Dec 2023, not yet issued
0 Situs To Be AssignedClark Construction Group Ca Lpproj-23-0554. erect new shops building for the sfpuc water department. building includes machine shop and employee support areas including lockers, break room, and office areas. shops building is 1 of 6 buildings on the new sfwd campus at 2000 marin st.
Details
Permit
202312152634
Status
approved
Filed
Dec 15, 2023
Declared cost
$18,300,000
Address
0 Situs To Be Assigned

proj-23-0554. erect new shops building for the sfpuc water department. building includes machine shop and employee support areas including lockers, break room, and office areas. shops building is 1 of 6 buildings on the new sfwd campus at 2000 marin st.

Open the permit page

$18,300,000
Dec 15, 2023In progress
filed Dec 2023, not yet issued
0 Situs To Be AssignedClark Construction Group Ca Lpproj-23-0548. erect new administration building for sfpuc water department. building includes offices, multi-purpose spaces, locker rooms, wellness center, training room, electrical, & landscape shops. administrative building is 1 of 6 bldg on new sfwd campus at 2000 marin st.
Details
Permit
202312152620
Status
approved
Filed
Dec 15, 2023
Declared cost
$48,200,000
Address
0 Situs To Be Assigned

proj-23-0548. erect new administration building for sfpuc water department. building includes offices, multi-purpose spaces, locker rooms, wellness center, training room, electrical, & landscape shops. administrative building is 1 of 6 bldg on new sfwd campus at 2000 marin st.

Open the permit page

$48,200,000
Jul 25, 2023In progress
issued Aug 2024
2001 37th AvDevcon Construction
Details
Permit
202307252968
Status
issued
Filed
Jul 25, 2023
Permit issued
Aug 6, 2024
Declared cost
$75,000,000
Address
2001 37th Av

Open the permit page

$75,000,000
May 10, 2023Completed
final sign-off Jul 2025
2 Lake StPlant Construction Co, Lpsoft demo of temple house & court yard wings including removal/saluage of historic elements & materials for reuse.
Details
Permit
202305107486
Status
complete
Filed
May 10, 2023
Permit issued
Jun 14, 2023
Final sign-off
Jul 16, 2025
Declared cost
$75,000
Address
2 Lake St

soft demo of temple house & court yard wings including removal/saluage of historic elements & materials for reuse.

Open the permit page

$75,000
Dec 16, 2022Completed
final sign-off Sep 2026
77 Harriet StSwinerton Builderspriority ab-004. erect a one story bldg, no basement, no dwelligs, recreation center type a-3. separate permit for demolition under pa# 202402236444.
Details
Permit
202212168587
Status
complete
Filed
Dec 16, 2022
Permit issued
Apr 22, 2024
Final sign-off
Sep 17, 2026
Declared cost
$32,500,000
Address
77 Harriet St

priority ab-004. erect a one story bldg, no basement, no dwelligs, recreation center type a-3. separate permit for demolition under pa# 202402236444.

Open the permit page

$32,500,000
Oct 17, 2022Never finaled
filed Oct 2022, never issued
170 Seacliff Averect a 3-story, type v-b, single family building with an adu and one basement level.
Details
Permit
202210174473
Status
approved
Filed
Oct 17, 2022
Declared cost
$2,400,000
Address
170 Seacliff Av

erect a 3-story, type v-b, single family building with an adu and one basement level.

Open the permit page

$2,400,000
Oct 17, 2022Never finaled
filed Oct 2022, never issued
170 Seacliff Avdemolish a 3-story, type v-b, single family building.
Details
Permit
202210174467
Status
filed
Filed
Oct 17, 2022
Declared cost
$25,000
Address
170 Seacliff Av

demolish a 3-story, type v-b, single family building.

