- Sep 2006 to Aug 2026
77 permits since 2000 (architect on 73 permits, engineer on 3 permits, designer on 1 permit): 46 completed, 15 in progress, 8 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2026 | In progress filed Aug 2026, not yet issued | 125 03rd St | construct permanent tnent on 4/f to be fire sprinkled and alarmed. new lighting and receptacles for temp event lighting. no change to (e) roof drainage.Details
construct permanent tnent on 4/f to be fire sprinkled and alarmed. new lighting and receptacles for temp event lighting. no change to (e) roof drainage. | $4,217,680 | |
| Jul 29, 2026 | In progress issued Aug 2026 | 77 Harriet St | administrative permit to establish occupancy load as follow up to dbi site 202212168587 (an ab-004 city priority project)Details
administrative permit to establish occupancy load as follow up to dbi site 202212168587 (an ab-004 city priority project) | ||
| Jun 4, 2026 | In progress issued Aug 2026 | 235 Stockton St | Singular Builders | (n) interior build-out. will consist of (n) custom millwork island , (n) food service equipment, new mechanical exhaust system and fire suppression system, new interior finishes, flour, paint and tile, new non load bearing, furring partition, revised fin/life safety/information, revise fire alarmDetails
(n) interior build-out. will consist of (n) custom millwork island , (n) food service equipment, new mechanical exhaust system and fire suppression system, new interior finishes, flour, paint and tile, new non load bearing, furring partition, revised fin/life safety/information, revise fire alarm | $1,030,000 |
| Mar 20, 2026 | In progress issued May 2026 | 2001 37th Av | Reprohaus Corp | non-electric sign within campus; sign name as: st. ignatius college preparatoryDetails
non-electric sign within campus; sign name as: st. ignatius college preparatory | $3,000 |
| Feb 23, 2026 | In progress issued Mar 2026 | 1045 Sansome St | Singular Builders | interior tenant improvement of level 3 at 1045 sansome st. includes new non-load bearing partitions and floor finishes. no changes to existing exterior facade, elevator, or exit stairs. hvac, electrical, plumbing and fire protection work to be permited by contractor.Details
interior tenant improvement of level 3 at 1045 sansome st. includes new non-load bearing partitions and floor finishes. no changes to existing exterior facade, elevator, or exit stairs. hvac, electrical, plumbing and fire protection work to be permited by contractor. | $250,000 |
| Jan 21, 2026 | In progress filed Jan 2026, not yet issued | 2000 Marin St | Clark Construction Group Ca Lp | proj-26-2627 mou: erect new 1 story type iib & iiib fuel station.Details
proj-26-2627 mou: erect new 1 story type iib & iiib fuel station. | $850,000 |
| Sep 18, 2025 | Completed final sign-off Nov 2025 | 77 Bruton St | Toms Metal Specialists Dba: Toms Welding | new metal mesh railing at e) concrete patios on seven seas av & mid blocl alley frontages, no interior modification, work in within property lineDetails
new metal mesh railing at e) concrete patios on seven seas av & mid blocl alley frontages, no interior modification, work in within property line | $49,500 |
| Aug 21, 2025 | Completed final sign-off Aug 2025 | 2 Lake St | Plant Construction Co, Lp | administrative permit to document ab-005 equivalency associated with pre-school occupancy and exiting from the 4th story. ref. permit #202202097657Details
administrative permit to document ab-005 equivalency associated with pre-school occupancy and exiting from the 4th story. ref. permit #202202097657 | |
| Jul 23, 2025 | Completed final sign-off Sep 2025 | 2 Lake St | Plant Construction Co, Lp | restoration of the e) lake st exteior archDetails
restoration of the e) lake st exteior arch | $10,000 |
| Jul 9, 2025 | In progress issued Nov 2025 | 1687 Market St | Build Group Inc. | demolish (e) 3 story type v retail building.Details
demolish (e) 3 story type v retail building. | $300,000 |
| Feb 27, 2025 | Completed final sign-off Dec 2025 | 2 Lake St | Plant Construction Co, Lp | installation of exterior building lighting at the temple house facade on lake st & the sanctuary facade facing the interior courtyardDetails
