Lend Lease (Us) Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Mar 2023
- Last 24 months
- 0 permits filed
104 permits since 2000: 76 completed, 1 in progress, 17 never finaled, 10 expired or cancelled.
Of the 17 never-finaled permits, 5 are 3 to 5 years old, 10 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 104.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 7, 2023 | Never finaled issued Mar 2023, no final | 30 Van Ness Av | pid review of plumbing systems for stormwater control plan compliance. ref#2019-1213-9539 s.Details
pid review of plumbing systems for stormwater control plan compliance. ref#2019-1213-9539 s. | |
| Feb 10, 2023 | Completed final sign-off Sep 2024 | 160 Folsom St | to renew pa#201406259481 & 201703222036 for final inspection onlyDetails
to renew pa#201406259481 & 201703222036 for final inspection only | |
| Aug 10, 2022 | In progress issued Jun 2025 | 30 Van Ness Av | rev 202103227002: supplemental level 3 bracing of (e) support of excavation system for extended design live. nc 4.7.25.Details
rev 202103227002: supplemental level 3 bracing of (e) support of excavation system for extended design live. nc 4.7.25. | |
| Jun 29, 2022 | Never finaled issued Jun 2022, no final | 1446 Market St | new power & signal devices thru out the space new 2019 t-24 complaint lighting & controls. ref to t.i. 2021 1005 9840Details
new power & signal devices thru out the space new 2019 t-24 complaint lighting & controls. ref to t.i. 2021 1005 9840 | $5,000 |
| Feb 1, 2022 | Never finaled issued Feb 2022, no final | 30 Van Ness Av | design and install 2 new 8" fire service off of existing 8" main on fell street. ref site permit 201912139539.Details
design and install 2 new 8" fire service off of existing 8" main on fell street. ref site permit 201912139539. | $10,000 |
| Oct 5, 2021 | Never finaled issued Dec 2021, no final | 1446 Market St | t.i. work includes selective removal and replacement of interior elements including non structural partitions doors and partital ceilings for field office on ground fl. deferred submittals of fire sprinklers, fire alarm, mep and signage.Details
t.i. work includes selective removal and replacement of interior elements including non structural partitions doors and partital ceilings for field office on ground fl. deferred submittals of fire sprinklers, fire alarm, mep and signage. | $75,000 |
| Aug 31, 2021 | Completed final sign-off Mar 2022 | 950 Market St | exterior building maintenance eq of roof. ref pa# 201602089004Details
exterior building maintenance eq of roof. ref pa# 201602089004 | |
| Mar 22, 2021 | Never finaled issued Jul 2022, no final | 30 Van Ness Av | temporary shoring + excavation consisting of an internally braced csm shoring wall. ref pa# 201912139539.Details
temporary shoring + excavation consisting of an internally braced csm shoring wall. ref pa# 201912139539. | |
| Nov 5, 2020 | Completed final sign-off May 2022 | 160 Folsom St | revision to the issued s10 ( f0, piping & generator) re pa # 2014-0625-9481. clouded area on reused f0-1 & f0-5, show rated pirtek r17-08 seamless flexible fuel oil supply & return hoses between the generator connection points & the sch. 40 fuel oil piping.Details
revision to the issued s10 ( f0, piping & generator) re pa # 2014-0625-9481. clouded area on reused f0-1 & f0-5, show rated pirtek r17-08 seamless flexible fuel oil supply & return hoses between the generator connection points & the sch. 40 fuel oil piping. | $205 |
| Sep 3, 2020 | Completed final sign-off Nov 2021 | 30 Van Ness Av | selective interior demolition for abatment per ab-017. mayoral ed 17.02Details
selective interior demolition for abatment per ab-017. mayoral ed 17.02 | $100,000 |
| Dec 13, 2019 | Never finaled issued Aug 2021, no final | 30 Van Ness Av | (e) walls to remain - (n) high rise bldg w/ appoxi 853,400 gsf/515'-4" tall w/ family/office mixed use type 1 construction. including a grd flr residential lobby, 5000 s.f. retail space, 2 below grade basement parking, 7 levels of office w/ terraces, residences from level 11-47. total 348 units.Details
