Ronald Hamburger
- Listed as
- engineer
- Firm
- Simpson Gumpertz & Heger Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2019 to May 2023
7 permits since 2000 (engineer on 7 permits): 6 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 26, 2023 | Completed final sign-off Nov 2023 | 301 Mission St | Shimmick Construction Co. Inc. | revision to pa 2021-0719-4668.increase size of bearing plate on high strength threaded rods to accommodate 1,000 kip jacking loads.Details
revision to pa 2021-0719-4668.increase size of bearing plate on high strength threaded rods to accommodate 1,000 kip jacking loads. | |
| Jun 28, 2022 | Completed final sign-off Nov 2022 | 50 California St | Principal Builders Inc. | 23/f-24/f: strengthening of existing steel framing for installation of a new high density shelving unit.Details
23/f-24/f: strengthening of existing steel framing for installation of a new high density shelving unit. | $25,000 |
| Jul 19, 2021 | Completed final sign-off Oct 2023 | 301 Mission St | Shimmick Construction Co. Inc. | revision to pa# 201812047402,to reduce the quantity of piles from 52 to 18 and to reduce the vault extents accordingly,to relocate the piles 8" farther from the building face,to modify the locations of piles to avoid existing utilities,to increase the pile diameter in the rock socket form 20"to24".Details
revision to pa# 201812047402,to reduce the quantity of piles from 52 to 18 and to reduce the vault extents accordingly,to relocate the piles 8" farther from the building face,to modify the locations of piles to avoid existing utilities,to increase the pile diameter in the rock socket form 20"to24". | |
| Jul 19, 2021 | Completed final sign-off Aug 2023 | 301 Mission St | Shimmick Construction Co. Inc. | revision to pa# 2018-1207-7828. to abandon indicator pile no. 1 and to add indicator pile no. 2, with a rock-socket diameter of 24 inches, located 8 feet to the north along fremont street.Details
revision to pa# 2018-1207-7828. to abandon indicator pile no. 1 and to add indicator pile no. 2, with a rock-socket diameter of 24 inches, located 8 feet to the north along fremont street. | $50,000 |
| Oct 2, 2020 | Completed final sign-off Jun 2023 | 1045 Sansome St | Bcci Construction Company | add a roof terrace with outdoor seating, 42"tall guardrails set back 5' from (e) bldg parapets & new stair vestibule. demolition (e) partitions & assosciated power/data & floor finishes. construct new partitions, doors, power & tele/data, lighting, millwork & finish. 2 new restrooms.Details
add a roof terrace with outdoor seating, 42"tall guardrails set back 5' from (e) bldg parapets & new stair vestibule. demolition (e) partitions & assosciated power/data & floor finishes. construct new partitions, doors, power & tele/data, lighting, millwork & finish. 2 new restrooms. | $1,400,000 |
| Jul 2, 2019 | Never finaled issued Sep 2019, no final | 1 La Avanzada | Best Endeavours | temporary removal of cladding on tower legs above 4th level. to facilitate construction of broadcast repacking and structural upgrade performed under separate permits. cladding will be replaced after completion.Details
temporary removal of cladding on tower legs above 4th level. to facilitate construction of broadcast repacking and structural upgrade performed under separate permits. cladding will be replaced after completion. | $500,000 |
| Jan 8, 2019 | Completed final sign-off Jul 2024 | 1 La Avanzada | Wadleigh Group, Inc. | to comply with nov# 202178667. remove cladding on leg b remove cladding legs a and c from 30 ft above base. paint tower legs and the horizontal and vertical faces of the horizontal levels 2, 3, and 4 and all of levels 5 and 6 in aviation orange and white.Details
to comply with nov# 202178667. remove cladding on leg b remove cladding legs a and c from 30 ft above base. paint tower legs and the horizontal and vertical faces of the horizontal levels 2, 3, and 4 and all of levels 5 and 6 in aviation orange and white. | $500,000 |