installation of exterior building lighting at the temple house facade on lake st & the sanctuary facade facing the interior courtyard | $15,000 |
| Feb 11, 2025 | In progress issued Nov 2025 | 1687 Market St | Build Group Inc. | mayors directive 13-01: construction of a 17-story type i-a, 94 units of 100% affordable housing. 17 total stories of occupancy including 2 basements providing both dwelling units and art community colaboration spaces.Details
mayors directive 13-01: construction of a 17-story type i-a, 94 units of 100% affordable housing. 17 total stories of occupancy including 2 basements providing both dwelling units and art community colaboration spaces. | $70,205,789 |
| Jan 31, 2025 | Completed final sign-off Oct 2025 | 2 Lake St | Plant Construction Co, Lp | deferred food service permit#: 202202097657 add2;Details
deferred food service permit#: 202202097657 add2; | |
| Aug 13, 2024 | Expired or cancelled withdrawn Sep 2024 | 2 Lake St | Plant Construction Co, Lp | revision to pa# 202202097657-s2. to include 2 new exterior light wells @ level 1. reduce level 2 court yard size. add planters & tree wells @ court yard / light wells. redesign level 1 office suite & associated mepf changes.Details
revision to pa# 202202097657-s2. to include 2 new exterior light wells @ level 1. reduce level 2 court yard size. add planters & tree wells @ court yard / light wells. redesign level 1 office suite & associated mepf changes. | |
| Jul 30, 2024 | Completed final sign-off Jun 2025 | 55 Music Concourse Dr | C C I Commercial Construction & Improv | renovation of (e) cafe shop facility, removal of part of (e) ceilings. replace (e) equipment, relocation of (e) light fixtures and mechanical hvac.Details
renovation of (e) cafe shop facility, removal of part of (e) ceilings. replace (e) equipment, relocation of (e) light fixtures and mechanical hvac. | $218,191 |
| May 1, 2024 | Completed final sign-off Jan 2025 | 2001 37th Av | Devcon Construction | partial interior non structural demo only per ab017Details
partial interior non structural demo only per ab017 | $45,000 |
| Feb 23, 2024 | Completed final sign-off Jul 2024 | 77 Harriet St | Swinerton Builders | priority processing ab-004*** to demolish a type v, 1-story recreation building. (new construction under pa# 202212168587)Details
priority processing ab-004*** to demolish a type v, 1-story recreation building. (new construction under pa# 202212168587) | $230,200 |
| Dec 15, 2023 | In progress filed Dec 2023, not yet issued | 0 Situs To Be Assigned | Clark Construction Group Ca Lp | proj-23-0553. erect new auto shop building for the sfpuc water department. building includes vehicle repair bays, paint booths, carpentry shop, and employee areas including lockers, break room, and office areas. auto shop building is 1 of 6 buildings on the new sfwd campus at 2000 marin st.Details
proj-23-0553. erect new auto shop building for the sfpuc water department. building includes vehicle repair bays, paint booths, carpentry shop, and employee areas including lockers, break room, and office areas. auto shop building is 1 of 6 buildings on the new sfwd campus at 2000 marin st. | $23,800,000 |
| Dec 15, 2023 | In progress filed Dec 2023, not yet issued | 0 Situs To Be Assigned | Clark Construction Group Ca Lp | proj-23-0550. erect new meter kiosk for sfpuc water department. building is for storing meters for distribution to the public by appointment only. meter kiosk is 1 of 6 bldg on new sfwd campus at 2000 marin st.Details
proj-23-0550. erect new meter kiosk for sfpuc water department. building is for storing meters for distribution to the public by appointment only. meter kiosk is 1 of 6 bldg on new sfwd campus at 2000 marin st. | $700,000 |
| Dec 15, 2023 | In progress filed Dec 2023, not yet issued | 0 Situs To Be Assigned | Clark Construction Group Ca Lp | proj-23-0551. erect new parking garage for sfpuc water department. parking garage includes electrical room serving the garage building & fire pump room & domestic water pump room serving entire campus. parking garage is 1 of 6 bldg on new sfwd campus at 2000 marin st.Details