Open the permit page

$25,000
Sep 15, 2022Completed
final sign-off Apr 2025
3410 Washington StThe Toboni Groupinterior & exterior alteration including side & rear facade alterations, minor front facade alterations,in kind replacement of window sash, infill below rear sunroom, remodel front planters, garage door widening, n skylights, structural upgrades, new interior finishes fixtures
Details
Permit
202209152534
Status
complete
Filed
Sep 15, 2022
Permit issued
May 1, 2023
Final sign-off
Apr 1, 2025
Declared cost
$395,000
Address
3410 Washington St

interior & exterior alteration including side & rear facade alterations, minor front facade alterations,in kind replacement of window sash, infill below rear sunroom, remodel front planters, garage door widening, n skylights, structural upgrades, new interior finishes fixtures

Open the permit page

$395,000
Apr 21, 2022Completed
final sign-off Nov 2022
100 34th AvHathaway Dinwiddie Co.demolition of (e) millwork, carpet, gyp bd ceiling (existing framing to remain for reuse), light fixtures, mech linear diffusers and ceiling mounted devices. remove (e) layer of gyp bd and plywood backing, from (e) metal stud framing scheduled for reuse. scope of new work will include gallery
Details
Permit
202204212736
Status
complete
Filed
Apr 21, 2022
Permit issued
May 6, 2022
Final sign-off
Nov 17, 2022
Declared cost
$494,797
Address
100 34th Av

demolition of (e) millwork, carpet, gyp bd ceiling (existing framing to remain for reuse), light fixtures, mech linear diffusers and ceiling mounted devices. remove (e) layer of gyp bd and plywood backing, from (e) metal stud framing scheduled for reuse. scope of new work will include gallery

Open the permit page

$494,797
Feb 9, 2022Completed
final sign-off Jul 2026
2 Lake StPlant Construction Co, Lpinterior renovation of the temple house & (n) addition to main sanctuary within (e) historic exterior walls of courtyard wing. renovation includes: (n) mech systems, seismic strengthening, (n) stairs & elevators, excavation for additional program spaces, & a (n) occupiable roof deck.
Details
Permit
202202097657
Status
complete
Filed
Feb 9, 2022
Permit issued
May 3, 2023
Final sign-off
Jul 14, 2026
Declared cost
$21,500,000
Address
2 Lake St

interior renovation of the temple house & (n) addition to main sanctuary within (e) historic exterior walls of courtyard wing. renovation includes: (n) mech systems, seismic strengthening, (n) stairs & elevators, excavation for additional program spaces, & a (n) occupiable roof deck.

Open the permit page

$21,500,000
Aug 9, 2021Expired or cancelled
withdrawn Mar 2022
308 Seacliff AvVan Acker Const Assoc Incseismic upgrade, replacement of oroof, added elevator, added skylights, reconstructed stairs, replace windows, new interior finsihes & fixtures.
Details
Permit
202108096031
Status
withdrawn
Filed
Aug 9, 2021
Declared cost
$800,000
Address
308 Seacliff Av

seismic upgrade, replacement of oroof, added elevator, added skylights, reconstructed stairs, replace windows, new interior finsihes & fixtures.

Open the permit page

$800,000
Jul 7, 2021Completed
final sign-off Jun 2022
55 Music Concourse DrC C I Commercial Construction & Improvcal academy of sciences: exterior renovation of extg east garden. new 1 story outdoor pavilion structure - type 5b, open and free-standing. ol=33. new landscape structures and features.
Details
Permit
202107073922
Status
complete
Filed
Jul 7, 2021
Permit issued
Nov 10, 2021
Final sign-off
Jun 27, 2022
Declared cost
$350,000
Address
55 Music Concourse Dr

cal academy of sciences: exterior renovation of extg east garden. new 1 story outdoor pavilion structure - type 5b, open and free-standing. ol=33. new landscape structures and features.

Open the permit page

$350,000
Jul 1, 2021Completed
final sign-off Feb 2026
200 Van Ness AvEdgewood Builders Incfloors 10 & 11: add new partition wall in 12 (e) student housing units on levels 10/11 to create 3 separate bedrooms in each modified unit. no change to life saftey, d/a or bed count. maher n/a
Details
Permit
202107013631
Status
complete
Filed
Jul 1, 2021
Permit issued
Jul 12, 2021
Final sign-off
Feb 27, 2026
Declared cost
$49,000
Address
200 Van Ness Av

floors 10 & 11: add new partition wall in 12 (e) student housing units on levels 10/11 to create 3 separate bedrooms in each modified unit. no change to life saftey, d/a or bed count. maher n/a

Open the permit page

$49,000
Jun 24, 2021Completed
final sign-off Feb 2026
200 Van Ness AvEdgewood Builders Incfloors 8 & 9: add new partition wall in 12 (e) student housing units on levels 8/9 to create 3 separate bedrooms in each modified unit. no change to life saftey, d/a. maher n/a
Details
Permit
202106243165
Status
complete
Filed
Jun 24, 2021
Permit issued
Jul 12, 2021
Final sign-off
Feb 27, 2026
Declared cost
$49,000
Address
200 Van Ness Av

floors 8 & 9: add new partition wall in 12 (e) student housing units on levels 8/9 to create 3 separate bedrooms in each modified unit. no change to life saftey, d/a. maher n/a

