Block 2724, lot 003
250 La Avanzada St
- City’s use
- Commercial Retail
- Built
- 1974
- Stories
- 3
- Rooms
- 3 bathrooms
- Building
- 21,797 sq ft
- Lot
- 224,996 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
68 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2024 | Completed final sign-off Apr 2026 | 1 La Avanzada | Mastec Network Solutions Inc | modification to e tmobile installation on sutro tower. at tower level 2 , remove e e antennas and replace w 6 new antennas on new mounts. remove 3 e rrus and replace w 6 new rrus. remove 2 e cabinets on level 2 and install 2 new cabinets in gr fl equp room 214. remove all e coax cables and installDetails
modification to e tmobile installation on sutro tower. at tower level 2 , remove e e antennas and replace w 6 new antennas on new mounts. remove 3 e rrus and replace w 6 new rrus. remove 2 e cabinets on level 2 and install 2 new cabinets in gr fl equp room 214. remove all e coax cables and install | $400,000 |
| Jun 27, 2024 | In progress filed Jun 2024, not yet issued | 250 Palo Alto Av | modification to existing wireeless installation to remove 3 existing panel antennas and replace with 6 new panel antennas; remove 3 radios and install 6 new radios; remove 2 equipment cabinets; install 2 new frp panels; remove ancillary equipment.Details
modification to existing wireeless installation to remove 3 existing panel antennas and replace with 6 new panel antennas; remove 3 radios and install 6 new radios; remove 2 equipment cabinets; install 2 new frp panels; remove ancillary equipment. | ||
| Jan 18, 2024 | Completed final sign-off Dec 2025 | 1 La Avanzada | Wadleigh Group, Inc. | voluntary of exterior cladding on horizontal levels 2, 3, and 4.Details
voluntary of exterior cladding on horizontal levels 2, 3, and 4. | $300,500 |
| Dec 26, 2023 | In progress filed Dec 2023, not yet issued | 1 La Avanzada | Tilson Technology Management Inc | removing all t-mobile equipment,antenna,lines, all cabinets,ice bridge, and any associated hardware. there will no new installation of equipment and no other alterations to the building. there are two t-mobile sites at this location. this permit is to remove sprint id sf52xm665 only.Details
removing all t-mobile equipment,antenna,lines, all cabinets,ice bridge, and any associated hardware. there will no new installation of equipment and no other alterations to the building. there are two t-mobile sites at this location. this permit is to remove sprint id sf52xm665 only. | $16,280 |
| Jul 25, 2023 | Completed final sign-off Jan 2024 | 1 La Avanzada | Premier Security Solutions Corp | voluntary upgrade of (e) fire alarm system & devices.Details
voluntary upgrade of (e) fire alarm system & devices. | $78,995 |
| Dec 30, 2022 | Expired or cancelled cancelled Jan 2026 | 1 La Avanzada | Air Systems, Inc. | 1) remove and replace (2) 3-ton heat pump mechnical split systems.Details
1) remove and replace (2) 3-ton heat pump mechnical split systems. | $60,815 |
| Nov 23, 2021 | Completed final sign-off Jun 2024 | 1 La Avanzada | Wadleigh Group, Inc. | voluntary upgrade of the lower cladding wind resistance through. replace of cladding on interior faces of horizontal level 2,3, & 4. paint new cladding to match extg aviation theme.Details
voluntary upgrade of the lower cladding wind resistance through. replace of cladding on interior faces of horizontal level 2,3, & 4. paint new cladding to match extg aviation theme. | $250,000 |
| Jun 17, 2021 | Expired or cancelled withdrawn Jun 2024 | 1 La Avanzada | Best Endeavours | revision to pa #201907024914 & to comply with complaint 202178667 - temporary removal of cladding on tower legs from ground to 4th level to facilitate construction of broadcast repacking and structural upgrade performed under separate permits. cladding will be replaced upon completionDetails
revision to pa #201907024914 & to comply with complaint 202178667 - temporary removal of cladding on tower legs from ground to 4th level to facilitate construction of broadcast repacking and structural upgrade performed under separate permits. cladding will be replaced upon completion | $300,000 |