proj-23-0551. erect new parking garage for sfpuc water department. parking garage includes electrical room serving the garage building & fire pump room & domestic water pump room serving entire campus. parking garage is 1 of 6 bldg on new sfwd campus at 2000 marin st. | $38,100,000 |
| Dec 15, 2023 | In progress filed Dec 2023, not yet issued | 0 Situs To Be Assigned | Clark Construction Group Ca Lp | proj-23-0558. erect new warehouse building for sfpuc water department. bldg includes regular height and high piled storage, meter shop, fabrication shop and employee support area including lockers, break room, and office areas. warehouse bldg is 1 of 6 bldgs on the new sfwd campus at 2000 marin st.Details
proj-23-0558. erect new warehouse building for sfpuc water department. bldg includes regular height and high piled storage, meter shop, fabrication shop and employee support area including lockers, break room, and office areas. warehouse bldg is 1 of 6 bldgs on the new sfwd campus at 2000 marin st. | $20,900,000 |
| Dec 15, 2023 | In progress filed Dec 2023, not yet issued | 0 Situs To Be Assigned | Clark Construction Group Ca Lp | proj-23-0554. erect new shops building for the sfpuc water department. building includes machine shop and employee support areas including lockers, break room, and office areas. shops building is 1 of 6 buildings on the new sfwd campus at 2000 marin st.Details
proj-23-0554. erect new shops building for the sfpuc water department. building includes machine shop and employee support areas including lockers, break room, and office areas. shops building is 1 of 6 buildings on the new sfwd campus at 2000 marin st. | $18,300,000 |
| Dec 15, 2023 | In progress filed Dec 2023, not yet issued | 0 Situs To Be Assigned | Clark Construction Group Ca Lp | proj-23-0548. erect new administration building for sfpuc water department. building includes offices, multi-purpose spaces, locker rooms, wellness center, training room, electrical, & landscape shops. administrative building is 1 of 6 bldg on new sfwd campus at 2000 marin st.Details
proj-23-0548. erect new administration building for sfpuc water department. building includes offices, multi-purpose spaces, locker rooms, wellness center, training room, electrical, & landscape shops. administrative building is 1 of 6 bldg on new sfwd campus at 2000 marin st. | $48,200,000 |
| Jul 25, 2023 | In progress issued Aug 2024 | 2001 37th Av | Devcon Construction | Details
| $75,000,000 |
| May 10, 2023 | Completed final sign-off Jul 2025 | 2 Lake St | Plant Construction Co, Lp | soft demo of temple house & court yard wings including removal/saluage of historic elements & materials for reuse.Details
soft demo of temple house & court yard wings including removal/saluage of historic elements & materials for reuse. | $75,000 |
| Dec 16, 2022 | Completed final sign-off Sep 2026 | 77 Harriet St | Swinerton Builders | priority ab-004. erect a one story bldg, no basement, no dwelligs, recreation center type a-3. separate permit for demolition under pa# 202402236444.Details
priority ab-004. erect a one story bldg, no basement, no dwelligs, recreation center type a-3. separate permit for demolition under pa# 202402236444. | $32,500,000 |
| Oct 17, 2022 | Never finaled filed Oct 2022, never issued | 170 Seacliff Av | erect a 3-story, type v-b, single family building with an adu and one basement level.Details
erect a 3-story, type v-b, single family building with an adu and one basement level. | $2,400,000 | |
| Oct 17, 2022 | Never finaled filed Oct 2022, never issued | 170 Seacliff Av | demolish a 3-story, type v-b, single family building.Details
demolish a 3-story, type v-b, single family building. | $25,000 | |
| Sep 15, 2022 | Completed final sign-off Apr 2025 | 3410 Washington St | The Toboni Group | interior & exterior alteration including side & rear facade alterations, minor front facade alterations,in kind replacement of window sash, infill below rear sunroom, remodel front planters, garage door widening, n skylights, structural upgrades, new interior finishes fixturesDetails
