Block 3702, lot 054
1155 Market St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
90 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 15, 2016 | Completed final sign-off May 2016 | 1155 Market St | H C I Systems Inc | 10th & 11th flrs: new kitchen & fire suppression system (pyro-chem), install of tanks, pull station, detection, piping & gas valve. ref. t.i. permit #2015-0702-0526Details
10th & 11th flrs: new kitchen & fire suppression system (pyro-chem), install of tanks, pull station, detection, piping & gas valve. ref. t.i. permit #2015-0702-0526 | $4,995 |
| Mar 17, 2016 | Completed final sign-off May 2016 | 1155 Market St | Pyro-Comm Systems, Inc. | 10th & 11th floors: new fire alarm - 2 power supplies, 61 modules, 50 detectors, 2 speakers, 81 speaker/strobes. ref pa 2015 0702 0526Details
10th & 11th floors: new fire alarm - 2 power supplies, 61 modules, 50 detectors, 2 speakers, 81 speaker/strobes. ref pa 2015 0702 0526 | $24,430 |
| Mar 4, 2016 | Never finaled issued Mar 2016, no final | 1155 Market St | street space permitDetails
street space permit | ||
| Feb 10, 2016 | Never finaled issued Feb 2016, no final | 1155 Market St | street spaceDetails
street space | ||
| Feb 10, 2016 | Completed final sign-off Apr 2016 | 1155 Market St | Dpr Construction | ground floor: revision to existing permit 2015-0528-7397, revise drawings to reflect existing conditions. existing non-rated full height partition.Details
ground floor: revision to existing permit 2015-0528-7397, revise drawings to reflect existing conditions. existing non-rated full height partition. | |
| Dec 22, 2015 | Completed final sign-off Dec 2016 | 1155 Market St | R L H Fire Protection Inc | 10th & 11th floors: fire sprinkler permit. relocate 230, add 65 & delete 52 pendents. relocate 6 and add 6 uprights. add 1 new fire hose valve on the 11th floor. t.i. #201507020526.Details
10th & 11th floors: fire sprinkler permit. relocate 230, add 65 & delete 52 pendents. relocate 6 and add 6 uprights. add 1 new fire hose valve on the 11th floor. t.i. #201507020526. | $83,907 |
| Dec 22, 2015 | Completed final sign-off Jun 2017 | 1155 Market St | Dpr Construction | floors 10 & 11 - lighting revision to pa #201507020526.Details
floors 10 & 11 - lighting revision to pa #201507020526. | |
| Nov 23, 2015 | Completed final sign-off Jun 2017 | 1155 Market St | Dpr Construction | 9th floor: modification to permit 2015-0728-2625. add 2 hr corridor and associated mechanical revisions. increase lighting levels with request for special accomodationsDetails
9th floor: modification to permit 2015-0728-2625. add 2 hr corridor and associated mechanical revisions. increase lighting levels with request for special accomodations | |
| Nov 23, 2015 | Completed final sign-off Jun 2017 | 1155 Market St | Dpr Construction | 9th floor: modification to pa 2015-0319-1356, add 2 hr corridor. remove floor strengthening from scope of work.Details
9th floor: modification to pa 2015-0319-1356, add 2 hr corridor. remove floor strengthening from scope of work. | |
| Nov 6, 2015 | Completed final sign-off Jun 2016 | 1155 Market St | R L H Fire Protection Inc | fire sprinkler, relocate 108, add 37 and delete 21 pendents; relocate 2 uprights on the 9th fl. draft stop for stair by others.Details
fire sprinkler, relocate 108, add 37 and delete 21 pendents; relocate 2 uprights on the 9th fl. draft stop for stair by others. | $29,400 |
| Oct 23, 2015 | Completed final sign-off May 2016 | 1155 Market St | Pyro-Comm Systems, Inc. | 9th floor new fire alarm devices for a t.i, in an existing bldg to include: (12) relay modules, (29) smoke detectors, (2) duct detectors, (5) speakers, (43) speaker/strobes. ref pa #201503191356.Details
9th floor new fire alarm devices for a t.i, in an existing bldg to include: (12) relay modules, (29) smoke detectors, (2) duct detectors, (5) speakers, (43) speaker/strobes. ref pa #201503191356. | $29,400 |
