Block 3794, lot 025
153 Townsend St
- City’s use
- Commercial Office
- Built
- 2002
- Stories
- 9
- Building
- 323,983 sq ft
- Lot
- 37,812 sq ft
- Zoning
- MUO
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 18, 2026 | In progress filed Jun 2026, not yet issued | 153 Townsend St | Evercharge Inc | (n) 1200amp 480/277v, 30 electrical service from utility for evse infrastructure. demo (e) 100amp, 480v, 30 circuits breaker from (e) 400a, 480/277v, 30 main switchboard reconnect primary side of 750kva step down for (e) 200amp, 240/139v, 30 ev main switchboard from (n) 100amp, 480/277v, 30 evDetails
(n) 1200amp 480/277v, 30 electrical service from utility for evse infrastructure. demo (e) 100amp, 480v, 30 circuits breaker from (e) 400a, 480/277v, 30 main switchboard reconnect primary side of 750kva step down for (e) 200amp, 240/139v, 30 ev main switchboard from (n) 100amp, 480/277v, 30 ev | $110,878 |
| Apr 20, 2026 | In progress issued Jun 2026 | 153 Townsend St | Singular Builders | 9th/f t.i. demo of non-structural partitions, install new elevator lobby door. all new or revised meps or life safety work will be design build & submitted separately (bldg is fully sprinklerd)Details
9th/f t.i. demo of non-structural partitions, install new elevator lobby door. all new or revised meps or life safety work will be design build & submitted separately (bldg is fully sprinklerd) | $150,000 |
| Apr 20, 2026 | In progress issued Jun 2026 | 153 Townsend St | Singular Builders | 8th/f t.i. demo of non-structural partition, install new interior glazing storefront system. (bldg is fully sprinklerd)Details
8th/f t.i. demo of non-structural partition, install new interior glazing storefront system. (bldg is fully sprinklerd) | $42,600 |
| Mar 17, 2026 | In progress filed Mar 2026, not yet issued | 153 Townsend St | installation of 50 level ev charging stations & electrical gear/equipment to support charger energization.Details
installation of 50 level ev charging stations & electrical gear/equipment to support charger energization. | $1,000,000 | |
| Dec 18, 2025 | In progress issued Jun 2026 | 153 Townsend St | Singular Builders | 1st floor: t.i. including the emo of non-structural partitions and building. new non-structural partitions: all new or revised mep and life safety work will be design-build and submitted separately. (bldg is fully sprinklered)Details
1st floor: t.i. including the emo of non-structural partitions and building. new non-structural partitions: all new or revised mep and life safety work will be design-build and submitted separately. (bldg is fully sprinklered) | $189,254 |
| Oct 7, 2022 | Completed final sign-off May 2023 | 153 Townsend St | Acco Engineered Systems Inc. Dba Acco En | like for like replacement of 2 ac units. not visible from street.Details
like for like replacement of 2 ac units. not visible from street. | $996,000 |
| Feb 18, 2021 | Completed final sign-off Apr 2021 | 153 Townsend St | Martin Sign Co Inc. | fabrication and installation of evacuation maps for the 5th floor.Details
fabrication and installation of evacuation maps for the 5th floor. | |
| Dec 28, 2020 | Completed final sign-off Mar 2021 | 153 Townsend St | Everon Llc | fire alarm t.i. on 5th flr. - add (37) speaker strobes, (4) speakers only, add (1) control relay & (1) modnitoring relay for bms control of ufts & (1) led desplay/switch at existing fire alarm panel. ref # 2020 0820 2254Details
fire alarm t.i. on 5th flr. - add (37) speaker strobes, (4) speakers only, add (1) control relay & (1) modnitoring relay for bms control of ufts & (1) led desplay/switch at existing fire alarm panel. ref # 2020 0820 2254 | $23,000 |
| Dec 9, 2020 | Completed final sign-off Mar 2021 | 153 Townsend St | R L H Fire Protection Inc | fire sprinkler permit. relocate 69 add 34 and delete 83 sprinklers on the 5th floor. t.i. # 2020 0820 2254Details
fire sprinkler permit. relocate 69 add 34 and delete 83 sprinklers on the 5th floor. t.i. # 2020 0820 2254 | $32,000 |
| Aug 20, 2020 | Completed final sign-off Apr 2021 | 153 Townsend St | Skyline Construction | ti includes demo on non-structural partitions and building new non-structural partitions. all new or revised mep will be fully engineered & part of this submittal. life safety and sprinklers if needed will be design buils & submitted separately. building is fully sprinklered.Details