interior & exterior alteration including side & rear facade alterations, minor front facade alterations,in kind replacement of window sash, infill below rear sunroom, remodel front planters, garage door widening, n skylights, structural upgrades, new interior finishes fixtures | $395,000 |
| Apr 21, 2022 | Completed final sign-off Nov 2022 | 100 34th Av | Hathaway Dinwiddie Co. | demolition of (e) millwork, carpet, gyp bd ceiling (existing framing to remain for reuse), light fixtures, mech linear diffusers and ceiling mounted devices. remove (e) layer of gyp bd and plywood backing, from (e) metal stud framing scheduled for reuse. scope of new work will include galleryDetails
demolition of (e) millwork, carpet, gyp bd ceiling (existing framing to remain for reuse), light fixtures, mech linear diffusers and ceiling mounted devices. remove (e) layer of gyp bd and plywood backing, from (e) metal stud framing scheduled for reuse. scope of new work will include gallery | $494,797 |
| Feb 9, 2022 | Completed final sign-off Jul 2026 | 2 Lake St | Plant Construction Co, Lp | interior renovation of the temple house & (n) addition to main sanctuary within (e) historic exterior walls of courtyard wing. renovation includes: (n) mech systems, seismic strengthening, (n) stairs & elevators, excavation for additional program spaces, & a (n) occupiable roof deck.Details
interior renovation of the temple house & (n) addition to main sanctuary within (e) historic exterior walls of courtyard wing. renovation includes: (n) mech systems, seismic strengthening, (n) stairs & elevators, excavation for additional program spaces, & a (n) occupiable roof deck. | $21,500,000 |
| Aug 9, 2021 | Expired or cancelled withdrawn Mar 2022 | 308 Seacliff Av | Van Acker Const Assoc Inc | seismic upgrade, replacement of oroof, added elevator, added skylights, reconstructed stairs, replace windows, new interior finsihes & fixtures.Details
seismic upgrade, replacement of oroof, added elevator, added skylights, reconstructed stairs, replace windows, new interior finsihes & fixtures. | $800,000 |
| Jul 7, 2021 | Completed final sign-off Jun 2022 | 55 Music Concourse Dr | C C I Commercial Construction & Improv | cal academy of sciences: exterior renovation of extg east garden. new 1 story outdoor pavilion structure - type 5b, open and free-standing. ol=33. new landscape structures and features.Details
cal academy of sciences: exterior renovation of extg east garden. new 1 story outdoor pavilion structure - type 5b, open and free-standing. ol=33. new landscape structures and features. | $350,000 |
| Jul 1, 2021 | Completed final sign-off Feb 2026 | 200 Van Ness Av | Edgewood Builders Inc | floors 10 & 11: add new partition wall in 12 (e) student housing units on levels 10/11 to create 3 separate bedrooms in each modified unit. no change to life saftey, d/a or bed count. maher n/aDetails
floors 10 & 11: add new partition wall in 12 (e) student housing units on levels 10/11 to create 3 separate bedrooms in each modified unit. no change to life saftey, d/a or bed count. maher n/a | $49,000 |
| Jun 24, 2021 | Completed final sign-off Feb 2026 | 200 Van Ness Av | Edgewood Builders Inc | floors 8 & 9: add new partition wall in 12 (e) student housing units on levels 8/9 to create 3 separate bedrooms in each modified unit. no change to life saftey, d/a. maher n/aDetails
floors 8 & 9: add new partition wall in 12 (e) student housing units on levels 8/9 to create 3 separate bedrooms in each modified unit. no change to life saftey, d/a. maher n/a | $49,000 |
| Jun 24, 2021 | Completed final sign-off Feb 2026 | 200 Van Ness Av | Edgewood Builders Inc | add (n) partition wall in 12 (e) student housing units on levels 6 & 7 to create 3 separate bedrooms in each modified unit. no change in life safety, da or bed countDetails
add (n) partition wall in 12 (e) student housing units on levels 6 & 7 to create 3 separate bedrooms in each modified unit. no change in life safety, da or bed count | $49,000 |
