Block 1355, lot 011
2 Lake St
- City’s use
- Commercial Misc
- Built
- 1926
- Stories
- 4
- Rooms
- 24 bathrooms
- Building
- 107,588 sq ft
- Lot
- 45,376 sq ft
- Zoning
- RM1
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
30 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 3, 2025 | Completed final sign-off Jul 2026 | 2 Lake St | Plant Construction Co, Lp | to obtain cfc memorializing accurate building type for the temple house building (3a) and courtyard building is (1a) as shown and approved in 202202097657 s2 arch mep addendum plans. this corrects the type of construction for the existing temple house bldg noted on the site permit.Details
to obtain cfc memorializing accurate building type for the temple house building (3a) and courtyard building is (1a) as shown and approved in 202202097657 s2 arch mep addendum plans. this corrects the type of construction for the existing temple house bldg noted on the site permit. | |
| Aug 21, 2025 | Completed final sign-off Aug 2025 | 2 Lake St | Plant Construction Co, Lp | administrative permit to document ab-005 equivalency associated with pre-school occupancy and exiting from the 4th story. ref. permit #202202097657Details
administrative permit to document ab-005 equivalency associated with pre-school occupancy and exiting from the 4th story. ref. permit #202202097657 | |
| Jul 23, 2025 | Completed final sign-off Sep 2025 | 2 Lake St | Plant Construction Co, Lp | restoration of the e) lake st exteior archDetails
restoration of the e) lake st exteior arch | $10,000 |
| Jun 13, 2025 | In progress issued Jun 2025 | 2 Lake St | Plant Construction Co, Lp | fabricate and install evacuation signage for basement through level 4.Details
fabricate and install evacuation signage for basement through level 4. | |
| Feb 27, 2025 | Completed final sign-off Dec 2025 | 2 Lake St | Plant Construction Co, Lp | installation of exterior building lighting at the temple house facade on lake st & the sanctuary facade facing the interior courtyardDetails
installation of exterior building lighting at the temple house facade on lake st & the sanctuary facade facing the interior courtyard | $15,000 |
| Jan 31, 2025 | Completed final sign-off Oct 2025 | 2 Lake St | Plant Construction Co, Lp | deferred food service permit#: 202202097657 add2;Details
deferred food service permit#: 202202097657 add2; | |
| Dec 18, 2024 | Completed final sign-off Aug 2025 | 2 Lake St | Pribuss Engineering Inc | rev to pa# 2022-0209-7657 s4 addition of (5) window sprinklers at historic glass trasomes per approvd ab005Details
rev to pa# 2022-0209-7657 s4 addition of (5) window sprinklers at historic glass trasomes per approvd ab005 | $5,000 |
| Oct 15, 2024 | Completed final sign-off Aug 2025 | 2 Lake St | Aaa Restaurant Fire Control/Dba Aaa Fire | ref pa # 2022-0209-7657 furnish & install (1) ansul r-102 fire supression system in main kitchen areaDetails
ref pa # 2022-0209-7657 furnish & install (1) ansul r-102 fire supression system in main kitchen area | $15,275 |
| Aug 13, 2024 | Expired or cancelled withdrawn Sep 2024 | 2 Lake St | Plant Construction Co, Lp | revision to pa# 202202097657-s2. to include 2 new exterior light wells @ level 1. reduce level 2 court yard size. add planters & tree wells @ court yard / light wells. redesign level 1 office suite & associated mepf changes.Details
revision to pa# 202202097657-s2. to include 2 new exterior light wells @ level 1. reduce level 2 court yard size. add planters & tree wells @ court yard / light wells. redesign level 1 office suite & associated mepf changes. | |
| Oct 26, 2023 | Completed final sign-off Jul 2025 | 2 Lake St | Plant Construction Co, Lp | erect tower crane for temporary use. potain mdt 109. jib length 98ft. tower ht 127.9ft. ref site pa#202202097657Details