ti includes demo on non-structural partitions and building new non-structural partitions. all new or revised mep will be fully engineered & part of this submittal. life safety and sprinklers if needed will be design buils & submitted separately. building is fully sprinklered. | $3,900,000 |
| Nov 4, 2019 | Expired or cancelled cancelled Jan 2021 | 153 Townsend St | Red Hawk Fire & Security Ca Llc | ref pa# 201904258969; fire alarm t.i. on 1st fl. add (1) data card at facu, add (1) smoke detector, 1 power supply, 1 sync modeule, 18 duct detectors for hvac units, w/control 1 cibtrik rely for gas shutdown and 23 speaker /strobesDetails
ref pa# 201904258969; fire alarm t.i. on 1st fl. add (1) data card at facu, add (1) smoke detector, 1 power supply, 1 sync modeule, 18 duct detectors for hvac units, w/control 1 cibtrik rely for gas shutdown and 23 speaker /strobes | $22,000 |
| Oct 17, 2019 | Expired or cancelled cancelled Nov 2020 | 160 King St | Westates Mechanical Corporation Inc | ref pa# 201904258969; modify fire sprinklers in the area of work as tenant improvement existing main piping beyond the area of work are to remain, relocate (16) upright sprinklers, relocate (57) pendent sprinklers total relocate (73) headsDetails
ref pa# 201904258969; modify fire sprinklers in the area of work as tenant improvement existing main piping beyond the area of work are to remain, relocate (16) upright sprinklers, relocate (57) pendent sprinklers total relocate (73) heads | $37,500 |
| Sep 27, 2019 | Expired or cancelled cancelled Aug 2023 | 153 Townsend St | Red Hawk Fire & Security Ca Llc | 9th fl - fire alarm modification - removal of 1 dual monitor for tsd as they will capped offDetails
9th fl - fire alarm modification - removal of 1 dual monitor for tsd as they will capped off | $600 |
| Sep 11, 2019 | Completed final sign-off May 2021 | 153 Townsend St | Acco Engineered Systems Inc. Dba Acco En | revision to 201807063876 change out 1 additional rooftop packaged ac unitDetails
revision to 201807063876 change out 1 additional rooftop packaged ac unit | $300,000 |
| Jun 26, 2019 | Never finaled issued Aug 2019, no final | 160 King St | Skyline Construction | 1st flr and garage. mech and electrical work. 4 (n) outdoor vrv condenser units are being added. 4 (n) branch selectors. electrical workDetails
1st flr and garage. mech and electrical work. 4 (n) outdoor vrv condenser units are being added. 4 (n) branch selectors. electrical work | $15,000 |
| Apr 25, 2019 | Never finaled issued Apr 2019, no final | 160 King St | Kopplin Construction Company | demo only: will comply with ab017. all (e) fire life safety assublies & support must be maintained.Details
demo only: will comply with ab017. all (e) fire life safety assublies & support must be maintained. | $30,000 |
| Apr 25, 2019 | Never finaled issued Aug 2019, no final | 160 King St | Rudolph Commercial Interiors Inc, Rci, Kopplin Construction Company | change of use from retail to person service, boxing studio. interior only tenant improvement. 6451sf. f/a l/s deferred. maher n/a.Details
change of use from retail to person service, boxing studio. interior only tenant improvement. 6451sf. f/a l/s deferred. maher n/a. | $700,000 |
| Mar 4, 2019 | Completed final sign-off Mar 2019 | 153 Townsend St | Red Hawk Fire & Security Ca Llc | fire alarm as built for pa 2019-0219-3272, correct floor planDetails
fire alarm as built for pa 2019-0219-3272, correct floor plan | |
| Feb 19, 2019 | Completed final sign-off Feb 2019 | 153 Townsend St | Red Hawk Fire & Security Ca Llc | modify existing graphic fan panel per smoke control report to accomodate new communicating stair. ref pa 2018-0919-0734 and 2019-0212-2687Details
modify existing graphic fan panel per smoke control report to accomodate new communicating stair. ref pa 2018-0919-0734 and 2019-0212-2687 | $2,000 |
| Feb 19, 2019 | Completed final sign-off Feb 2019 | 153 Townsend St | Red Hawk Fire & Security Ca Llc | 6th fl - fire alarm as built drawing for pa 2015-1029-4443 as built drawing required per sffd field inspectorDetails
