Permit GraphShortlistSan Francisco building permits since 2000

Jeanne Gang

License
C34329
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect, authorized agent-others
Firm
Studio Gang Architects
Based in
Chicago
On San Francisco permits
Jul 2006 to Sep 2025

24 permits since 2000 (architect on 12 permits, authorized agent-others on 12 permits): 17 completed, 2 in progress, 3 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Hathaway Dinwiddie Co. (5), Achill Beg Construction Inc (4), Cannon Constructors North Inc (4), Lend Lease (Us) Construction Inc (2), Peacock Construction
Architects
Christiani Johnson
Engineers
Kevin O'connor (4), Brady Engineering, Paul Mcgrath, Ron Klemencic, Shauna D. Dunton, Susanna See
Authorized agents
Edward Damien Conlon

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 25, 2025In progress
filed Sep 2025, not yet issued
365 Toni Stone Cgproj-25-0620: priority process: rev to arch + mep to document 2hr rating & 90-min door for level 1 mpoe room separation. ref b-2022-0127 (addendum #3) & b-2023-0252 (rev to addendum #3). dbi ref 201910073784 s3 & 202312293282 (rev to addendum #3). and to document revised location of fsd-1 1-6
Details
Permit
202509165349

proj-25-0620: priority process: rev to arch + mep to document 2hr rating & 90-min door for level 1 mpoe room separation. ref b-2022-0127 (addendum #3) & b-2023-0252 (rev to addendum #3). dbi ref 201910073784 s3 & 202312293282 (rev to addendum #3). and to document revised location of fsd-1 1-6

Open the permit page

Aug 6, 2024Completed
final sign-off Jun 2026
1140 07th StHathaway Dinwiddie Co.rev to pa 201806283199-s3: to document approved assembly loads.
Details
Permit
202408068065
Permit issued
Aug 8, 2024
Final sign-off
Jun 4, 2026

rev to pa 201806283199-s3: to document approved assembly loads.

Open the permit page

Jul 24, 2024Completed
final sign-off Jun 2026
1140 07th StHathaway Dinwiddie Co.revision to bpa 201806283199 s3 interior updated spaces provided in level 2 of irwin and hooper pavilions, as well as levels 3-4 of hooper pavilion 1-hr fire separation added between levels 1 and 2 of hooper pavilion at group a occupancy. back check hours to be applied, dmj 07/23/2024;
Details
Permit
202407166537
Permit issued
Sep 9, 2025
Final sign-off
Jun 4, 2026

revision to bpa 201806283199 s3 interior updated spaces provided in level 2 of irwin and hooper pavilions, as well as levels 3-4 of hooper pavilion 1-hr fire separation added between levels 1 and 2 of hooper pavilion at group a occupancy. back check hours to be applied, dmj 07/23/2024;

Open the permit page

Jan 22, 2024Completed
final sign-off Sep 2024
160 Folsom StPeacock Constructionstorage locker to be relocated, signage to be replaced to comply with cbc 11b, stanchion to be replaced, cane detect rail added, window covering to be relocated, doors to be adjuste, new ramp configurations to be constructed including adjustments to landing, slope and handrail mounting, electrical..
Details
Permit
202401224358
Permit issued
Apr 25, 2024
Final sign-off
Sep 18, 2024

storage locker to be relocated, signage to be replaced to comply with cbc 11b, stanchion to be replaced, cane detect rail added, window covering to be relocated, doors to be adjuste, new ramp configurations to be constructed including adjustments to landing, slope and handrail mounting, electrical..

Open the permit page

$200,000
Dec 29, 2023In progress
filed Dec 2023, not yet issued
365 Toni Stone Cgproj-23-0563: prority process - mayor dir# 17-02. mou proj port of sf: revision to 2019-1007-3784 s3 / arch + mep addendum s3. revision to port application # b-2022-0127 & dbi pa #201910073784 s3. aka mission rock-bldg f.
Details
Permit
202312293282

proj-23-0563: prority process - mayor dir# 17-02. mou proj port of sf: revision to 2019-1007-3784 s3 / arch + mep addendum s3. revision to port application # b-2022-0127 & dbi pa #201910073784 s3. aka mission rock-bldg f.

Open the permit page

Dec 28, 2022Completed
final sign-off Jun 2026
1140 07th StHathaway Dinwiddie Co.revision to bpa# 202207087976. storm water control plans for pa# 201806283199. for pid review only.
Details
Permit
202212289311
Permit issued
Feb 24, 2023
Final sign-off
Jun 4, 2026

revision to bpa# 202207087976. storm water control plans for pa# 201806283199. for pid review only.

