Block 3721, lot 072
595 Mission St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
123 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 595 Mission St | Hp Build | ground floor/suite #102: coffee shop t.i. in an existing (1,783 sq ft). coffee shop (formerly pete's coffee). no change of use or occupancy. no change in egress or existing. existing mech. distribution to remain. replace finishes, lighting,case work & equipment.Details
ground floor/suite #102: coffee shop t.i. in an existing (1,783 sq ft). coffee shop (formerly pete's coffee). no change of use or occupancy. no change in egress or existing. existing mech. distribution to remain. replace finishes, lighting,case work & equipment. | $760,000 |
| Mar 6, 2012 | Completed final sign-off Apr 2012 | 101 02nd St | Ayoob & Peery Plumbing Co Inc | modify extg sprinklers due to new walls and ceiling. 52 relocate and 5 demo.Details
modify extg sprinklers due to new walls and ceiling. 52 relocate and 5 demo. | $14,392 |
| Nov 3, 2011 | Completed final sign-off May 2012 | 101 02nd St | Field Construction Inc. | floor 24th & 25th floor for mechanical, electrical & plumbing work. t.i. pa #201110116424.Details
floor 24th & 25th floor for mechanical, electrical & plumbing work. t.i. pa #201110116424. | $200,000 |
| Oct 11, 2011 | Completed final sign-off May 2012 | 101 02nd St | Field Construction Inc. | tentant improvement on 24th and 25th fl including demo of non structural partitions. construction of non structural partitions. removal of existing acoutsitcal ceilings and gyp board ceilings, new elec and lighting, niew finishes throughout. mech, elec, plumbing. life safety, sprinklers, evac signs.Details
tentant improvement on 24th and 25th fl including demo of non structural partitions. construction of non structural partitions. removal of existing acoutsitcal ceilings and gyp board ceilings, new elec and lighting, niew finishes throughout. mech, elec, plumbing. life safety, sprinklers, evac signs. | $1,685,000 |
| Jul 27, 2011 | Never finaled issued Jul 2011, no final | 101 02nd St | street space & sidewalkDetails
street space & sidewalk | ||
| Dec 2, 2010 | Completed final sign-off Mar 2011 | 101 02nd St | Novo Construction Inc | 3rd fl. t.i. includes demolition of non-structural partitions & bldg new non-structural partitions. all new or revised hvac, electrical plumbing, sprinkler & life safety will be design build under separate permit (bldg fully sprinklered).Details
3rd fl. t.i. includes demolition of non-structural partitions & bldg new non-structural partitions. all new or revised hvac, electrical plumbing, sprinkler & life safety will be design build under separate permit (bldg fully sprinklered). | $171,000 |
| Oct 19, 2010 | Completed final sign-off Nov 2010 | 101 02nd St | Siemens Industry, Inc. | addition of 1 speaker strobe and relocation of existing speaker strobe for the spec suite remodel on floor 5. both devices connect onto existing life safety system circuitsDetails
addition of 1 speaker strobe and relocation of existing speaker strobe for the spec suite remodel on floor 5. both devices connect onto existing life safety system circuits | $900 |
| Oct 13, 2010 | Completed final sign-off Nov 2010 | 101 02nd St | R L H Fire Protection Inc | ti upgrade on e fire sprinkler. relcate 4 heads, add 1 head total 5 heads. myers development 5th fl 3326Details
ti upgrade on e fire sprinkler. relcate 4 heads, add 1 head total 5 heads. myers development 5th fl 3326 | $1,500 |
| Sep 14, 2010 | Completed final sign-off Oct 2010 | 101 02nd St | R L H Fire Protection Inc | 10th floor t.i. upgrade on an (e) fire sprinkler system. relocate 4 heads & add 3 heads total of 7 heads.Details