| Feb 1, 2021 | Never finaled issued Mar 2021, no final | 1 La Avanzada | Premier Security Solutions Corp | as-built submittal to fire alarm permit 2019-0722-6454; reference 2018-1214-8341Details
as-built submittal to fire alarm permit 2019-0722-6454; reference 2018-1214-8341 | |
| Aug 28, 2020 | Expired or cancelled cancelled Jan 2026 | 1 La Avanzada | Advantage Roofing (See Notes) | re-roofing.rremove current roof, apply one layer of dense deck glass mat. apply one layer 60 mil tpo roofing. comply with the cool roof requirements per 2019 cec 141.0(b)2b.Details
re-roofing.rremove current roof, apply one layer of dense deck glass mat. apply one layer 60 mil tpo roofing. comply with the cool roof requirements per 2019 cec 141.0(b)2b. | $21,000 |
| Dec 26, 2019 | Completed final sign-off Aug 2020 | 1 La Avanzada | Matrix Hg Inc | replace existing split-systm with identical unit by same manufacturerDetails
replace existing split-systm with identical unit by same manufacturer | $84,804 |
| Dec 9, 2019 | Never finaled issued Dec 2019, no final | 1 La Avanzada | Wadleigh Group, Inc. | alteration of an (e) tv transmitter space @ sutro tower to accomodate new rf and electrical equipment. scope of work includes arch, elec and mechanical alterationsDetails
alteration of an (e) tv transmitter space @ sutro tower to accomodate new rf and electrical equipment. scope of work includes arch, elec and mechanical alterations | $500,000 |
| Oct 11, 2019 | Expired or cancelled cancelled Jan 2026 | 1 La Avanzada | Matrix Hg Inc | remove & replace (1) split systemDetails
remove & replace (1) split system | $79,084 |
| Aug 15, 2019 | Never finaled issued Sep 2019, no final | 1 La Avanzada | Wadleigh Group, Inc. | alteration of an existing tv transmitter space at sutro tower to accommodate new rf and electrical equipment. scope of work include architectural, electrical and mechanical alterationsDetails
alteration of an existing tv transmitter space at sutro tower to accommodate new rf and electrical equipment. scope of work include architectural, electrical and mechanical alterations | $750,000 |
| Jul 22, 2019 | Never finaled issued Oct 2019, no final | 1 La Avanzada | Premier Security Solutions Corp | modification to fire alarm system. adding duct detectors monitoring and notification appliances. ref app#201812148341Details
modification to fire alarm system. adding duct detectors monitoring and notification appliances. ref app#201812148341 | $7,600 |
| Jul 2, 2019 | Never finaled issued Sep 2019, no final | 1 La Avanzada | Best Endeavours | temporary removal of cladding on tower legs above 4th level. to facilitate construction of broadcast repacking and structural upgrade performed under separate permits. cladding will be replaced after completion.Details
temporary removal of cladding on tower legs above 4th level. to facilitate construction of broadcast repacking and structural upgrade performed under separate permits. cladding will be replaced after completion. | $500,000 |
| May 30, 2019 | Never finaled issued Sep 2019, no final | 1 La Avanzada | Best Endeavours | voluntary structural (seismic & wind) upgrade. note: link to environmental case #20070206e-3Details
voluntary structural (seismic & wind) upgrade. note: link to environmental case #20070206e-3 | $1,250,000 |
| May 21, 2019 | Never finaled issued Aug 2019, no final | 1 La Avanzada | Wadleigh Group, Inc. | alteration of existing tv transmitter, electrical for new transmitter and hvac, replace existing hvac with (2) new 15 ton split systemDetails
alteration of existing tv transmitter, electrical for new transmitter and hvac, replace existing hvac with (2) new 15 ton split system | $550,000 |
| Apr 23, 2019 | Expired or cancelled cancelled Jan 2026 | 1 La Avanzada | suite 201: interior ti 2 new non structural walls, replace e hvac equipment, electerical work for new transmitter and hvacDetails
suite 201: interior ti 2 new non structural walls, replace e hvac equipment, electerical work for new transmitter and hvac | $750,000 | |
| Jan 8, 2019 | Completed final sign-off Jul 2024 | 1 La Avanzada | Wadleigh Group, Inc. | to comply with nov# 202178667. remove cladding on leg b remove cladding legs a and c from 30 ft above base. paint tower legs and the horizontal and vertical faces of the horizontal levels 2, 3, and 4 and all of levels 5 and 6 in aviation orange and white.Details