(e) walls to remain - (n) high rise bldg w/ appoxi 853,400 gsf/515'-4" tall w/ family/office mixed use type 1 construction. including a grd flr residential lobby, 5000 s.f. retail space, 2 below grade basement parking, 7 levels of office w/ terraces, residences from level 11-47. total 348 units. | $230,000,000 |
| Nov 15, 2019 | Completed final sign-off May 2022 | 160 Folsom St | revision to pa# 2014/06/25/9481-s5 (arch / mep): update amenity space design. revise property line retaining wall design. ** maher: n/a **Details
revision to pa# 2014/06/25/9481-s5 (arch / mep): update amenity space design. revise property line retaining wall design. ** maher: n/a ** | |
| Nov 5, 2019 | Never finaled issued Nov 2019, no final | 221 Main St | 1/f: install new pre manufactured ramp along south elevation bldg on level 01/ground level which is exterior. temporary rerouting of extg egress path from extg to public way. maher n/a.Details
1/f: install new pre manufactured ramp along south elevation bldg on level 01/ground level which is exterior. temporary rerouting of extg egress path from extg to public way. maher n/a. | $8,000 |
| May 20, 2019 | Completed final sign-off Aug 2021 | 950 Market St | foundation for west tower crane at 950 market st. erection of temporay tower crane. refgerence to site permit application #201602089004s.Details
foundation for west tower crane at 950 market st. erection of temporay tower crane. refgerence to site permit application #201602089004s. | $206,500 |
| May 20, 2019 | Completed final sign-off Mar 2022 | 950 Market St | erect of east temporary tower crane at 950 market st. foundation for east towner carne. reference to site permit application #201602089004s.Details
erect of east temporary tower crane at 950 market st. foundation for east towner carne. reference to site permit application #201602089004s. | $206,500 |
| Feb 26, 2019 | Expired or cancelled withdrawn Mar 2019 | 160 Folsom St | exterior framing submittal (ref appln #201406259481-s)Details
exterior framing submittal (ref appln #201406259481-s) | |
| Dec 17, 2018 | Completed final sign-off Jan 2019 | 19 Tehama St | comply with nov #201806045. repair damaged siding, flashing and guardrail at the rear of the building in-kind.Details
comply with nov #201806045. repair damaged siding, flashing and guardrail at the rear of the building in-kind. | $1,500 |
| Nov 14, 2018 | Completed final sign-off Mar 2022 | 950 Market St | soil/ground improvementDetails
soil/ground improvement | |
| Nov 14, 2018 | Completed final sign-off Mar 2022 | 950 Market St | construction of piers below gradeDetails
construction of piers below grade | |
| Oct 9, 2018 | Completed final sign-off May 2022 | 160 Folsom St | revision to issued pa #201802070641 (tower crane 1 tie in) which called for 2 tie-in locations. revised drawings call for 3 tie-in locations with revised reactions. ref pa #201406259481-s. ** maher: n/a **Details
revision to issued pa #201802070641 (tower crane 1 tie in) which called for 2 tie-in locations. revised drawings call for 3 tie-in locations with revised reactions. ref pa #201406259481-s. ** maher: n/a ** | $25,000 |
| Jul 10, 2018 | Completed final sign-off Aug 2024 | 950 Market St | excavation for new 13 story hotel, retail and residential bldg.Details
excavation for new 13 story hotel, retail and residential bldg. | |
| Jul 10, 2018 | Completed final sign-off Mar 2022 | 950 Market St | shoring for new 13 story hotel, retail, and residential buildingDetails
shoring for new 13 story hotel, retail, and residential building | |
| Jun 14, 2018 | Completed final sign-off May 2022 | 160 Folsom St | garage entry ramp - excavation shoring system comprised of wood lagging system with soldier beams in addtion to the original shoring pa #2016-0621-0505 and excavation pa #2016-0621-0515. (ref pa #2014-0625-9481 s)Details