Open the permit page

$49,000
Jun 24, 2021Completed
final sign-off Feb 2026
200 Van Ness AvEdgewood Builders Incadd (n) partition wall in 12 (e) student housing units on levels 6 & 7 to create 3 separate bedrooms in each modified unit. no change in life safety, da or bed count
Details
Permit
202106243173
Status
complete
Filed
Jun 24, 2021
Permit issued
Jul 12, 2021
Final sign-off
Feb 27, 2026
Declared cost
$49,000
Address
200 Van Ness Av

add (n) partition wall in 12 (e) student housing units on levels 6 & 7 to create 3 separate bedrooms in each modified unit. no change in life safety, da or bed count

Open the permit page

$49,000
Apr 12, 2021Completed
final sign-off Jun 2022
55 Music Concourse DrC C I Commercial Construction & Improvremove interior partitions, at west project research area, construction new partitions, modify the exterior and chang the interior finishes with new mep's to create 1667 sq ft of public exhibit area.
Details
Permit
202104128289
Status
complete
Filed
Apr 12, 2021
Permit issued
Jun 2, 2021
Final sign-off
Jun 6, 2022
Declared cost
$592,529
Address
55 Music Concourse Dr

remove interior partitions, at west project research area, construction new partitions, modify the exterior and chang the interior finishes with new mep's to create 1667 sq ft of public exhibit area.

Open the permit page

$592,529
Feb 10, 2021Completed
final sign-off Jul 2021
55 Music Concourse DrC C I Commercial Construction & Improvnon-structural interior demo (ab-017) soft demo.
Details
Permit
202102104350
Status
complete
Filed
Feb 10, 2021
Permit issued
Apr 16, 2021
Final sign-off
Jul 14, 2021
Declared cost
$35,000
Address
55 Music Concourse Dr

non-structural interior demo (ab-017) soft demo.

Open the permit page

$35,000
Nov 19, 2020Completed
final sign-off Mar 2026
1 Avenue Of The PalmsSuffolk Constr Co. Inc. Dba Suffolk-Roelpriority processing per mayoral ed 17-02. to erect a type 3-a + 5-a over 1a podium, 6-story, (148) residential unit bldg with (1) basement. (bldg c3.4)
Details
Permit
202011199306
Status
complete
Filed
Nov 19, 2020
Permit issued
Jan 14, 2022
Final sign-off
Mar 9, 2026
Declared cost
$61,000,000
Address
1 Avenue Of The Palms

priority processing per mayoral ed 17-02. to erect a type 3-a + 5-a over 1a podium, 6-story, (148) residential unit bldg with (1) basement. (bldg c3.4)

Open the permit page

$61,000,000
Aug 7, 2020Never finaled
issued Mar 2021, no final
50 Fremont StGci, Incinterior single floor ti for single tenant on level 41. new buildout will consist of non-load bearing partitions, suspended ceiling systems, floors, wall finishes, casework & mep.
Details
Permit
202008071346
Status
issued
Filed
Aug 7, 2020
Permit issued
Mar 22, 2021
Declared cost
$2,200,000
Address
50 Fremont St

interior single floor ti for single tenant on level 41. new buildout will consist of non-load bearing partitions, suspended ceiling systems, floors, wall finishes, casework & mep.

Open the permit page

$2,200,000
Jul 6, 2020Completed
final sign-off Apr 2025
200 Van Ness AvCharles Pankow Builders Ltdsffd only review; revision to approved pa# 201705055487-s2 & approved revision pa# 202001232617. minor revision to the smoke control matrix to conform to approved smoke control report dated 12/6/19. ** maher: n/a **
Details
Permit
202007069626
Status
complete
Filed
Jul 6, 2020
Permit issued
Aug 25, 2020
Final sign-off
Apr 30, 2025
Address
200 Van Ness Av

sffd only review; revision to approved pa# 201705055487-s2 & approved revision pa# 202001232617. minor revision to the smoke control matrix to conform to approved smoke control report dated 12/6/19. ** maher: n/a **