| Sep 25, 2015 | Never finaled issued Feb 2016, no final | 1155 Market St | Dpr Construction | lighting, electrical and plumbing for office and restroom under permit 2015-0528-7397Details
lighting, electrical and plumbing for office and restroom under permit 2015-0528-7397 | $11,951 |
| Aug 4, 2015 | Never finaled issued Aug 2015, no final | 1155 Market St | Pyro-Comm Systems, Inc. | new fire alarm appliances added to tenant improvment in an existing bldg to include: (2)speakers/strobes. 1st fl: ref pa# 201505287397Details
new fire alarm appliances added to tenant improvment in an existing bldg to include: (2)speakers/strobes. 1st fl: ref pa# 201505287397 | $3,000 |
| Jul 28, 2015 | Completed final sign-off Aug 2017 | 1155 Market St | Dpr Construction | new mechanical, electrical and plumbing in the area of work in pa#201503191356. sprinklers and life safety under deferred submittal.Details
new mechanical, electrical and plumbing in the area of work in pa#201503191356. sprinklers and life safety under deferred submittal. | $455,800 |
| Jul 22, 2015 | Never finaled issued Jul 2015, no final | 1155 Market St | fire sprinkler permit. relocate 4 and delete 1 pendent on 1st flDetails
fire sprinkler permit. relocate 4 and delete 1 pendent on 1st fl | $2,056 | |
| Jul 2, 2015 | Completed final sign-off Aug 2017 | 1155 Market St | Dpr Construction | change of use. t-i includes new partitions, lighting, finishes and fixture throughout. structural work includes new interior connecting stair & floors 9-11 and flat roof skylight. new mechanical, electrical, plumbing and fire alarm will be the in area of work.Details
change of use. t-i includes new partitions, lighting, finishes and fixture throughout. structural work includes new interior connecting stair & floors 9-11 and flat roof skylight. new mechanical, electrical, plumbing and fire alarm will be the in area of work. | $2,395,639 |
| Jun 17, 2015 | Never finaled issued Jul 2015, no final | 1155 Market St | Dpr Construction | revision (adjustment) to pa #201502128172 for structural drwgs to support previous submittal (replacement of existing glass guardrail at the 6th & 7th floor balcony tenant space). installation of new handrail at existing maint, stair at elevator machine room penthouse roof access.Details
revision (adjustment) to pa #201502128172 for structural drwgs to support previous submittal (replacement of existing glass guardrail at the 6th & 7th floor balcony tenant space). installation of new handrail at existing maint, stair at elevator machine room penthouse roof access. | $15,000 |
| May 28, 2015 | Never finaled issued Jul 2015, no final | 1155 Market St | Dpr Construction | ground floor: non structural demo - new non structural partitions,, lighting, electrical, plumbing, finishes and millwork.Details
ground floor: non structural demo - new non structural partitions,, lighting, electrical, plumbing, finishes and millwork. | $32,400 |
| Mar 19, 2015 | Completed final sign-off Jun 2017 | 1155 Market St | Dpr Construction | 9th flr: ti - new partitions, finishes and fixtures throughout. mech, ele, plum, life safety and sprinkler as deffered submittalDetails
9th flr: ti - new partitions, finishes and fixtures throughout. mech, ele, plum, life safety and sprinkler as deffered submittal | $732,016 |
| Mar 12, 2015 | Completed final sign-off Jun 2017 | 1155 Market St | Dpr Construction | floors: 9,10&11: demo of (e) interior remodel on flrs 9, 10 & 11. work to be removed includs non-structural partitions, ceiling tiles, fixtures, mep. distribution and an abandoned waterless fire suppresion systm. area of work vacant, disabled access upgrades will be provided under seperate permit.Details
floors: 9,10&11: demo of (e) interior remodel on flrs 9, 10 & 11. work to be removed includs non-structural partitions, ceiling tiles, fixtures, mep. distribution and an abandoned waterless fire suppresion systm. area of work vacant, disabled access upgrades will be provided under seperate permit. | $120,000 |