| Apr 12, 2021 | Completed final sign-off Jun 2022 | 55 Music Concourse Dr | C C I Commercial Construction & Improv | remove interior partitions, at west project research area, construction new partitions, modify the exterior and chang the interior finishes with new mep's to create 1667 sq ft of public exhibit area.Details
remove interior partitions, at west project research area, construction new partitions, modify the exterior and chang the interior finishes with new mep's to create 1667 sq ft of public exhibit area. | $592,529 |
| Feb 10, 2021 | Completed final sign-off Jul 2021 | 55 Music Concourse Dr | C C I Commercial Construction & Improv | non-structural interior demo (ab-017) soft demo.Details
non-structural interior demo (ab-017) soft demo. | $35,000 |
| Nov 19, 2020 | Completed final sign-off Mar 2026 | 1 Avenue Of The Palms | Suffolk Constr Co. Inc. Dba Suffolk-Roel | priority processing per mayoral ed 17-02. to erect a type 3-a + 5-a over 1a podium, 6-story, (148) residential unit bldg with (1) basement. (bldg c3.4)Details
priority processing per mayoral ed 17-02. to erect a type 3-a + 5-a over 1a podium, 6-story, (148) residential unit bldg with (1) basement. (bldg c3.4) | $61,000,000 |
| Aug 7, 2020 | Never finaled issued Mar 2021, no final | 50 Fremont St | Gci, Inc | interior single floor ti for single tenant on level 41. new buildout will consist of non-load bearing partitions, suspended ceiling systems, floors, wall finishes, casework & mep.Details
interior single floor ti for single tenant on level 41. new buildout will consist of non-load bearing partitions, suspended ceiling systems, floors, wall finishes, casework & mep. | $2,200,000 |
| Jul 6, 2020 | Completed final sign-off Apr 2025 | 200 Van Ness Av | Charles Pankow Builders Ltd | sffd only review; revision to approved pa# 201705055487-s2 & approved revision pa# 202001232617. minor revision to the smoke control matrix to conform to approved smoke control report dated 12/6/19. ** maher: n/a **Details
sffd only review; revision to approved pa# 201705055487-s2 & approved revision pa# 202001232617. minor revision to the smoke control matrix to conform to approved smoke control report dated 12/6/19. ** maher: n/a ** | |
| Mar 9, 2020 | Completed final sign-off Jun 2025 | 200 Van Ness Av | Con-Am Inc | suite 219: interior t.i. on level 2 will consist of non-load bearing partitions, suspendid ceiling systems, floor & wall finishes, casework, hvac, elec, & plmg work. low voltage cabling for radio broadcasting studios. cabling up to roof level for l.v. broadcasing equipment.Details
suite 219: interior t.i. on level 2 will consist of non-load bearing partitions, suspendid ceiling systems, floor & wall finishes, casework, hvac, elec, & plmg work. low voltage cabling for radio broadcasting studios. cabling up to roof level for l.v. broadcasing equipment. | $1,800,000 |
| Feb 5, 2020 | Completed final sign-off Feb 2021 | 50 Fremont St | Gci, Inc | interior demolition of 41st fl to include removeal of interior partitions, celings, finishes, mep distribution ab017 ref#202002073824 (sprinkler)Details
interior demolition of 41st fl to include removeal of interior partitions, celings, finishes, mep distribution ab017 ref#202002073824 (sprinkler) | $45,000 |
| Jan 23, 2020 | Completed final sign-off Aug 2021 | 200 Van Ness Av | Charles Pankow Builders Ltd | revision to approved pa #201705055847 s-2 (arch/mech): updates to smoke control report due to removal of smoke partition & fs on 12th fl. changing "smoke barrier" to "smoke partition". updates to rooftop fan room & clarificaiton on rated duct enclosure from fan room.Details
revision to approved pa #201705055847 s-2 (arch/mech): updates to smoke control report due to removal of smoke partition & fs on 12th fl. changing "smoke barrier" to "smoke partition". updates to rooftop fan room & clarificaiton on rated duct enclosure from fan room. | |
| Dec 16, 2019 | Never finaled filed Dec 2019, never issued | 940 Battery St | Oliver & Company Inc. | structural upgrade demo(e) 3rd fl & roof. construct new 3rd & 4th floor within existing height add 5th fl, no increase height. new elvelator. new mep upgrade electrical service. new storefront entrance.maintain historical facade. **maher applicable**Details
