Aaron Newman
- License
- M26214
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M26214 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Petro Analytical, Inc.
- Based in
- Corte Madera
- On San Francisco permits
- Feb 2005 to Mar 2020
5 permits since 2000 (engineer on 5 permits): 3 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Balch Petroleum Contractors & Builders (2), Becker Electric Inc, Sut's Superior Underground Tank Service, Webcor Construction Lp
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 13, 2020 | Never finaled issued Aug 2020, no final | 706 Mission St | Webcor Construction Lp | revision to 201312204747 to move emergency generator fuel vent pipes fro orig designDetails
revision to 201312204747 to move emergency generator fuel vent pipes fro orig design | |
| Mar 10, 2017 | Completed final sign-off Nov 2017 | 1067 Post St | Becker Electric Inc | installation of new 30kw generator, new 220 gallon diesel fuel tank, new fuel oil piping system & controls (on roof & rear elevation only), paint pipe to match exterior color. ** maher: n/a **Details
installation of new 30kw generator, new 220 gallon diesel fuel tank, new fuel oil piping system & controls (on roof & rear elevation only), paint pipe to match exterior color. ** maher: n/a ** | $175,000 |
| Jun 14, 2011 | Never finaled issued Jan 2012, no final | 1 La Avanzada | Sut's Superior Underground Tank Service | replace underground fuel piping for standby generator; replace underground storage tank piping sump; install new suction pump set; install new monitoring console & sensors. install one 25 gal us 142 overflow tank with pump.Details
replace underground fuel piping for standby generator; replace underground storage tank piping sump; install new suction pump set; install new monitoring console & sensors. install one 25 gal us 142 overflow tank with pump. | $12,000 |
| Feb 17, 2005 | Completed final sign-off Apr 2005 | 1330 16th St | Balch Petroleum Contractors & Builders | remove underground gasoline storage tank & associated dispenserDetails
remove underground gasoline storage tank & associated dispenser | $40,000 |
| Feb 17, 2005 | Completed final sign-off Apr 2005 | 610 Brannan St | Balch Petroleum Contractors & Builders | remove underground gasoline storage tank & associated dispenserDetails
remove underground gasoline storage tank & associated dispenser | $40,000 |