Block 3706, lot 093
86 03rd St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
49 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 19, 2023 | In progress issued Jan 2025 | 86 03rd St | Metropolitan Electrical Construction | remove & replacce (3) antennas; remove & replace 3 rru radios; install 1 new battery cabinet to replace (e) cabinet; install routers baseban unit; install 3 dsu; install 12 batteries in (e) battery cabinetDetails
remove & replacce (3) antennas; remove & replace 3 rru radios; install 1 new battery cabinet to replace (e) cabinet; install routers baseban unit; install 3 dsu; install 12 batteries in (e) battery cabinet | $30,000 |
| Apr 8, 2021 | Never finaled filed Apr 2021, never issued | 700 Mission St | Webcor Construction Lp | administrative permit only for sffd assembly stamps for approved permit. pa # 2020-0306-6390, 2013-1220-4747.Details
administrative permit only for sffd assembly stamps for approved permit. pa # 2020-0306-6390, 2013-1220-4747. | |
| Jan 14, 2021 | Completed final sign-off Mar 2021 | 706 Mission St | Allied Fire Protection | fire sprinklers: (87) added sprinklers apn: 2016-1221-5599Details
fire sprinklers: (87) added sprinklers apn: 2016-1221-5599 | $44,800 |
| Jan 14, 2021 | Completed final sign-off Mar 2021 | 706 Mission St | Garibaldi Plumbing Company Inc | relocate (4) fire sprinklers and remove (5) fire sprinklers in unit #17aDetails
relocate (4) fire sprinklers and remove (5) fire sprinklers in unit #17a | $2,100 |
| Jan 14, 2021 | Completed final sign-off Oct 2021 | 706 Mission St | Aaron Gordon Construction Inc | remodel 3.5 baths. no wall removal. replace finishes and fixtures in kind. new tile floor,wall tile,basebd in pwdr rm. floor,walltile in mster bath, bath 2 and 3. tub in master.tile showers in mster, 2, 3. vanities,sinks,fxtures master,2,3,pwdr. steam in master shwr.Details
remodel 3.5 baths. no wall removal. replace finishes and fixtures in kind. new tile floor,wall tile,basebd in pwdr rm. floor,walltile in mster bath, bath 2 and 3. tub in master.tile showers in mster, 2, 3. vanities,sinks,fxtures master,2,3,pwdr. steam in master shwr. | $150,000 |
| Dec 18, 2020 | Completed final sign-off Oct 2021 | 706 Mission St | Aaron Gordon Construction Inc | modify/add outlets/switches to accomodate wainscot installation. add light fixtures in closets and bedrooms. replace extg kitchen and bathroom faucets and toilets. remove entry door into master closet. paint. no new wall and no extg wall relocation. new lighting shall comply with cec 150 (k) 3.5Details
modify/add outlets/switches to accomodate wainscot installation. add light fixtures in closets and bedrooms. replace extg kitchen and bathroom faucets and toilets. remove entry door into master closet. paint. no new wall and no extg wall relocation. new lighting shall comply with cec 150 (k) 3.5 | $100,000 |
| Nov 2, 2020 | Never finaled issued Nov 2020, no final | 706 Mission St | Baxter Construction | unit 14b - install drywall partition to accommodate installation of full height cabinet at (e) family room. no structure work or changes to (e) doorways or walls.Details
unit 14b - install drywall partition to accommodate installation of full height cabinet at (e) family room. no structure work or changes to (e) doorways or walls. | $5,000 |
| Sep 4, 2020 | Expired or cancelled withdrawn Sep 2023 | 86 03rd St | Metropolitan Electrical Construction | modification to existing unmanned telecommunications facility including replace 3 antenna, remove all rrus11, install 3 antennas (air6449), 34449 and 4415 rru, 2 bb6630, 1 bb6648, 1 6160 cabinet, 1 b160 cabinet, 6 6x12hcs 120m, new batteries, 4 new bb and 1 xmuDetails
modification to existing unmanned telecommunications facility including replace 3 antenna, remove all rrus11, install 3 antennas (air6449), 34449 and 4415 rru, 2 bb6630, 1 bb6648, 1 6160 cabinet, 1 b160 cabinet, 6 6x12hcs 120m, new batteries, 4 new bb and 1 xmu | $25,000 |
| Sep 2, 2020 | Completed final sign-off Sep 2021 | 706 Mission St | Black Mountain Development | unit 17a: replace (3) toilets, reconfigure master closet, lower ceiling in living room, dining room, family room, & master bedroom to add recessed lighting, create soffits for downlights in bedrooms, install window shades. mech & fire protection are deferred under separate permitDetails
