Block 8901, lot 002
60 Clipper Cove Way #bldg 183
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
59 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 6, 2026 | In progress issued May 2026 | 1 Avenue Of The Palms | Eco Bay Services Inc. | building 450: asbestos abatement for demo permit 202112023515.Details
building 450: asbestos abatement for demo permit 202112023515. | $100 |
| Jan 16, 2026 | In progress issued Jan 2026 | 60 Clipper Cove Wy | Eco Bay Services Inc. | abatement of hazardous material, asbestos, lead, p&b and universal waste. asb#14069Details
abatement of hazardous material, asbestos, lead, p&b and universal waste. asb#14069 | $950,000 |
| Apr 25, 2025 | In progress filed Apr 2025, not yet issued | 60 Clipper Cove Wy | new bar in open existing area in existing historic bldg. work consists of new millwork bar, finishes, bar equipmentDetails
new bar in open existing area in existing historic bldg. work consists of new millwork bar, finishes, bar equipment | $50,000 | |
| Feb 12, 2024 | In progress issued Feb 2024 | 60 Clipper Cove Wy | Yes General Construction Builder Llc | revision to pa# 202302282774, revised equipment layout per sfdph request. relocate 3 hand sinksDetails
revision to pa# 202302282774, revised equipment layout per sfdph request. relocate 3 hand sinks | |
| Feb 5, 2024 | Completed final sign-off Feb 2024 | 60 Clipper Cove Wy | Safe Assurance Fire Protection | install a new fire suppression system for a 9'-6" typer 1 hoodDetails
install a new fire suppression system for a 9'-6" typer 1 hood | $7,500 |
| Sep 11, 2023 | Never finaled filed Sep 2023, never issued | 60 Clipper Cove Wy | revision to bpa#202212027569 to correct occupant loadDetails
revision to bpa#202212027569 to correct occupant load | ||
| Feb 28, 2023 | In progress issued Oct 2023 | 60 Clipper Cove Wy | Yes General Construction Builder Llc | new food service and seating area in e historic building. work consists of new kitchen equipment and finishes, millwork bar, bar equipment, type 1 and 2 hoods. hood/duct fire suppression system under sep permit. (bar scope on sep permit)Details
new food service and seating area in e historic building. work consists of new kitchen equipment and finishes, millwork bar, bar equipment, type 1 and 2 hoods. hood/duct fire suppression system under sep permit. (bar scope on sep permit) | $80,000 |
| Dec 2, 2022 | Completed final sign-off Sep 2023 | 60 Clipper Cove Wy | Yes General Construction Builder Llc | new bar in open existing area in existing historic building. work consists of new mill work bar, finsihes bar equipment.Details
new bar in open existing area in existing historic building. work consists of new mill work bar, finsihes bar equipment. | $50,000 |
| Aug 4, 2022 | Completed final sign-off May 2024 | 60 Clipper Cove Wy | Cal C A D E Construction Inc | renovate (e) storage room by adding a 2-hour fire rated wall to divide a room space of about 1500 sf into (2) rooms, server (716 sf) & storage rooms (770 sf).Details
renovate (e) storage room by adding a 2-hour fire rated wall to divide a room space of about 1500 sf into (2) rooms, server (716 sf) & storage rooms (770 sf). | $20,000 |
| Mar 25, 2022 | Completed final sign-off May 2024 | 1 Avenue Of The Palms | test pile installation for confirmation of pile parameters, test pile array includes 5 steel hp piles as recommended by pile designer in accordance with recommendations of the geor and project for associated with site permit # 201912169619Details
test pile installation for confirmation of pile parameters, test pile array includes 5 steel hp piles as recommended by pile designer in accordance with recommendations of the geor and project for associated with site permit # 201912169619 | $50,000 | |
| Mar 15, 2022 | Completed final sign-off Dec 2023 | 1 Avenue Of The Palms | Cahill Contractors Llc. | ref 201810223762 was destroyed by water damage. remove and replace water damaged finishes (94 units) units 601-604, 615-625, 501-504, 515-525, 401-404, 415-425, 301-325, 201-225.. replace in kind and maintain fire rated assemblies.Details