| Feb 23, 2015 | Never finaled issued Feb 2015, no final | 1155 Market St | street space permitDetails
street space permit | ||
| Feb 12, 2015 | Never finaled issued Feb 2015, no final | 1155 Market St | Plant Construction Company Lp | 6th flr: replacement of existing glass guard rail at the 6th flr, covered balcony tenant space (non public)Details
6th flr: replacement of existing glass guard rail at the 6th flr, covered balcony tenant space (non public) | $50,000 |
| Feb 12, 2015 | Never finaled issued Feb 2015, no final | 1155 Market St | C B F Inc | t-24 for t.i. to office space, work consists of connecting power to new or relocated light fixtures, power outlets & tenant equipment, all work consists of making connection to base bldg. (e) panels, no changes have been made to (e) base bldg electrical system. ref. t.i. #201412194161Details
t-24 for t.i. to office space, work consists of connecting power to new or relocated light fixtures, power outlets & tenant equipment, all work consists of making connection to base bldg. (e) panels, no changes have been made to (e) base bldg electrical system. ref. t.i. #201412194161 | $185,000 |
| Feb 4, 2015 | Never finaled issued Feb 2015, no final | 1155 Market St | Pribuss Engineering Inc | 6th flr: fire sprinkler t.i. change/relocate 87, add 5 total 92; ref to 201412194161 (permit pending issuance).Details
6th flr: fire sprinkler t.i. change/relocate 87, add 5 total 92; ref to 201412194161 (permit pending issuance). | $47,345 |
| Feb 2, 2015 | Completed final sign-off Mar 2015 | 1155 Market St | Pyro-Comm Systems, Inc. | 6th floor: 2 new fire alarm devices added to tenant improvement to an existing bldg to include: (2) speaker/strobes. ref pa #201412194161.Details
6th floor: 2 new fire alarm devices added to tenant improvement to an existing bldg to include: (2) speaker/strobes. ref pa #201412194161. | $3,200 |
| Jan 23, 2015 | Never finaled issued Jan 2015, no final | 1155 Market St | street space permitDetails
street space permit | ||
| Dec 23, 2014 | Never finaled issued Dec 2014, no final | 1155 Market St | street spaceDetails
street space | ||
| Dec 19, 2014 | Completed final sign-off Apr 2015 | 1155 Market St | Plant Construction Company Lp | 6th floor tenant improvement to existing office space. new non-structural interior partitions, electrical outlets, lighting, restroom accessibility upgrades. life safety deferred.Details
6th floor tenant improvement to existing office space. new non-structural interior partitions, electrical outlets, lighting, restroom accessibility upgrades. life safety deferred. | $950,000 |
| Oct 29, 2014 | Never finaled issued Feb 2015, no final | 1155 Market St | Plant Construction Company Lp | 6th flr: demolition of existing interior partitions & finishes, electrical outlets, lighting, restroom fixtures. per ab-17 accessibility documentation will be provied with tenant improvement application.Details
6th flr: demolition of existing interior partitions & finishes, electrical outlets, lighting, restroom fixtures. per ab-17 accessibility documentation will be provied with tenant improvement application. | $25,000 |
| Apr 30, 2014 | Completed final sign-off May 2014 | 1155 Market St | Truebeck Construction | rervision to pa#2012-1120-4569 & ab-056. relocated ada van parking at 1160 mission (soma grand) 20 ft approx. north. updated path of travel from parking to 1155 market. new white curb shown at stevenson st.Details
rervision to pa#2012-1120-4569 & ab-056. relocated ada van parking at 1160 mission (soma grand) 20 ft approx. north. updated path of travel from parking to 1155 market. new white curb shown at stevenson st. | |
| Mar 21, 2014 | Never finaled issued Mar 2014, no final | 1155 Market St | street spaceDetails
street space | ||
