John A Egan
- License
- GE291
- Geotechnical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up GE291 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Dec 2018 to Dec 2018
1 permit since 2000 (engineer on 1 permit): 1 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Shimmick Construction Co. Inc.
- Engineers
- Angelo Obertello, Ronald O Hamburger
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 4, 2018 | Completed final sign-off Feb 2025 | 301 Mission St | Shimmick Construction Co. Inc. | parallel plan check, voluntary seismic upgrade and foundation stabilization, addition of new piles, extending to rock, and tranfer approximatly 20% of building weight to the new piles with intent of arresting boilding settlement and improving the foundation lateral capacity.Details
parallel plan check, voluntary seismic upgrade and foundation stabilization, addition of new piles, extending to rock, and tranfer approximatly 20% of building weight to the new piles with intent of arresting boilding settlement and improving the foundation lateral capacity. | $30,000,000 |