to comply with nov# 202178667. remove cladding on leg b remove cladding legs a and c from 30 ft above base. paint tower legs and the horizontal and vertical faces of the horizontal levels 2, 3, and 4 and all of levels 5 and 6 in aviation orange and white. | $500,000 |
| Dec 14, 2018 | Never finaled issued Feb 2019, no final | 1 La Avanzada | Wadleigh Group, Inc. | interior ti on third floor of 2 new non structural partitions, 3 interior doors. replace existing hvac and electrical for new equipment racksDetails
interior ti on third floor of 2 new non structural partitions, 3 interior doors. replace existing hvac and electrical for new equipment racks | $150,000 |
| Sep 22, 2017 | Never finaled issued Sep 2019, no final | 1 La Avanzada | Best Endeavours | reconfigure broadcast antenna for kgo, kron, kbcw, lptv, kfog to accomodate federally. mandated frequency band modification includes remove & replace mast atop leg b. structural strengthening as necessitated by above.Details
reconfigure broadcast antenna for kgo, kron, kbcw, lptv, kfog to accomodate federally. mandated frequency band modification includes remove & replace mast atop leg b. structural strengthening as necessitated by above. | $500,000 |
| Aug 4, 2016 | Completed final sign-off Aug 2016 | 1 La Avanzada | to comply with nov 201629881: replace fallen panelDetails
to comply with nov 201629881: replace fallen panel | $500 | |
| Feb 16, 2016 | Completed final sign-off Jan 2018 | 1 La Avanzada | Hanford Applied Restoration & Conservati | landscape revision on permit 201304124453 per planning commission. new landscape plan. all site work previously approved.Details
landscape revision on permit 201304124453 per planning commission. new landscape plan. all site work previously approved. | $100,000 |
| Feb 16, 2016 | Completed final sign-off Oct 2020 | 1 La Avanzada | Wadleigh Group, Inc. | installation of eight foot parapet wall extension. move antennas to new locations on roof; screening existing antennas. relocation only no additional antennasDetails
installation of eight foot parapet wall extension. move antennas to new locations on roof; screening existing antennas. relocation only no additional antennas | $200,000 |
| Dec 8, 2015 | Never finaled issued May 2016, no final | 1 La Avanzada | Infrastructure Construction | remove and replae (3) existing backhaul antennas, (3) odu radios, (3) coax cables for sprint. no change in height to the structure and no ground work proposedDetails
remove and replae (3) existing backhaul antennas, (3) odu radios, (3) coax cables for sprint. no change in height to the structure and no ground work proposed | $8,500 |
| Jul 21, 2015 | Completed final sign-off Feb 2017 | 1 La Avanzada | install 1 low power fm antenna on sutro tower.Details
install 1 low power fm antenna on sutro tower. | $10,000 | |
| Feb 4, 2015 | Never finaled issued Feb 2015, no final | 1 La Avanzada | Intelligent Technologies & Services Inc | to obtain final inspection for work approved under pa 201202103943; all work is completeDetails
to obtain final inspection for work approved under pa 201202103943; all work is complete | |
| Oct 16, 2014 | Completed final sign-off Aug 2016 | 1 La Avanzada | Jtd Consulting Inc Dba Wireless Infrast | install a new broadcast transmitter, equipment rack, 200 amp electrical panel, new tuss, new ac unit, new heat exchanger and new metal stud wall.Details
install a new broadcast transmitter, equipment rack, 200 amp electrical panel, new tuss, new ac unit, new heat exchanger and new metal stud wall. | $120,000 |
| Jul 30, 2014 | Never finaled issued Jul 2014, no final | 1 La Avanzada | Cal Phase Construction Inc | to complete work and to obtain final inspection for work aproved under pa 201208238117Details
to complete work and to obtain final inspection for work aproved under pa 201208238117 | $3,800 |
| Mar 10, 2014 | Completed final sign-off May 2014 | 1 La Avanzada | Premier Security Solutions Corp | 1st floor: comcast:adding power supply and horn strobes to extg fire alarm system. adding 1 power supply and 3 horn/strobes to extg fire alarm panel; ref. 201309126701.Details
