Permit GraphSan Francisco building permits since 2000

Block 8903, lot 004

77 Bruton St

City’s use
Miscellaneous/Mixed-Use
Lot
48,919 sq ft
Zoning
NA
Construction type
NA

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

15 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 25, 2026In progress
issued Sep 2026
77 Bruton Stg/f- tenant improvement in existing vacant space. change of use to cafe. proposed new cafe: aracely cafe. add new entrace door facing bruton st.
Details
Permit
202606253911
Status
issued
Filed
Jun 25, 2026
Permit issued
Sep 3, 2026
Declared cost
$200,000
Address
77 Bruton St

g/f- tenant improvement in existing vacant space. change of use to cafe. proposed new cafe: aracely cafe. add new entrace door facing bruton st.

Open the permit page

$200,000
Sep 18, 2025Completed
final sign-off Nov 2025
77 Bruton StToms Metal Specialists Dba: Toms Weldingnew metal mesh railing at e) concrete patios on seven seas av & mid blocl alley frontages, no interior modification, work in within property line
Details
Permit
202509185591
Status
complete
Filed
Sep 18, 2025
Permit issued
Sep 18, 2025
Final sign-off
Nov 18, 2025
Declared cost
$49,500
Address
77 Bruton St

new metal mesh railing at e) concrete patios on seven seas av & mid blocl alley frontages, no interior modification, work in within property line

Open the permit page

$49,500
May 30, 2024Completed
final sign-off Apr 2025
55 Bruton StJames E Roberts-Obayashi Corporation, Westates Mechanical Corporation Increv pa201912169614-s5 fire sprinkler. to update locations of the (e) fire sprinkler and fire hydrants per sffd condition of approval.
Details
Permit
202405232772
Status
complete
Filed
May 30, 2024
Permit issued
Sep 5, 2024
Final sign-off
Apr 18, 2025
Address
55 Bruton St

rev pa201912169614-s5 fire sprinkler. to update locations of the (e) fire sprinkler and fire hydrants per sffd condition of approval.

Open the permit page

May 29, 2024Completed
final sign-off Jul 2025
77 Bruton StGarnett Signs Llcinstall a luminated channel letter sign (hawkins) 15' x 2'
Details
Permit
202405293187
Status
complete
Filed
May 29, 2024
Permit issued
Oct 23, 2024
Final sign-off
Jul 11, 2025
Declared cost
$3,500
Address
77 Bruton St

install a luminated channel letter sign (hawkins) 15' x 2'

Open the permit page

$3,500
May 23, 2024Completed
final sign-off Jul 2025
55 Bruton StJames E Roberts-Obayashi Corporation, Westates Mechanical Corporation Increv pa 202307212738. to update locations of the (e) fire hydrants and memorialize approve ab-005 for location of fdc.
Details
Permit
202405232781
Status
complete
Filed
May 23, 2024
Permit issued
Jul 31, 2024
Final sign-off
Jul 2, 2025
Address
55 Bruton St

rev pa 202307212738. to update locations of the (e) fire hydrants and memorialize approve ab-005 for location of fdc.

Open the permit page

Apr 26, 2024Completed
final sign-off Mar 2025
77 Bruton StGarnett Signs Llc24 evacuation maps
Details
Permit
202404260839
Status
complete
Filed
Apr 26, 2024
Permit issued
May 14, 2024
Final sign-off
Mar 21, 2025
Declared cost
$6,000
Address
77 Bruton St

24 evacuation maps

Open the permit page

$6,000
Dec 4, 2023Completed
final sign-off Jan 2025
77 Bruton StSun Light & Powerclosed loopsolar domestic hot water system with (24)heliodynegobi 410 collectors & (1) 1500 gallon tank.
Details
Permit
202312041874
Status
complete
Filed
Dec 4, 2023
Permit issued
Mar 20, 2024
Final sign-off
Jan 30, 2025
Declared cost
$265,605
Address
77 Bruton St

closed loopsolar domestic hot water system with (24)heliodynegobi 410 collectors & (1) 1500 gallon tank.

Open the permit page

$265,605
Oct 16, 2023Completed
final sign-off Mar 2025
55 Bruton StJames E Roberts-Obayashi Corporationrevision to pa#: 201912169614 s4, to incorporate required venting to underside of exterior balconies at levels 3,4, and 5.
Details
Permit
202310168677
Status
complete
Filed
Oct 16, 2023
Permit issued
Nov 9, 2023
Final sign-off
Mar 6, 2025
Address
55 Bruton St

revision to pa#: 201912169614 s4, to incorporate required venting to underside of exterior balconies at levels 3,4, and 5.