6th fl - fire alarm as built drawing for pa 2015-1029-4443 as built drawing required per sffd field inspector | |
| Feb 19, 2019 | Completed final sign-off Mar 2019 | 153 Townsend St | Red Hawk Fire & Security Ca Llc | 9th fl - fire alarm as built drawing for pa 2018-1029-4444 as built required per sffd field inspectorDetails
9th fl - fire alarm as built drawing for pa 2018-1029-4444 as built required per sffd field inspector | |
| Feb 12, 2019 | Never finaled issued Feb 2019, no final | 153 Townsend St | Skyline Construction | revision to pa #201809196734, to enclose 6th fl stairs.Details
revision to pa #201809196734, to enclose 6th fl stairs. | |
| Feb 6, 2019 | Never finaled issued Feb 2019, no final | 153 Townsend St | Skyline Construction | revision to pa #201808167508 & 201809109525, to rmeove partitions and revise occupant loads. mechanical, electrical, plumbing revisions included. 6th flDetails
revision to pa #201808167508 & 201809109525, to rmeove partitions and revise occupant loads. mechanical, electrical, plumbing revisions included. 6th fl | |
| Jan 3, 2019 | Never finaled issued Jan 2019, no final | 153 Townsend St | Skyline Construction | revision to pa #201808167508 to add cage in idf room. 6th flDetails
revision to pa #201808167508 to add cage in idf room. 6th fl | $5,000 |
| Nov 21, 2018 | Never finaled issued Nov 2018, no final | 153 Townsend St | 9th floor evacuation maps (3). maher n/a.Details
9th floor evacuation maps (3). maher n/a. | $1,425 | |
| Nov 21, 2018 | Never finaled issued Nov 2018, no final | 153 Townsend St | 6th floor evacuation maps (3). maher n/a.Details
6th floor evacuation maps (3). maher n/a. | $1,425 | |
| Nov 5, 2018 | Completed final sign-off Dec 2018 | 153 Townsend St | Pioneer Fire Inc. | 9/f: relocate 47 pendents and remove 6 uprights. maher n/a.Details
9/f: relocate 47 pendents and remove 6 uprights. maher n/a. | $36,983 |
| Oct 29, 2018 | Completed final sign-off Dec 2018 | 153 Townsend St | Red Hawk Fire & Security Ca Llc | 9th fl: fire alarm t.i. on 9th fl. add (13) speaker strobes, (2) duct detectors for fan with relay removal of (3) ceiling strobes, removal of (6) ceiling speaker, relocate (4) existing speaker, & relocate (4) existing speaker strobes ref pa# 201806273078Details
9th fl: fire alarm t.i. on 9th fl. add (13) speaker strobes, (2) duct detectors for fan with relay removal of (3) ceiling strobes, removal of (6) ceiling speaker, relocate (4) existing speaker, & relocate (4) existing speaker strobes ref pa# 201806273078 | $14,000 |
| Oct 29, 2018 | Completed final sign-off Feb 2019 | 153 Townsend St | Red Hawk Fire & Security Ca Llc | 6th fl: fire alarm t.t. on 6th fl. add (61) speaker strobes, (16) duct detectores for fans with relays, (1) duct detector for fsd with relay, (1) control relay for card reader, (1) smoke detector, add (2) power supply, relocate (10) existing speakers & add (1) amplifierDetails
6th fl: fire alarm t.t. on 6th fl. add (61) speaker strobes, (16) duct detectores for fans with relays, (1) duct detector for fsd with relay, (1) control relay for card reader, (1) smoke detector, add (2) power supply, relocate (10) existing speakers & add (1) amplifier | $42,000 |
| Sep 19, 2018 | Never finaled issued Oct 2018, no final | 153 Townsend St | Skyline Construction | rev to (e) communicating stair. demo (e) stairs between 9&8 flrs. create (n) openings from 8-6 flrs. construct (n) communicating stairs between 9 & 6th flrs with new finishes, hand rails & guard rails. maher n/a.Details
rev to (e) communicating stair. demo (e) stairs between 9&8 flrs. create (n) openings from 8-6 flrs. construct (n) communicating stairs between 9 & 6th flrs with new finishes, hand rails & guard rails. maher n/a. | $1,100,000 |
| Sep 13, 2018 | Never finaled issued Sep 2018, no final | 153 Townsend St | Red Hawk Fire & Security Ca Llc | fire alarm as built drawing for app#201806273102Details
fire alarm as built drawing for app#201806273102 | |
| Sep 10, 2018 | Never finaled issued Sep 2018, no final | 153 Townsend St | Skyline Construction | 6th flr. electrical and mechanical work for tenant improvement. ref 201808167508. maher n/aDetails
6th flr. electrical and mechanical work for tenant improvement. ref 201808167508. maher n/a | |
