Alexander Shorts

License
E21782
Look the license up with the state
Listed as
engineer
Firm
Evercharge
Based in
Palo Alto
On San Francisco permits
Aug 2025 to May 2026

4 permits since 2000 (engineer on 4 permits): 1 completed, 3 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 6, 2026In progress
filed May 2026, not yet issued
301 Mission StEvercharge Incinstallation of 1 lv3 ev charging state and relocating the load of 6 (e) lv2 stsations to behind the same service. connected to (n) ded panel behind main breaker at 480v main. new 1200a panelboard in main electrical rm. lv3 charger connection at this pnl. (n) transformer will connect (e) ev panelbrd
Details
Permit
202604079005
Status
filed
Filed
May 6, 2026
Declared cost
$175,000
Address
301 Mission St

installation of 1 lv3 ev charging state and relocating the load of 6 (e) lv2 stsations to behind the same service. connected to (n) ded panel behind main breaker at 480v main. new 1200a panelboard in main electrical rm. lv3 charger connection at this pnl. (n) transformer will connect (e) ev panelbrd

Open the permit page

$175,000
Mar 3, 2026Completed
final sign-off Apr 2026
1150 Lombard StCee Jay Industrycommon area parking (lower/upper) - installation of 15 lvl 2 ev charging stations. (e) infrastructure was designed for future ev chargers. only 15 to be installed and energized. all others shown for future chargers, work includes mounting of chargers and install of associated branch circuit breakers
Details
Permit
202603036827
Status
complete
Filed
Mar 3, 2026
Permit issued
Mar 27, 2026
Final sign-off
Apr 21, 2026
Declared cost
$17,750
Address
1150 Lombard St

common area parking (lower/upper) - installation of 15 lvl 2 ev charging stations. (e) infrastructure was designed for future ev chargers. only 15 to be installed and energized. all others shown for future chargers, work includes mounting of chargers and install of associated branch circuit breakers

Open the permit page

$17,750
Nov 24, 2025In progress
issued Mar 2026
300 Berry StCee Jay Industrynew electrical infrastructure within an (e) parking garage, includes installation of service equipment, transformer, ev-dedicated panelboard, conduits and submetering. new electrical infrastructure construction to support future installation of up to 40 level 2 electric vehicle charging stations.
Details
Permit
202510308528
Status
issued
Filed
Nov 24, 2025
Permit issued
Mar 19, 2026
Declared cost
$88,300
Address
300 Berry St

new electrical infrastructure within an (e) parking garage, includes installation of service equipment, transformer, ev-dedicated panelboard, conduits and submetering. new electrical infrastructure construction to support future installation of up to 40 level 2 electric vehicle charging stations.

Open the permit page

$88,300
Aug 4, 2025In progress
filed Aug 2025, not yet issued
2222 17th Stinstallation of 10 level 2 ev chargers.
Details
Permit
202507181128
Status
approved
Filed
Aug 4, 2025
Declared cost
$100,000
Address
2222 17th St

installation of 10 level 2 ev chargers.

Open the permit page

$100,000