| Jan 23, 2014 | Completed final sign-off May 2014 | 1155 Market St | Pyro-Comm Systems, Inc. | lobby renovation t.i. to (e) bldg. all core bldg fire alarm components are existing to remain, unless otherwise specified in this sumittal, (1) remote annunicator, (1) speaker/strobe. ref pa #2013.02.13.0143 & rev #2014..01.075747Details
lobby renovation t.i. to (e) bldg. all core bldg fire alarm components are existing to remain, unless otherwise specified in this sumittal, (1) remote annunicator, (1) speaker/strobe. ref pa #2013.02.13.0143 & rev #2014..01.075747 | $5,000 |
| Jan 7, 2014 | Expired or cancelled cancelled Jan 2026 | 1155 Market St | revision to pa#2013-02-13-0143. revised work includes art wall, in lieu of lightboxes, new lighting, design, demo of (e) cafe & dimentional change to exterior glazing & structural update to canopy design & adding bike rack on market st.Details
revision to pa#2013-02-13-0143. revised work includes art wall, in lieu of lightboxes, new lighting, design, demo of (e) cafe & dimentional change to exterior glazing & structural update to canopy design & adding bike rack on market st. | ||
| Dec 19, 2013 | Never finaled issued Dec 2013, no final | 1155 Market St | Decker Electric Co Inc Electrical Contra | interior lobby renovation. reception desk. building entry renovation. electrical only. approved ti 201302130143Details
interior lobby renovation. reception desk. building entry renovation. electrical only. approved ti 201302130143 | |
| Dec 19, 2013 | Never finaled issued Jan 2014, no final | 1155 Market St | Truebeck Construction | roof mechanical and piping upgrades. fire alarm and fire sprinkler under seperate permitDetails
roof mechanical and piping upgrades. fire alarm and fire sprinkler under seperate permit | $200,000 |
| Dec 5, 2013 | Never finaled issued Dec 2013, no final | 1155 Market St | Allied Fire Protection | 1st floor lobby. relocate (17) sprinkler heads.Details
1st floor lobby. relocate (17) sprinkler heads. | $8,500 |
| Nov 26, 2013 | Never finaled issued Nov 2013, no final | 1155 Market St | Acco Engineered Systems Inc. Dba Acco En | 1st & 2nd floor - install new ductwork & grilles & air balance hvac system. construction under pa#2013.0213.0147Details
1st & 2nd floor - install new ductwork & grilles & air balance hvac system. construction under pa#2013.0213.0147 | $40,000 |
| Nov 12, 2013 | Never finaled issued Nov 2013, no final | 1155 Market St | street space permit only.Details
street space permit only. | ||
| Aug 12, 2013 | Expired or cancelled cancelled Jan 2026 | 1155 Market St | 6, 10 & 11 floors - barrier removal accessiblity upgrades to restrooms and elev. lobbies floors 6,10,&11. mep and fire safety under seperate permit.Details
6, 10 & 11 floors - barrier removal accessiblity upgrades to restrooms and elev. lobbies floors 6,10,&11. mep and fire safety under seperate permit. | $480,000 | |
| Jul 29, 2013 | Never finaled issued Jul 2013, no final | 1155 Market St | Allied Fire Protection | add 2 sprinkler heads at 12th floor. generator room.Details
add 2 sprinkler heads at 12th floor. generator room. | $1,000 |
| Mar 29, 2013 | Never finaled issued Aug 2013, no final | 1155 Market St | Truebeck Construction | install fuel fill port at street with double-walled fuel pipe to extg generator on roof. installing new 75 gallon tank at generator to replace old tank which will be abandoned in place.Details
install fuel fill port at street with double-walled fuel pipe to extg generator on roof. installing new 75 gallon tank at generator to replace old tank which will be abandoned in place. | $45,000 |
| Feb 13, 2013 | Never finaled issued Oct 2013, no final | 1155 Market St | Hathaway Dinwiddie Co. | interior lobby:ceiling, feature wall, reception desk. exterior work: demolition of exterior wall & entry on level 1. intallation on nw wll as noted, nw glazing on level 2. nw canopy, miscelanious work at roof to accomodate mep eqpmnt. mep under seperate permit. base bldg ref permit #201211204569.Details