| Aug 16, 2018 | Never finaled issued Aug 2018, no final | 153 Townsend St | 8th flr - evac maps (3) (to contact inspector with template prior to printing and mounting)Details
8th flr - evac maps (3) (to contact inspector with template prior to printing and mounting) | $1,350 | |
| Aug 16, 2018 | Never finaled issued Aug 2018, no final | 153 Townsend St | Skyline Construction | 6th fl - ti on the 6th fl to include new partitions glazing doors millwork. mep, life safety and fire sprinkler under separate permitDetails
6th fl - ti on the 6th fl to include new partitions glazing doors millwork. mep, life safety and fire sprinkler under separate permit | $2,300,000 |
| Aug 8, 2018 | Never finaled issued Aug 2018, no final | 153 Townsend St | Skyline Construction | 6th fl: demo of nonload bearing partitions, associated power/telecom, outlets, millwork, ceiing tile, grid & lighting. sprinkler app: 2018-0808-6757Details
6th fl: demo of nonload bearing partitions, associated power/telecom, outlets, millwork, ceiing tile, grid & lighting. sprinkler app: 2018-0808-6757 | $10,000 |
| Aug 8, 2018 | Completed final sign-off Dec 2018 | 153 Townsend St | Pioneer Fire Inc. | 6th flr - return to warm shell ref 201802060472Details
6th flr - return to warm shell ref 201802060472 | $10,000 |
| Aug 1, 2018 | Completed final sign-off Sep 2018 | 153 Townsend St | Pioneer Fire Inc. | add and replace fire sprinkler per ti 201802060472 total of 35 relocate, 5 addDetails
add and replace fire sprinkler per ti 201802060472 total of 35 relocate, 5 add | $22,240 |
| Jul 6, 2018 | Completed final sign-off May 2021 | 153 Townsend St | Acco Engineered Systems Inc. Dba Acco En | remove and replace one extg packaged unit.Details
remove and replace one extg packaged unit. | $400,000 |
| Jun 27, 2018 | Completed final sign-off Aug 2018 | 153 Townsend St | Red Hawk Fire & Security Ca Llc | 8th flr - fa - add 24 ceiling speakers/strobes, 2 duct det for heat pump & ufi, 2 control relays for fan shutdown, 1 new power supply & 1 sync module. relocate 8 (e) speakers/strobes & removal of 12 (e) speakers. ref 201804237026 maher naDetails
8th flr - fa - add 24 ceiling speakers/strobes, 2 duct det for heat pump & ufi, 2 control relays for fan shutdown, 1 new power supply & 1 sync module. relocate 8 (e) speakers/strobes & removal of 12 (e) speakers. ref 201804237026 maher na | $13,000 |
| Jun 27, 2018 | Never finaled issued Aug 2018, no final | 153 Townsend St | Skyline Construction | 9th flr - ti - new partitions, glazing, doors & millwork. new lighting, ele work. telecom, plm and mech maher naDetails
9th flr - ti - new partitions, glazing, doors & millwork. new lighting, ele work. telecom, plm and mech maher na | $2,500,000 |
| Jun 21, 2018 | Completed final sign-off Sep 2018 | 160 King St | Pribuss Engineering Inc | 1st floor - fire sprinkler tenant improvement. relocate 10 and plugging 20 sprinklers. ref#201802010099. n/a for maher.Details
1st floor - fire sprinkler tenant improvement. relocate 10 and plugging 20 sprinklers. ref#201802010099. n/a for maher. | $5,140 |
| Jun 7, 2018 | Completed final sign-off Jun 2018 | 157 Townsend St | Decker Electric Co Inc Electrical Contra | fire alarm as builts for 201805048200 ref comments on as built permit set maher na elimante smoke detectors and door hold open device on west side of elevator lobby- relocate hp-3Details
fire alarm as builts for 201805048200 ref comments on as built permit set maher na elimante smoke detectors and door hold open device on west side of elevator lobby- relocate hp-3 | |
| May 4, 2018 | Completed final sign-off Jun 2018 | 153 Townsend St | Red Hawk Fire & Security Ca Llc | fie alarm as built drawing for 201803234404Details
fie alarm as built drawing for 201803234404 | |
| Apr 27, 2018 | Completed final sign-off May 2018 | 153 Townsend St | 7th fl. evacuation maps (3)Details
7th fl. evacuation maps (3) | $1,650 | |
| Apr 23, 2018 | Never finaled issued May 2018, no final | 153 Townsend St | Skyline Construction | 8/f: t.i. consisting of new interior partitions, glazing, doors & millwork; new lighting, electrical, audio visual, telecom, plumbing, & mechanical. maher ord 155-13Details