Open the permit page

Mar 9, 2020Completed
final sign-off Jun 2025
200 Van Ness AvCon-Am Incsuite 219: interior t.i. on level 2 will consist of non-load bearing partitions, suspendid ceiling systems, floor & wall finishes, casework, hvac, elec, & plmg work. low voltage cabling for radio broadcasting studios. cabling up to roof level for l.v. broadcasing equipment.
Details
Permit
202003096471
Status
complete
Filed
Mar 9, 2020
Permit issued
Dec 18, 2020
Final sign-off
Jun 3, 2025
Declared cost
$1,800,000
Address
200 Van Ness Av

suite 219: interior t.i. on level 2 will consist of non-load bearing partitions, suspendid ceiling systems, floor & wall finishes, casework, hvac, elec, & plmg work. low voltage cabling for radio broadcasting studios. cabling up to roof level for l.v. broadcasing equipment.

Open the permit page

$1,800,000
Feb 5, 2020Completed
final sign-off Feb 2021
50 Fremont StGci, Incinterior demolition of 41st fl to include removeal of interior partitions, celings, finishes, mep distribution ab017 ref#202002073824 (sprinkler)
Details
Permit
202002053555
Status
complete
Filed
Feb 5, 2020
Permit issued
Feb 12, 2020
Final sign-off
Feb 24, 2021
Declared cost
$45,000
Address
50 Fremont St

interior demolition of 41st fl to include removeal of interior partitions, celings, finishes, mep distribution ab017 ref#202002073824 (sprinkler)

Open the permit page

$45,000
Jan 23, 2020Completed
final sign-off Aug 2021
200 Van Ness AvCharles Pankow Builders Ltdrevision to approved pa #201705055847 s-2 (arch/mech): updates to smoke control report due to removal of smoke partition & fs on 12th fl. changing "smoke barrier" to "smoke partition". updates to rooftop fan room & clarificaiton on rated duct enclosure from fan room.
Details
Permit
202001232617
Status
complete
Filed
Jan 23, 2020
Permit issued
Jun 13, 2020
Final sign-off
Aug 17, 2021
Address
200 Van Ness Av

revision to approved pa #201705055847 s-2 (arch/mech): updates to smoke control report due to removal of smoke partition & fs on 12th fl. changing "smoke barrier" to "smoke partition". updates to rooftop fan room & clarificaiton on rated duct enclosure from fan room.

Open the permit page

Dec 16, 2019Never finaled
filed Dec 2019, never issued
940 Battery StOliver & Company Inc.structural upgrade demo(e) 3rd fl & roof. construct new 3rd & 4th floor within existing height add 5th fl, no increase height. new elvelator. new mep upgrade electrical service. new storefront entrance.maintain historical facade. **maher applicable**
Details
Permit
201912169604
Status
filed
Filed
Dec 16, 2019
Declared cost
$11,000,000
Address
940 Battery St

structural upgrade demo(e) 3rd fl & roof. construct new 3rd & 4th floor within existing height add 5th fl, no increase height. new elvelator. new mep upgrade electrical service. new storefront entrance.maintain historical facade. **maher applicable**

Open the permit page

$11,000,000
Dec 16, 2019Completed
final sign-off Aug 2025
55 Bruton StWebcor Construction Lp, James E Roberts-Obayashi Corporationmayor ed #17-02. priority processing. ab-004 attached. to erect 6 stories, 1 basement, type 1-a, 178 residential units with mixed-used building (r-2,b,a-3,s-2). parcel-
Details
Permit
201912169614
Status
complete
Filed
Dec 16, 2019
Permit issued
Jul 8, 2022
Final sign-off
Aug 29, 2025
Declared cost
$84,400,000
Address
55 Bruton St

mayor ed #17-02. priority processing. ab-004 attached. to erect 6 stories, 1 basement, type 1-a, 178 residential units with mixed-used building (r-2,b,a-3,s-2). parcel-

Open the permit page

$84,400,000
Aug 5, 2019Never finaled
filed Aug 2019, never issued
555 Howard Staltered site permit for 37-story tourist hotel. reference pa #2016-1227-5918 s.
Details
Permit
201908057904
Status
filed
Filed
Aug 5, 2019
Declared cost
$12,000,000
Address
555 Howard St

altered site permit for 37-story tourist hotel. reference pa #2016-1227-5918 s.