structural upgrade demo(e) 3rd fl & roof. construct new 3rd & 4th floor within existing height add 5th fl, no increase height. new elvelator. new mep upgrade electrical service. new storefront entrance.maintain historical facade. **maher applicable** | $11,000,000 |
| Dec 16, 2019 | Completed final sign-off Aug 2025 | 55 Bruton St | Webcor Construction Lp, James E Roberts-Obayashi Corporation | mayor ed #17-02. priority processing. ab-004 attached. to erect 6 stories, 1 basement, type 1-a, 178 residential units with mixed-used building (r-2,b,a-3,s-2). parcel-Details
mayor ed #17-02. priority processing. ab-004 attached. to erect 6 stories, 1 basement, type 1-a, 178 residential units with mixed-used building (r-2,b,a-3,s-2). parcel- | $84,400,000 |
| Aug 5, 2019 | Never finaled filed Aug 2019, never issued | 555 Howard St | altered site permit for 37-story tourist hotel. reference pa #2016-1227-5918 s.Details
altered site permit for 37-story tourist hotel. reference pa #2016-1227-5918 s. | $12,000,000 | |
| Jul 29, 2019 | Expired or cancelled suspend Oct 2019 | 445 Geary St | Oliver & Company Inc. | structural support & architectural improvements for building mounted theater sign.Details
structural support & architectural improvements for building mounted theater sign. | $15,000 |
| Jul 18, 2019 | Completed final sign-off Mar 2021 | 415 Mission St | Hathaway Dinwiddie Co. | 45th flr - interior ti for single tenant. non load nearing partitions, suspended systems, floor and wall finishes, casework, hvac, ele and plm.Details
45th flr - interior ti for single tenant. non load nearing partitions, suspended systems, floor and wall finishes, casework, hvac, ele and plm. | $900,000 |
| Jun 6, 2019 | Completed final sign-off Sep 2019 | 445 Geary St | Oliver & Company Inc. | lower level basement: replace carpet, paint, renovate fitting room, add 2 showers, excavation for pit for a temp stage lift. maher n/a.Details
lower level basement: replace carpet, paint, renovate fitting room, add 2 showers, excavation for pit for a temp stage lift. maher n/a. | $500,000 |
| Dec 20, 2018 | Completed final sign-off May 2019 | 50 Fremont St | Gci, Inc | tenant improvement on level 1 to add new baxcking office, new non-load bearing partitions, ceiling systems & mep.Details
tenant improvement on level 1 to add new baxcking office, new non-load bearing partitions, ceiling systems & mep. | $70,000 |
| Aug 21, 2018 | Completed final sign-off Oct 2019 | 415 Mission St | Hathaway Dinwiddie Co. | revision to 201711204457 for 5th floor ti smoke control and descrides the rational analysis for levels 3,4,5 & 6. maher n/a.Details
revision to 201711204457 for 5th floor ti smoke control and descrides the rational analysis for levels 3,4,5 & 6. maher n/a. | |
| Jun 14, 2018 | Completed final sign-off Jun 2019 | 415 Mission St | Hathaway Dinwiddie Co. | 60/f: premit revision to pa #2017121956848 & #201804166392 for the 60th fl t.i. maher naDetails
60/f: premit revision to pa #2017121956848 & #201804166392 for the 60th fl t.i. maher na | |
| Jun 5, 2018 | Never finaled issued Jun 2018, no final | 415 Mission St | Novo Construction Inc | new interior communicating stair between 57th & 58th floorDetails
new interior communicating stair between 57th & 58th floor | |
| Nov 20, 2017 | Completed final sign-off Oct 2019 | 415 Mission St | 5/f: full floor interior ti. new build out will consist of new partitions, suspended ceiling system, floors * wall finishes, casework communicating stairs, fire alarm & sprinklers under sep permit. maher na mep & food service deferredDetails
5/f: full floor interior ti. new build out will consist of new partitions, suspended ceiling system, floors * wall finishes, casework communicating stairs, fire alarm & sprinklers under sep permit. maher na mep & food service deferred | $2,300,000 | |
| Oct 19, 2017 | Expired or cancelled cancelled Jan 2026 | 55 Music Concourse Dr | increase occupant load; mount additional sprinkler heads, update egress components, sprinklers and electrical under seperate permit. maher naDetails