garage entry ramp - excavation shoring system comprised of wood lagging system with soldier beams in addtion to the original shoring pa #2016-0621-0505 and excavation pa #2016-0621-0515. (ref pa #2014-0625-9481 s) | $250,000 |
| May 2, 2018 | Completed final sign-off May 2022 | 160 Folsom St | structural revisions to the permitted plans associated with pa #2014-0625-9481 s2 with upgrades for level 1 structural framing plan & associated reinforcing plans & details per the attached clouded changes noted as "revision #9 ccd-008.1"Details
structural revisions to the permitted plans associated with pa #2014-0625-9481 s2 with upgrades for level 1 structural framing plan & associated reinforcing plans & details per the attached clouded changes noted as "revision #9 ccd-008.1" | |
| Feb 7, 2018 | Completed final sign-off May 2022 | 160 Folsom St | tower crane #1 tie-in (ref pa #2014-0625-9481 s)Details
tower crane #1 tie-in (ref pa #2014-0625-9481 s) | $150,000 |
| Feb 7, 2018 | Completed final sign-off May 2022 | 160 Folsom St | tower crane #2 foundation (ref pa #2014-0625-9481 s)Details
tower crane #2 foundation (ref pa #2014-0625-9481 s) | $50,000 |
| Feb 6, 2018 | Never finaled issued Feb 2018, no final | 33 Tehama St | to erect illuminate electrical sign. maher n/aDetails
to erect illuminate electrical sign. maher n/a | $11,600 |
| Feb 6, 2018 | Completed final sign-off Apr 2018 | 33 Tehama St | evacuation maps. n/a for maherDetails
evacuation maps. n/a for maher | $18,270 |
| Jan 10, 2018 | Never finaled issued Feb 2018, no final | 33 Tehama St | install non-electric projecting wall sign "loading i6""Details
install non-electric projecting wall sign "loading i6"" | |
| Jan 10, 2018 | Never finaled issued Feb 2018, no final | 33 Tehama St | install non-electric projecting wall sign "33 tehama resident parking"Details
install non-electric projecting wall sign "33 tehama resident parking" | $1,450 |
| Jan 10, 2018 | Never finaled issued Feb 2018, no final | 33 Tehama St | install non-electric single faced wall sign "33 tehama"Details
install non-electric single faced wall sign "33 tehama" | $3,475 |
| Jan 9, 2018 | Completed final sign-off Mar 2019 | 1000 03rd St | revision & corrections to fsd matrix. revisions & corrections to smoke control panel. revise application #201408133775, addenda 4 mep. maher naDetails
revision & corrections to fsd matrix. revisions & corrections to smoke control panel. revise application #201408133775, addenda 4 mep. maher na | |
| Nov 28, 2017 | Completed final sign-off Mar 2019 | 1000 03rd St | modification to elevator c lobby doors as approved 201408133775 addenda 3Details
modification to elevator c lobby doors as approved 201408133775 addenda 3 | |
| Oct 4, 2017 | Completed final sign-off Mar 2019 | 1000 03rd St | revision to fsd matrix & revise fsd tag on mechanical drawings to correct app #201408133775 s-4 addendum 4 - mep. no additional fsd's added. maher naDetails
revision to fsd matrix & revise fsd tag on mechanical drawings to correct app #201408133775 s-4 addendum 4 - mep. no additional fsd's added. maher na | |
| Oct 4, 2017 | Completed final sign-off Mar 2019 | 110 Channel | revision to fsd matrix & revise mechanical drawings to correct app #201408133766 s-4 addendum 4 - mep. no additional fsd's added. maher naDetails
revision to fsd matrix & revise mechanical drawings to correct app #201408133766 s-4 addendum 4 - mep. no additional fsd's added. maher na | |
| Aug 23, 2017 | Completed final sign-off May 2022 | 160 Folsom St | tower crane site safety permit & associated crane foundation & tie-in design for erection. tc# 1 - liebherr 550 ec# 20 litronic with 2 tie-inc. ref pa# 2014/06/25/9481-s. ** maher: n/a **Details
tower crane site safety permit & associated crane foundation & tie-in design for erection. tc# 1 - liebherr 550 ec# 20 litronic with 2 tie-inc. ref pa# 2014/06/25/9481-s. ** maher: n/a ** | $474,522 |