ref 201810223762 was destroyed by water damage. remove and replace water damaged finishes (94 units) units 601-604, 615-625, 501-504, 515-525, 401-404, 415-425, 301-325, 201-225.. replace in kind and maintain fire rated assemblies. | $10,000 |
| Mar 1, 2022 | Expired or cancelled cancelled Jan 2026 | 1 Avenue Of The Palms | administrative permit to ferry terminal permit package to change address to: 2 avenue of the palms the occupancy group to a3. includes permits: fixed pier 202008182044, steel ferry float 202009164281, aluminum gangway & ramps 202012040242. project architutural drawings 202101122536. mech/elet/plumbDetails
administrative permit to ferry terminal permit package to change address to: 2 avenue of the palms the occupancy group to a3. includes permits: fixed pier 202008182044, steel ferry float 202009164281, aluminum gangway & ramps 202012040242. project architutural drawings 202101122536. mech/elet/plumb | ||
| Jan 24, 2022 | Never finaled issued Mar 2022, no final | 1 Avenue Of The Palms | R & B Equipment Rentals | bathroom bldg - demolish a 1-story, type 5b, bathroom building.Details
bathroom bldg - demolish a 1-story, type 5b, bathroom building. | $1,500 |
| Dec 7, 2021 | Completed final sign-off Feb 2022 | 1 Avenue Of The Palms | Power Engineering Contraction Co. | ferry terminal revision to pa 2019-1120-7799 construction of a submerged rock dike between the concrete sheet pile breakwater & the landing slope at offshore locationDetails
ferry terminal revision to pa 2019-1120-7799 construction of a submerged rock dike between the concrete sheet pile breakwater & the landing slope at offshore location | |
| Dec 2, 2021 | In progress issued May 2026 | 1 Avenue Of The Palms | Eco Bay Services Inc. | bldg 450 - demolish a 3-story, type 5b, office building.Details
bldg 450 - demolish a 3-story, type 5b, office building. | $50,000 |
| Dec 2, 2021 | Completed final sign-off Mar 2022 | 1 Avenue Of The Palms | Plant Construction Co, Lp | bldg 530 - demolish a 1-story, type 5b, garage building.Details
bldg 530 - demolish a 1-story, type 5b, garage building. | $15,000 |
| Nov 24, 2021 | Never finaled issued Mar 2022, no final | 1 Avenue Of The Palms | R & B Equipment Rentals | bldg 485 - to demolish a type v-b, 1-story bldg.Details
bldg 485 - to demolish a type v-b, 1-story bldg. | $10,000 |
| Nov 24, 2021 | Never finaled issued Mar 2022, no final | 1 Avenue Of The Palms | R & B Equipment Rentals | (hydraulic training bldg) - to demolish a type i-b, 1-story bldg.Details
(hydraulic training bldg) - to demolish a type i-b, 1-story bldg. | $10,000 |
| Nov 24, 2021 | Never finaled issued Mar 2022, no final | 1 Avenue Of The Palms | R & B Equipment Rentals | bldg 381 - to demolish a type v-b, 1-story bldg.Details
bldg 381 - to demolish a type v-b, 1-story bldg. | $10,000 |
| Nov 24, 2021 | Never finaled issued Mar 2022, no final | 1 Avenue Of The Palms | R & B Equipment Rentals | bldg 480 - to demolish a type v-b, 1-story bldg.Details
bldg 480 - to demolish a type v-b, 1-story bldg. | $10,000 |
| Nov 24, 2021 | Never finaled issued Mar 2022, no final | 1 Avenue Of The Palms | R & B Equipment Rentals | bldg 458 - to demolish a type iii-b, 1-story bldg.Details
bldg 458 - to demolish a type iii-b, 1-story bldg. | $10,000 |
| Sep 2, 2021 | Expired or cancelled cancelled Jan 2026 | 1 Avenue Of The Palms | gaa field 13th & ave h (treasure island): installation of temps and staging for 1 day music and art event. 3 x stage pieces, 1 x platform for gaivip viewing.Details
gaa field 13th & ave h (treasure island): installation of temps and staging for 1 day music and art event. 3 x stage pieces, 1 x platform for gaivip viewing. | $56,000 | |
| Sep 2, 2021 | Never finaled issued Oct 2021, no final | 1 Avenue Of The Palms | H & M Fire Protection, Inc. | install fire sprinkler underground supply per new apartment building. ref app#201912139581 sDetails
install fire sprinkler underground supply per new apartment building. ref app#201912139581 s | $10,000 |