erect tower crane for temporary use. potain mdt 109. jib length 98ft. tower ht 127.9ft. ref site pa#202202097657 | $70,000 |
| Sep 12, 2023 | Completed final sign-off Jul 2025 | 2 Lake St | Plant Construction Co, Lp | fire only permit for new 6" underground fire serviceDetails
fire only permit for new 6" underground fire service | $30,000 |
| Jun 20, 2023 | Completed final sign-off Sep 2025 | 2 Lake St | Anderson, Rowe & Buckley, Inc. | one 500 gallon propane tank to supply temporary boiler for constructoin project.Details
one 500 gallon propane tank to supply temporary boiler for constructoin project. | |
| May 10, 2023 | Completed final sign-off Jul 2025 | 2 Lake St | Plant Construction Co, Lp | soft demo of temple house & court yard wings including removal/saluage of historic elements & materials for reuse.Details
soft demo of temple house & court yard wings including removal/saluage of historic elements & materials for reuse. | $75,000 |
| Mar 27, 2023 | Completed final sign-off Sep 2025 | 2 Lake St | Plant Construction Co, Lp | temporary shoring & tiebacks associated with renovations to temple emanu-703Details
temporary shoring & tiebacks associated with renovations to temple emanu-703 | $1,250,000 |
| Feb 9, 2022 | Completed final sign-off Jul 2026 | 2 Lake St | Plant Construction Co, Lp | interior renovation of the temple house & (n) addition to main sanctuary within (e) historic exterior walls of courtyard wing. renovation includes: (n) mech systems, seismic strengthening, (n) stairs & elevators, excavation for additional program spaces, & a (n) occupiable roof deck.Details
interior renovation of the temple house & (n) addition to main sanctuary within (e) historic exterior walls of courtyard wing. renovation includes: (n) mech systems, seismic strengthening, (n) stairs & elevators, excavation for additional program spaces, & a (n) occupiable roof deck. | $21,500,000 |
| Jul 27, 2016 | Never finaled issued Jul 2016, no final | 2 Lake St | C & J Roofing Company Inc | roof repairs 2 sections of tile. no work visable from street.Details
roof repairs 2 sections of tile. no work visable from street. | $40,000 |
| Dec 16, 2015 | Completed final sign-off Mar 2016 | 2 Lake St | Plant Construction Co, Lp | install steel channels and expansion anchors to extg concrete walls. install steel braces between steel channels. voluntary seismic strengthening.Details
install steel channels and expansion anchors to extg concrete walls. install steel braces between steel channels. voluntary seismic strengthening. | $20,000 |
| Apr 18, 2014 | Expired or cancelled cancelled Sep 2023 | 2 Lake St | H C I Systems Inc | voluntary fire alarm coverage upgrade, no new construction, all devices shall be added to an existing fa system. this includes 55 speaker strobes, 1 strobe, 9 smoke detectors and 2 bps.Details
voluntary fire alarm coverage upgrade, no new construction, all devices shall be added to an existing fa system. this includes 55 speaker strobes, 1 strobe, 9 smoke detectors and 2 bps. | $37,400 |
| Jun 21, 2013 | Completed final sign-off Sep 2013 | 2 Lake St | J M K Construction Inc | add interior partitions, electrical outlets and associated finishes to extg four level offices. no change in occupant load. path of travel to remain unchanged. field verify sprinkler and fire alarm coverage.Details
add interior partitions, electrical outlets and associated finishes to extg four level offices. no change in occupant load. path of travel to remain unchanged. field verify sprinkler and fire alarm coverage. | $26,127 |
| Nov 9, 2011 | Never finaled issued Nov 2011, no final | 2 Lake St | Carter Brothers Fire & Life Safety | add the elevator control functions to the fire alarm panel. this includes primary and secondary recall and shunt trip. 7 smoke detectors, 3 heats, and 2 monitor modules.Details