Open the permit page

Aug 16, 2022Never finaled
filed Aug 2022, never issued
1051 03rd Stproj mayoral directive 17-02. mou port priority processing (bldg #f). tower crane safety permit. ref pa #202206287214 for approved tower crane foundation. ref # pa #201910073784-s2 for the approved superstructure tie-ins. per ab-023
Details
Permit
202208160659

proj mayoral directive 17-02. mou port priority processing (bldg #f). tower crane safety permit. ref pa #202206287214 for approved tower crane foundation. ref # pa #201910073784-s2 for the approved superstructure tie-ins. per ab-023

Open the permit page

Jul 8, 2022Completed
final sign-off Jun 2026
1140 07th StHathaway Dinwiddie Co.storm water control plans for pa# 2018-0628-3199. for pid review only.
Details
Permit
202207087976
Permit issued
Oct 4, 2022
Final sign-off
Jun 4, 2026

storm water control plans for pa# 2018-0628-3199. for pid review only.

Open the permit page

Jun 29, 2022Expired or cancelled
withdrawn Jul 2022
1140 07th StHathaway Dinwiddie Co.administratvie permit for dph review of site mitigation compliance to start work associated with site permit 2018-0628-3199 per sfbc 106a.3.2.4.2
Details
Permit
202206297367

administratvie permit for dph review of site mitigation compliance to start work associated with site permit 2018-0628-3199 per sfbc 106a.3.2.4.2

Open the permit page

Nov 15, 2019Completed
final sign-off May 2022
160 Folsom StLend Lease (Us) Construction Increvision to pa# 2014/06/25/9481-s5 (arch / mep): update amenity space design. revise property line retaining wall design. ** maher: n/a **
Details
Permit
201911157403
Permit issued
Jul 2, 2020
Final sign-off
May 9, 2022

revision to pa# 2014/06/25/9481-s5 (arch / mep): update amenity space design. revise property line retaining wall design. ** maher: n/a **

Open the permit page

Oct 7, 2019Never finaled
filed Oct 2019, never issued
365 Toni Stone Cgproj-19-0275. mayor dir# 17-02. mou proj port of sf. priority processing. (building f) to erect 23 stories, 1 basementm, type i-a, 258 residential units with retail, office, restaurant, assembly, mix use (r-2,m,b,a-2,a-3)
Details
Permit
201910073784

proj-19-0275. mayor dir# 17-02. mou proj port of sf. priority processing. (building f) to erect 23 stories, 1 basementm, type i-a, 258 residential units with retail, office, restaurant, assembly, mix use (r-2,m,b,a-2,a-3)

Open the permit page

$99,907,840
Jun 25, 2014Expired or cancelled
expired Oct 2024
160 Folsom StLend Lease (Us) Construction Incto erect 40 stories, 2 basements, 390 units residential & retail building.
Details
Permit
201406259481
Permit issued
Dec 30, 2016

to erect 40 stories, 2 basements, 390 units residential & retail building.

Open the permit page

$150,000,000
Feb 3, 2011Completed
final sign-off Jul 2017
2425 Larkin StAchill Beg Construction Inctemporary shoring & permanent underpinning due to adjacent construction under separate permits 2008-10-27-5223, 2010-09-27-1690 & 2010-09-27-1691.
Details
Permit
201102039629
Permit issued
Nov 9, 2011
Final sign-off
Jul 26, 2017

temporary shoring & permanent underpinning due to adjacent construction under separate permits 2008-10-27-5223, 2010-09-27-1690 & 2010-09-27-1691.

Open the permit page

$47,000
Feb 3, 2011Completed
final sign-off Jul 2017
2401 Larkin StAchill Beg Construction Inctemporary shoring & permanent underpinning due to adjacent construction under separate permits 2008-10-27-5223, 2010-09-27-1690 & 2010-09-27-1691.
Details
Permit
201102039624
Permit issued
Nov 9, 2011
Final sign-off
Jul 26, 2017

temporary shoring & permanent underpinning due to adjacent construction under separate permits 2008-10-27-5223, 2010-09-27-1690 & 2010-09-27-1691.

Open the permit page

$72,000
Feb 3, 2011Completed
final sign-off Jul 2017
2417 Larkin StAchill Beg Construction Inctemporary shoring & permanent underpinning due to adjacent construction under separate permits 2008-10-27-5223, 2010-09-27-1690 & 2010-09-27-1691.
Details
Permit
201102039628
Permit issued
Nov 9, 2011
Final sign-off
Jul 26, 2017

temporary shoring & permanent underpinning due to adjacent construction under separate permits 2008-10-27-5223, 2010-09-27-1690 & 2010-09-27-1691.