unit 17a: replace (3) toilets, reconfigure master closet, lower ceiling in living room, dining room, family room, & master bedroom to add recessed lighting, create soffits for downlights in bedrooms, install window shades. mech & fire protection are deferred under separate permit | $100,000 |
| Aug 28, 2020 | Never finaled issued Apr 2021, no final | 706 Mission St | Webcor Construction Lp | install 4 exterior wall brass single faced non-illuminated sign "four seasons private residences 706 mission, san francisco"Details
install 4 exterior wall brass single faced non-illuminated sign "four seasons private residences 706 mission, san francisco" | $5,000 |
| Aug 28, 2020 | Never finaled issued Apr 2021, no final | 706 Mission St | Webcor Construction Lp | install 1 exterior corner non-illuminated wall marble sign "four seasons private residences 706 mission, san francisco"Details
install 1 exterior corner non-illuminated wall marble sign "four seasons private residences 706 mission, san francisco" | $5,000 |
| Jun 12, 2020 | Never finaled issued Oct 2020, no final | 706 Mission St | Webcor Construction Lp | all floors: evac signage for building. see site permit application # 201312204747. maher n/a.Details
all floors: evac signage for building. see site permit application # 201312204747. maher n/a. | $15,000 |
| Mar 13, 2020 | Never finaled issued Aug 2020, no final | 706 Mission St | Webcor Construction Lp | revision to 201312204747 to move emergency generator fuel vent pipes fro orig designDetails
revision to 201312204747 to move emergency generator fuel vent pipes fro orig design | |
| Mar 6, 2020 | Completed final sign-off Aug 2021 | 706 Mission St | Webcor Construction Lp | revision to pa# 201312204747-s5 (arch & mep). changes include updates to floor plans @ levels b1, 1,3,4,5,7,14,15,39 & 40. rcp, slab plans: elevations have been updated to cordinate to floor plans. mep updated accordingly. ** maher: n/a **Details
revision to pa# 201312204747-s5 (arch & mep). changes include updates to floor plans @ levels b1, 1,3,4,5,7,14,15,39 & 40. rcp, slab plans: elevations have been updated to cordinate to floor plans. mep updated accordingly. ** maher: n/a ** | |
| Dec 24, 2019 | Completed final sign-off Aug 2021 | 706 Mission St | Webcor Construction Lp | revision to aronson exterior restoration addendum #4. revison includes updates to the storefronts at 3rd st facade, mission st facade and the corner of 3rd & mission streets. porte cohere & 3rd st canopies. reference #201312204747 -s4Details
revision to aronson exterior restoration addendum #4. revison includes updates to the storefronts at 3rd st facade, mission st facade and the corner of 3rd & mission streets. porte cohere & 3rd st canopies. reference #201312204747 -s4 | |
| Dec 20, 2019 | Completed final sign-off Sep 2021 | 706 Mission St | Metropolitan Electrical Construction | remove (3) (e) antennas & replace w/ (3) (n) antennas, remove (3) (e) rrus & replace w/(3) (n) radios behind each (n) antenna relocate (e) rbs cabine to (n) lease area in basement install (3)(n) hybrid cablesDetails
remove (3) (e) antennas & replace w/ (3) (n) antennas, remove (3) (e) rrus & replace w/(3) (n) radios behind each (n) antenna relocate (e) rbs cabine to (n) lease area in basement install (3)(n) hybrid cables | $25,000 |
| Nov 26, 2019 | Completed final sign-off Sep 2021 | 706 Mission St | Webcor Construction Lp | rev to pa201312204747-s5: mechanical smoke control systems.Details
rev to pa201312204747-s5: mechanical smoke control systems. | |
| Nov 22, 2019 | Completed final sign-off Aug 2021 | 706 Mission St | Webcor Construction Lp | revision to superstructure addendum 3 - 201312204747 s3. change include an update to stairway st-01 on level 1-4, reclocation of elevator p3, infill of flr opening in the mexican museum level 3+4, and update to the solarium roof framing.Details
revision to superstructure addendum 3 - 201312204747 s3. change include an update to stairway st-01 on level 1-4, reclocation of elevator p3, infill of flr opening in the mexican museum level 3+4, and update to the solarium roof framing. | |
| Oct 18, 2019 | Never finaled issued Oct 2019, no final | 706 Mission St | street spaceDetails
street space | ||
| Apr 9, 2019 | Never finaled issued Apr 2019, no final | 706 Mission St | street space w/mtaDetails
street space w/mta | ||