| Aug 1, 2017 | Completed final sign-off Sep 2017 | 30 Van Ness Av | supply and install 42" tall exclusion zone barrier to existing rooftop. railing to be generally setback six feet from (e) 36" parapet at roof edge. barrier to be guardian g-rail or similar. railing not visible from street.Details
supply and install 42" tall exclusion zone barrier to existing rooftop. railing to be generally setback six feet from (e) 36" parapet at roof edge. barrier to be guardian g-rail or similar. railing not visible from street. | $57,340 |
| Jul 20, 2017 | Completed final sign-off May 2018 | 41 Tehama St | revise sheet a0.17p to include tfc letter regarding the change in smoke control run time from 20 to 40 minutes per sffd request. (ref #201404304554-s2)Details
revise sheet a0.17p to include tfc letter regarding the change in smoke control run time from 20 to 40 minutes per sffd request. (ref #201404304554-s2) | |
| May 16, 2017 | Expired or cancelled cancelled Jan 2026 | 110 Channel | revise app #2014-0813-3766 s-14. change wood framing to cold form metal studs load bearing locations to locations to be modified by this permit for load bearing walls.Details
revise app #2014-0813-3766 s-14. change wood framing to cold form metal studs load bearing locations to locations to be modified by this permit for load bearing walls. | |
| Mar 23, 2017 | Completed final sign-off Jan 2018 | 41 Tehama St | structural drawing for spa permit included in the approved site permit and architectural addendum (ref. appln #201404304554s)Details
structural drawing for spa permit included in the approved site permit and architectural addendum (ref. appln #201404304554s) | |
| Mar 22, 2017 | Completed final sign-off Sep 2024 | 160 Folsom St | for record purposes only: p/a#2014-06-25-9481s. revise record: from 390 units with 2 basements to 392 units with 3 basements. n/a for maher ordinance.Details
for record purposes only: p/a#2014-06-25-9481s. revise record: from 390 units with 2 basements to 392 units with 3 basements. n/a for maher ordinance. | |
| Feb 22, 2017 | Completed final sign-off May 2022 | 160 Folsom St | pile load test drawings. (ref pa# 2014/06/25/9481-s) ** maher: n/a **Details
pile load test drawings. (ref pa# 2014/06/25/9481-s) ** maher: n/a ** | $30,000 |
| Nov 28, 2016 | Completed final sign-off Mar 2019 | 972 Market St | demolish 3-story retail/commercial buildingDetails
demolish 3-story retail/commercial building | $100,000 |
| Nov 28, 2016 | Completed final sign-off Mar 2019 | 950 Market St | demolish retail/office/commercial 3-story buildingDetails
demolish retail/office/commercial 3-story building | $100,000 |
| Nov 28, 2016 | Completed final sign-off Mar 2019 | 974 Market St | demolish retail/commercial 3-story buildingDetails
demolish retail/commercial 3-story building | $100,000 |
| Nov 28, 2016 | Completed final sign-off Mar 2019 | 966 Market St | demolish 3-story retail/office/commercial buildingDetails
demolish 3-story retail/office/commercial building | $100,000 |
| Nov 17, 2016 | Never finaled issued Dec 2016, no final | 318 Main St | roof: propose temporary at&t cell site- install at&t indoor equipment in (e) head endroom, 6 panel antennas, 3 per sector a, 3 per sector b/c on (e) penthouse facade, 18 rrhs, 3 surge suppression units, 3 dus 41 units & rf screen wall @each sector. painted & texture to match penthouse wall.Details
roof: propose temporary at&t cell site- install at&t indoor equipment in (e) head endroom, 6 panel antennas, 3 per sector a, 3 per sector b/c on (e) penthouse facade, 18 rrhs, 3 surge suppression units, 3 dus 41 units & rf screen wall @each sector. painted & texture to match penthouse wall. | $240,000 |
| Jul 19, 2016 | Never finaled issued Jan 2017, no final | 160 Folsom St | to demolish 2 story office building. ** maher: exempted - approval from dph attached **Details
to demolish 2 story office building. ** maher: exempted - approval from dph attached ** | $113,586 |
| Jul 19, 2016 | Never finaled issued Jan 2017, no final | 126 Folsom St | to demolish 1 story office building. ** maher: exempted - approval from dph attached **Details