Open the permit page

$47,000
Feb 3, 2011Completed
final sign-off Jul 2017
2415 Larkin StAchill Beg Construction Inctemporary shoring & permanent underpinning due to adjacent construction under separate permits 2008-10-27-5223, 2010-09-27-1690 & 2010-09-27-1691.
Details
Permit
201102039627
Permit issued
Nov 9, 2011
Final sign-off
Jul 26, 2017

temporary shoring & permanent underpinning due to adjacent construction under separate permits 2008-10-27-5223, 2010-09-27-1690 & 2010-09-27-1691.

Open the permit page

$72,000
Oct 26, 2010Completed
final sign-off Sep 2011
1167 Market StCannon Constructors North Incdemo portn 4 stry wing of (e) bldg closest to mission st. remv 66 units. maintain (e) fire protc,sanity safeguards&strl soundness.comply w/sec 3403.1 to assure tenant safety,adj units will be vacated to maint safguards during const. all wk under this permit is consis w/dev't agrmt 6/2007. entr into
Details
Permit
201010263766
Permit issued
Dec 14, 2010
Final sign-off
Sep 20, 2011

demo portn 4 stry wing of (e) bldg closest to mission st. remv 66 units. maintain (e) fire protc,sanity safeguards&strl soundness.comply w/sec 3403.1 to assure tenant safety,adj units will be vacated to maint safguards during const. all wk under this permit is consis w/dev't agrmt 6/2007. entr into

Open the permit page

$1,200,000
Sep 20, 2010Completed
final sign-off Jun 2011
857 Jamestown AvCannon Constructors North Incto complete work and obtain final inspection for work approved under pa 9924079s
Details
Permit
201009201205
Permit issued
Sep 22, 2010
Final sign-off
Jun 29, 2011

to complete work and obtain final inspection for work approved under pa 9924079s

Open the permit page

$176,814
Sep 20, 2010Completed
final sign-off Jun 2011
861 Jamestown AvCannon Constructors North Incto complete work and obtain final inspection for work approved under pa 9924081s
Details
Permit
201009201196
Permit issued
Sep 22, 2010
Final sign-off
Jun 29, 2011

to complete work and obtain final inspection for work approved under pa 9924081s

Open the permit page

$415,645
Sep 20, 2010Completed
final sign-off Jun 2011
855 Jamestown AvCannon Constructors North Incto complete work and obtain final inspection for work approved under pa #9924077s
Details
Permit
201009201195
Permit issued
Sep 22, 2010
Final sign-off
Jun 29, 2011

to complete work and obtain final inspection for work approved under pa #9924077s

Open the permit page

$2,629,155
Jun 15, 2010Never finaled
issued Aug 2010, no final
723 Taylor Stfull mech re-design to bldg under constr 2005-05-02-1333/s. no chg to bldg exterior, height or bulk review under 2001 code-as-built revisions-correct record fire did not review issued addenda 2 for arch & mech.
Details
Permit
201006154517
Permit issued
Aug 2, 2010

full mech re-design to bldg under constr 2005-05-02-1333/s. no chg to bldg exterior, height or bulk review under 2001 code-as-built revisions-correct record fire did not review issued addenda 2 for arch & mech.

Open the permit page

Apr 30, 2010Completed
final sign-off May 2010
1517 Taraval Stchange occupancy class indicated on issued permit appl.#200903123986 from r-2/b/m to r-2/b. add lever to bathroom door.
Details
Permit
201004301512
Permit issued
May 4, 2010
Final sign-off
May 18, 2010

change occupancy class indicated on issued permit appl.#200903123986 from r-2/b/m to r-2/b. add lever to bathroom door.

Open the permit page

Apr 30, 2010Completed
final sign-off May 2010
1519 Taraval Stchange occupancy class indicated on issued permit #200903123988 from r-2/b/m to r-2/b. add lever hardware to bathroom door.
Details
Permit
201004301509
Permit issued
May 4, 2010
Final sign-off
May 18, 2010

change occupancy class indicated on issued permit #200903123988 from r-2/b/m to r-2/b. add lever hardware to bathroom door.

Open the permit page

Jul 14, 2006Completed
final sign-off Oct 2014
1844 Market Stto erect 8 stories, 113 dwelling units of residential / retail / parking / assembly building.
Details
Permit
200607146588
Permit issued
Jul 17, 2007
Final sign-off
Oct 31, 2014

to erect 8 stories, 113 dwelling units of residential / retail / parking / assembly building.

Open the permit page

$33,800,000