10th floor t.i. upgrade on an (e) fire sprinkler system. relocate 4 heads & add 3 heads total of 7 heads. | $2,100 |
| Sep 9, 2010 | Completed final sign-off Oct 2010 | 101 02nd St | Anderson, Rowe & Buckley, Inc. | 16th floor fire sprinkler tenant improvement- relocate 6 heads for coverage.Details
16th floor fire sprinkler tenant improvement- relocate 6 heads for coverage. | $1,800 |
| Jun 28, 2010 | Completed final sign-off Aug 2010 | 101 02nd St | Pribuss Engineering Inc | 22nd floor fire sprinkler t.i. add 1 heads, relocated 10 heads, 2 heads changed out to ssp, 5 heads changed out to ssp & relocated, total 18 heads.Details
22nd floor fire sprinkler t.i. add 1 heads, relocated 10 heads, 2 heads changed out to ssp, 5 heads changed out to ssp & relocated, total 18 heads. | $5,400 |
| May 20, 2010 | Completed final sign-off Jul 2010 | 101 02nd St | Ayoob & Peery Plumbing Co Inc | 24th floor-relocate fire sprinkler heads per tenant improvements ( 3 heads relocated)Details
24th floor-relocate fire sprinkler heads per tenant improvements ( 3 heads relocated) | $1,542 |
| Feb 5, 2010 | Completed final sign-off Mar 2010 | 101 02nd St | R L H Fire Protection Inc | 3rd floor-ti upgrade on e fire sprinkler system for trc on 3rd fl. relocate 28 heads, add 4 heads, remove 6. total 32 headsDetails
3rd floor-ti upgrade on e fire sprinkler system for trc on 3rd fl. relocate 28 heads, add 4 heads, remove 6. total 32 heads | $6,400 |
| Jan 5, 2010 | Completed final sign-off Mar 2010 | 101 02nd St | Novo Construction Inc | 3rd floor-reference pa# 2009-1217-3400-mechanical onlyDetails
3rd floor-reference pa# 2009-1217-3400-mechanical only | $45,000 |
| Jul 28, 2009 | Completed final sign-off Nov 2009 | 101 02nd St | Principal Builders Inc. | add, relocate & remove fire sprinkler per tenant improvement: (18) relocate, (3) removed @ 2nd floor. (81) relocate, (5) removed @ 18th floor.Details
add, relocate & remove fire sprinkler per tenant improvement: (18) relocate, (3) removed @ 2nd floor. (81) relocate, (5) removed @ 18th floor. | $19,800 |
| Jul 7, 2009 | Completed final sign-off Nov 2009 | 101 02nd St | Principal Builders Inc. | partial t.i. on floors 2 & 18. new non-load bearing partitions, ceilings & finishes, new mechanical & electrical as required. mep design build.Details
partial t.i. on floors 2 & 18. new non-load bearing partitions, ceilings & finishes, new mechanical & electrical as required. mep design build. | $500,000 |
| Dec 16, 2008 | Completed final sign-off Feb 2009 | 101 02nd St | Ayoob & Peery Plumbing Co Inc | at 23rd fl: relocate fire sprinkler heads per tenant improvement. (7 relocate)Details
at 23rd fl: relocate fire sprinkler heads per tenant improvement. (7 relocate) | $1,250 |
| Oct 10, 2008 | Never finaled issued Oct 2008, no final | 101 02nd St | Gci, Inc | at 11th fl: fire sprinklers for full floor, relocating 20 devices & removing 3 devices, ref #200808290425Details
at 11th fl: fire sprinklers for full floor, relocating 20 devices & removing 3 devices, ref #200808290425 | $10,000 |
| Jul 16, 2008 | Completed final sign-off Nov 2008 | 101 02nd St | at 12th floor, tenant improvement, ceiling hight non-structural partitions. electrical mechanical & life safety under separate permit. building fully sprinklered.Details
at 12th floor, tenant improvement, ceiling hight non-structural partitions. electrical mechanical & life safety under separate permit. building fully sprinklered. | $85,000 | |
| Apr 7, 2008 | Completed final sign-off Jun 2008 | 101 02nd St | 12th fl, removal of existing demising wall (n) full height, demisirg wall, (mechanical, electrical and life safety under separate permit.)Details
12th fl, removal of existing demising wall (n) full height, demisirg wall, (mechanical, electrical and life safety under separate permit.) | $40,000 | |