1st floor: comcast:adding power supply and horn strobes to extg fire alarm system. adding 1 power supply and 3 horn/strobes to extg fire alarm panel; ref. 201309126701. | $3,000 |
| Sep 12, 2013 | Completed final sign-off May 2014 | 1 La Avanzada | Brandon Construction Inc | install wall to seperate noisy switch space from office desks. fix duct to new register, relocate lightsDetails
install wall to seperate noisy switch space from office desks. fix duct to new register, relocate lights | $12,500 |
| Apr 12, 2013 | Completed final sign-off Jun 2017 | 1 La Avanzada | Best Endeavours | site improvements including: new retaining wall, drainage, paving & driveway repair. installation of 1 at-grade dish antenna.Details
site improvements including: new retaining wall, drainage, paving & driveway repair. installation of 1 at-grade dish antenna. | $250,000 |
| Apr 12, 2013 | Never finaled issued May 2015, no final | 1 La Avanzada | Tower Consultants Inc | addition of 50 wireless/tv/fm broadcast + reception antennas to (e) tower.Details
addition of 50 wireless/tv/fm broadcast + reception antennas to (e) tower. | $250,000 |
| Feb 27, 2013 | Completed final sign-off Nov 2013 | 1 La Avanzada | Western Machinery Electric | remove extg kofy generator. install new generator. relocate kfsf generator. install new structural pads. install new epdu. connect epdu to tenant loads as detailed. connect new gas to extg site fuel system.Details
remove extg kofy generator. install new generator. relocate kfsf generator. install new structural pads. install new epdu. connect epdu to tenant loads as detailed. connect new gas to extg site fuel system. | $865,000 |
| Aug 23, 2012 | Never finaled filed Aug 2012, never issued | 1 La Avanzada | reconfigure fuel piping assembly at generator base tank so as to not block float switch acess. replace e pump controller and add new leak detection monitoring system moduleDetails
reconfigure fuel piping assembly at generator base tank so as to not block float switch acess. replace e pump controller and add new leak detection monitoring system module | $3,800 | |
| Aug 23, 2012 | Never finaled issued Sep 2012, no final | 1 La Avanzada | Cal Phase Construction Inc | reconfigure fuel piping assembly at generator base tank as to not block float switch access. replace (e) pump controller and add new detection monitoring system moduleDetails
reconfigure fuel piping assembly at generator base tank as to not block float switch access. replace (e) pump controller and add new detection monitoring system module | $3,800 |
| Apr 25, 2012 | Completed final sign-off Feb 2013 | 1 La Avanzada | replace approx 1300 sq ft of 8ft chain link fenceDetails
replace approx 1300 sq ft of 8ft chain link fence | $25,000 | |
| Feb 10, 2012 | Completed final sign-off Mar 2015 | 1 La Avanzada | Intelligent Technologies & Services Inc | new hfc-227 ea (fm-200) clean agent fire suppression system within dc power room 212aDetails
new hfc-227 ea (fm-200) clean agent fire suppression system within dc power room 212a | $2,825 |
| Nov 30, 2011 | Never finaled issued Nov 2011, no final | 1 La Avanzada | Chris Wadleigh | construct new non-structural demising wall in existing space #212 & install new 4-0 x 8-0 door.Details
construct new non-structural demising wall in existing space #212 & install new 4-0 x 8-0 door. | $20,000 |
| Jun 16, 2011 | Completed final sign-off Apr 2012 | 1 La Avanzada | replace 1 30' antenna mast.Details
replace 1 30' antenna mast. | $20,000 | |
| Jun 14, 2011 | Never finaled issued Jan 2012, no final | 1 La Avanzada | Sut's Superior Underground Tank Service | replace underground fuel piping for standby generator; replace underground storage tank piping sump; install new suction pump set; install new monitoring console & sensors. install one 25 gal us 142 overflow tank with pump.Details
replace underground fuel piping for standby generator; replace underground storage tank piping sump; install new suction pump set; install new monitoring console & sensors. install one 25 gal us 142 overflow tank with pump. | $12,000 |
| May 27, 2010 | Completed final sign-off May 2013 | 1 La Avanzada | addition of 14 antenna on (e) mount locations. previously approved by planning.Details