interior lobby:ceiling, feature wall, reception desk. exterior work: demolition of exterior wall & entry on level 1. intallation on nw wll as noted, nw glazing on level 2. nw canopy, miscelanious work at roof to accomodate mep eqpmnt. mep under seperate permit. base bldg ref permit #201211204569. | $1,600,000 |
| Jan 22, 2013 | Completed final sign-off Apr 2014 | 1155 Market St | Pyro-Comm Systems, Inc. | basement & 5th floor-replace all strobes with new, add new strobes & speakers per new ti build out. ti pa's# 2012-1126-4818 & 2012-1133-5206Details
basement & 5th floor-replace all strobes with new, add new strobes & speakers per new ti build out. ti pa's# 2012-1126-4818 & 2012-1133-5206 | $5,000 |
| Jan 22, 2013 | Completed final sign-off Apr 2014 | 1155 Market St | Pyro-Comm Systems, Inc. | 7th/8th/9th floors-replace all strobes with new, add new strobes & speakers per new ti build out. ti pa #2012-1126-4817Details
7th/8th/9th floors-replace all strobes with new, add new strobes & speakers per new ti build out. ti pa #2012-1126-4817 | $5,500 |
| Jan 17, 2013 | Completed final sign-off Apr 2014 | 1155 Market St | Pyro-Comm Systems, Inc. | replace (e) fire alarm system per the scope of work on drawing.Details
replace (e) fire alarm system per the scope of work on drawing. | $90,000 |
| Jan 15, 2013 | Never finaled issued Jan 2013, no final | 1155 Market St | Allied Fire Protection | floors 5,7, & 8 - a total of (10) relcoated sprinklers, (7) added sprinklers. ref #2012.1.26.4817 & 2012.11.26.4818.Details
floors 5,7, & 8 - a total of (10) relcoated sprinklers, (7) added sprinklers. ref #2012.1.26.4817 & 2012.11.26.4818. | $8,500 |
| Jan 10, 2013 | Never finaled issued Jan 2013, no final | 1155 Market St | Allied Fire Protection | fire sprinklers flors 1 and 3: 18 relocates, 9 addedDetails
fire sprinklers flors 1 and 3: 18 relocates, 9 added | $15,000 |
| Jan 8, 2013 | Completed final sign-off Apr 2014 | 1155 Market St | Pyro-Comm Systems, Inc. | ti pa# 2012-11-33-5206 & 2012-11-26-4820. add (n) speaker, 3 strobes throughout tenant areas.Details
ti pa# 2012-11-33-5206 & 2012-11-26-4820. add (n) speaker, 3 strobes throughout tenant areas. | $6,000 |
| Jan 8, 2013 | Never finaled issued Jan 2013, no final | 1155 Market St | Allied Fire Protection | on floors 2 and 4 a total of 14 relocated sprinklers and 5 added sprinklers. ti app#201211264820/4818Details
on floors 2 and 4 a total of 14 relocated sprinklers and 5 added sprinklers. ti app#201211264820/4818 | $9,500 |
| Jan 7, 2013 | Completed final sign-off Apr 2014 | 1155 Market St | Pyro-Comm Systems, Inc. | add new strobes and speakers. repalce all strobes in tenant area. ref#201211264820/4818Details
add new strobes and speakers. repalce all strobes in tenant area. ref#201211264820/4818 | $7,000 |
| Dec 11, 2012 | Completed final sign-off May 2014 | 1155 Market St | Truebeck Construction | mechanical ductwork, electrical power & lighting and plumbing upgrade to floor 2 & 3. ref arch pa #201211264820 & accessibility pa# 201211204569. fire sprinkler under separate permit.Details
mechanical ductwork, electrical power & lighting and plumbing upgrade to floor 2 & 3. ref arch pa #201211264820 & accessibility pa# 201211204569. fire sprinkler under separate permit. | $110,000 |
| Dec 11, 2012 | Completed final sign-off May 2014 | 1155 Market St | Truebeck Construction | mechanical ductwork, electrical power & lighting and plumbing upgrade to floor basement & 1st floor. ref arch pa #201211305206 & accessibility pa# 201211204569. fire sprinkler under separate permit.Details
mechanical ductwork, electrical power & lighting and plumbing upgrade to floor basement & 1st floor. ref arch pa #201211305206 & accessibility pa# 201211204569. fire sprinkler under separate permit. | $100,000 |