| Mar 6, 2008 | Expired or cancelled withdrawn Jul 2008 | 101 02nd St | Novo Construction Inc | 12th floor: partial floor tenant improvement including demolition & new partiion ceiling and finishes.Details
12th floor: partial floor tenant improvement including demolition & new partiion ceiling and finishes. | $20,000 |
| Feb 15, 2008 | Never finaled issued Feb 2008, no final | 101 02nd St | Cannon Constructors North Inc | mechanical reconfiguration to new wall layout for tenant improvement. title 24 for lighting for t.i. per 200712049605.Details
mechanical reconfiguration to new wall layout for tenant improvement. title 24 for lighting for t.i. per 200712049605. | $142,000 |
| Dec 4, 2007 | Completed final sign-off Jun 2008 | 101 02nd St | Cannon Constructors North Inc | 14th floor-tenant remodel of reception area, conference rooms. copy room and addition of 2 offices, walls, new flooring. mep, life safety, sprinklers under seperate permitsDetails
14th floor-tenant remodel of reception area, conference rooms. copy room and addition of 2 offices, walls, new flooring. mep, life safety, sprinklers under seperate permits | $350,000 |
| May 25, 2007 | Never finaled issued May 2007, no final | 101 02nd St | Ayoob & Peery Plumbing Co Inc | relocate sprinkler heads per tenant improvements, relocates 23, remove 3.Details
relocate sprinkler heads per tenant improvements, relocates 23, remove 3. | $5,025 |
| Apr 16, 2007 | Never finaled issued Apr 2007, no final | 101 02nd St | oti-2 5th floor el, meDetails
oti-2 5th floor el, me | $65,000 | |
| Apr 16, 2007 | Completed final sign-off Jul 2007 | 101 02nd St | oti-1 rev. 5th floor el, me, ls, spDetails
oti-1 rev. 5th floor el, me, ls, sp | $10,000 | |
| Aug 16, 2006 | Completed final sign-off May 2008 | 101 02nd St | provide tiebacks per plans ref 2001/10/13/0668sDetails
provide tiebacks per plans ref 2001/10/13/0668s | $100,000 | |
| Aug 1, 2006 | Expired or cancelled expired May 2007 | 101 02nd St | Priola Construction, Inc. | renew permits for final inspections 9926570 200004137120 9926569 20006272940Details
renew permits for final inspections 9926570 200004137120 9926569 20006272940 | |
| May 30, 2006 | Completed final sign-off Jul 2006 | 101 02nd St | Novo Construction Inc | oti-2 25th floor, el, me.Details
oti-2 25th floor, el, me. | $15,000 |
| May 22, 2006 | Completed final sign-off Jul 2006 | 101 02nd St | Novo Construction Inc | oti-1 25th floor, el, me, ls, sp. (n) walls, remove existing data floor core, penetration only, new offices.Details
oti-1 25th floor, el, me, ls, sp. (n) walls, remove existing data floor core, penetration only, new offices. | $107,000 |
| May 16, 2006 | Completed final sign-off Dec 2006 | 101 02nd St | Novo Construction Inc | add new walls, new doors, paint,minor electricaland mechanical. oti-1=11th floor =me, lsDetails
add new walls, new doors, paint,minor electricaland mechanical. oti-1=11th floor =me, ls | $22,100 |
| Oct 27, 2005 | Completed final sign-off Mar 2006 | 101 02nd St | Young Electric Co | modification of fire alarm on 12th fl rowbothamDetails
modification of fire alarm on 12th fl rowbotham | $9,500 |
| Oct 27, 2005 | Completed final sign-off Mar 2006 | 101 02nd St | Young Electric Co | add 2 strobe/speakers on 12/f (hsbc)Details
add 2 strobe/speakers on 12/f (hsbc) | $7,500 |
| Aug 12, 2005 | Completed final sign-off Mar 2006 | 101 02nd St | oti-1, floor 12, el, me, ls, spDetails
oti-1, floor 12, el, me, ls, sp | $75,000 | |
| Jan 10, 2005 | Expired or cancelled expired May 2007 | 101 02nd St | demo of non struct. partitions, doors, frames, ceiling, ltg. new non structural partitions, doors/Details
demo of non struct. partitions, doors, frames, ceiling, ltg. new non structural partitions, doors/ | $300,000 | |