to demolish 1 story office building. ** maher: exempted - approval from dph attached ** | $44,812 |
| Jun 21, 2016 | Completed final sign-off May 2022 | 160 Folsom St | excavation for foundation of new construction @ 160 folsom street. ref pa# 2014/06/25/9481-s. grade excavate (maher ordinance - extended ord. no.155-13 exempted)Details
excavation for foundation of new construction @ 160 folsom street. ref pa# 2014/06/25/9481-s. grade excavate (maher ordinance - extended ord. no.155-13 exempted) | $3,200,000 |
| Jun 21, 2016 | Completed final sign-off May 2022 | 160 Folsom St | shoring and underpinning for new construction at 160 folsom street ref app #201406259481s (maher ordinance - extended ord. no.155-13 exempted)Details
shoring and underpinning for new construction at 160 folsom street ref app #201406259481s (maher ordinance - extended ord. no.155-13 exempted) | $3,300,000 |
| Jun 21, 2016 | Never finaled issued Apr 2017, no final | 221 Main St | tiebacks for new construction at 160 folsom street ref appln #201406259481s - maher ordinance - extended - exemptedDetails
tiebacks for new construction at 160 folsom street ref appln #201406259481s - maher ordinance - extended - exempted | $500,000 |
| Feb 8, 2016 | Completed final sign-off Aug 2024 | 950 Market St | to erect 13 stories, 2 basements, type i-a, 470 units residential, hotel, retail building. (r-2,r-1,m)Details
to erect 13 stories, 2 basements, type i-a, 470 units residential, hotel, retail building. (r-2,r-1,m) | $114,272,000 |
| Oct 21, 2015 | Completed final sign-off Jul 2018 | 110 Channel | temporary 300' crane for tower 2.Details
temporary 300' crane for tower 2. | $70,000 |
| Oct 21, 2015 | Completed final sign-off Jul 2018 | 1000 03rd St | temporary 281' crane for tower 1.Details
temporary 281' crane for tower 1. | $60,000 |
| Apr 24, 2015 | Completed final sign-off Jun 2018 | 1000 03rd St | revision to previously appl#2015-0313-0826. soil stabilization works to be peformed in accordance with geotech report, work includes the compacion & coordination of stone columns under the observation of the geotech of record. n/a maher ord. # 155-13Details
revision to previously appl#2015-0313-0826. soil stabilization works to be peformed in accordance with geotech report, work includes the compacion & coordination of stone columns under the observation of the geotech of record. n/a maher ord. # 155-13 | |
| Mar 18, 2015 | Completed final sign-off Jun 2018 | 1000 03rd St | foundation associated w/ appn #201408133775-s construction of (n) bldg.gsDetails
foundation associated w/ appn #201408133775-s construction of (n) bldg.gs | $25,000 |
| Mar 18, 2015 | Completed final sign-off Jul 2018 | 110 Channel | foundation associated w/ construction of (n) bldg appln #201408133766-s.gsDetails
foundation associated w/ construction of (n) bldg appln #201408133766-s.gs | $25,000 |
| Mar 13, 2015 | Completed final sign-off Jan 2018 | 41 Tehama St | excavation for new construction @ 41 tehama. ref pa# 2014/04/30/4554-s. ** maher: compliance with ordinance no# 155-13 required, route to dph **Details
excavation for new construction @ 41 tehama. ref pa# 2014/04/30/4554-s. ** maher: compliance with ordinance no# 155-13 required, route to dph ** | $1,885,000 |
| Mar 13, 2015 | Completed final sign-off Jun 2018 | 1000 03rd St | grading plan for work associated with site permit applications 2014 0813 3775 s & 2014 0873 3766sDetails
grading plan for work associated with site permit applications 2014 0813 3775 s & 2014 0873 3766s | $45,000 |
| Mar 13, 2015 | Completed final sign-off Jan 2018 | 19 Tehama St | underpinning along east property line @ 19 tehama for new construction. ref. pa# 2014/04/30/4554-s.Details
underpinning along east property line @ 19 tehama for new construction. ref. pa# 2014/04/30/4554-s. | $320,000 |
| Mar 13, 2015 | Completed final sign-off Jan 2018 | 41 Tehama St | temporary shoring for subsurface construction @ 41 tehama. ref pa# 2014/04/30/4554-s.Details
