From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
33 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 6, 2026 | In progress filed May 2026, not yet issued | 301 Mission St | Evercharge Inc | installation of 1 lv3 ev charging state and relocating the load of 6 (e) lv2 stsations to behind the same service. connected to (n) ded panel behind main breaker at 480v main. new 1200a panelboard in main electrical rm. lv3 charger connection at this pnl. (n) transformer will connect (e) ev panelbrdDetails
installation of 1 lv3 ev charging state and relocating the load of 6 (e) lv2 stsations to behind the same service. connected to (n) ded panel behind main breaker at 480v main. new 1200a panelboard in main electrical rm. lv3 charger connection at this pnl. (n) transformer will connect (e) ev panelbrd | $175,000 |
| Oct 19, 2023 | In progress issued Oct 2023 | 301 Mission St | Ad Art Inc. | to elect one non-electric, single faced, wall sign (bmo).Details
to elect one non-electric, single faced, wall sign (bmo). | $3,000 |
| Oct 19, 2023 | In progress issued Oct 2023 | 301 Mission St | Ad Art Inc. | to elect 2 electric, single faced, wall signs (bmo).Details
to elect 2 electric, single faced, wall signs (bmo). | $10,000 |
| Aug 1, 2023 | Never finaled issued Sep 2023, no final | 301 Mission St | Baxter Construction | 1/f: restore bank of west t.i. space, modify back to original condition pnrior to bpa#202003167141. remove temporary interior sound mitigattion wall/temporary systems to be restored to original entry door on mission st., restore doors/adjust signate to original condition. egress systems to beDetails
1/f: restore bank of west t.i. space, modify back to original condition pnrior to bpa#202003167141. remove temporary interior sound mitigattion wall/temporary systems to be restored to original entry door on mission st., restore doors/adjust signate to original condition. egress systems to be | $140,000 |
| Jun 9, 2023 | Completed final sign-off Feb 2026 | 301 Mission St | remove and dispose of (e) stay arms screws install stay arms and ss screws per hardware schedule. all units total 420 units.Details
remove and dispose of (e) stay arms screws install stay arms and ss screws per hardware schedule. all units total 420 units. | $30,000 | |
| May 26, 2023 | Completed final sign-off Nov 2023 | 301 Mission St | Shimmick Construction Co. Inc. | revision to pa 2021-0719-4668.increase size of bearing plate on high strength threaded rods to accommodate 1,000 kip jacking loads.Details
revision to pa 2021-0719-4668.increase size of bearing plate on high strength threaded rods to accommodate 1,000 kip jacking loads. | |
| Oct 3, 2022 | Completed final sign-off Jul 2023 | 301 Mission St | Bcci Construction Company | emergency repairs of failed facade system. structural onlyDetails
emergency repairs of failed facade system. structural only | $400,000 |
| Sep 28, 2022 | Never finaled issued Jan 2023, no final | 301 Mission St | Bcci Construction Company | owners lounge: scope of project limited to interior renovation of selected spaces onlevel 2 of e project. ti spaces are l2 bar, pantry, and private dining door refurbishmentDetails
owners lounge: scope of project limited to interior renovation of selected spaces onlevel 2 of e project. ti spaces are l2 bar, pantry, and private dining door refurbishment | $350,000 |
| Mar 22, 2022 | Completed final sign-off Nov 2023 | 301 Mission St | revision to pa# 201812077819, to revise the excavation and shoring due to change of primary shoring system from jet grout columns to a secant pile wall, modify shoring wall to avoid conflicts with the pg&e vaults & conduits.Details
revision to pa# 201812077819, to revise the excavation and shoring due to change of primary shoring system from jet grout columns to a secant pile wall, modify shoring wall to avoid conflicts with the pg&e vaults & conduits. | ||
| Jul 19, 2021 | Completed final sign-off Oct 2023 | 301 Mission St | Shimmick Construction Co. Inc. | revision to pa# 201812047402,to reduce the quantity of piles from 52 to 18 and to reduce the vault extents accordingly,to relocate the piles 8" farther from the building face,to modify the locations of piles to avoid existing utilities,to increase the pile diameter in the rock socket form 20"to24".Details
revision to pa# 201812047402,to reduce the quantity of piles from 52 to 18 and to reduce the vault extents accordingly,to relocate the piles 8" farther from the building face,to modify the locations of piles to avoid existing utilities,to increase the pile diameter in the rock socket form 20"to24". | |