Open the permit page

Jul 26, 2023Completed
final sign-off Mar 2025
55 Bruton StJames E Roberts-Obayashi Corporationrevision to pa#201912169614-s4 addendum 4, archmep. update mech and electrical details per plan.
Details
Permit
202307263033
Status
complete
Filed
Jul 26, 2023
Permit issued
Mar 26, 2024
Final sign-off
Mar 6, 2025
Address
55 Bruton St

revision to pa#201912169614-s4 addendum 4, archmep. update mech and electrical details per plan.

Open the permit page

Jul 21, 2023Completed
final sign-off Mar 2025
55 Bruton StWestates Mechanical Corporation Incinstall new 6 in fire water service to existing 8" main on bruton st. ref 201912169614.
Details
Permit
202307212738
Status
complete
Filed
Jul 21, 2023
Permit issued
Aug 28, 2023
Final sign-off
Mar 18, 2025
Declared cost
$30,000
Address
55 Bruton St

install new 6 in fire water service to existing 8" main on bruton st. ref 201912169614.

Open the permit page

$30,000
Apr 21, 2023Completed
final sign-off Mar 2025
55 Bruton StJames E Roberts-Obayashi Corporation55-77 bruton c2.2 deferred submittal tie down system. ref pa 2019-1216-9614
Details
Permit
202304216223
Status
complete
Filed
Apr 21, 2023
Permit issued
Jul 12, 2023
Final sign-off
Mar 6, 2025
Declared cost
$60,000
Address
55 Bruton St

55-77 bruton c2.2 deferred submittal tie down system. ref pa 2019-1216-9614

Open the permit page

$60,000
Dec 2, 2022Completed
final sign-off Dec 2024
77 Bruton StJames E Roberts-Obayashi Corporationparcel c2.2 - tower crane erection; temporary use. potain mdt219 j10 tower crame with 164 ft long jib at 131.2ft in ht. ref site bpa# 201912169614. (mayor ed 17-02 priority)
Details
Permit
202212027555
Status
complete
Filed
Dec 2, 2022
Permit issued
Jan 4, 2023
Final sign-off
Dec 17, 2024
Declared cost
$70,000
Address
77 Bruton St

parcel c2.2 - tower crane erection; temporary use. potain mdt219 j10 tower crame with 164 ft long jib at 131.2ft in ht. ref site bpa# 201912169614. (mayor ed 17-02 priority)

Open the permit page

$70,000
May 17, 2022Completed
final sign-off Dec 2024
55 Bruton StJames E Roberts-Obayashi Corporationshoring associated with new building under pa# 201912169614.
Details
Permit
202205174388
Status
complete
Filed
May 17, 2022
Permit issued
Sep 14, 2022
Final sign-off
Dec 17, 2024
Declared cost
$225,000
Address
55 Bruton St

shoring associated with new building under pa# 201912169614.

Open the permit page

$225,000
May 16, 2022Completed
final sign-off Dec 2024
55 Bruton StJames E Roberts-Obayashi Corporationgrading associated to new building under pa #201912169614
Details
Permit
202205164306
Status
complete
Filed
May 16, 2022
Permit issued
Sep 14, 2022
Final sign-off
Dec 17, 2024
Declared cost
$225,000
Address
55 Bruton St

grading associated to new building under pa #201912169614

Open the permit page

$225,000
Dec 16, 2019Completed
final sign-off Aug 2025
55 Bruton StWebcor Construction Lp, James E Roberts-Obayashi Corporationmayor ed #17-02. priority processing. ab-004 attached. to erect 6 stories, 1 basement, type 1-a, 178 residential units with mixed-used building (r-2,b,a-3,s-2). parcel-
Details
Permit
201912169614
Status
complete
Filed
Dec 16, 2019
Permit issued
Jul 8, 2022
Final sign-off
Aug 29, 2025
Declared cost
$84,400,000
Address
55 Bruton St

mayor ed #17-02. priority processing. ab-004 attached. to erect 6 stories, 1 basement, type 1-a, 178 residential units with mixed-used building (r-2,b,a-3,s-2). parcel-

Open the permit page

$84,400,000

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.