temporary shoring for subsurface construction @ 41 tehama. ref pa# 2014/04/30/4554-s. | $4,450,000 |
| Mar 6, 2015 | Completed final sign-off Jun 2018 | 1000 03rd St | preliminary site prep demolition and erosion control associated with site permit 2014081333775s and 201408133766s (under review). n/a maher ordinanceDetails
preliminary site prep demolition and erosion control associated with site permit 2014081333775s and 201408133766s (under review). n/a maher ordinance | $15,000 |
| Oct 6, 2014 | Completed final sign-off Jan 2016 | 41 Tehama St | demolition of 1 story storage shed.Details
demolition of 1 story storage shed. | $47,000 |
| Aug 13, 2014 | Completed final sign-off Nov 2020 | 110 Channel | to erect 6 stories, 1 basement, 152 residential apartment, office, retail & parking building. ** maher: compliance with ordinance no# 155-13 required **Details
to erect 6 stories, 1 basement, 152 residential apartment, office, retail & parking building. ** maher: compliance with ordinance no# 155-13 required ** | $50,000,000 |
| Aug 13, 2014 | Completed final sign-off Nov 2020 | 1000 03rd St | to erect 16 stories, no basement, 198 residential apartment, office, retail & parking building. ** maher: compliance with ordinance no# 155-13 required **Details
to erect 16 stories, no basement, 198 residential apartment, office, retail & parking building. ** maher: compliance with ordinance no# 155-13 required ** | $80,000,000 |
| Jun 25, 2014 | Expired or cancelled expired Oct 2024 | 160 Folsom St | to erect 40 stories, 2 basements, 390 units residential & retail building.Details
to erect 40 stories, 2 basements, 390 units residential & retail building. | $150,000,000 |
| Jun 24, 2014 | Completed final sign-off Jun 2021 | 119 07th St | erect new mixed-used 8 story 39 residential units apartment/parking lot. maher ordinane is not required.Details
erect new mixed-used 8 story 39 residential units apartment/parking lot. maher ordinane is not required. | $17,237,620 |
| Apr 30, 2014 | Completed final sign-off May 2018 | 41 Tehama St | to erect 35 stories, 3 basement, 403 residential units with mix used & parking building. (r-2,b,a-3,m,h-3,s-2)Details
to erect 35 stories, 3 basement, 403 residential units with mix used & parking building. (r-2,b,a-3,m,h-3,s-2) | $60,000,000 |
| Dec 5, 2013 | Completed final sign-off May 2017 | 338 Main St | crane permit & crane foundation (tower d)(compliance with ordinance no.155-13 not required. excavation less than 50 cu. yd.)Details
crane permit & crane foundation (tower d)(compliance with ordinance no.155-13 not required. excavation less than 50 cu. yd.) | $50,000 |
| Dec 5, 2013 | Completed final sign-off May 2017 | 301 Beale St | crane permit & crane foundation & tie-ins(compliance with ordinance no.155-13 not required. excavation less than 50 cu. yd.)Details
crane permit & crane foundation & tie-ins(compliance with ordinance no.155-13 not required. excavation less than 50 cu. yd.) | $50,000 |
| Oct 30, 2013 | Completed final sign-off May 2017 | 333 Beale St | additional rebar installation in mat foundation for tower crane support at plaza c. crane safety permit(compliance with ordinance no.155-13 is not required. excavation less than 50 cu. yd.,)Details
additional rebar installation in mat foundation for tower crane support at plaza c. crane safety permit(compliance with ordinance no.155-13 is not required. excavation less than 50 cu. yd.,) | $50,000 |
| Oct 30, 2013 | Completed final sign-off May 2017 | 318 Main St | additional rebar installation in mat foundation for tower crane support at plaza a. crane permit and crane foundation.Details
additional rebar installation in mat foundation for tower crane support at plaza a. crane permit and crane foundation. | $50,000 |
| Jun 12, 2013 | Completed final sign-off Dec 2016 | 201 Folsom St | grade & excavate lot for archaeological significance & future construction.Details
grade & excavate lot for archaeological significance & future construction. | $40,000 |