| Dec 11, 2012 | Completed final sign-off May 2014 | 1155 Market St | Truebeck Construction | mechanical ductwork, electrical power & lighting and plumbing upgrade to floor 7,8 & 9. ref arch pa #201211264817 & accessibility pa# 201211204569. fire sprinkler under separate permit.Details
mechanical ductwork, electrical power & lighting and plumbing upgrade to floor 7,8 & 9. ref arch pa #201211264817 & accessibility pa# 201211204569. fire sprinkler under separate permit. | $175,000 |
| Dec 11, 2012 | Completed final sign-off May 2014 | 1155 Market St | Truebeck Construction | mechanical ductwork & plumbing, electrical power & lighting and plumbing upgrade to floor 4 & 5. ref arch pa #201211264818 & accessibility pa# 201211204569. fire sprinkler under separate permit.Details
mechanical ductwork & plumbing, electrical power & lighting and plumbing upgrade to floor 4 & 5. ref arch pa #201211264818 & accessibility pa# 201211204569. fire sprinkler under separate permit. | $110,000 |
| Dec 4, 2012 | Never finaled issued Dec 2012, no final | 1155 Market St | Truebeck Construction | revisison to pa#2012-11-20-4569 & 2012-11-30-5206. bsmt & 1st fl. structural work including slab cuts at ground fl & bsmt, curb cut & move in bsmt, ramp alteration in bsmt, platform @ 2nd exit for new lift access.Details
revisison to pa#2012-11-20-4569 & 2012-11-30-5206. bsmt & 1st fl. structural work including slab cuts at ground fl & bsmt, curb cut & move in bsmt, ramp alteration in bsmt, platform @ 2nd exit for new lift access. | $10,000 |
| Nov 30, 2012 | Never finaled issued Nov 2012, no final | 1155 Market St | street spaceDetails
street space | ||
| Nov 30, 2012 | Completed final sign-off May 2014 | 1155 Market St | Truebeck Construction | basement & 1st floor-interior tenant improvement & minor demolition in basement & ground floor (1st fl). m.e.p is not included & is design build. accessibility is not addressed & can be referenced under seperate permit #2012-1120-4569.Details
basement & 1st floor-interior tenant improvement & minor demolition in basement & ground floor (1st fl). m.e.p is not included & is design build. accessibility is not addressed & can be referenced under seperate permit #2012-1120-4569. | $14,032 |
| Nov 26, 2012 | Completed final sign-off May 2014 | 1155 Market St | Truebeck Construction | floors 7,8,9 tenant improvement - (base bldg accessibility work ab-056 under appl# 2012.11.20.4569) includes restroom, elev lobbies, elev cabs, path of travel, drinking fountains, parking entrance. mep & fire protection under a separate permit.Details
floors 7,8,9 tenant improvement - (base bldg accessibility work ab-056 under appl# 2012.11.20.4569) includes restroom, elev lobbies, elev cabs, path of travel, drinking fountains, parking entrance. mep & fire protection under a separate permit. | $827,323 |
| Nov 26, 2012 | Completed final sign-off May 2014 | 1155 Market St | Truebeck Construction | tenant improvement of floor 2 and 3. base bldg accessibility under separate permit. mep and fire protection under separate permitDetails
tenant improvement of floor 2 and 3. base bldg accessibility under separate permit. mep and fire protection under separate permit | $585,775 |
| Nov 26, 2012 | Completed final sign-off May 2014 | 1155 Market St | Truebeck Construction | 4th & 5th floors-tenant improvement of floor 4 and 5. base bldg accessibility under 201211204569. mep and fire protection under separate permitDetails
4th & 5th floors-tenant improvement of floor 4 and 5. base bldg accessibility under 201211204569. mep and fire protection under separate permit | $770,000 |
| Nov 20, 2012 | Completed final sign-off May 2014 | 1155 Market St | Truebeck Construction | base building accessibiltiy work ab-056 floor 1-5. floor 7-9, and basement floor. in addition to providing showers and bike storage at the basement level. ab-o56: parking, path of travel, entry doors, stairs ramps, lifts elevators rest room floors.Details