Open the permit page

$12,000,000
Jul 29, 2019Expired or cancelled
suspend Oct 2019
445 Geary StOliver & Company Inc.structural support & architectural improvements for building mounted theater sign.
Details
Permit
201907297237
Status
suspend
Filed
Jul 29, 2019
Permit issued
Oct 15, 2019
Declared cost
$15,000
Address
445 Geary St

structural support & architectural improvements for building mounted theater sign.

Open the permit page

$15,000
Jul 18, 2019Completed
final sign-off Mar 2021
415 Mission StHathaway Dinwiddie Co.45th flr - interior ti for single tenant. non load nearing partitions, suspended systems, floor and wall finishes, casework, hvac, ele and plm.
Details
Permit
201907186243
Status
complete
Filed
Jul 18, 2019
Permit issued
Aug 8, 2019
Final sign-off
Mar 3, 2021
Declared cost
$900,000
Address
415 Mission St

45th flr - interior ti for single tenant. non load nearing partitions, suspended systems, floor and wall finishes, casework, hvac, ele and plm.

Open the permit page

$900,000
Jun 6, 2019Completed
final sign-off Sep 2019
445 Geary StOliver & Company Inc.lower level basement: replace carpet, paint, renovate fitting room, add 2 showers, excavation for pit for a temp stage lift. maher n/a.
Details
Permit
201906062705
Status
complete
Filed
Jun 6, 2019
Permit issued
Jun 20, 2019
Final sign-off
Sep 20, 2019
Declared cost
$500,000
Address
445 Geary St

lower level basement: replace carpet, paint, renovate fitting room, add 2 showers, excavation for pit for a temp stage lift. maher n/a.

Open the permit page

$500,000
Dec 20, 2018Completed
final sign-off May 2019
50 Fremont StGci, Inctenant improvement on level 1 to add new baxcking office, new non-load bearing partitions, ceiling systems & mep.
Details
Permit
201812208891
Status
complete
Filed
Dec 20, 2018
Permit issued
Dec 21, 2018
Final sign-off
May 23, 2019
Declared cost
$70,000
Address
50 Fremont St

tenant improvement on level 1 to add new baxcking office, new non-load bearing partitions, ceiling systems & mep.

Open the permit page

$70,000
Aug 21, 2018Completed
final sign-off Oct 2019
415 Mission StHathaway Dinwiddie Co.revision to 201711204457 for 5th floor ti smoke control and descrides the rational analysis for levels 3,4,5 & 6. maher n/a.
Details
Permit
201808217931
Status
complete
Filed
Aug 21, 2018
Permit issued
Sep 18, 2018
Final sign-off
Oct 3, 2019
Address
415 Mission St

revision to 201711204457 for 5th floor ti smoke control and descrides the rational analysis for levels 3,4,5 & 6. maher n/a.

Open the permit page

Jun 14, 2018Completed
final sign-off Jun 2019
415 Mission StHathaway Dinwiddie Co.60/f: premit revision to pa #2017121956848 & #201804166392 for the 60th fl t.i. maher na
Details
Permit
201806141924
Status
complete
Filed
Jun 14, 2018
Permit issued
Jun 21, 2018
Final sign-off
Jun 18, 2019
Address
415 Mission St

60/f: premit revision to pa #2017121956848 & #201804166392 for the 60th fl t.i. maher na

Open the permit page

Jun 5, 2018Never finaled
issued Jun 2018, no final
415 Mission StNovo Construction Incnew interior communicating stair between 57th & 58th floor
Details
Permit
201806050987
Status
issued
Filed
Jun 5, 2018
Permit issued
Jun 26, 2018
Address
415 Mission St

new interior communicating stair between 57th & 58th floor

Open the permit page

Nov 20, 2017Completed
final sign-off Oct 2019
415 Mission St5/f: full floor interior ti. new build out will consist of new partitions, suspended ceiling system, floors * wall finishes, casework communicating stairs, fire alarm & sprinklers under sep permit. maher na mep & food service deferred
Details
Permit
201711204457
Status
complete
Filed
Nov 20, 2017
Permit issued
Jan 16, 2018
Final sign-off
Oct 10, 2019
Declared cost
$2,300,000
Address
415 Mission St

5/f: full floor interior ti. new build out will consist of new partitions, suspended ceiling system, floors * wall finishes, casework communicating stairs, fire alarm & sprinklers under sep permit. maher na mep & food service deferred