| Dec 18, 2012 | Completed final sign-off Jan 2013 | 33 Columbus Av | to obtail final inspection for work approved under pa#200906100171. all work is complete. special inspection required.Details
to obtail final inspection for work approved under pa#200906100171. all work is complete. special inspection required. | |
| Dec 18, 2012 | Completed final sign-off Jan 2013 | 37 Columbus Av | to obtain final inspection for work approved under pa# 200905158496. all work is complete. special inspection requiredDetails
to obtain final inspection for work approved under pa# 200905158496. all work is complete. special inspection required | |
| Dec 18, 2012 | Completed final sign-off Jan 2013 | 636 Washington St | to obtain final inspection for work approved under pa# 200906100174. all work is complete.Details
to obtain final inspection for work approved under pa# 200906100174. all work is complete. | |
| Aug 9, 2010 | Completed final sign-off Jan 2011 | 71 Stevenson St | suite#800,frame up new demising wall, 70 sf as noted on plans. no lack on door for exit.Details
suite#800,frame up new demising wall, 70 sf as noted on plans. no lack on door for exit. | $2,100 |
| Jul 30, 2009 | Completed final sign-off Jul 2009 | 300 Berry St | for documentation and record keeping, purposes 300 bery street lot & block no.s have been changed from block 8704 lot 001 to block 8704 lots 006 on 06/30/2008 and on 10/07/2008, to block 8704 lots 008 through lot 277.Details
for documentation and record keeping, purposes 300 bery street lot & block no.s have been changed from block 8704 lot 001 to block 8704 lots 006 on 06/30/2008 and on 10/07/2008, to block 8704 lots 008 through lot 277. | |
| Jul 22, 2009 | Never finaled issued Jul 2009, no final | 300 Berry St | add corridor door 4th. level. revise egress path 1st. revise egress path 1st. level garage & remove signage.Details
add corridor door 4th. level. revise egress path 1st. revise egress path 1st. level garage & remove signage. | $1,500 |
| Jun 10, 2009 | Expired or cancelled expired Jan 2013 | 33 Columbus Av | underpinning piers under west wall of lot 4.Details
underpinning piers under west wall of lot 4. | $150,000 |
| Jun 10, 2009 | Completed final sign-off Jun 2009 | 501 Beale St | (hoa ) administrative permit for the purpose of transferring jurisdiction from the sf port authority to the dpt of bldg insp for the cosntruction of 136 residential condo as authorized under sf port authority permit #6726 memorandum of understanding to sf dbi dated 4-28-09 attachedDetails
(hoa ) administrative permit for the purpose of transferring jurisdiction from the sf port authority to the dpt of bldg insp for the cosntruction of 136 residential condo as authorized under sf port authority permit #6726 memorandum of understanding to sf dbi dated 4-28-09 attached | |
| Jun 10, 2009 | Expired or cancelled expired Jan 2013 | 636 Washington St | underpinning piles under east wall of lot 6.Details
underpinning piles under east wall of lot 6. | $150,000 |
| May 15, 2009 | Expired or cancelled expired Jan 2013 | 37 Columbus Av | shoring in prepartion for a new building. roughly 8' max excavation on separate permitDetails
shoring in prepartion for a new building. roughly 8' max excavation on separate permit | $350,000 |
| Apr 17, 2009 | Completed final sign-off May 2009 | 511 Harrison St | interior demolition of non bearing walls. tenamt improvement under separate permit.Details
interior demolition of non bearing walls. tenamt improvement under separate permit. | $10,000 |
| Dec 9, 2008 | Completed final sign-off Apr 2012 | 425 01st St | revision to appl #200809171878 - deletion of the smoke curtain (smoke guard) and shunt trip which are not required in this installation.Details
revision to appl #200809171878 - deletion of the smoke curtain (smoke guard) and shunt trip which are not required in this installation. | |
