Permit GraphShortlistSan Francisco building permits since 2000

Thomas Morse

License
49457
Board not determined from the city's record: no role or letter places this number
About the state's license search
Search the state's license records (not the contractors board)
Listed as
engineer
Firm
Bkf Engineers
Based in
Redwood City
On San Francisco permits
Jun 2018 to Nov 2022

25 permits since 2000 (engineer on 25 permits): 8 completed, 1 in progress, 16 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
R & B Equipment Rentals (6), Ampco North Inc (5), De Silva Gates Construction (4), C C I Commercial Construction & Improv, Devcon Construction, Gci, Inc, Preston Pipelines Inc
Architects
Albert Costa (2)
Engineers
Christopher Guillard, Diep Nguyen, Edward Rivera, Julio C. Herdocia, Matthew Tropp
Authorized agents
Albert Costa

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in. 1 of 25 have no building type on record and are shown as other.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 29, 2022Completed
final sign-off Apr 2023
28 Bruton StDe Silva Gates Constructionfire only review of generator & fuel storage only. bruton st. pump station generator permit in support of puc infrastructure, plans previosly reviewed& approved by dpw ahead of installation in field, permit intended to facilitate fire dept. inspection of as-built conditions.
Details
Permit
202211297332
Permit issued
Mar 17, 2023
Final sign-off
Apr 3, 2023

fire only review of generator & fuel storage only. bruton st. pump station generator permit in support of puc infrastructure, plans previosly reviewed& approved by dpw ahead of installation in field, permit intended to facilitate fire dept. inspection of as-built conditions.

Open the permit page

Jan 24, 2022Never finaled
issued Mar 2022, no final
1 Avenue Of The PalmsR & B Equipment Rentalsbathroom bldg - demolish a 1-story, type 5b, bathroom building.
Details
Permit
202201246535
Permit issued
Mar 23, 2022

bathroom bldg - demolish a 1-story, type 5b, bathroom building.

Open the permit page

$1,500
Nov 24, 2021Never finaled
issued Mar 2022, no final
1 Avenue Of The PalmsR & B Equipment Rentalsbldg 381 - to demolish a type v-b, 1-story bldg.
Details
Permit
202111243094
Permit issued
Mar 23, 2022

bldg 381 - to demolish a type v-b, 1-story bldg.

Open the permit page

$10,000
Nov 24, 2021Never finaled
issued Mar 2022, no final
1 Avenue Of The PalmsR & B Equipment Rentalsbldg 485 - to demolish a type v-b, 1-story bldg.
Details
Permit
202111243100
Permit issued
Mar 23, 2022

bldg 485 - to demolish a type v-b, 1-story bldg.

Open the permit page

$10,000
Nov 24, 2021Never finaled
issued Mar 2022, no final
1 Avenue Of The PalmsR & B Equipment Rentalsbldg 458 - to demolish a type iii-b, 1-story bldg.
Details
Permit
202111243098
Permit issued
Mar 23, 2022

bldg 458 - to demolish a type iii-b, 1-story bldg.

Open the permit page

$10,000
Nov 24, 2021Never finaled
issued Mar 2022, no final
1 Avenue Of The PalmsR & B Equipment Rentalsbldg 480 - to demolish a type v-b, 1-story bldg.
Details
Permit
202111243099
Permit issued
Mar 23, 2022

bldg 480 - to demolish a type v-b, 1-story bldg.

Open the permit page

$10,000
Nov 24, 2021Never finaled
issued Mar 2022, no final
1 Avenue Of The PalmsR & B Equipment Rentals(hydraulic training bldg) - to demolish a type i-b, 1-story bldg.
Details
Permit
202111243101
Permit issued
Mar 23, 2022

(hydraulic training bldg) - to demolish a type i-b, 1-story bldg.

Open the permit page

$10,000
Mar 24, 2021In progress
issued Sep 2025
900 Sansome StGci, Incchange of use and occupancy from s-2 (parking garage) to b (office) use, including: a new elevator, egress and ada bathroom upgrades
Details
Permit
202103247205
Permit issued
Sep 16, 2025

change of use and occupancy from s-2 (parking garage) to b (office) use, including: a new elevator, egress and ada bathroom upgrades

Open the permit page

$260,000
Oct 8, 2020Completed
final sign-off Nov 2021
20 Heron StC C I Commercial Construction & Improv(n) elevator extension to roof deck, plus new vehicle/man door entrance at rodgers st and new property line windows.
Details
Permit
202010086198
Permit issued
Mar 30, 2021
Final sign-off
Nov 16, 2021

(n) elevator extension to roof deck, plus new vehicle/man door entrance at rodgers st and new property line windows.

Open the permit page

$48,000
Mar 27, 2019Never finaled
filed Mar 2019, never issued
150 04th Ti Stbuilding 343. to demolish a type 5-b, 1-story bldg.
Details
Permit
201903276319

building 343. to demolish a type 5-b, 1-story bldg.

Open the permit page

$15,000
Mar 27, 2019Never finaled
filed Mar 2019, never issued
150 04th Ti Sttida project. hydraulic training school. to demolish a type 1-b, 1-story bldg.
Details
Permit
201903276315

tida project. hydraulic training school. to demolish a type 1-b, 1-story bldg.