Open the permit page

$2,300,000
Oct 19, 2017Expired or cancelled
cancelled Jan 2026
55 Music Concourse Drincrease occupant load; mount additional sprinkler heads, update egress components, sprinklers and electrical under seperate permit. maher na
Details
Permit
201710191645
Status
cancelled
Filed
Oct 19, 2017
Declared cost
$2,500
Address
55 Music Concourse Dr

increase occupant load; mount additional sprinkler heads, update egress components, sprinklers and electrical under seperate permit. maher na

Open the permit page

$2,500
Oct 4, 2017Completed
final sign-off Feb 2023
2120 BroadwayHerrero Builders Incorporated, Kwan Wo Ironworks Inc, R L H Fire Protection Incalteration to mckinae building to include theater, gym & classroom. alteration to middle classroom building - seismic & cosmetic
Details
Permit
201710040323
Status
complete
Filed
Oct 4, 2017
Permit issued
Jun 6, 2019
Final sign-off
Feb 17, 2023
Declared cost
$20,000,000
Address
2120 Broadway

alteration to mckinae building to include theater, gym & classroom. alteration to middle classroom building - seismic & cosmetic

Open the permit page

$20,000,000
Sep 6, 2017Expired or cancelled
cancelled Nov 2022
547 Howard Stdemolition of a type v, 2-story, 1 basement - office building.
Details
Permit
201709067029
Status
cancelled
Filed
Sep 6, 2017
Declared cost
$100,000
Address
547 Howard St

demolition of a type v, 2-story, 1 basement - office building.

Open the permit page

$100,000
Sep 6, 2017Expired or cancelled
cancelled Nov 2022
557 Howard Stdemolition of a type v, 2-story, 1 basement restaurant.
Details
Permit
201709067032
Status
cancelled
Filed
Sep 6, 2017
Declared cost
$100,000
Address
557 Howard St

demolition of a type v, 2-story, 1 basement restaurant.

Open the permit page

$100,000
Sep 6, 2017Expired or cancelled
cancelled Nov 2022
555 Howard Stdemolition of a type v, 2-story, 1 basement office building.
Details
Permit
201709067031
Status
cancelled
Filed
Sep 6, 2017
Declared cost
$100,000
Address
555 Howard St

demolition of a type v, 2-story, 1 basement office building.

Open the permit page

$100,000
May 23, 2017Completed
final sign-off Dec 2019
415 Mission StHathaway Dinwiddie Co.new custom tenant security desk at level 1 multi tenant lobby, and (n) idf/av room at level p1. scope includes (n) lighting, elect. tele/data services & finishes. ref pa 2013-0313-8080 & for base building
Details
Permit
201705237351
Status
complete
Filed
May 23, 2017
Permit issued
Jun 2, 2017
Final sign-off
Dec 16, 2019
Declared cost
$30,000
Address
415 Mission St

new custom tenant security desk at level 1 multi tenant lobby, and (n) idf/av room at level p1. scope includes (n) lighting, elect. tele/data services & finishes. ref pa 2013-0313-8080 & for base building

Open the permit page

$30,000
May 5, 2017Completed
final sign-off Jun 2023
200 Van Ness AvCharles Pankow Builders Ltdto erect 12 stories, 2 basements, type i-a, 145 units (mix use w/apts/dorm,office classrooms, restaurant.)(r-2,r-1,a-2,b,f-1,a-1) ** maher: n/a **
Details
Permit
201705055847
Status
complete
Filed
May 5, 2017
Permit issued
Aug 31, 2018
Final sign-off
Jun 28, 2023
Declared cost
$60,000,000
Address
200 Van Ness Av

to erect 12 stories, 2 basements, type i-a, 145 units (mix use w/apts/dorm,office classrooms, restaurant.)(r-2,r-1,a-2,b,f-1,a-1) ** maher: n/a **

Open the permit page

$60,000,000
Dec 27, 2016Never finaled
issued Nov 2018, no final
555 Howard Sterect 37 stories, 4 basements, 80 units residential hotel, restaurant and parking.
Details
Permit
201612275918
Status
issued
Filed
Dec 27, 2016
Permit issued
Nov 28, 2018
Declared cost
$164,560,580
Address
555 Howard St

erect 37 stories, 4 basements, 80 units residential hotel, restaurant and parking.