8/f: t.i. consisting of new interior partitions, glazing, doors & millwork; new lighting, electrical, audio visual, telecom, plumbing, & mechanical. maher ord 155-13 | $3,748,944 |
| Apr 23, 2018 | Never finaled issued May 2018, no final | 153 Townsend St | Durkin Signs & Graphics Inc | electric wall sign for ancestryDetails
electric wall sign for ancestry | $5,000 |
| Apr 3, 2018 | Never finaled issued Apr 2018, no final | 153 Townsend St | Pioneer Fire Inc. | 7th flr. relocate 67 pendents, relocate 23 uprights, remove 9 uprights. related to ti pa #2018020604732.Details
7th flr. relocate 67 pendents, relocate 23 uprights, remove 9 uprights. related to ti pa #2018020604732. | $42,112 |
| Mar 23, 2018 | Completed final sign-off Jun 2018 | 153 Townsend St | Red Hawk Fire & Security Ca Llc | f/a on 7th fl: 19 duct detectors, 68 speaker/strobes, 6 smoke detectors. maher na. ti under pa# 201802060472. including mepDetails
f/a on 7th fl: 19 duct detectors, 68 speaker/strobes, 6 smoke detectors. maher na. ti under pa# 201802060472. including mep | $10,000 |
| Feb 6, 2018 | Completed final sign-off Aug 2018 | 153 Townsend St | Skyline Construction | 7th flr - ti to include new partitions, mep, glazing, doors and millwork. fire/life safety under sep permit maher naDetails
7th flr - ti to include new partitions, mep, glazing, doors and millwork. fire/life safety under sep permit maher na | $3,748,944 |
| Feb 1, 2018 | Completed final sign-off Feb 2019 | 160 King St | Richlen Construction | mezzanine level - ab-017 demo of non structural partitions maher naDetails
mezzanine level - ab-017 demo of non structural partitions maher na | $150,000 |
| Jan 4, 2018 | Completed final sign-off Aug 2018 | 153 Townsend St | Skyline Construction | demolition of non-structural partitions associated power/telecom outlets, millwork, finishes, ceiling, tileDetails
demolition of non-structural partitions associated power/telecom outlets, millwork, finishes, ceiling, tile | $20,000 |
| Dec 22, 2017 | Completed final sign-off Apr 2018 | 153 Townsend St | Pioneer Fire Inc. | 7th floor returning to warm shell condition remove all pendents & provide upright fire sprinkler protectionDetails
7th floor returning to warm shell condition remove all pendents & provide upright fire sprinkler protection | $59,441 |
| Apr 5, 2017 | Completed final sign-off Jun 2017 | 153 Townsend St | 5th floor - evacuation signage to install 1 new mapDetails
5th floor - evacuation signage to install 1 new map | $400 | |
| Jan 30, 2017 | Completed final sign-off Feb 2017 | 153 Townsend St | Red Hawk Fire & Security Ca Llc | 5th floor: add 3 new wall speaker strobes. add one new wall strobe. relocation as needed to maintain coverage. ref app#201611233414. n/a for maherDetails
5th floor: add 3 new wall speaker strobes. add one new wall strobe. relocation as needed to maintain coverage. ref app#201611233414. n/a for maher | $2,500 |
| Jan 26, 2017 | Never finaled issued Jan 2017, no final | 153 Townsend St | Allied Fire Protection | fire sprinkler t/i "odg" 5th floor (19) relocated sprinklers. ref pa 2016-1123-3414. maher naDetails
fire sprinkler t/i "odg" 5th floor (19) relocated sprinklers. ref pa 2016-1123-3414. maher na | $13,500 |
| Jan 23, 2017 | Completed final sign-off Jun 2017 | 153 Townsend St | Principal Builders Inc. | revision to 201611233414 to upate smoke control statement on the 5th fl. change only to the coversheet; na maherDetails
revision to 201611233414 to upate smoke control statement on the 5th fl. change only to the coversheet; na maher | |
| Dec 28, 2016 | Completed final sign-off Oct 2017 | 153 Townsend St | Principal Builders Inc. | title 24 mechanical electrical to instqall new equipment on the 5th flr. ref 201611233414 for ti work. maher naDetails
title 24 mechanical electrical to instqall new equipment on the 5th flr. ref 201611233414 for ti work. maher na | $160,000 |
| Nov 23, 2016 | Completed final sign-off Oct 2017 | 153 Townsend St | Principal Builders Inc. | non-structural demo (n) non-structural partitions, glazing, millwork finishes. no change in occupancy, use or area. mep and fire under separate permit. n/a for maher.Details
non-structural demo (n) non-structural partitions, glazing, millwork finishes. no change in occupancy, use or area. mep and fire under separate permit. n/a for maher. | $448,812 |