| Oct 14, 2004 | Expired or cancelled expired Nov 2005 | 101 02nd St | California Sign Installation | erect signDetails
erect sign | $2,000 |
| Jun 22, 2004 | Expired or cancelled expired Jan 2005 | 101 02nd St | Hathaway Dinwiddie Co. | submitting revised sequence of operations for pa200306025970uukl upgrade and 200310157509 ncircleDetails
submitting revised sequence of operations for pa200306025970uukl upgrade and 200310157509 ncircle | |
| Apr 15, 2004 | Completed final sign-off Aug 2004 | 101 02nd St | Richlen Construction | renew app#200310026381 . oti-fire alarmDetails
renew app#200310026381 . oti-fire alarm | |
| Apr 15, 2004 | Completed final sign-off Aug 2004 | 101 02nd St | Richlen Construction | renew app#200308071523Details
renew app#200308071523 | |
| Apr 15, 2004 | Completed final sign-off Aug 2004 | 101 02nd St | Richlen Construction | renew app#200309154743 . oti-3 fire alarmDetails
renew app#200309154743 . oti-3 fire alarm | |
| Apr 6, 2004 | Completed final sign-off Apr 2004 | 101 02nd St | Hathaway Dinwiddie Co. | renew app #200309267553/200210189375/200210229595Details
renew app #200309267553/200210189375/200210229595 | |
| Apr 6, 2004 | Completed final sign-off Apr 2004 | 101 02nd St | Hathaway Dinwiddie Co. | renew app #200302137409/200209267550Details
renew app #200302137409/200209267550 | |
| Jan 28, 2004 | Completed final sign-off Jul 2004 | 101 02nd St | Pribuss Engineering Inc | 4/f- fire sprinkler t.i., add 2, relocate 3,total 5 headsDetails
4/f- fire sprinkler t.i., add 2, relocate 3,total 5 heads | $750 |
| Dec 22, 2003 | Completed final sign-off Jul 2004 | 101 02nd St | Baxter Electric Inc | relocate 1 speaker/strobe & add 2 other fire alarm modification on 4th floor.Details
relocate 1 speaker/strobe & add 2 other fire alarm modification on 4th floor. | $6,000 |
| Oct 27, 2003 | Completed final sign-off Jul 2004 | 101 02nd St | Rudolph Commercial Interiors Inc, Rci | oti-2 4th fl, el, meDetails
oti-2 4th fl, el, me | $65,000 |
| Oct 15, 2003 | Completed final sign-off Jul 2004 | 101 02nd St | revision to 200308152258 e closet, offices, mdf room and store to remain mep, sprinklers and life saDetails
revision to 200308152258 e closet, offices, mdf room and store to remain mep, sprinklers and life sa | ||
| Oct 2, 2003 | Expired or cancelled expired Aug 2004 | 101 02nd St | provide fire alarm system on the 22nd flr per plan, ref. 200308071523Details
provide fire alarm system on the 22nd flr per plan, ref. 200308071523 | $5,000 | |
| Sep 15, 2003 | Expired or cancelled expired Aug 2004 | 101 02nd St | Richlen Construction | oti-3, 22nd floor, spDetails
oti-3, 22nd floor, sp | $2,500 |
| Aug 15, 2003 | Completed final sign-off Jul 2004 | 101 02nd St | Rudolph Commercial Interiors Inc, Rci | oti-1 4th floor, el, me, ls, spDetails
oti-1 4th floor, el, me, ls, sp | $110,000 |
| Aug 11, 2003 | Expired or cancelled expired Aug 2004 | 101 02nd St | Richlen Construction | rev. to pa#2003/08/07/1523- mechanical w/ title 24, lighting & electrical w/ title 24, plumbingDetails
rev. to pa#2003/08/07/1523- mechanical w/ title 24, lighting & electrical w/ title 24, plumbing | |
| Aug 7, 2003 | Completed final sign-off Aug 2004 | 101 02nd St | demo non structural partitions, doors/frames, elec/data outlets. new non structural partitions, dooDetails
demo non structural partitions, doors/frames, elec/data outlets. new non structural partitions, doo | $65,000 | |
| Jul 25, 2003 | Expired or cancelled expired Jan 2005 | 101 02nd St | Mc Millan Electric | life safety work in new server room- 6th flr only; no increase in office spac e interiorsDetails
life safety work in new server room- 6th flr only; no increase in office spac e interiors | $8,000 |