| Aug 20, 2021 | Completed final sign-off Sep 2021 | 1 Avenue Of The Palms | Certified Fire And Safety | 900 avenue 'd' treasure island - bldg #33a: install ul300 ansul fire system to pretect kitchen hoods and cooking equipment. ref to 2021 0719 4623.Details
900 avenue 'd' treasure island - bldg #33a: install ul300 ansul fire system to pretect kitchen hoods and cooking equipment. ref to 2021 0719 4623. | $29,000 |
| Jun 30, 2021 | Completed final sign-off Jan 2024 | 1 Avenue Of The Palms | Mc Kee And Company Electric | install emergency respones radio covarge systemDetails
install emergency respones radio covarge system | $50,000 |
| Jun 25, 2021 | Never finaled issued Oct 2021, no final | 1 Avenue Of The Palms | Crown Construction San Francisco | temporary tent structure & furniture layout; duration will be 6 months from date of permit issuance.Details
temporary tent structure & furniture layout; duration will be 6 months from date of permit issuance. | $10,000 |
| May 27, 2021 | Completed final sign-off Dec 2021 | 1 Avenue Of The Palms | Silverado Contractors Inc, Plant Construction Co, Lp | bldg 34 - demolish a type v-b, 1-story bldgDetails
bldg 34 - demolish a type v-b, 1-story bldg | $15,000 |
| May 25, 2021 | Never finaled issued Dec 2021, no final | 1 Avenue Of The Palms | Blach+Cahill Joint Venture | priority processing per mayor ed #17-02 to erect 5 stories 1 basement, type v-a over 1-a w/ 3hr podium 117 residential units, 3 retail shell spaces on ground floor, garage with 59 stalls and storage in the basement. treasure island parcel b1Details
priority processing per mayor ed #17-02 to erect 5 stories 1 basement, type v-a over 1-a w/ 3hr podium 117 residential units, 3 retail shell spaces on ground floor, garage with 59 stalls and storage in the basement. treasure island parcel b1 | $55,000,000 |
| Jan 28, 2021 | Completed final sign-off Jan 2023 | 1 Avenue Of The Palms | Power Engineering Contraction Co. | ferry terminal fire protection system - construction of 4" dry standpipe fire protection system for the fixed pier (2020-0818-2044) and ferry float (2020-0916-4281)Details
ferry terminal fire protection system - construction of 4" dry standpipe fire protection system for the fixed pier (2020-0818-2044) and ferry float (2020-0916-4281) | $107,000 |
| Jan 12, 2021 | Completed final sign-off Dec 2022 | 1 Avenue Of The Palms | Power Engineering Contraction Co. | fixed pier utilities- construct power, water, comms and low volts systems on fixed pier-pa 202008182044, ferry float platform-202009164281, ramps, gangway-pa 202012040242Details
fixed pier utilities- construct power, water, comms and low volts systems on fixed pier-pa 202008182044, ferry float platform-202009164281, ramps, gangway-pa 202012040242 | $1,065,000 |
| Jan 12, 2021 | Completed final sign-off Dec 2022 | 1 Avenue Of The Palms | Power Engineering Contraction Co. | treasure island ferry terminal - construction of glass windscreen, roof sheathing and finish schedule on the fixed pier structure. ref pa 202008182044.Details
treasure island ferry terminal - construction of glass windscreen, roof sheathing and finish schedule on the fixed pier structure. ref pa 202008182044. | $3,500,000 |
| Dec 4, 2020 | Completed final sign-off Dec 2022 | 1 Avenue Of The Palms | Power Engineering Contraction Co. | priority plan review treasure island project. const of 2,260 sf of aluminum platforms, mechanically actvatep ramps, and stairs mounted top side of ferry float per pa #202009164281, construction of , 884 sf aluminum gangway connecting ferry loat platforms to fixed pier per pa #202008182044.Details
priority plan review treasure island project. const of 2,260 sf of aluminum platforms, mechanically actvatep ramps, and stairs mounted top side of ferry float per pa #202009164281, construction of , 884 sf aluminum gangway connecting ferry loat platforms to fixed pier per pa #202008182044. | $125,000 |
| Nov 19, 2020 | Completed final sign-off Mar 2026 | 1 Avenue Of The Palms | Suffolk Constr Co. Inc. Dba Suffolk-Roel | priority processing per mayoral ed 17-02. to erect a type 3-a + 5-a over 1a podium, 6-story, (148) residential unit bldg with (1) basement. (bldg c3.4)Details