| Apr 3, 2019 | Never finaled filed Apr 2019, never issued | 706 Mission St | streetspaceDetails
streetspace | ||
| Oct 5, 2018 | Completed final sign-off Feb 2021 | 706 Mission St | Webcor Construction Lp | minor permit to alter for for exterior lighting at the 706 mission aronson building. ref 2013/1220/4747s ** maher: n/a **Details
minor permit to alter for for exterior lighting at the 706 mission aronson building. ref 2013/1220/4747s ** maher: n/a ** | |
| Sep 25, 2018 | Never finaled issued Oct 2018, no final | 706 Mission St | street spaceDetails
street space | ||
| Aug 3, 2018 | Never finaled issued Aug 2018, no final | 700 Mission St | temporary installatoin of interior non load bearing partition walls in e gallery space, walls will be in place until 2/20/20 and then removedDetails
temporary installatoin of interior non load bearing partition walls in e gallery space, walls will be in place until 2/20/20 and then removed | $20,000 | |
| May 23, 2018 | Expired or cancelled withdrawn Mar 2021 | 706 Mission St | Allied Fire Protection | ref: 201312204747; fire sprinklers (87) added sprinklers n/a maherDetails
ref: 201312204747; fire sprinklers (87) added sprinklers n/a maher | $44,800 |
| Apr 2, 2018 | Never finaled issued Apr 2018, no final | 706 Mission St | street space w/mtaDetails
street space w/mta | ||
| Feb 2, 2018 | Completed final sign-off Jul 2018 | 706 Mission St | Metropolitan Electrical Construction | modification to existing telecommunication facility to remove and relocate rood top equipmentDetails
modification to existing telecommunication facility to remove and relocate rood top equipment | $20,000 |
| Nov 30, 2017 | Never finaled issued Dec 2017, no final | 706 Mission St | revision to superstructure addendum subnittal for tower crane tie-ins. ref pa 201312204747 s2Details
revision to superstructure addendum subnittal for tower crane tie-ins. ref pa 201312204747 s2 | $10,000 | |
| Nov 17, 2017 | Completed final sign-off Sep 2021 | 706 Mission St | reference to pa #201312204747s5 (arch & mep) 46 story mixed use building, for plumbing plan check review only.maher ordinance not comply.Details
reference to pa #201312204747s5 (arch & mep) 46 story mixed use building, for plumbing plan check review only.maher ordinance not comply. | ||
| Sep 28, 2017 | Never finaled issued Oct 2017, no final | 706 Mission St | Webcor Construction Lp | street spaceDetails
street space | |
| Sep 19, 2017 | Completed final sign-off Jan 2021 | 706 Mission St | Webcor Construction Lp | intall tower crane foundation and tower crane. work includes tie-in to building. ref pa #2013-1220-4747.Details
intall tower crane foundation and tower crane. work includes tie-in to building. ref pa #2013-1220-4747. | $200,000 |
| Apr 28, 2017 | Completed final sign-off Feb 2021 | 706 Mission St | Acco Engineered Systems Inc. Dba Acco En | reference to site permit 201312204747, plans provided for alternate water system review plan check.Details
reference to site permit 201312204747, plans provided for alternate water system review plan check. | $120,000 |
| Mar 23, 2017 | Never finaled issued Mar 2017, no final | 706 Mission St | Webcor Construction Lp | street spaceDetails
street space | |
| Oct 24, 2016 | Completed final sign-off Nov 2017 | 706 Mission St | Webcor Construction Lp | construction of single drilled shaft that will be tested to establish design parametersDetails
construction of single drilled shaft that will be tested to establish design parameters | $10,000 |
| Sep 16, 2016 | Never finaled issued Sep 2016, no final | 706 Mission St | street space w/mtaDetails
street space w/mta | ||
| Jun 17, 2016 | Completed final sign-off Jul 2018 | 706 Mission St | Metropolitan Electrical Construction | t*mobile: modification of an (e) facility consisting of minor relocation of 6 t*mobile panel antennasDetails
t*mobile: modification of an (e) facility consisting of minor relocation of 6 t*mobile panel antennas | $15,000 |
| May 4, 2016 | Completed final sign-off May 2016 | 86 03rd St | W M Wireless Inc | to obtain a final inspection for work approved under pa#201210232648. all work is complete.Details
to obtain a final inspection for work approved under pa#201210232648. all work is complete. | |