| Jul 16, 2003 | Expired or cancelled expired Jan 2005 | 101 02nd St | Pankow Special Projects Lp | #600- tap into (e)heat pumpts to provide ac for new server rm & officeDetails
#600- tap into (e)heat pumpts to provide ac for new server rm & office | $5,500 |
| Jun 27, 2003 | Expired or cancelled expired Jan 2005 | 101 02nd St | Pankow Special Projects Lp | rated wall for niew server room, carpet,paint for (1) office, install dishwasher,Details
rated wall for niew server room, carpet,paint for (1) office, install dishwasher, | $35,000 |
| Jun 2, 2003 | Never finaled issued Jul 2003, no final | 101 02nd St | Hathaway Dinwiddie Co. | limited to installation & programming of new mylv node in order to incorp. uukl testing to (e) fireDetails
limited to installation & programming of new mylv node in order to incorp. uukl testing to (e) fire | $17,000 |
| Mar 7, 2003 | Expired or cancelled expired Sep 2005 | 101 02nd St | Taslimi Construction Co Inc | to renew app#2001/12/19/5578,2002/01/22/7448, & 2001/12/17/5407 for final inspection.Details
to renew app#2001/12/19/5578,2002/01/22/7448, & 2001/12/17/5407 for final inspection. | |
| Feb 13, 2003 | Expired or cancelled expired Apr 2004 | 101 02nd St | Hathaway Dinwiddie Co. | oti-3 9/f lsDetails
oti-3 9/f ls | $5,000 |
| Dec 6, 2002 | Expired or cancelled cancelled Mar 2004 | 101 02nd St | Siemens Bldg Technologies | auto weekly test of smoke control system related to life safetyDetails
auto weekly test of smoke control system related to life safety | $1,000 |
| Dec 4, 2002 | Expired or cancelled expired May 2004 | 101 02nd St | Hathaway Dinwiddie Co. | revision to 978938,request of elec inspector.show fire stopping methods & partition types.Details
revision to 978938,request of elec inspector.show fire stopping methods & partition types. | |
| Oct 22, 2002 | Expired or cancelled cancelled Oct 2003 | 101 02nd St | Hathaway Dinwiddie Co. | oti-2 9th floor el, me, l/sDetails
oti-2 9th floor el, me, l/s | $50,000 |
| Oct 22, 2002 | Expired or cancelled expired Apr 2004 | 101 02nd St | Hathaway Dinwiddie Co. | oti-3 8th floor l/sDetails
oti-3 8th floor l/s | $2,000 |
| Oct 18, 2002 | Expired or cancelled expired Apr 2004 | 101 02nd St | Hathaway Dinwiddie Co. | oti 2: 8th fl. elDetails
oti 2: 8th fl. el | $5,000 |
| Oct 17, 2002 | Completed final sign-off Feb 2003 | 101 02nd St | Hathaway Dinwiddie Co. | oti-2 11th flr, me,lsDetails
oti-2 11th flr, me,ls | $10,000 |
| Oct 3, 2002 | Completed final sign-off Jan 2003 | 101 02nd St | Hathaway Dinwiddie Co. | oti-3, 7th floor, ls.Details
oti-3, 7th floor, ls. | $1,500 |
| Sep 26, 2002 | Expired or cancelled expired Apr 2004 | 101 02nd St | Hathaway Dinwiddie Co. | oti-1 9/f el meDetails
oti-1 9/f el me | $50,000 |
| Sep 26, 2002 | Expired or cancelled expired Apr 2004 | 101 02nd St | Hathaway Dinwiddie Co. | oti-1 8/f el meDetails
oti-1 8/f el me | $25,000 |
| Sep 19, 2002 | Never finaled issued Sep 2002, no final | 101 02nd St | Hathaway Dinwiddie Co. | remove non structural drywall partitions & finishes. no increase in ofice space.Details
remove non structural drywall partitions & finishes. no increase in ofice space. | $1,000 |
| Sep 4, 2002 | Completed final sign-off Feb 2003 | 101 02nd St | Hathaway Dinwiddie Co. | relocate 1 door & removing 1 non-structural wallDetails
relocate 1 door & removing 1 non-structural wall | $500 |
| Aug 30, 2002 | Completed final sign-off Feb 2003 | 101 02nd St | Hathaway Dinwiddie Co. | oti-1 11th floor, el, me, lsDetails
oti-1 11th floor, el, me, ls | $30,000 |
| Aug 19, 2002 | Completed final sign-off Jan 2003 | 101 02nd St | Hathaway Dinwiddie Co. | oti-2, 7th fl, el, me.Details
oti-2, 7th fl, el, me. | $10,000 |
| Aug 8, 2002 | Completed final sign-off Jan 2003 | 101 02nd St | Hathaway Dinwiddie Co. | oti-1,7th flr-el, me, lsDetails
