Evercharge Inc
- Based in
- Hayward
- On San Francisco permits
- May 2026 to Aug 2026
- Last 24 months
- 3 permits filed
3 permits since 2000: 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2026 | In progress issued Aug 2026 | 1150 Lombard St | common area parking space (64&65)-addition of (1) lv2 ev charger to (e) shared ev charging network. the addition will not add to the load of the site, instead it will share with the load available for the ev charger. the new charger will be added to (e)ev panel board with conduuit run to location.Details
common area parking space (64&65)-addition of (1) lv2 ev charger to (e) shared ev charging network. the addition will not add to the load of the site, instead it will share with the load available for the ev charger. the new charger will be added to (e)ev panel board with conduuit run to location. | $1,500 |
| Jun 18, 2026 | In progress filed Jun 2026, not yet issued | 153 Townsend St | (n) 1200amp 480/277v, 30 electrical service from utility for evse infrastructure. demo (e) 100amp, 480v, 30 circuits breaker from (e) 400a, 480/277v, 30 main switchboard reconnect primary side of 750kva step down for (e) 200amp, 240/139v, 30 ev main switchboard from (n) 100amp, 480/277v, 30 evDetails
(n) 1200amp 480/277v, 30 electrical service from utility for evse infrastructure. demo (e) 100amp, 480v, 30 circuits breaker from (e) 400a, 480/277v, 30 main switchboard reconnect primary side of 750kva step down for (e) 200amp, 240/139v, 30 ev main switchboard from (n) 100amp, 480/277v, 30 ev | $110,878 |
| May 6, 2026 | In progress filed May 2026, not yet issued | 301 Mission St | installation of 1 lv3 ev charging state and relocating the load of 6 (e) lv2 stsations to behind the same service. connected to (n) ded panel behind main breaker at 480v main. new 1200a panelboard in main electrical rm. lv3 charger connection at this pnl. (n) transformer will connect (e) ev panelbrdDetails
installation of 1 lv3 ev charging state and relocating the load of 6 (e) lv2 stsations to behind the same service. connected to (n) ded panel behind main breaker at 480v main. new 1200a panelboard in main electrical rm. lv3 charger connection at this pnl. (n) transformer will connect (e) ev panelbrd | $175,000 |