increase occupant load; mount additional sprinkler heads, update egress components, sprinklers and electrical under seperate permit. maher na | $2,500 | |
| Oct 4, 2017 | Completed final sign-off Feb 2023 | 2120 Broadway | Herrero Builders Incorporated, Kwan Wo Ironworks Inc, R L H Fire Protection Inc | alteration to mckinae building to include theater, gym & classroom. alteration to middle classroom building - seismic & cosmeticDetails
alteration to mckinae building to include theater, gym & classroom. alteration to middle classroom building - seismic & cosmetic | $20,000,000 |
| Sep 6, 2017 | Expired or cancelled cancelled Nov 2022 | 547 Howard St | demolition of a type v, 2-story, 1 basement - office building.Details
demolition of a type v, 2-story, 1 basement - office building. | $100,000 | |
| Sep 6, 2017 | Expired or cancelled cancelled Nov 2022 | 557 Howard St | demolition of a type v, 2-story, 1 basement restaurant.Details
demolition of a type v, 2-story, 1 basement restaurant. | $100,000 | |
| Sep 6, 2017 | Expired or cancelled cancelled Nov 2022 | 555 Howard St | demolition of a type v, 2-story, 1 basement office building.Details
demolition of a type v, 2-story, 1 basement office building. | $100,000 | |
| May 23, 2017 | Completed final sign-off Dec 2019 | 415 Mission St | Hathaway Dinwiddie Co. | new custom tenant security desk at level 1 multi tenant lobby, and (n) idf/av room at level p1. scope includes (n) lighting, elect. tele/data services & finishes. ref pa 2013-0313-8080 & for base buildingDetails
new custom tenant security desk at level 1 multi tenant lobby, and (n) idf/av room at level p1. scope includes (n) lighting, elect. tele/data services & finishes. ref pa 2013-0313-8080 & for base building | $30,000 |
| May 5, 2017 | Completed final sign-off Jun 2023 | 200 Van Ness Av | Charles Pankow Builders Ltd | to erect 12 stories, 2 basements, type i-a, 145 units (mix use w/apts/dorm,office classrooms, restaurant.)(r-2,r-1,a-2,b,f-1,a-1) ** maher: n/a **Details
to erect 12 stories, 2 basements, type i-a, 145 units (mix use w/apts/dorm,office classrooms, restaurant.)(r-2,r-1,a-2,b,f-1,a-1) ** maher: n/a ** | $60,000,000 |
| Dec 27, 2016 | Never finaled issued Nov 2018, no final | 555 Howard St | erect 37 stories, 4 basements, 80 units residential hotel, restaurant and parking.Details
erect 37 stories, 4 basements, 80 units residential hotel, restaurant and parking. | $164,560,580 | |
| Jul 20, 2016 | Expired or cancelled cancelled Jan 2026 | 550 El Camino Del Mar | renovation of sfd on exterior and interior including ext landscaping, foundation replacements & structural upgrades.Details
renovation of sfd on exterior and interior including ext landscaping, foundation replacements & structural upgrades. | $1,200,000 | |
| Dec 22, 2015 | Completed final sign-off Jun 2017 | 1155 Market St | Dpr Construction | floors 10 & 11 - lighting revision to pa #201507020526.Details
floors 10 & 11 - lighting revision to pa #201507020526. | |
| Jul 28, 2015 | Completed final sign-off Aug 2017 | 1155 Market St | Dpr Construction | new mechanical, electrical and plumbing in the area of work in pa#201503191356. sprinklers and life safety under deferred submittal.Details
new mechanical, electrical and plumbing in the area of work in pa#201503191356. sprinklers and life safety under deferred submittal. | $455,800 |
| Jul 2, 2015 | Completed final sign-off Aug 2017 | 1155 Market St | Dpr Construction | change of use. t-i includes new partitions, lighting, finishes and fixture throughout. structural work includes new interior connecting stair & floors 9-11 and flat roof skylight. new mechanical, electrical, plumbing and fire alarm will be the in area of work.Details
change of use. t-i includes new partitions, lighting, finishes and fixture throughout. structural work includes new interior connecting stair & floors 9-11 and flat roof skylight. new mechanical, electrical, plumbing and fire alarm will be the in area of work. | $2,395,639 |