oti-1,7th flr-el, me, ls | $65,000 |
| Jul 12, 2002 | Expired or cancelled expired May 2004 | 101 02nd St | Hathaway Dinwiddie Co. | limited to changing fire dampers to fire smoke dampers at elec rms flr 1-25 (no 13) w/associated conDetails
limited to changing fire dampers to fire smoke dampers at elec rms flr 1-25 (no 13) w/associated con | $150,000 |
| Jan 22, 2002 | Expired or cancelled expired Jul 2002 | 101 02nd St | renovate (e) fire sprinklers sym on 24/f per plans dated 1/5/02 total 19 added headsDetails
renovate (e) fire sprinklers sym on 24/f per plans dated 1/5/02 total 19 added heads | $8,500 | |
| Jan 8, 2002 | Expired or cancelled expired Jul 2002 | 101 02nd St | Thunder Electric Inc. | add to (e) 24th floor fire alarm - no increase in office spaceDetails
add to (e) 24th floor fire alarm - no increase in office space | $13,000 |
| Jan 8, 2002 | Completed final sign-off Feb 2003 | 101 02nd St | Turner Construction Co | fill in curb ramp & cut out sloped walkway @basement, accessible pakring striping & signage, magnetiDetails
fill in curb ramp & cut out sloped walkway @basement, accessible pakring striping & signage, magneti | $12,500 |
| Dec 19, 2001 | Expired or cancelled expired Sep 2005 | 101 02nd St | oti-2,24th flr, ltg, mechDetails
oti-2,24th flr, ltg, mech | $30,000 | |
| Dec 6, 2001 | Completed final sign-off Jan 2002 | 101 02nd St | interior non-structural demolition of previous tenants improvem. on 24th floorDetails
interior non-structural demolition of previous tenants improvem. on 24th floor | $6,500 | |
| Oct 26, 2001 | Completed final sign-off Jan 2002 | 101 02nd St | Hathaway Dinwiddie Co. | build partition wall/install new door w/ frame in tenant spaceDetails
build partition wall/install new door w/ frame in tenant space | $2,500 |
| Aug 3, 2001 | Completed final sign-off Jan 2002 | 101 02nd St | minor renovation to divide one tenant space into 2 offices on 22nd floor of highriseDetails
minor renovation to divide one tenant space into 2 offices on 22nd floor of highrise | $25,000 | |
| Jul 17, 2001 | Completed final sign-off Feb 2002 | 101 02nd St | Hathaway Dinwiddie Co. | oti-2, 23rd floor el, me, l/s, spDetails
oti-2, 23rd floor el, me, l/s, sp | $234,000 |
| Jun 27, 2001 | Completed final sign-off Feb 2002 | 101 02nd St | Hathaway Dinwiddie Co. | oti-1,23rd flr,el,me,ls,spDetails
oti-1,23rd flr,el,me,ls,sp | $643,050 |
| Jun 7, 2001 | Completed final sign-off Feb 2002 | 101 02nd St | Hathaway Dinwiddie Co. | non structural demo of tenant space on 23rd floorDetails
non structural demo of tenant space on 23rd floor | $15,000 |
| Oct 17, 2000 | Expired or cancelled expired Feb 2001 | 595 Mission St | address assignmentDetails
address assignment | ||
| Oct 4, 2000 | Completed final sign-off Nov 2000 | 101 02nd St | Real Enterprises | sign permit-electric, single faced.Details
sign permit-electric, single faced. | |
| Oct 3, 2000 | Completed final sign-off Nov 2000 | 101 02nd St | renovate (e) fire alarm system. add 2 strobes,2 speakers 1 smoke detector & 2 manual pull stationsDetails
renovate (e) fire alarm system. add 2 strobes,2 speakers 1 smoke detector & 2 manual pull stations | $7,500 | |
| Sep 8, 2000 | Completed final sign-off Nov 2000 | 101 02nd St | Ledda Plumbing Inc | relocate fire sprinklers 1st floorDetails
relocate fire sprinklers 1st floor | $1,100 |
| Aug 18, 2000 | Expired or cancelled expired Aug 2001 | 595 Mission St | street spaceDetails
street space | ||
| Aug 8, 2000 | Expired or cancelled expired Dec 2000 | 101 02nd St | signDetails
sign | ||
| Aug 7, 2000 | Expired or cancelled expired Dec 2000 | 101 02nd St | Simplex Grinnell*** See 802591**** | install duct & plenum fire system-ansul-in smog hogs -2 separate systemsDetails