addition of 14 antenna on (e) mount locations. previously approved by planning. | $25,000 | |
| May 27, 2010 | Completed final sign-off Jan 2012 | 1 La Avanzada | Tower Consultants Inc | revision to pa# 2007/12/20/0973. addition of lateral brace to aux dtu mast antenna. no change to antenna.Details
revision to pa# 2007/12/20/0973. addition of lateral brace to aux dtu mast antenna. no change to antenna. | $150,000 |
| Nov 23, 2009 | Completed final sign-off Dec 2009 | 1 La Avanzada | Whiteman Petroleum Inc. | remove & replace fill spill containment for diesel emergency generator tank. refer to pa# 2006-0303-5973 (sutro tower inc)Details
remove & replace fill spill containment for diesel emergency generator tank. refer to pa# 2006-0303-5973 (sutro tower inc) | $3,358 |
| Apr 24, 2009 | Never finaled issued Apr 2009, no final | 1 La Avanzada | Cosco Fire Protection Inc. | add 6 smoke detectors in mechanical rooms located on roofDetails
add 6 smoke detectors in mechanical rooms located on roof | $6,000 |
| Jan 3, 2008 | Never finaled issued Jan 2008, no final | 1 La Avanzada | A A C Designers Builders Inc | to renew expired app #200509163160 and 200603035973 for final inspectionDetails
to renew expired app #200509163160 and 200603035973 for final inspection | |
| Dec 20, 2007 | Completed final sign-off Jan 2012 | 1 La Avanzada | replace analog tv antennas with digital. install auxilary antenaas. enlarge roof equipment shelter. reinforce portion of existing tower.Details
replace analog tv antennas with digital. install auxilary antenaas. enlarge roof equipment shelter. reinforce portion of existing tower. | $2,000,000 | |
| Jan 30, 2007 | Never finaled issued May 2007, no final | 1 La Avanzada | Diversified Fire Products | install a water based protection system (watermist) to protect generator. see 200603035973 for generator and tank installation permit. water tank is not visible from street or outside fence.Details
install a water based protection system (watermist) to protect generator. see 200603035973 for generator and tank installation permit. water tank is not visible from street or outside fence. | $40,000 |
| Jun 21, 2006 | Completed final sign-off Apr 2009 | 1 La Avanzada | replace 4 microwave receive antennas. install 1 microwave receive antenna.Details
replace 4 microwave receive antennas. install 1 microwave receive antenna. | $50,000 | |
| Jun 21, 2006 | Completed final sign-off May 2008 | 1 La Avanzada | install 4 receive only satellite antennas on building roof.Details
install 4 receive only satellite antennas on building roof. | $25,000 | |
| Mar 3, 2006 | Expired or cancelled expired Feb 2008 | 1 La Avanzada | Mcclier Corporation | above ground 6000 gal diesel tank for ememergency generator and kohler 1000 kw generator. see 200509163160 for enclosure & concrete work.Details
above ground 6000 gal diesel tank for ememergency generator and kohler 1000 kw generator. see 200509163160 for enclosure & concrete work. | $110,000 |
| Sep 16, 2005 | Expired or cancelled expired Feb 2008 | 1 La Avanzada | to erect 1 story of emergency generator building.Details
to erect 1 story of emergency generator building. | $295,000 | |
| Jun 6, 2005 | Completed final sign-off Mar 2007 | 1 La Avanzada | Sabah International Incorporated | install one fm200 fire suppression sys ecs server room-1 control panel,2 aberts,1 tank,4 smoke detector, 2 mt strobes, 2 nozzles, 2 manuel pulls, 2 rss strobes.Details
install one fm200 fire suppression sys ecs server room-1 control panel,2 aberts,1 tank,4 smoke detector, 2 mt strobes, 2 nozzles, 2 manuel pulls, 2 rss strobes. | $42,747 |
| Jan 25, 2005 | Completed final sign-off Sep 2006 | 1 La Avanzada | build concrete pads to support new sat dishes for tv broadcast.no const under this permit.site onlyDetails
build concrete pads to support new sat dishes for tv broadcast.no const under this permit.site only | $20,000 | |
| Dec 20, 2004 | Completed final sign-off Jul 2005 | 1 La Avanzada | replace fm radio antenna on existing structure with similar antena.Details
replace fm radio antenna on existing structure with similar antena. | $20,000 | |