Open the permit page

$164,560,580
Jul 20, 2016Expired or cancelled
cancelled Jan 2026
550 El Camino Del Marrenovation of sfd on exterior and interior including ext landscaping, foundation replacements & structural upgrades.
Details
Permit
201607202913
Status
cancelled
Filed
Jul 20, 2016
Declared cost
$1,200,000
Address
550 El Camino Del Mar

renovation of sfd on exterior and interior including ext landscaping, foundation replacements & structural upgrades.

Open the permit page

$1,200,000
Dec 22, 2015Completed
final sign-off Jun 2017
1155 Market StDpr Constructionfloors 10 & 11 - lighting revision to pa #201507020526.
Details
Permit
201512225693
Status
complete
Filed
Dec 22, 2015
Permit issued
Dec 29, 2015
Final sign-off
Jun 9, 2017
Address
1155 Market St

floors 10 & 11 - lighting revision to pa #201507020526.

Open the permit page

Jul 28, 2015Completed
final sign-off Aug 2017
1155 Market StDpr Constructionnew mechanical, electrical and plumbing in the area of work in pa#201503191356. sprinklers and life safety under deferred submittal.
Details
Permit
201507282625
Status
complete
Filed
Jul 28, 2015
Permit issued
Aug 3, 2015
Final sign-off
Aug 18, 2017
Declared cost
$455,800
Address
1155 Market St

new mechanical, electrical and plumbing in the area of work in pa#201503191356. sprinklers and life safety under deferred submittal.

Open the permit page

$455,800
Jul 2, 2015Completed
final sign-off Aug 2017
1155 Market StDpr Constructionchange of use. t-i includes new partitions, lighting, finishes and fixture throughout. structural work includes new interior connecting stair & floors 9-11 and flat roof skylight. new mechanical, electrical, plumbing and fire alarm will be the in area of work.
Details
Permit
201507020526
Status
complete
Filed
Jul 2, 2015
Permit issued
Dec 1, 2015
Final sign-off
Aug 22, 2017
Declared cost
$2,395,639
Address
1155 Market St

change of use. t-i includes new partitions, lighting, finishes and fixture throughout. structural work includes new interior connecting stair & floors 9-11 and flat roof skylight. new mechanical, electrical, plumbing and fire alarm will be the in area of work.

Open the permit page

$2,395,639
Mar 12, 2015Completed
final sign-off Jun 2017
1155 Market StDpr Constructionfloors: 9,10&11: demo of (e) interior remodel on flrs 9, 10 & 11. work to be removed includs non-structural partitions, ceiling tiles, fixtures, mep. distribution and an abandoned waterless fire suppresion systm. area of work vacant, disabled access upgrades will be provided under seperate permit.
Details
Permit
201503120588
Status
complete
Filed
Mar 12, 2015
Permit issued
Mar 12, 2015
Final sign-off
Jun 9, 2017
Declared cost
$120,000
Address
1155 Market St

floors: 9,10&11: demo of (e) interior remodel on flrs 9, 10 & 11. work to be removed includs non-structural partitions, ceiling tiles, fixtures, mep. distribution and an abandoned waterless fire suppresion systm. area of work vacant, disabled access upgrades will be provided under seperate permit.

Open the permit page

$120,000
Dec 18, 2014Completed
final sign-off Aug 2016
401 Van Ness AvR L H Fire Protection Incsprinkler ti: add 560 headssprinkler heads in the basement including paint booth and exhaust duct in the unsprinklered rooms of the 4th floor. ref appln #201312234851- orginal permit for sprinklers 201402037656- building will eb fully sprinkler protected
Details
Permit
201412184054
Status
complete
Filed
Dec 18, 2014
Permit issued
Jan 22, 2015
Final sign-off
Aug 23, 2016
Declared cost
$243,000
Address
401 Van Ness Av

sprinkler ti: add 560 headssprinkler heads in the basement including paint booth and exhaust duct in the unsprinklered rooms of the 4th floor. ref appln #201312234851- orginal permit for sprinklers 201402037656- building will eb fully sprinkler protected

Open the permit page

$243,000
Jan 27, 2014Completed
final sign-off Sep 2014
55 Music Concourse DrPlant Construction Company Lpsoft demo, guardrail, weathering yard, partitions & rails, windows slats for future tenant. compliance with ordinance #155-13 not required. excavation <50 cu.yd.
Details
Permit
201401277132
Status
complete
Filed
Jan 27, 2014
Permit issued
Jan 27, 2014
Final sign-off
Sep 29, 2014
Declared cost
$6,000
Address
55 Music Concourse Dr

soft demo, guardrail, weathering yard, partitions & rails, windows slats for future tenant. compliance with ordinance #155-13 not required. excavation <50 cu.yd.