| Oct 28, 2016 | Completed final sign-off Dec 2016 | 153 Townsend St | Pioneer Fire Inc. | 6/f, 7/f- return fire system to upgright fire sprinkler coverage. n/a ordinance #155-13Details
6/f, 7/f- return fire system to upgright fire sprinkler coverage. n/a ordinance #155-13 | $7,299 |
| Oct 28, 2016 | Completed final sign-off Jan 2017 | 153 Townsend St | Gci, Inc | demo-non structural partitions on 6/f & 7/f; per ab 17Details
demo-non structural partitions on 6/f & 7/f; per ab 17 | $5,000 |
| Jun 15, 2016 | Completed final sign-off Jun 2016 | 153 Townsend St | Allied Fire Protection | convert preaction system to a wet fire sprinkler system on the 7th floor. #700. 12 sprinklers. maher naDetails
convert preaction system to a wet fire sprinkler system on the 7th floor. #700. 12 sprinklers. maher na | $4,000 |
| May 10, 2016 | Completed final sign-off Jul 2016 | 153 Townsend St | Red Hawk Fire & Security Ca Llc | 7th floor: remove one smoke detector for fm 200. remove 3 modules for fm 200. n/a for maherDetails
7th floor: remove one smoke detector for fm 200. remove 3 modules for fm 200. n/a for maher | $2,500 |
| Jan 5, 2016 | Completed final sign-off Jun 2016 | 153 Townsend St | Arrow Sign Company | install one (1) non-illuminated warnng sign on garage entrance, non-electric, wall sign and single-faced; maher n/aDetails
install one (1) non-illuminated warnng sign on garage entrance, non-electric, wall sign and single-faced; maher n/a | $500 |
| Jan 5, 2016 | Completed final sign-off Jun 2016 | 153 Townsend St | Arrow Sign Company | install two (2) illuminated single faced wall signs on garage interior walls; maher n/aDetails
install two (2) illuminated single faced wall signs on garage interior walls; maher n/a | $4,000 |
| Jan 5, 2016 | Completed final sign-off Jun 2016 | 153 Townsend St | Arrow Sign Company | install one (1) illuminated projection sign (faces only structure is existing) on building exterior; double faced; maher n/aDetails
install one (1) illuminated projection sign (faces only structure is existing) on building exterior; double faced; maher n/a | $4,000 |
| Nov 12, 2015 | Never finaled issued Nov 2015, no final | 153 Townsend St | sidewalk onlyDetails
sidewalk only | ||
| Oct 22, 2015 | Completed final sign-off Feb 2016 | 153 Townsend St | Red Hawk Fire & Security Ca Llc | relocate (e) pullstation =1 and 1 speaker/strobe. t.i. pa#201506098456, n/a ordinance #155-13Details
relocate (e) pullstation =1 and 1 speaker/strobe. t.i. pa#201506098456, n/a ordinance #155-13 | $5,500 |
| Oct 15, 2015 | Never finaled filed Oct 2015, never issued | 153 Townsend St | streetspaceDetails
streetspace | ||
| Oct 15, 2015 | Never finaled issued Oct 2015, no final | 153 Townsend St | streetspace and mtaDetails
streetspace and mta | ||
| Sep 24, 2015 | Completed final sign-off Sep 2016 | 153 Townsend St | Acco Engineered Systems Inc. Dba Acco En | 1st floor: mep for ref pa 2015 0609 8456: demo (e) grilles and ductwork to accomodate new lobby zone. redistribute (e) ductwork & provide new diffusers for new zone. add supply fan to ticket booth. maher naDetails
1st floor: mep for ref pa 2015 0609 8456: demo (e) grilles and ductwork to accomodate new lobby zone. redistribute (e) ductwork & provide new diffusers for new zone. add supply fan to ticket booth. maher na | $28,000 |
| Sep 17, 2015 | Completed final sign-off Mar 2016 | 153 Townsend St | Ayoob & Peery Plumbing Co Inc | lobby and ground floor - replace (5) sprinkler, relocate (10) and add (3) sprinkler. ref pa 2015-0609-8456Details
lobby and ground floor - replace (5) sprinkler, relocate (10) and add (3) sprinkler. ref pa 2015-0609-8456 | $3,000 |
| Jun 9, 2015 | Completed final sign-off Sep 2016 | 153 Townsend St | Swinerton Builders | 1st floor: t.i. includes demo of extg bldg entry & replacement wth nw glazed entry. nw preforated metal screen facade adjustment to nw renovated lobby entry. relocate cashier office inside extg unconditioned parking grg. mep& life safty under seperate permit if needed. bldg fully sprinklr n/a maherDetails
1st floor: t.i. includes demo of extg bldg entry & replacement wth nw glazed entry. nw preforated metal screen facade adjustment to nw renovated lobby entry. relocate cashier office inside extg unconditioned parking grg. mep& life safty under seperate permit if needed. bldg fully sprinklr n/a maher | $160,000 |
