Chau Tang
- Listed as
- engineer
- On San Francisco permits
- Oct 2014 to Jul 2025
5 permits since 2000 (engineer on 5 permits): 3 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 25, 2025 | In progress issued Feb 2026 | 5235 Diamond Heights Bl | Metropolitan Electrical Construction | t-mobile: install 6 new antennas, 6 radios, add 2 cabinets, remove 1 existing cabinet, remove 1 antenna.Details
t-mobile: install 6 new antennas, 6 radios, add 2 cabinets, remove 1 existing cabinet, remove 1 antenna. | $25,000 |
| Jan 21, 2021 | Completed final sign-off Dec 2022 | 758 Divisadero St | Metropolitan Electrical Construction | att modification: swap 3 (e) antennas. swap 6 (e) rru's with 3 (n) rru's. relocate 2 (e) anteannas to within 2 (n) frp radomes. upgrade (e) 100a meter with 200a meter. no change to (e) batteries.Details
att modification: swap 3 (e) antennas. swap 6 (e) rru's with 3 (n) rru's. relocate 2 (e) anteannas to within 2 (n) frp radomes. upgrade (e) 100a meter with 200a meter. no change to (e) batteries. | $38,000 |
| Jul 16, 2019 | Completed final sign-off Jan 2024 | 755 Stanyan St | Advanced Wireless & Logistics Inc | installation of an att wireless telecom facility. 12 antennas, 24 rru's, 4 dc-6 surge suppressors. ground equipment for telco + power sow on cps.Details
installation of an att wireless telecom facility. 12 antennas, 24 rru's, 4 dc-6 surge suppressors. ground equipment for telco + power sow on cps. | $200,000 |
| Apr 24, 2019 | Never finaled issued Jan 2020, no final | 81 09th St | Sac Wireless | replace 3 antennas w/ 3 antennas, replace 3 rrus with 9 rrus, install 1 elter radio cabinet on (p) equipment pad, 1 elter battery cabineton (p) pad, 1 elter 1-cabent on (p) pad, install (1) 100a ppc cabinet on (p) h-frame, install (p) 30" dia faux vent for sector "3" only install diplexorsDetails
replace 3 antennas w/ 3 antennas, replace 3 rrus with 9 rrus, install 1 elter radio cabinet on (p) equipment pad, 1 elter battery cabineton (p) pad, 1 elter 1-cabent on (p) pad, install (1) 100a ppc cabinet on (p) h-frame, install (p) 30" dia faux vent for sector "3" only install diplexors | $20,000 |
| Oct 16, 2014 | Completed final sign-off Aug 2016 | 1 La Avanzada | Jtd Consulting Inc Dba Wireless Infrast | install a new broadcast transmitter, equipment rack, 200 amp electrical panel, new tuss, new ac unit, new heat exchanger and new metal stud wall.Details
install a new broadcast transmitter, equipment rack, 200 amp electrical panel, new tuss, new ac unit, new heat exchanger and new metal stud wall. | $120,000 |