Shauna D. Dunton
- Listed as
- engineer
- Firm
- Lotus Water Engineering
- Based in
- Sf
- On San Francisco permits
- Mar 2019 to Apr 2026
6 permits since 2000 (engineer on 6 permits): 4 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 16, 2026 | In progress issued Jun 2026 | 501 Cambridge St | Jensen Corp Landscape Contractors | ext improvements to (e) parking lot and playyard: removal of (e) pavement to create bioretention basin & permeable pavers to capture & treat stormwater. additionally underutilized parking lot at se corner will be depaved to be biohabitat. new drain & irrigation systems.Details
ext improvements to (e) parking lot and playyard: removal of (e) pavement to create bioretention basin & permeable pavers to capture & treat stormwater. additionally underutilized parking lot at se corner will be depaved to be biohabitat. new drain & irrigation systems. | $600,000 |
| Jan 9, 2025 | Completed final sign-off May 2026 | 499 Alabama St | Beam Construction Enterprises Inc | reroute roof water to 10k gal above ground cistern anchored to new reinforced concrete pad in (e) parking lot. extend rainwater piping from interior of theater bldg to upper floor windows,along face buiding to suport posts along fence and then over to cistern.construction of bioretention plantersDetails
reroute roof water to 10k gal above ground cistern anchored to new reinforced concrete pad in (e) parking lot. extend rainwater piping from interior of theater bldg to upper floor windows,along face buiding to suport posts along fence and then over to cistern.construction of bioretention planters | $380,000 |
| Dec 28, 2022 | Completed final sign-off Jun 2026 | 1140 07th St | Hathaway Dinwiddie Co. | revision to bpa# 202207087976. storm water control plans for pa# 201806283199. for pid review only.Details
revision to bpa# 202207087976. storm water control plans for pa# 201806283199. for pid review only. | |
| Jun 26, 2020 | Completed final sign-off Apr 2024 | 1140 07th St | Hathaway Dinwiddie Co. | test pile program associated with 201806283199, cordon-johnson & assoct will install 4 sacraficial test piles, 4 sacrificial reaction piles & perform load testing in advance of installation of appox production piles.Details
test pile program associated with 201806283199, cordon-johnson & assoct will install 4 sacraficial test piles, 4 sacrificial reaction piles & perform load testing in advance of installation of appox production piles. | $100,000 |
| Feb 14, 2020 | Expired or cancelled expired Jun 2026 | 1140 07th St | Hathaway Dinwiddie Co. | pre construction grading and ground improvement associated w/ pa# 2018-0628-3199.Details
pre construction grading and ground improvement associated w/ pa# 2018-0628-3199. | |
| Mar 18, 2019 | Completed final sign-off Nov 2020 | 200 John F Shelley Dr | Cazadoro Construction | renovation of a picnic area and playground. replacement of asphalt paths, concrete and site furnishing. upgrade to utilities including irrigation & drainage. new playground safety surfacing & equip installationDetails
renovation of a picnic area and playground. replacement of asphalt paths, concrete and site furnishing. upgrade to utilities including irrigation & drainage. new playground safety surfacing & equip installation | $750,000 |