install duct & plenum fire system-ansul-in smog hogs -2 separate systems | $1,500 |
| Jun 17, 2000 | Expired or cancelled expired Jan 2001 | 101 02nd St | revision 9926570. install addition support , mech. platform.Details
revision 9926570. install addition support , mech. platform. | $10,000 | |
| Jun 12, 2000 | Expired or cancelled expired Oct 2000 | 101 02nd St | hood and duct fire systemsDetails
hood and duct fire systems | $4,000 | |
| Jun 1, 2000 | Completed final sign-off Oct 2000 | 101 02nd St | Hathaway Dinwiddie Constr**See 729664*** | oti-2, 5th floor, el, me, l/s, spDetails
oti-2, 5th floor, el, me, l/s, sp | $189,000 |
| May 19, 2000 | Expired or cancelled expired Sep 2000 | 101 02nd St | revise to app #200002182326 provide mech and electricalDetails
revise to app #200002182326 provide mech and electrical | ||
| May 19, 2000 | Expired or cancelled expired May 2001 | 101 02nd St | mechanical, electric, plumbing and kitchen equipmentDetails
mechanical, electric, plumbing and kitchen equipment | $50,000 | |
| May 15, 2000 | Completed final sign-off Oct 2000 | 101 02nd St | Hathaway Dinwiddie Constr**See 729664*** | oti 1 5th fl el me l/s spDetails
oti 1 5th fl el me l/s sp | $134,993 |
| May 15, 2000 | Expired or cancelled expired Nov 2000 | 101 02nd St | Sierra Electric Co | install fire alarm systemDetails
install fire alarm system | $18,100 |
| May 11, 2000 | Completed final sign-off Nov 2000 | 101 02nd St | revise appn #200003144321 life safety 22/f e lsDetails
revise appn #200003144321 life safety 22/f e ls | ||
| May 8, 2000 | Expired or cancelled expired Nov 2000 | 101 02nd St | provide life safety at corridor and electrical & mech workDetails
provide life safety at corridor and electrical & mech work | $15,000 | |
| May 6, 2000 | Expired or cancelled withdrawn Aug 2000 | 101 02nd St | tenant improvement-interior frame, drywall paint&fixtures, mep&fire protection under seperate permitDetails
tenant improvement-interior frame, drywall paint&fixtures, mep&fire protection under seperate permit | $250,000 | |
| May 4, 2000 | Expired or cancelled expired Nov 2000 | 101 02nd St | oti-1, 22nd floor, el, me, l/s, spDetails
oti-1, 22nd floor, el, me, l/s, sp | $20,000 | |
| May 2, 2000 | Expired or cancelled expired Dec 2000 | 101 02nd St | Allied Fire Protection | relocate sprinkler heads for new walls & ceiling on first floorDetails
relocate sprinkler heads for new walls & ceiling on first floor | $5,500 |
| Apr 26, 2000 | Completed final sign-off Oct 2000 | 101 02nd St | Hathaway Dinwiddie Constr**See 729664*** | oti-2 4th floor electrical, mechanlical lifesafty sprinklerDetails
oti-2 4th floor electrical, mechanlical lifesafty sprinkler | $130,000 |
| Apr 19, 2000 | Expired or cancelled expired Nov 2000 | 101 02nd St | Hathaway Dinwiddie Co. | oti-3 fire alarm install new end of line for speaker and strobe circuit oti-3 3/f l/sDetails
oti-3 fire alarm install new end of line for speaker and strobe circuit oti-3 3/f l/s | $20,000 |
| Apr 14, 2000 | Expired or cancelled expired Aug 2000 | 101 02nd St | installationDetails
installation | $1,500 | |
| Apr 13, 2000 | Expired or cancelled expired Aug 2000 | 101 02nd St | revision to app #9926570 revise kitchen designDetails
revision to app #9926570 revise kitchen design | ||
| Mar 29, 2000 | Expired or cancelled expired Apr 2001 | 101 02nd St | oti:2= el, sp, 25th floorDetails
oti:2= el, sp, 25th floor | $67,000 | |
| Mar 21, 2000 | Expired or cancelled expired Apr 2001 | 101 02nd St | Allied Fire Protection | relocate sprinkler heads for new walls & ceilingDetails
relocate sprinkler heads for new walls & ceiling | $500 |
| Mar 17, 2000 | Expired or cancelled expired Apr 2002 | 101 02nd St | Field Construction Inc. | oti-1, el, me, ls, sp 15th floorDetails