Open the permit page

$20,000
Mar 27, 2019Never finaled
filed Mar 2019, never issued
150 04th Ti Sttida project. building 69. to demolish a type 5-b, 1-story bldg.
Details
Permit
201903276321

tida project. building 69. to demolish a type 5-b, 1-story bldg.

Open the permit page

$10,000
Mar 27, 2019Never finaled
filed Mar 2019, never issued
150 04th Ti Sttida project. building 344. to demolish a type 5-b, 1-story bldg.
Details
Permit
201903276318

tida project. building 344. to demolish a type 5-b, 1-story bldg.

Open the permit page

$3,000
Mar 27, 2019Never finaled
filed Mar 2019, never issued
150 04th Ti Sttida project. building 342. to demolish a a type 5-b, 1-story bldg.
Details
Permit
201903276320

tida project. building 342. to demolish a a type 5-b, 1-story bldg.

Open the permit page

$15,000
Mar 27, 2019Never finaled
filed Mar 2019, never issued
150 04th Ti Sttida project. building 458. to demolish a type 3-b, 1-story bldg.
Details
Permit
201903276317

tida project. building 458. to demolish a type 3-b, 1-story bldg.

Open the permit page

$2,000
Feb 14, 2019Completed
final sign-off Jan 2020
1080 Avenue MAmpco North Incdemolish treasure island building 330. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.
Details
Permit
201902142920
Permit issued
Mar 13, 2019
Final sign-off
Jan 22, 2020

demolish treasure island building 330. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.

Open the permit page

$50,000
Feb 14, 2019Completed
final sign-off Jan 2020
1080 Avenue MAmpco North Inc, De Silva Gates Constructiondemolish treasure island building 216. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.
Details
Permit
201902142919
Permit issued
Mar 13, 2019
Final sign-off
Jan 22, 2020

demolish treasure island building 216. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.

Open the permit page

$50,000
Feb 14, 2019Completed
final sign-off Jan 2020
1080 Avenue MAmpco North Incdemolish treasure island building 670. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.
Details
Permit
201902142922
Permit issued
Mar 13, 2019
Final sign-off
Jan 22, 2020

demolish treasure island building 670. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.

Open the permit page

$50,000
Feb 14, 2019Completed
final sign-off Jan 2020
1080 Avenue MAmpco North Incdemolish treasure island building 215. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.
Details
Permit
201902142918
Permit issued
Mar 13, 2019
Final sign-off
Jan 22, 2020

demolish treasure island building 215. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.

Open the permit page

$50,000
Feb 14, 2019Completed
final sign-off Jan 2020
1080 Avenue MAmpco North Incdemolish treasure island building 671. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.
Details
Permit
201902142921
Permit issued
Mar 13, 2019
Final sign-off
Jan 22, 2020

demolish treasure island building 671. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.

Open the permit page

$50,000
Sep 28, 2018Never finaled
issued Oct 2018, no final
2500 Turk BlPreston Pipelines Incstudent housing 10" fire water relocation.
Details
Permit
201809281804
Permit issued
Oct 11, 2018

student housing 10" fire water relocation.

Open the permit page

Aug 14, 2018Never finaled
issued Aug 2018, no final
2500 Turk Blutlities corridor from turk to the buildings. collection of stormwater from the buildings to the stormwater infiltration field. pg&e joint trench (electric & gas) is by pg&e.
Details
Permit
201808147321
Permit issued
Aug 22, 2018

utlities corridor from turk to the buildings. collection of stormwater from the buildings to the stormwater infiltration field. pg&e joint trench (electric & gas) is by pg&e.

Open the permit page

$1,235,000
Jul 3, 2018Never finaled
filed Jul 2018, never issued
1080 Avenue MDe Silva Gates Constructiondemolish treasure island buildings 215, 216, 330, 670, 671. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.
Details
Permit
201807033718

demolish treasure island buildings 215, 216, 330, 670, 671. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.

Open the permit page

$250,000
Jun 29, 2018Never finaled
filed Jun 2018, never issued
1080 Avenue MDe Silva Gates Constructiondemolish treasure island builidngs 215, 216, 330, 670, 671, type vb,3b,1a,1b, warehouse/office vacant building. demolition for preparation of pad for new treasure island wastewater treatment facility.
Details
Permit
201806293399

demolish treasure island builidngs 215, 216, 330, 670, 671, type vb,3b,1a,1b, warehouse/office vacant building. demolition for preparation of pad for new treasure island wastewater treatment facility.

Open the permit page

$250,000
Jun 22, 2018Completed
final sign-off Mar 2024
2500 Turk BlDevcon Constructiondesign of a temp shoring & permanent retaining wall system for the lone mountain sobrato hall project @ usf. the excavation with cuts upt o 28 ft. will be shored using temp & permanent tieback soldier beams. ref pa# 2016/11/30/3815-s (east bldg) & pa# 2016/11/30/3820-s (west bldg)
Details
Permit
201806222663
Permit issued
Sep 18, 2018
Final sign-off
Mar 21, 2024

design of a temp shoring & permanent retaining wall system for the lone mountain sobrato hall project @ usf. the excavation with cuts upt o 28 ft. will be shored using temp & permanent tieback soldier beams. ref pa# 2016/11/30/3815-s (east bldg) & pa# 2016/11/30/3820-s (west bldg)

Open the permit page

$909,000