base building accessibiltiy work ab-056 floor 1-5. floor 7-9, and basement floor. in addition to providing showers and bike storage at the basement level. ab-o56: parking, path of travel, entry doors, stairs ramps, lifts elevators rest room floors. | $500,000 |
| Nov 17, 2009 | Completed final sign-off Nov 2010 | 1155 Market St | Cal-Air Inc | install a new cooling tower (100 ton). for (e) water source air conditioning units in the building.Details
install a new cooling tower (100 ton). for (e) water source air conditioning units in the building. | $85,000 |
| May 3, 2007 | Completed final sign-off Jul 2007 | 1155 Market St | legalize existing atm located at front of property line in response to nov complaint #200790110.Details
legalize existing atm located at front of property line in response to nov complaint #200790110. | $2,000 | |
| Feb 5, 2007 | Completed final sign-off Aug 2007 | 1155 Market St | Potter Fire Protection | relocate (6) fire sprinklers on the 6th floor only.Details
relocate (6) fire sprinklers on the 6th floor only. | $1,950 |
| Nov 30, 2006 | Completed final sign-off Aug 2007 | 1155 Market St | Angotti & Reilly Inc. | at the 6th floor, construction of 6 new offices, remodel of extg storate room and extg copy room. sprnklr to be submitted on separate permitDetails
at the 6th floor, construction of 6 new offices, remodel of extg storate room and extg copy room. sprnklr to be submitted on separate permit | $107,000 |
| Sep 28, 2005 | Never finaled issued Sep 2005, no final | 1155 Market St | Team Commercial Construction Inc. | renew appl#200303119387,200307018480,200304112032,200306207329 for final inspectionDetails
renew appl#200303119387,200307018480,200304112032,200306207329 for final inspection | |
| Sep 28, 2005 | Never finaled issued Sep 2005, no final | 1155 Market St | Team Commercial Construction Inc. | mep/lighting/life safety. relocate 3 strobesDetails
mep/lighting/life safety. relocate 3 strobes | $8,000 |
| Sep 28, 2005 | Never finaled issued Sep 2005, no final | 1155 Market St | Team Commercial Construction Inc. | mep & lighting & sprinkler piping plan per appl#200306207329Details
mep & lighting & sprinkler piping plan per appl#200306207329 | $7,000 |
| Jul 7, 2005 | Never finaled issued Jul 2005, no final | 1155 Market St | Cosco Fire Protection Inc. | relocate 3 pendant fire sprinkler heads at 7th floorDetails
relocate 3 pendant fire sprinkler heads at 7th floor | $3,000 |
| May 10, 2005 | Never finaled issued May 2005, no final | 1155 Market St | Angotti & Reilly Inc. | oti-1,7th/fl-el,sp.Details
oti-1,7th/fl-el,sp. | |
| Feb 25, 2004 | Expired or cancelled expired Sep 2005 | 1155 Market St | Honeywell International, Inc | card access doors being added on 4th, 5th, 7th, and 8th. intergrates with fire system per cbc 403.9Details
card access doors being added on 4th, 5th, 7th, and 8th. intergrates with fire system per cbc 403.9 | |
| Jul 24, 2003 | Expired or cancelled expired Sep 2005 | 1155 Market St | California Suppresion Dba Calif. Protect | furnish and install new fm200 fire suppression system for the expansion in the 10th floor main frameDetails
furnish and install new fm200 fire suppression system for the expansion in the 10th floor main frame | $16,935 |
| Jul 1, 2003 | Expired or cancelled expired Sep 2005 | 1155 Market St | oti-1 1/f el lsDetails
oti-1 1/f el ls | $88,417 | |
| Jun 20, 2003 | Expired or cancelled expired Sep 2005 | 1155 Market St | oti-1 10th floor elDetails
oti-1 10th floor el | $91,309 | |
| Apr 11, 2003 | Expired or cancelled expired Sep 2005 | 1155 Market St | t.i to exsting office space barrier removal project. add drinking foundation, lower urinal, ada signDetails
t.i to exsting office space barrier removal project. add drinking foundation, lower urinal, ada sign | $92,750 | |