| Nov 5, 2008 | Expired or cancelled expired Nov 2013 | 425 01st St | temporarly modify 2 condos to be used as a temporary sales office at unit e (3rd and 4th fl) and unit p (5th and 7th fl)Details
temporarly modify 2 condos to be used as a temporary sales office at unit e (3rd and 4th fl) and unit p (5th and 7th fl) | $50,000 |
| Sep 17, 2008 | Expired or cancelled cancelled Apr 2012 | 425 01st St | revised curtin wall design, additional interior living space. also, to add an elevator to floors 4, 5, and 7. original permit application # 2004/1221/1847.Details
revised curtin wall design, additional interior living space. also, to add an elevator to floors 4, 5, and 7. original permit application # 2004/1221/1847. | $50,000 |
| Jan 24, 2008 | Completed final sign-off Feb 2010 | 425 01st St | revision to correct permit application number 2004/1221/1847 from 63 stories above grade and 2 stories below grade with 382 dwellings units to 58 stories above grade and 5 stories below grade with 390 units.Details
revision to correct permit application number 2004/1221/1847 from 63 stories above grade and 2 stories below grade with 382 dwellings units to 58 stories above grade and 5 stories below grade with 390 units. | |
| Jan 17, 2008 | Completed final sign-off Apr 2009 | 300 Berry St | revision to appl #200509273964-s3 on detail 10/a9.16 for 2-hr roof construction at stair #3. penthouse stair tower.Details
revision to appl #200509273964-s3 on detail 10/a9.16 for 2-hr roof construction at stair #3. penthouse stair tower. | |
| Aug 8, 2007 | Completed final sign-off Nov 2007 | 71 Stevenson St | 8th floor: mechanical, electrical, plumbing for new ti space.Details
8th floor: mechanical, electrical, plumbing for new ti space. | $250,000 |
| Aug 2, 2007 | Completed final sign-off Nov 2007 | 71 Stevenson St | 8th floor-minor revisions to original application #2007/0620/4597. revisions include: additional square footage added to this suite, common corridor upgrades to floors and walls, additional lighting.Details
8th floor-minor revisions to original application #2007/0620/4597. revisions include: additional square footage added to this suite, common corridor upgrades to floors and walls, additional lighting. | $40,000 |
| Jun 20, 2007 | Completed final sign-off Nov 2007 | 71 Stevenson St | tenant improvement of 10,500 sf suite, new partitions, ceiling, millwork, finishes, one sink. life safety & mep under separate permit.Details
tenant improvement of 10,500 sf suite, new partitions, ceiling, millwork, finishes, one sink. life safety & mep under separate permit. | $525,000 |
| Oct 27, 2006 | Expired or cancelled expired Nov 2013 | 425 01st St | install additional reinforcement.Details
install additional reinforcement. | |
| Aug 15, 2006 | Never finaled issued Oct 2007, no final | 55 Page St | erect construction tower crane on site. dismantle construction tower carane on siteDetails
erect construction tower crane on site. dismantle construction tower carane on site | $51,000 |
| Jul 25, 2006 | Completed final sign-off Sep 2006 | 1 Federal St | renew pa# 2003/02/10/7047 for final inspection.Details
renew pa# 2003/02/10/7047 for final inspection. | |
| Jul 25, 2006 | Completed final sign-off Sep 2006 | 1 Federal St | renew pa# 2002/12/23/4070, pa# 2003/09/02/3576, pa# 2003/09/18/5108 for final inspection.Details
renew pa# 2002/12/23/4070, pa# 2003/09/02/3576, pa# 2003/09/18/5108 for final inspection. | |
| Jul 25, 2006 | Completed final sign-off Sep 2006 | 200 Brannan St | renew pa# 2004/05/18/4188 for final inspection.Details
renew pa# 2004/05/18/4188 for final inspection. | |
| Jul 25, 2006 | Completed final sign-off May 2008 | 1 Federal St | renew pa# 2002/11/12/1170 for final only.Details
renew pa# 2002/11/12/1170 for final only. | |
| Jul 25, 2006 | Completed final sign-off Sep 2006 | 1 Federal St | renew pa# 2000/05/13/9923 s, pa# 2000/05/13/9923 s-1, pa# 2000/05/13/9923 s-2 for final inspection.Details
renew pa# 2000/05/13/9923 s, pa# 2000/05/13/9923 s-1, pa# 2000/05/13/9923 s-2 for final inspection. |