| Jul 19, 2021 | Completed final sign-off Aug 2023 | 301 Mission St | Shimmick Construction Co. Inc. | revision to pa# 201812077819, to revise the excavation and shoring extents due to the relocation and reduction in quantity of permanent piles to change the primary shoring system from jet groot columns to a secant pile wall, modify shoring wall to avoid conflicts with the pg&e vaults & conduits.Details
revision to pa# 201812077819, to revise the excavation and shoring extents due to the relocation and reduction in quantity of permanent piles to change the primary shoring system from jet groot columns to a secant pile wall, modify shoring wall to avoid conflicts with the pg&e vaults & conduits. | |
| Jul 19, 2021 | Completed final sign-off Aug 2023 | 301 Mission St | Shimmick Construction Co. Inc. | revision to pa# 2018-1207-7828. to abandon indicator pile no. 1 and to add indicator pile no. 2, with a rock-socket diameter of 24 inches, located 8 feet to the north along fremont street.Details
revision to pa# 2018-1207-7828. to abandon indicator pile no. 1 and to add indicator pile no. 2, with a rock-socket diameter of 24 inches, located 8 feet to the north along fremont street. | $50,000 |
| Jan 28, 2020 | Completed final sign-off Apr 2020 | 301 Mission St | Convergint Technologies Llc | 1st floor, level 1: fire alarm voluntary upgrade. add 1 new smoke detector to extg system. add 2 new door holders to extg circuit.Details
1st floor, level 1: fire alarm voluntary upgrade. add 1 new smoke detector to extg system. add 2 new door holders to extg circuit. | $3,000 |
| Dec 7, 2018 | Completed final sign-off Nov 2023 | 301 Mission St | Shimmick Construction Co. Inc. | **paralle plan check", shoring and excavation on freemont and mission. reference to perimeter pile upgrade permit application #201812047402Details
**paralle plan check", shoring and excavation on freemont and mission. reference to perimeter pile upgrade permit application #201812047402 | $4,800,000 |
| Dec 7, 2018 | Completed final sign-off Oct 2023 | 301 Mission St | Shimmick Construction Co. Inc. | indicator pile located on mission and fremont street sidewalk. reference to perimeter pile upgrade permit application #201812047402Details
indicator pile located on mission and fremont street sidewalk. reference to perimeter pile upgrade permit application #201812047402 | $1,800,000 |
| Dec 4, 2018 | Completed final sign-off Feb 2025 | 301 Mission St | Shimmick Construction Co. Inc. | parallel plan check, voluntary seismic upgrade and foundation stabilization, addition of new piles, extending to rock, and tranfer approximatly 20% of building weight to the new piles with intent of arresting boilding settlement and improving the foundation lateral capacity.Details
parallel plan check, voluntary seismic upgrade and foundation stabilization, addition of new piles, extending to rock, and tranfer approximatly 20% of building weight to the new piles with intent of arresting boilding settlement and improving the foundation lateral capacity. | $30,000,000 |
| Sep 13, 2018 | Completed final sign-off Jun 2019 | 301 Mission St | Accelerated Engineering Services Inc, Swinerton Builders | sub surface exploration consisting of 2 borings to approx. 250 feet below the top of the basement mat foundation, to obtain data for future foundation retrofit design, no exterior work.Details
sub surface exploration consisting of 2 borings to approx. 250 feet below the top of the basement mat foundation, to obtain data for future foundation retrofit design, no exterior work. | $40,000 |
| Apr 16, 2018 | Completed final sign-off Jan 2019 | 301 Mission St | Swinerton Builders | core of holes through basement wall of podium structure & into mat foundation of tower to collect concrete core samples for testingDetails
core of holes through basement wall of podium structure & into mat foundation of tower to collect concrete core samples for testing | |
| Mar 12, 2018 | Completed final sign-off Jan 2019 | 301 Mission St | Swinerton Builders | (e)shoring wall investigation: 2-3 ftx3ft holes will be made in the basement well of the adjacent podium structural at 301 mission. in order to see if the mat foundation of the tower is resting on the shoring wall of the podium structure due to the excessive settlement of the tower. n/a for maherDetails
(e)shoring wall investigation: 2-3 ftx3ft holes will be made in the basement well of the adjacent podium structural at 301 mission. in order to see if the mat foundation of the tower is resting on the shoring wall of the podium structure due to the excessive settlement of the tower. n/a for maher | $225,000 |