| Dec 17, 2014 | Completed final sign-off Sep 2016 | 153 Townsend St | Swinerton Builders | 1st floor: building lobby remodel includes leveling of slan w/new step and ramp. new millwork, lighting and finishes. mep and life safety work under separate permit. maher n/a.Details
1st floor: building lobby remodel includes leveling of slan w/new step and ramp. new millwork, lighting and finishes. mep and life safety work under separate permit. maher n/a. | $100,000 |
| Oct 29, 2014 | Never finaled issued Dec 2014, no final | 160 King St | O'keeffe Construction Inc | shoring tiebacks.Details
shoring tiebacks. | $150,000 |
| Oct 16, 2014 | Never finaled issued Oct 2014, no final | 160 King St | Golden Gate Sign Company Inc. | revision to sign permit 201402108136. revise location on building. letter style and attachement detail. n/a maher ordinance # 155-13Details
revision to sign permit 201402108136. revise location on building. letter style and attachement detail. n/a maher ordinance # 155-13 | $2,000 |
| Apr 10, 2014 | Never finaled issued Apr 2014, no final | 153 Townsend St | Principal Builders Inc. | 5th floor - mechanical / electrical - t.i. to demo ductwork & lighting & construct new ductwork, grilles, diffusers & lighting. refer to #2014.0310.0263 for t.i. work. compliance with ordinance #155-13 not requiredDetails
5th floor - mechanical / electrical - t.i. to demo ductwork & lighting & construct new ductwork, grilles, diffusers & lighting. refer to #2014.0310.0263 for t.i. work. compliance with ordinance #155-13 not required | $70,000 |
| Mar 10, 2014 | Never finaled issued Apr 2014, no final | 153 Townsend St | Principal Builders Inc. | 5th floor: non-structural demo. new non-structural partitions, lighting, electrical,millwork, finishes. no change in occupancy, use area. mep under seperate permit. n/a for the maher ordinance #155-13Details
5th floor: non-structural demo. new non-structural partitions, lighting, electrical,millwork, finishes. no change in occupancy, use area. mep under seperate permit. n/a for the maher ordinance #155-13 | $350,000 |
| Feb 10, 2014 | Never finaled issued Feb 2014, no final | 160 King St | Golden Gate Sign Company Inc. | to erect electrical wall sign. n/a for the maher ordinance #155-13Details
to erect electrical wall sign. n/a for the maher ordinance #155-13 | $5,000 |
| Jan 14, 2014 | Never finaled issued Jan 2014, no final | 153 Townsend St | Red Hawk Fire & Security Ca Llc | ste. 580: speaker/strobes and (1) relay for access door interface, gc. principal builders- 201312234880; compliance with ord. 15-133 not requiredDetails
ste. 580: speaker/strobes and (1) relay for access door interface, gc. principal builders- 201312234880; compliance with ord. 15-133 not required | $7,000 |
| Dec 23, 2013 | Completed final sign-off Feb 2014 | 153 Townsend St | Principal Builders Inc. | 5th floor. title 24 electrical mechanical t.i. to demo & construct new lighting and fixtures. reference to pa#2013-1125-2705.Details
5th floor. title 24 electrical mechanical t.i. to demo & construct new lighting and fixtures. reference to pa#2013-1125-2705. | $56,000 |
| Dec 11, 2013 | Expired or cancelled cancelled Jan 2026 | 153 Townsend St | non-structural demo, (n) non-structural walls, doors, lighting, electrical, millwork, finishes. no change in occupancy, use area. mep under separate permit.Details
non-structural demo, (n) non-structural walls, doors, lighting, electrical, millwork, finishes. no change in occupancy, use area. mep under separate permit. | $32,468 | |
| Nov 25, 2013 | Completed final sign-off Feb 2014 | 153 Townsend St | Principal Builders Inc. | non structural demo. new non structrual partitons, doors, lighting, elec, finishes. no change in occupancy, use, area, or footprint. mep and l/s under separate permitDetails
non structural demo. new non structrual partitons, doors, lighting, elec, finishes. no change in occupancy, use, area, or footprint. mep and l/s under separate permit | $94,185 |
| Jul 1, 2013 | Completed final sign-off Jul 2013 | 153 Townsend St | create & produce 3 evacuation maps/signs for the 9th floor only.Details