| Apr 13, 2016 | Completed final sign-off Feb 2021 | 706 Mission St | Webcor Construction Lp | installation of underground fire service 2-8 inch fire service off 12 inch main on mission st.because the basmt of the bldg is located under the sidewall, all work to install the 2 fire services with the new 8-ich isolation valve in the city main located between fire services is done by the puc.Details
installation of underground fire service 2-8 inch fire service off 12 inch main on mission st.because the basmt of the bldg is located under the sidewall, all work to install the 2 fire services with the new 8-ich isolation valve in the city main located between fire services is done by the puc. | $60,000 |
| Mar 18, 2016 | Never finaled issued Mar 2016, no final | 706 Mission St | street spaceDetails
street space | ||
| Jan 21, 2016 | Never finaled issued Jan 2016, no final | 706 Mission St | street spaceDetails
street space | ||
| Dec 30, 2015 | Completed final sign-off Jan 2016 | 706 Mission St | Transceive Communications Inc. | t-mobile temporary installation of 1'0 0 mw dish on e pipe mount. pointing to 50 3rd st. park central hotel for special event from 1-13-16 until 1-17-16Details
t-mobile temporary installation of 1'0 0 mw dish on e pipe mount. pointing to 50 3rd st. park central hotel for special event from 1-13-16 until 1-17-16 | $1,700 |
| Dec 4, 2015 | Completed final sign-off Apr 2016 | 706 Mission St | Eco Bay Services Inc. | asbestos abatement at floor b,1,4,8 & roof. removal of flooring, roof mastic and a small amount of pipe insulation at the 10/f. new addition t.i.pa#2013-1220-4747 for ab-017.Details
asbestos abatement at floor b,1,4,8 & roof. removal of flooring, roof mastic and a small amount of pipe insulation at the 10/f. new addition t.i.pa#2013-1220-4747 for ab-017. | $57,000 |
| Dec 2, 2015 | Completed final sign-off Aug 2021 | 706 Mission St | Webcor Construction Lp | excavation, shoring, underpinning for future high rise bldg. ref. to pa#201312204747Details
excavation, shoring, underpinning for future high rise bldg. ref. to pa#201312204747 | $200,000 |
| Nov 20, 2015 | Completed final sign-off Oct 2016 | 706 Mission St | Silverado Contractors Inc | no structural demolition or work - comply with ab-017. exploratory demolition on floors: 10, 9, 7, 6,5, 3, & 2. no work on floors 1,4, 8 and roof. interior work only.Details
no structural demolition or work - comply with ab-017. exploratory demolition on floors: 10, 9, 7, 6,5, 3, & 2. no work on floors 1,4, 8 and roof. interior work only. | $2,000 |
| Aug 25, 2015 | Completed final sign-off Feb 2021 | 706 Mission St | Webcor Construction Lp | demo alternation of existing non-historic north & west bldg additions, stairs, fire escapes, elevators, roof, basement slabs & associated utilities. selective demo of inter flrs, walls & exterior facade. associated bracing & shoring per ab-017. refer pa 201312204747s. demo fire pump and distrib pipeDetails
demo alternation of existing non-historic north & west bldg additions, stairs, fire escapes, elevators, roof, basement slabs & associated utilities. selective demo of inter flrs, walls & exterior facade. associated bracing & shoring per ab-017. refer pa 201312204747s. demo fire pump and distrib pipe | $200,000 |
| Dec 20, 2013 | Completed final sign-off Sep 2021 | 706 Mission St | Webcor Construction Lp | (n) 46-story tower addition to the (e) historic 10-story bldg. (r-2,m,a-2,a-3,s-1,s-2,h-3)Details
(n) 46-story tower addition to the (e) historic 10-story bldg. (r-2,m,a-2,a-3,s-1,s-2,h-3) | $210,000,000 |
| Oct 23, 2012 | Completed final sign-off May 2016 | 86 03rd St | W M Wireless Inc | modify (e) t-mobile wireless facility. replace 5 (e) antennas w/ 5 (n) antennas on main roof.Details
modify (e) t-mobile wireless facility. replace 5 (e) antennas w/ 5 (n) antennas on main roof. | $19,000 |
| Nov 1, 2011 | Expired or cancelled cancelled Aug 2016 | 86 03rd St | remove one (e) t-mobile equipment cabinet & replace with one (n) t-mobile equipment cabinet in same location on roof.Details
remove one (e) t-mobile equipment cabinet & replace with one (n) t-mobile equipment cabinet in same location on roof. | $10,000 | |
| Sep 22, 2010 | Expired or cancelled withdrawn Aug 2012 | 86 03rd St | install tower-mounted amplifiers at an existing legal t-mobile facility. existing tma's are being replaced @ same location.Details
install tower-mounted amplifiers at an existing legal t-mobile facility. existing tma's are being replaced @ same location. | $9,000 |