| Feb 16, 2018 | Completed final sign-off Jan 2019 | 301 Mission St | Swinerton Builders | core through existing concrete mat foundation of building up to 12 holes; 2-16" diameter and 10-3" diameter holes to test a connection for the future retrofit pile under separate building permit.Details
core through existing concrete mat foundation of building up to 12 holes; 2-16" diameter and 10-3" diameter holes to test a connection for the future retrofit pile under separate building permit. | $120,000 |
| Mar 22, 2017 | Completed final sign-off Mar 2017 | 301 Mission St | administrative permit - no work- to correct miscalculation of penalty on app# 201703141380Details
administrative permit - no work- to correct miscalculation of penalty on app# 201703141380 | ||
| Mar 14, 2017 | Completed final sign-off Mar 2017 | 301 Mission St | adminitrative permit only to pay penalty on nov# 201643601 ( 9x20,000) in reference to pa# 201610281442Details
adminitrative permit only to pay penalty on nov# 201643601 ( 9x20,000) in reference to pa# 201610281442 | ||
| Jan 17, 2017 | Never finaled issued Jan 2017, no final | 301 Mission St | Thomas Swan Sign Co Inc | electric single faced wall signDetails
electric single faced wall sign | $15,000 |
| Jan 17, 2017 | Never finaled issued Jan 2017, no final | 301 Mission St | Thomas Swan Sign Co Inc | non electric single faced wall signDetails
non electric single faced wall sign | $1,000 |
| Nov 18, 2016 | Completed final sign-off Mar 2017 | 301 Mission St | Authentic Restoration & Water Roof Ive | revision to 201610281442, waterproofing repair to b4 and b5 lvel with acrylate grout injection. to comply with nov #201643601Details
revision to 201610281442, waterproofing repair to b4 and b5 lvel with acrylate grout injection. to comply with nov #201643601 | $15,000 |
| Nov 1, 2016 | Completed final sign-off Nov 2016 | 301 Mission St | Communication Technology Services Llc | revision to 201501296978: no exterior donor antennas to be installed maher na sheets a1, a3Details
revision to 201501296978: no exterior donor antennas to be installed maher na sheets a1, a3 | |
| Oct 28, 2016 | Completed final sign-off Mar 2017 | 301 Mission St | Authentic Restoration & Water Roof Ive | repair concrete wall on b4 from water damage maher na. ref to pa# 201611183133. to comply with nov #201643601Details
repair concrete wall on b4 from water damage maher na. ref to pa# 201611183133. to comply with nov #201643601 | $25,000 |
| Jan 29, 2015 | Completed final sign-off Nov 2016 | 301 Mission St | Communication Technology Services Llc | proposed installlation is for the colocation of verizon wireless equipment onto an extg indoor distributed antenna system (idas) consisting of radio equipment mounted to 2 extg rocks,dc power plant and radio equip. on extg extg rock, one antena mounting pipe for 1 gps antenna and 1 donor antennaDetails
proposed installlation is for the colocation of verizon wireless equipment onto an extg indoor distributed antenna system (idas) consisting of radio equipment mounted to 2 extg rocks,dc power plant and radio equip. on extg extg rock, one antena mounting pipe for 1 gps antenna and 1 donor antenna | $30,000 |
| Nov 3, 2014 | Never finaled issued Nov 2014, no final | 301 Mission St | street spaceDetails
street space | ||
| May 29, 2014 | Never finaled issued May 2014, no final | 301 Mission St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Dec 23, 2011 | Never finaled issued Dec 2011, no final | 301 Mission St | Anderson, Rowe & Buckley, Inc. | 1st floor-tenant improvement (e) fire sprinkler system-5 relocated sprinklers & 16 new sprinklersDetails
1st floor-tenant improvement (e) fire sprinkler system-5 relocated sprinklers & 16 new sprinklers | $8,000 |
| Nov 15, 2011 | Never finaled issued Mar 2012, no final | 301 Mission St | Communication Technology Services Llc | common area installation of antenna portion of att indoor das: 352 micro antennas, 70 fiber bdasDetails
common area installation of antenna portion of att indoor das: 352 micro antennas, 70 fiber bdas | $10,000 |
| Jun 29, 2011 | Never finaled issued Mar 2012, no final | 301 Mission St | Communication Technology Services Llc | for common area. intsallation of new indoor at&t telecomunications das equipment: 2 rbs cabinets, one 23" rack with a dc power system, four 19" racks, six rrv's, one 23" battery rack, and one 3206 rbs cabinet.Details
for common area. intsallation of new indoor at&t telecomunications das equipment: 2 rbs cabinets, one 23" rack with a dc power system, four 19" racks, six rrv's, one 23" battery rack, and one 3206 rbs cabinet. | $15,000 |
Find contractors for work like this