Open the permit page

$6,000
Aug 23, 2013Completed
final sign-off Sep 2014
55 Music Concourse DrPlant Construction Company Lperect 1 story, no basement, type 5, garden cafe building.
Details
Permit
201308235125
Status
complete
Filed
Aug 23, 2013
Permit issued
Feb 21, 2014
Final sign-off
Sep 30, 2014
Declared cost
$200,000
Address
55 Music Concourse Dr

erect 1 story, no basement, type 5, garden cafe building.

Open the permit page

$200,000
Dec 5, 2012Completed
final sign-off Apr 2013
205 Franklin Strequest stamp for assembly occupancy for app 201004130190s
Details
Permit
201212055542
Status
complete
Filed
Dec 5, 2012
Permit issued
Dec 7, 2012
Final sign-off
Apr 30, 2013
Address
205 Franklin St

request stamp for assembly occupancy for app 201004130190s

Open the permit page

Apr 13, 2010Completed
final sign-off Apr 2013
205 Franklin StHathaway Dinwiddie Co.to erect 4 stories, performing arts venue, education, admin, cafe. (n) bldg. 4-stories on the corner franklin st. and fell st.
Details
Permit
201004130190
Status
complete
Filed
Apr 13, 2010
Permit issued
May 10, 2011
Final sign-off
Apr 19, 2013
Declared cost
$18,000,000
Address
205 Franklin St

to erect 4 stories, performing arts venue, education, admin, cafe. (n) bldg. 4-stories on the corner franklin st. and fell st.

Open the permit page

$18,000,000
Apr 23, 2009Completed
final sign-off Oct 2010
3153 17th StOliver & Company Inc.reduce mat slab foundation thickness from 24".down to 20". adding reinforcement bars in select areas per plan. this is a revision to app #200710316962 s1/r2.
Details
Permit
200904236934
Status
complete
Filed
Apr 23, 2009
Permit issued
Apr 28, 2009
Final sign-off
Oct 5, 2010
Address
3153 17th St

reduce mat slab foundation thickness from 24".down to 20". adding reinforcement bars in select areas per plan. this is a revision to app #200710316962 s1/r2.

Open the permit page

Feb 15, 2008Never finaled
issued Feb 2008, no final
101 02nd StCannon Constructors North Incmechanical reconfiguration to new wall layout for tenant improvement. title 24 for lighting for t.i. per 200712049605.
Details
Permit
200802154888
Status
issued
Filed
Feb 15, 2008
Permit issued
Feb 15, 2008
Declared cost
$142,000
Address
101 02nd St

mechanical reconfiguration to new wall layout for tenant improvement. title 24 for lighting for t.i. per 200712049605.

Open the permit page

$142,000
Oct 31, 2007Completed
final sign-off Oct 2010
3151 17th StOliver & Company Inc.demolish and replace existing theater and offices. increase gross area by 3673 sq.ft. reduce existing theater seating by 16 seats. preserve existing un-reinforced masonry walls & 17th st. facade. new mechanical and electrical throughout.
Details
Permit
200710316962
Status
complete
Filed
Oct 31, 2007
Permit issued
Mar 6, 2009
Final sign-off
Oct 5, 2010
Declared cost
$5,000,000
Address
3151 17th St

demolish and replace existing theater and offices. increase gross area by 3673 sq.ft. reduce existing theater seating by 16 seats. preserve existing un-reinforced masonry walls & 17th st. facade. new mechanical and electrical throughout.

Open the permit page

$5,000,000
Sep 27, 2006Completed
final sign-off Dec 2006
680 02nd StHathaway Dinwiddie Co.demo (non structural) only. per plans. building pa# 2006/08/14/9336 under independent permit.
Details
Permit
200609273540
Status
complete
Filed
Sep 27, 2006
Permit issued
Sep 27, 2006
Final sign-off
Dec 20, 2006
Declared cost
$50,000
Address
680 02nd St

demo (non structural) only. per plans. building pa# 2006/08/14/9336 under independent permit.

Open the permit page

$50,000