| Mar 12, 2015 | Completed final sign-off Jun 2017 | 1155 Market St | Dpr Construction | floors: 9,10&11: demo of (e) interior remodel on flrs 9, 10 & 11. work to be removed includs non-structural partitions, ceiling tiles, fixtures, mep. distribution and an abandoned waterless fire suppresion systm. area of work vacant, disabled access upgrades will be provided under seperate permit.Details
floors: 9,10&11: demo of (e) interior remodel on flrs 9, 10 & 11. work to be removed includs non-structural partitions, ceiling tiles, fixtures, mep. distribution and an abandoned waterless fire suppresion systm. area of work vacant, disabled access upgrades will be provided under seperate permit. | $120,000 |
| Dec 18, 2014 | Completed final sign-off Aug 2016 | 401 Van Ness Av | R L H Fire Protection Inc | sprinkler ti: add 560 headssprinkler heads in the basement including paint booth and exhaust duct in the unsprinklered rooms of the 4th floor. ref appln #201312234851- orginal permit for sprinklers 201402037656- building will eb fully sprinkler protectedDetails
sprinkler ti: add 560 headssprinkler heads in the basement including paint booth and exhaust duct in the unsprinklered rooms of the 4th floor. ref appln #201312234851- orginal permit for sprinklers 201402037656- building will eb fully sprinkler protected | $243,000 |
| Jan 27, 2014 | Completed final sign-off Sep 2014 | 55 Music Concourse Dr | Plant Construction Company Lp | soft demo, guardrail, weathering yard, partitions & rails, windows slats for future tenant. compliance with ordinance #155-13 not required. excavation <50 cu.yd.Details
soft demo, guardrail, weathering yard, partitions & rails, windows slats for future tenant. compliance with ordinance #155-13 not required. excavation <50 cu.yd. | $6,000 |
| Aug 23, 2013 | Completed final sign-off Sep 2014 | 55 Music Concourse Dr | Plant Construction Company Lp | erect 1 story, no basement, type 5, garden cafe building.Details
erect 1 story, no basement, type 5, garden cafe building. | $200,000 |
| Dec 5, 2012 | Completed final sign-off Apr 2013 | 205 Franklin St | request stamp for assembly occupancy for app 201004130190sDetails
request stamp for assembly occupancy for app 201004130190s | ||
| Apr 13, 2010 | Completed final sign-off Apr 2013 | 205 Franklin St | Hathaway Dinwiddie Co. | to erect 4 stories, performing arts venue, education, admin, cafe. (n) bldg. 4-stories on the corner franklin st. and fell st.Details
to erect 4 stories, performing arts venue, education, admin, cafe. (n) bldg. 4-stories on the corner franklin st. and fell st. | $18,000,000 |
| Apr 23, 2009 | Completed final sign-off Oct 2010 | 3153 17th St | Oliver & Company Inc. | reduce mat slab foundation thickness from 24".down to 20". adding reinforcement bars in select areas per plan. this is a revision to app #200710316962 s1/r2.Details
reduce mat slab foundation thickness from 24".down to 20". adding reinforcement bars in select areas per plan. this is a revision to app #200710316962 s1/r2. | |
| Feb 15, 2008 | Never finaled issued Feb 2008, no final | 101 02nd St | Cannon Constructors North Inc | mechanical reconfiguration to new wall layout for tenant improvement. title 24 for lighting for t.i. per 200712049605.Details
mechanical reconfiguration to new wall layout for tenant improvement. title 24 for lighting for t.i. per 200712049605. | $142,000 |
| Oct 31, 2007 | Completed final sign-off Oct 2010 | 3151 17th St | Oliver & Company Inc. | demolish and replace existing theater and offices. increase gross area by 3673 sq.ft. reduce existing theater seating by 16 seats. preserve existing un-reinforced masonry walls & 17th st. facade. new mechanical and electrical throughout.Details
demolish and replace existing theater and offices. increase gross area by 3673 sq.ft. reduce existing theater seating by 16 seats. preserve existing un-reinforced masonry walls & 17th st. facade. new mechanical and electrical throughout. | $5,000,000 |
| Sep 27, 2006 | Completed final sign-off Dec 2006 | 680 02nd St | Hathaway Dinwiddie Co. | demo (non structural) only. per plans. building pa# 2006/08/14/9336 under independent permit.Details
demo (non structural) only. per plans. building pa# 2006/08/14/9336 under independent permit. | $50,000 |