Ron Klemencic
- License
- 4477
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Magnusson Klemencic Assoc.
- Based in
- Seattle
- On San Francisco permits
- Dec 2004 to Nov 2019
6 permits since 2000 (engineer on 6 permits): 4 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Avalon Bay Communities, Lend Lease (Us) Construction Inc, Malcolm Drilling Co Inc, Webcor Construction Lp
- Architects
- Christopher T. Pemberton, Gary Kohn, Jeanne Gang, Peter Noone
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 6
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 22, 2019 | Completed final sign-off Aug 2021 | 706 Mission St | Webcor Construction Lp | revision to superstructure addendum 3 - 201312204747 s3. change include an update to stairway st-01 on level 1-4, reclocation of elevator p3, infill of flr opening in the mexican museum level 3+4, and update to the solarium roof framing.Details
revision to superstructure addendum 3 - 201312204747 s3. change include an update to stairway st-01 on level 1-4, reclocation of elevator p3, infill of flr opening in the mexican museum level 3+4, and update to the solarium roof framing. | |
| Jun 25, 2014 | Expired or cancelled expired Oct 2024 | 160 Folsom St | Lend Lease (Us) Construction Inc | to erect 40 stories, 2 basements, 390 units residential & retail building.Details
to erect 40 stories, 2 basements, 390 units residential & retail building. | $150,000,000 |
| Jun 18, 2014 | Never finaled filed Jun 2014, never issued | 525 Harrison St | to erect 23 stories, 4 basement, 200 dwelling units & retail building. ** maher: compliance with ordinance no. 155-13 required; route to dph **Details
to erect 23 stories, 4 basement, 200 dwelling units & retail building. ** maher: compliance with ordinance no. 155-13 required; route to dph ** | $71,000,000 | |
| Aug 23, 2011 | Completed final sign-off Oct 2014 | 55 09th St | Avalon Bay Communities | to erect 17 stories, 273 units residential, retail & parking building.Details
to erect 17 stories, 273 units residential, retail & parking building. | $84,965,000 |
| Dec 21, 2004 | Completed final sign-off Jun 2015 | 401 Harrison St | to erect 48 stories, 312 dwelling units of residential condo.Details
to erect 48 stories, 312 dwelling units of residential condo. | $70,716,324 | |
| Dec 21, 2004 | Completed final sign-off Feb 2010 | 425 01st St | Malcolm Drilling Co Inc | to erect 63 stories, 382 dwelling units, 2 level basements of b1 & b1, residential condo.Details
to erect 63 stories, 382 dwelling units, 2 level basements of b1 & b1, residential condo. | $116,757,478 |