oti-1, el, me, ls, sp 15th floor | $350,000 |
| Mar 16, 2000 | Completed final sign-off Nov 2000 | 101 02nd St | Allied Fire Protection | addition of 28 pendant sprinkler heads & 20 upright sprinkler headsDetails
addition of 28 pendant sprinkler heads & 20 upright sprinkler heads | $5,300 |
| Mar 14, 2000 | Completed final sign-off Oct 2000 | 101 02nd St | oti-2: el, l/sDetails
oti-2: el, l/s | $54,000 | |
| Mar 14, 2000 | Completed final sign-off Oct 2000 | 101 02nd St | oti-2: l/s, eleDetails
oti-2: l/s, ele | $54,000 | |
| Mar 3, 2000 | Expired or cancelled expired Sep 2000 | 101 02nd St | oti 3 16th floor, spDetails
oti 3 16th floor, sp | $8,000 | |
| Mar 1, 2000 | Completed final sign-off Oct 2000 | 101 02nd St | oti-1: el, me, l/s, spDetails
oti-1: el, me, l/s, sp | $350,000 | |
| Feb 22, 2000 | Completed final sign-off Nov 2000 | 101 02nd St | oti-1, 22nd floor, el, me, l/s, spDetails
oti-1, 22nd floor, el, me, l/s, sp | $180,000 | |
| Feb 18, 2000 | Expired or cancelled expired Feb 2002 | 101 02nd St | t/i new restaurant.mep and kitchen equipmt under sep permitDetails
t/i new restaurant.mep and kitchen equipmt under sep permit | $75,000 | |
| Feb 18, 2000 | Expired or cancelled expired Mar 2001 | 101 02nd St | Hathaway Dinwiddie Co. | oti-2, 16th floor, el, me, l/sDetails
oti-2, 16th floor, el, me, l/s | $50,000 |
| Feb 16, 2000 | Completed final sign-off Oct 2000 | 101 02nd St | oti-1 24th fl, electrical,mechanical,lifesafty,sprinklerDetails
oti-1 24th fl, electrical,mechanical,lifesafty,sprinkler | $432,000 | |
| Feb 16, 2000 | Completed final sign-off Nov 2000 | 101 02nd St | oti-1, electrical, mechanical,lifesafty,sprinklerDetails
oti-1, electrical, mechanical,lifesafty,sprinkler | $203,000 | |
| Feb 16, 2000 | Completed final sign-off Oct 2000 | 101 02nd St | oti-1 23rd fl electrical,mechanical,lifesafty,sprinklerDetails
oti-1 23rd fl electrical,mechanical,lifesafty,sprinkler | $425,000 | |
| Feb 10, 2000 | Expired or cancelled expired Jun 2000 | 101 02nd St | new sprinkler-relocate 12 headsDetails
new sprinkler-relocate 12 heads | $2,200 | |
| Feb 9, 2000 | Completed final sign-off Oct 2000 | 101 02nd St | oti 2 3rd floor, el & lsDetails
oti 2 3rd floor, el & ls | $8,000 | |
| Feb 7, 2000 | Expired or cancelled expired Feb 2001 | 101 02nd St | oti-1 el, me, l/s, sp 25th floorDetails
oti-1 el, me, l/s, sp 25th floor | $64,500 | |
| Feb 4, 2000 | Expired or cancelled expired Feb 2001 | 101 02nd St | Hathaway Dinwiddie Co. | oti-1 16th fl, el, me, ls, spDetails
oti-1 16th fl, el, me, ls, sp | $300,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hathaway Dinwiddie Co. (26), Novo Construction Inc (6), Richlen Construction (5), Ayoob & Peery Plumbing Co Inc (4), Allied Fire Protection (3), Field Construction Inc. (3), Hathaway Dinwiddie Constr**See 729664*** (3), R L H Fire Protection Inc (3), Cannon Constructors North Inc (2), Pankow Special Projects Lp (2), Pribuss Engineering Inc (2), Principal Builders Inc. (2), Rudolph Commercial Interiors Inc, Rci (2), Young Electric Co (2), Anderson, Rowe & Buckley, Inc., Baxter Electric Inc, California Sign Installation, Gci, Inc, Hp Build, Ledda Plumbing Inc, Mc Millan Electric, Priola Construction, Inc., Real Enterprises, Siemens Bldg Technologies, Siemens Industry, Inc., Sierra Electric Co, Simplex Grinnell*** See 802591****, Taslimi Construction Co Inc, Thunder Electric Inc., Turner Construction Co
- Architects
- Hooks Design (2), Paul Bosman (2), Bonnie Bridges, Douglas Zucker, Hooksasd Hooks Asd, Keith Hooks Design, Mark Cavagnero
- Engineers
- Jeffrey Sacks (2), Amit Wadhwa, Regenald Montyne, Shakeel Ahmed
- Authorized agent-otherss
- Pamela Harris
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.