| Mar 11, 2003 | Expired or cancelled expired Sep 2005 | 1155 Market St | tenant improvement to extg office space/remove 2 walls/1 between conf. room/2nd wall to remove egresDetails
tenant improvement to extg office space/remove 2 walls/1 between conf. room/2nd wall to remove egres | $95,000 | |
| Feb 21, 2002 | Expired or cancelled expired Sep 2002 | 1155 Market St | Team Commercial Construction Inc. | oti-2 7th floor elDetails
oti-2 7th floor el | $12,000 |
| Oct 4, 2001 | Expired or cancelled expired Apr 2002 | 1155 Market St | Team Commercial Construction Inc. | oti-1,7th fl,ltg onlyDetails
oti-1,7th fl,ltg only | $10,000 |
| Oct 4, 2001 | Expired or cancelled expired Feb 2002 | 1155 Market St | Team Commercial Construction Inc. | oti-1 8th floor no oti-2Details
oti-1 8th floor no oti-2 | $2,000 |
| Oct 4, 2001 | Expired or cancelled expired Feb 2002 | 1155 Market St | Team Commercial Construction Inc. | oti-1 5th floor no oti-2Details
oti-1 5th floor no oti-2 | $2,500 |
| Nov 2, 2000 | Expired or cancelled expired May 2001 | 1155 Market St | build new offices/relocate light fixtures/add new elec. outletDetails
build new offices/relocate light fixtures/add new elec. outlet | $20,000 | |
| Aug 25, 2000 | Expired or cancelled expired Dec 2000 | 1155 Market St | Aquamatic Fire Protection | as built drawings from app #200008087290/fire sprnklr 7th floorDetails
as built drawings from app #200008087290/fire sprnklr 7th floor | |
| Aug 8, 2000 | Expired or cancelled expired Dec 2000 | 1155 Market St | Aquamatic Fire Protection | add 4 and relocate 1 head on fire sprinkler systemDetails
add 4 and relocate 1 head on fire sprinkler system | $1,000 |
| Jul 19, 2000 | Expired or cancelled expired Aug 2001 | 1155 Market St | Gateway Construction Service | minor demolition/upgrade walls/fm-200 on 10th floorDetails
minor demolition/upgrade walls/fm-200 on 10th floor | $80,000 |
| Jul 11, 2000 | Expired or cancelled expired Aug 2001 | 1155 Market St | Team Commercial Construction Inc. | oti-1 = el, me, ls & sp (7th fl.)Details
oti-1 = el, me, ls & sp (7th fl.) | $65,000 |
| Jul 5, 2000 | Expired or cancelled expired Nov 2000 | 1155 Market St | oti-3, 2nd floor, l/s onlyDetails
oti-3, 2nd floor, l/s only | ||
| Mar 30, 2000 | Expired or cancelled expired Sep 2000 | 1155 Market St | Honeywell | release lobby & stairwell locked doors for fire alarm.Details
release lobby & stairwell locked doors for fire alarm. | $11,838 |
| Feb 14, 2000 | Expired or cancelled expired Nov 2000 | 1155 Market St | install control cabinet, antennae, for wireless transmission facilityDetails
install control cabinet, antennae, for wireless transmission facility | $15,655 | |
| Jan 28, 2000 | Completed final sign-off Jul 2000 | 1155 Market St | oti-3, ls, sp, 2nd floorDetails
oti-3, ls, sp, 2nd floor | $14,000 | |
| Jan 21, 2000 | Completed final sign-off Jul 2000 | 1155 Market St | oti-2, el, me, 2nd floorDetails
oti-2, el, me, 2nd floor | $120,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Truebeck Construction (13), Dpr Construction (11), Pyro-Comm Systems, Inc. (10), Team Commercial Construction Inc. (8), Allied Fire Protection (5), Plant Construction Company Lp (3), Angotti & Reilly Inc. (2), Aquamatic Fire Protection (2), R L H Fire Protection Inc (2), Acco Engineered Systems Inc. Dba Acco En, C B F Inc, Cal-Air Inc, California Suppresion Dba Calif. Protect, Cosco Fire Protection Inc., Decker Electric Co Inc Electrical Contra, Gateway Construction Service, H C I Systems Inc, Hathaway Dinwiddie Co., Honeywell, Honeywell International, Inc, Potter Fire Protection, Pribuss Engineering Inc
- Architects
- George Soskin (5), Mark Cavagnero (4), Brynda Kirt (2), Gary Hoy, Mike Pierrom
- Engineers
- Craig Ristow (5), Dennis Chung (2), Joshua Mcmahan (2), Albert Eng, Elisabeth Allen, Guil Orihuela, Jesus Cabellon Jr., Jonathan Jaeger, Pak Hui
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.