| Nov 5, 2004 | Never finaled filed Nov 2004, never issued | 1 La Avanzada | Mcclier Corporation | install new stand by generator, associated fuel tank,switches,boards.construct masonry enclosure toDetails
install new stand by generator, associated fuel tank,switches,boards.construct masonry enclosure to | $295,000 |
| Oct 1, 2003 | Never finaled issued Oct 2003, no final | 1 La Avanzada | reinforce existing structureDetails
reinforce existing structure | $750,000 | |
| May 14, 2003 | Expired or cancelled expired Feb 2006 | 1 La Avanzada | Dpr Construction Inc | retaining wall and slab for kpst-tv per pa 9913916-s3Details
retaining wall and slab for kpst-tv per pa 9913916-s3 | $15,000 |
| Jan 28, 2003 | Expired or cancelled expired Feb 2006 | 1 La Avanzada | Acco Engineered Systems Inc. Dba Acco En | new door, saw cut for mechanical work, ti misc work, misc-demo, make up air handler, one exhaust fanDetails
new door, saw cut for mechanical work, ti misc work, misc-demo, make up air handler, one exhaust fan | $206,000 |
| Nov 15, 2002 | Never finaled issued Nov 2002, no final | 1 La Avanzada | Intelligent Technologies & Services Inc | 3/fl- install a hfc-227ea fire suppression system in transmitter roomDetails
3/fl- install a hfc-227ea fire suppression system in transmitter room | $17,500 |
| Feb 11, 2002 | Expired or cancelled cancelled Feb 2003 | 250 Palo Alto Av | retroactive pa to install commun antennas,repl undergrd tankDetails
retroactive pa to install commun antennas,repl undergrd tank | $75,000 | |
| Jul 31, 2001 | Completed final sign-off Dec 2001 | 1 La Avanzada | Total Telco Specialists Inc | installation of a wireless communications facility consisting of three antenana and nine related equDetails
installation of a wireless communications facility consisting of three antenana and nine related equ | $35,000 |
| Oct 27, 2000 | Expired or cancelled expired Mar 2002 | 1 La Avanzada | replace transmit antenna on 3rd level tower. add transmission line also.Details
replace transmit antenna on 3rd level tower. add transmission line also. | $35,000 | |
| Aug 18, 2000 | Completed final sign-off Jun 2001 | 1 La Avanzada | install int partitions, install digital audio broadcast equipment in existing bldng, install transmiDetails
install int partitions, install digital audio broadcast equipment in existing bldng, install transmi | $80,000 | |
| Jun 7, 2000 | Expired or cancelled expired Apr 2001 | 1 La Avanzada | install nurao microwave antenna on existing towerDetails
install nurao microwave antenna on existing tower | $3,000 | |
| Apr 7, 2000 | Expired or cancelled expired Apr 2001 | 1 La Avanzada | install jw/control equip on 3rd level of existing tower.Details
install jw/control equip on 3rd level of existing tower. | $19,640 | |
| Feb 11, 2000 | Expired or cancelled cancelled Jul 2001 | 1 La Avanzada | Mcclier Corporation | equipment pad to level the floor, per bldgn inspector, directions this drawing -9927276Details
equipment pad to level the floor, per bldgn inspector, directions this drawing -9927276 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Wadleigh Group, Inc. (8), Best Endeavours (5), Premier Security Solutions Corp (4), Intelligent Technologies & Services Inc (3), Mcclier Corporation (3), Cal Phase Construction Inc (2), Matrix Hg Inc (2), Tower Consultants Inc (2), A A C Designers Builders Inc, Acco Engineered Systems Inc. Dba Acco En, Advantage Roofing (See Notes), Air Systems, Inc., Brandon Construction Inc, Chris Wadleigh, Cosco Fire Protection Inc., Diversified Fire Products, Dpr Construction Inc, Hanford Applied Restoration & Conservati, Infrastructure Construction, Jtd Consulting Inc Dba Wireless Infrast, Mastec Network Solutions Inc, Sabah International Incorporated, Sut's Superior Underground Tank Service, Tilson Technology Management Inc, Total Telco Specialists Inc, Western Machinery Electric, Whiteman Petroleum Inc.
- Architects
- Ronald Hamburger (2), Ahmad Jahromi, Ahmad Jahromi, Madhan Samy, Mark Thieme, Sarah Hobsteter
- Engineers
- Ronald Hamburger (9), Aaron Lobas (3), Kirk A Fry (3), Ronald Hamburger (2), Aaron Newman, Babak Hashemi, Benjamin J. Weaver, Brett Mccomb, Chau Tang, Pablo Orozco, Sean Johnson, Wissam Zalzali
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.