add the elevator control functions to the fire alarm panel. this includes primary and secondary recall and shunt trip. 7 smoke detectors, 3 heats, and 2 monitor modules. | $6,800 |
| Apr 6, 2011 | Completed final sign-off Aug 2011 | 2 Lake St | Aaa Restaurant Fire Control/Dba Aaa Fire | ground floor-furnish & install 1 ansul r102 fire suppression system in the main kitchen areaDetails
ground floor-furnish & install 1 ansul r102 fire suppression system in the main kitchen area | $40,000 |
| Feb 24, 2011 | Never finaled issued Mar 2011, no final | 2 Lake St | Carter Brothers Fire & Life Safety | emergency replacement of fire alarm control panel per sffd ab#3.04. replace the malfunctional edwards f.a paenl part # 5721b with a new edwards f.a. panel part # est3. the existing 2-wire smoke detectors are listed compatible with both the existing and new facps. a c.p.a shall be submitted by 6/1/11Details
emergency replacement of fire alarm control panel per sffd ab#3.04. replace the malfunctional edwards f.a paenl part # 5721b with a new edwards f.a. panel part # est3. the existing 2-wire smoke detectors are listed compatible with both the existing and new facps. a c.p.a shall be submitted by 6/1/11 | $6,400 |
| May 29, 2009 | Never finaled issued May 2009, no final | 2 Lake St | street space permit.Details
street space permit. | ||
| May 8, 2008 | Never finaled issued May 2008, no final | 199 Arguello Bl | street space permitDetails
street space permit | ||
| Feb 21, 2008 | Completed final sign-off Jun 2008 | 199 Arguello Bl | Plant Construction Company Lp | relocation and consolidation of archive and artwork storage from balcony level to basement. partition 2 rabbi offices. upgrade stairs from ground floor to basement. remove bathroom toilet fixtures and partitions from basement level. no lighting changes.Details
relocation and consolidation of archive and artwork storage from balcony level to basement. partition 2 rabbi offices. upgrade stairs from ground floor to basement. remove bathroom toilet fixtures and partitions from basement level. no lighting changes. | $25,000 |
| May 11, 2006 | Never finaled issued Jul 2006, no final | 199 Arguello Bl | Plant Construction Company Lp | renovation of the (e) bimah for expansion and barrier removal efforts, plus general access up-grades to selected facilities.Details
renovation of the (e) bimah for expansion and barrier removal efforts, plus general access up-grades to selected facilities. | $480,000 |
| May 2, 2006 | Never finaled issued May 2006, no final | 2 Lake St | street space permitDetails
street space permit | ||
| Dec 4, 2002 | Expired or cancelled expired Jan 2004 | 2 Lake St | Plant Construction | replace window, repair wall around opening, add reinforcing steel & strucutral steel.Details
replace window, repair wall around opening, add reinforcing steel & strucutral steel. | $8,000 |
| Jul 11, 2002 | Completed final sign-off Feb 2003 | 199 Arguello Bl | Plant Construction | replace windows, in kind. repaint exterior ,repair cast stone ornament, repair bronze ornament, repaDetails
replace windows, in kind. repaint exterior ,repair cast stone ornament, repair bronze ornament, repa | $900,000 |
| Apr 29, 2002 | Never finaled issued Apr 2002, no final | 199 Arguello Bl | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Plant Construction Co, Lp (13), Aaa Restaurant Fire Control/Dba Aaa Fire (2), Carter Brothers Fire & Life Safety (2), Plant Construction (2), Plant Construction Company Lp (2), Anderson, Rowe & Buckley, Inc., C & J Roofing Company Inc, H C I Systems Inc, J M K Construction Inc, Pribuss Engineering Inc
- Architects
- Mark Cavagnero (7), Debra Lehtone
- Engineers
- Shaun David Landman (2), Andrew Scott, John Leventini, John Pribus Bayardo Chamorro, Raj Daswani, Wilson K. Hu
- Subcontractors
- C. Sabah, S. Kain, M. Cottle
Find contractors for work like this