priority processing per mayoral ed 17-02. to erect a type 3-a + 5-a over 1a podium, 6-story, (148) residential unit bldg with (1) basement. (bldg c3.4) | $61,000,000 |
| Oct 2, 2020 | Expired or cancelled cancelled Jan 2026 | 1 Avenue Of The Palms | Cal C A D E Construction Inc | treasure island: aka 749 9th street t.i.: selective demo of (e) resroom s & doors. new construction of food prip area & non-cooking kitchen including matching tile & finishes.Details
treasure island: aka 749 9th street t.i.: selective demo of (e) resroom s & doors. new construction of food prip area & non-cooking kitchen including matching tile & finishes. | $150,000 |
| Sep 16, 2020 | Completed final sign-off Dec 2022 | 1 Avenue Of The Palms | Power Engineering Contraction Co. | construction of a 42'x135" steel ferry landing float, reference to pa #202008182044 (concrete pier), pa #201911207799 (concrete breakwater) prior work.Details
construction of a 42'x135" steel ferry landing float, reference to pa #202008182044 (concrete pier), pa #201911207799 (concrete breakwater) prior work. | $250,000 |
| Aug 18, 2020 | Completed final sign-off Dec 2022 | 1 Avenue Of The Palms | Power Engineering Contraction Co. | construction of 156' concrete pier spanning shore abutment and (e) steel piles, reference pa #201911207799 for prior work including permitting of (e) steel piles. ferry terminal.Details
construction of 156' concrete pier spanning shore abutment and (e) steel piles, reference pa #201911207799 for prior work including permitting of (e) steel piles. ferry terminal. | $2,250,000 |
| Jun 18, 2020 | Never finaled issued Apr 2021, no final | 1 Avenue Of The Palms | Plant Construction Co, Lp | bldg 3 annex - to demolish a type v-b, 1-story shed.Details
bldg 3 annex - to demolish a type v-b, 1-story shed. | $3,000 |
| Jun 13, 2020 | Completed final sign-off Jan 2021 | 1 Avenue Of The Palms | Plant Construction Co, Lp | bldg 355 - to demolish a type v-b, 1-story bldg.Details
bldg 355 - to demolish a type v-b, 1-story bldg. | $4,000 |
| Jun 13, 2020 | Completed final sign-off Jan 2021 | 1 Avenue Of The Palms | Plant Construction Co, Lp | bldg 384 - to demolish a type v-b, 1-story bldg.Details
bldg 384 - to demolish a type v-b, 1-story bldg. | $6,000 |
| Jun 13, 2020 | Completed final sign-off Jan 2021 | 1 Avenue Of The Palms | Plant Construction Co, Lp | bldg 454 - to demolish a type v-b, 1-story bldg.Details
bldg 454 - to demolish a type v-b, 1-story bldg. | $3,000 |
| Jun 13, 2020 | Completed final sign-off Jan 2021 | 1 Avenue Of The Palms | Plant Construction Co, Lp | bldg 501 - to demolish a type v-b, 1-story storage shed.Details
bldg 501 - to demolish a type v-b, 1-story storage shed. | $3,000 |
| Jun 13, 2020 | Completed final sign-off Jan 2021 | 1 Avenue Of The Palms | Plant Construction Co, Lp | bldg 140 - to demolish a type v-b, 1-story bldg.Details
bldg 140 - to demolish a type v-b, 1-story bldg. | $15,000 |
| Jun 13, 2020 | Completed final sign-off Jan 2021 | 1 Avenue Of The Palms | Plant Construction Co, Lp | bldg 290 - to demolish a type v-b, 1-story bldg.Details
bldg 290 - to demolish a type v-b, 1-story bldg. | $3,000 |
| Jun 13, 2020 | Completed final sign-off Jan 2021 | 1 Avenue Of The Palms | Plant Construction Co, Lp | bldg 520 - to demolish a type v-b, 1-story storage shed.Details
bldg 520 - to demolish a type v-b, 1-story storage shed. | $5,000 |
| Jun 13, 2020 | Completed final sign-off Jan 2021 | 1 Avenue Of The Palms | Plant Construction Co, Lp | bldg 289 - to demolish a type v-b, 1-story storage shed.Details
bldg 289 - to demolish a type v-b, 1-story storage shed. | $3,000 |
| Jun 13, 2020 | Completed final sign-off Jan 2021 | 1 Avenue Of The Palms | Plant Construction Co, Lp | bldg 325 - to demolish a type v-b, 1-story bldg.Details
bldg 325 - to demolish a type v-b, 1-story bldg. | $3,000 |
| Jun 13, 2020 | Completed final sign-off Jan 2021 | 1 Avenue Of The Palms | Plant Construction Co, Lp | bldg 346 & 383 - to demolish a type v-b, 1-story bldg & radio tower.Details
