Christopher Guillard
- Listed as
- architect, engineer
- Firm
- Conger Moss Guillard
- Based in
- Sf
- On San Francisco permits
- Dec 2015 to Jul 2025
6 permits since 2000 (architect on 5 permits, engineer on 1 permit): 3 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 23, 2025 | In progress filed Jul 2025, not yet issued | 552 Folsom St | proj-25-0616: under ramp park: construct 2-story, type 5b, office/ assembly b & a-2Details
proj-25-0616: under ramp park: construct 2-story, type 5b, office/ assembly b & a-2 | $5,000,000 | |
| Jul 23, 2025 | In progress filed Jul 2025, not yet issued | 46 Clementina St | proj-25-0615: under ramp park: construct 1-story, type 5b, future restaurant, a-2Details
proj-25-0615: under ramp park: construct 1-story, type 5b, future restaurant, a-2 | $1,000,000 | |
| Jan 29, 2024 | In progress issued Feb 2024 | 39 Tehama St | Webcor Construction Lp | revision to pa 202303073201 addition of artwork/associated support structure & lighting (lighting is a deferred permit). removal & replacement of the existing concrete topping slab at the exterior plaza deck.Details
revision to pa 202303073201 addition of artwork/associated support structure & lighting (lighting is a deferred permit). removal & replacement of the existing concrete topping slab at the exterior plaza deck. | $1,000,000 |
| Nov 29, 2022 | Completed final sign-off Apr 2023 | 28 Bruton St | De Silva Gates Construction | fire only review of generator & fuel storage only. bruton st. pump station generator permit in support of puc infrastructure, plans previosly reviewed& approved by dpw ahead of installation in field, permit intended to facilitate fire dept. inspection of as-built conditions.Details
fire only review of generator & fuel storage only. bruton st. pump station generator permit in support of puc infrastructure, plans previosly reviewed& approved by dpw ahead of installation in field, permit intended to facilitate fire dept. inspection of as-built conditions. | |
| Mar 18, 2019 | Completed final sign-off Nov 2020 | 200 John F Shelley Dr | Cazadoro Construction | renovation of a picnic area and playground. replacement of asphalt paths, concrete and site furnishing. upgrade to utilities including irrigation & drainage. new playground safety surfacing & equip installationDetails
renovation of a picnic area and playground. replacement of asphalt paths, concrete and site furnishing. upgrade to utilities including irrigation & drainage. new playground safety surfacing & equip installation | $750,000 |
| Dec 21, 2015 | Completed final sign-off Jul 2018 | 3861 24th St | convert parking lot to park plaza. wood and metal trellis , wood and metal canopy structure, childrens play areaDetails
convert parking lot to park plaza. wood and metal trellis , wood and metal canopy structure, childrens play area | $250,000 |