bldg 346 & 383 - to demolish a type v-b, 1-story bldg & radio tower. | $4,000 |
| Mar 5, 2020 | Never finaled issued Mar 2020, no final | 1 Avenue Of The Palms | Cal C A D E Construction Inc | install ada door (not visible from the street)Details
install ada door (not visible from the street) | $8,000 |
| Dec 20, 2019 | Never finaled filed Dec 2019, never issued | 1 Avenue Of The Palms | mayor ed #17-02. priority processing. to erect (31) stories, (2) basement, type 1-a, (265) multifamily, mixed-use building (b,a,r-2) parcel c2.1Details
mayor ed #17-02. priority processing. to erect (31) stories, (2) basement, type 1-a, (265) multifamily, mixed-use building (b,a,r-2) parcel c2.1 | $207,100,000 | |
| Dec 16, 2019 | Completed final sign-off Jan 2020 | 1 Avenue Of The Palms | Cal C A D E Construction Inc | remove 3 windows and replace 3 roller doorsDetails
remove 3 windows and replace 3 roller doors | $10,000 |
| Dec 16, 2019 | Completed final sign-off Dec 2024 | 1 Avenue Of The Palms | Webcor Construction Lp | mayor ed #17-02. priority processing. ab-004 attached. to erect 22 stories, type 1-a, 250 residential units with mixed-used building (b,a,r-2) parcel-c2.4Details
mayor ed #17-02. priority processing. ab-004 attached. to erect 22 stories, type 1-a, 250 residential units with mixed-used building (b,a,r-2) parcel-c2.4 | $130,240,000 |
| Dec 13, 2019 | Completed final sign-off Jun 2024 | 1 Avenue Of The Palms | Nibbi Bros Assoc Inc. | erect (n) (138) 100% affordable multifamily dwelling residence & mixed-used buildingDetails
erect (n) (138) 100% affordable multifamily dwelling residence & mixed-used building | $60,000,000 |
| Nov 20, 2019 | Completed final sign-off Feb 2022 | 1 Avenue Of The Palms | Power Engineering Contraction Co. | construction of new 760' long concrete breakwater constisting of concrete sheet piles,concrete batter piles and concrete cap. in addition, 8 each steel pipe piles will be driven for future construction of a ferry terminal.Details
construction of new 760' long concrete breakwater constisting of concrete sheet piles,concrete batter piles and concrete cap. in addition, 8 each steel pipe piles will be driven for future construction of a ferry terminal. | $15,180,000 |
| Apr 5, 2019 | Never finaled filed Apr 2019, never issued | 1 Avenue Of The Palms | ada barrier removal, elevator replacement, fire alarmsDetails
ada barrier removal, elevator replacement, fire alarms | $1,000,000 | |
| Dec 17, 2018 | Completed final sign-off Apr 2023 | 1 Avenue Of The Palms | De Silva Gates Construction | bldg 243. demolish 1 story shed at 1 ave of palms, treasure islandDetails
bldg 243. demolish 1 story shed at 1 ave of palms, treasure island | $10,000 |
| Dec 17, 2018 | Completed final sign-off Apr 2023 | 1 Avenue Of The Palms | De Silva Gates Construction | bldg 242t. demolish water tank at 1 ave of palms, treasure islandDetails
bldg 242t. demolish water tank at 1 ave of palms, treasure island | $100,000 |
| Dec 17, 2018 | Completed final sign-off Apr 2023 | 1 Avenue Of The Palms | De Silva Gates Construction | bldg 261. demolish 1 story shed at 1 ave of palms, treasure islandDetails
bldg 261. demolish 1 story shed at 1 ave of palms, treasure island | $10,000 |
| Oct 22, 2018 | Completed final sign-off Dec 2023 | 1 Avenue Of The Palms | Cahill Contractors Inc | priority processing.to erect 6 stories, no basement, type i-a & iii-a. 105 units apartment, office, parking, amenity spaces buidling (r-2,b,a-3,s-2). (mayor executive directive 17-02) 100% affordable housing project. maceo may apts project.Details
priority processing.to erect 6 stories, no basement, type i-a & iii-a. 105 units apartment, office, parking, amenity spaces buidling (r-2,b,a-3,s-2). (mayor executive directive 17-02) 100% affordable housing project. maceo may apts project. | $40,000,000 |
| Aug 31, 2018 | Completed final sign-off Jun 2019 | 1 Avenue Of The Palms | Signawest Systems Inc | extend (e) fire alarm system in (e) school bldg to new dorm bldg. ** maher: n/a **Details
extend (e) fire alarm system in (e) school bldg to new dorm bldg. ** maher: n/a ** | $33,000 |