create & produce 3 evacuation maps/signs for the 9th floor only. | $1,100 | |
| May 6, 2013 | Completed final sign-off Jul 2013 | 153 Townsend St | Skyline Construction | 9th floor:revision to app# 201304104177 electrical changes including lighting. ref arch #201303132051Details
9th floor:revision to app# 201304104177 electrical changes including lighting. ref arch #201303132051 | |
| May 3, 2013 | Completed final sign-off May 2025 | 153 Townsend St | Ayoob & Peery Plumbing Co Inc | 9th floor:add and relocate fire sprinkler heads per t.i. 10 add, 149 relocate and 63 remove.Details
9th floor:add and relocate fire sprinkler heads per t.i. 10 add, 149 relocate and 63 remove. | $81,200 |
| Apr 10, 2013 | Completed final sign-off Jul 2013 | 153 Townsend St | Skyline Construction | 9th floor-mechanical & electrical work for tenant improvement. refer arch #2013-0313-2051Details
9th floor-mechanical & electrical work for tenant improvement. refer arch #2013-0313-2051 | $150,000 |
| Mar 25, 2013 | Completed final sign-off Jul 2013 | 153 Townsend St | Red Hawk Fire & Security Ca Llc | 9th floor: fire alarm t.i. upgrade amplified one, adding notification devices 60,adding 2 smoke detectors, and 2 control relays. ref app#201303132051Details
9th floor: fire alarm t.i. upgrade amplified one, adding notification devices 60,adding 2 smoke detectors, and 2 control relays. ref app#201303132051 | $25,000 |
| Mar 15, 2013 | Never finaled issued Mar 2013, no final | 153 Townsend St | street spaceDetails
street space | ||
| Mar 15, 2013 | Completed final sign-off Aug 2013 | 153 Townsend St | Skyline Construction | modification of extg communicating stair between 8th and 9th floor only, to include widening stair width and landing, new finishes, new hand and guardrails. ref. pa #2013-0206-9569Details
modification of extg communicating stair between 8th and 9th floor only, to include widening stair width and landing, new finishes, new hand and guardrails. ref. pa #2013-0206-9569 | $100,000 |
| Mar 13, 2013 | Completed final sign-off Jul 2013 | 153 Townsend St | Skyline Construction | 9th floor-tenant improvement consisting of new partitions, glazing, doors, millwork. mech, elec, fire sprinkler and life safety under sep permitDetails
9th floor-tenant improvement consisting of new partitions, glazing, doors, millwork. mech, elec, fire sprinkler and life safety under sep permit | $1,200,000 |
| Feb 6, 2013 | Completed final sign-off Jul 2013 | 153 Townsend St | Skyline Construction | 9th floor-interior non structural demolition-per ab-017Details
9th floor-interior non structural demolition-per ab-017 | $65,000 |
| Feb 6, 2013 | Completed final sign-off Jul 2013 | 153 Townsend St | Skyline Construction | 8th & 9th floor - existing communicating stair between floors 8 & 9 to have existing finishes removed to stair. demo of non-structural wall partitions around communicating stairs. ab-17 for t.i. under separate permit.Details
8th & 9th floor - existing communicating stair between floors 8 & 9 to have existing finishes removed to stair. demo of non-structural wall partitions around communicating stairs. ab-17 for t.i. under separate permit. | $5,000 |
| Jul 2, 2012 | Never finaled issued Jul 2012, no final | 153 Townsend St | Skyline Construction | 6th floor - removal of non-structural, non load bearing partitions, removal of all doors, frames & hardware under ab-017.Details
6th floor - removal of non-structural, non load bearing partitions, removal of all doors, frames & hardware under ab-017. | $7,500 |
| Jun 22, 2012 | Completed final sign-off Jul 2012 | 153 Townsend St | 8th floor-create & produce 3 evacuation plan signsDetails
8th floor-create & produce 3 evacuation plan signs | $2,000 | |
| Jun 12, 2012 | Completed final sign-off Jun 2012 | 153 Townsend St | Golden Gate Fire Protection Inc | fire sprinkelr system upgrade, relocate 64 pendent sprinkler heads on the 8th fl. frelocate 12 upright sprinkler heads and add 8 uprights. delete 14 sprinkler headsDetails
fire sprinkelr system upgrade, relocate 64 pendent sprinkler heads on the 8th fl. frelocate 12 upright sprinkler heads and add 8 uprights. delete 14 sprinkler heads | $43,260 |
| May 30, 2012 | Completed final sign-off Mar 2013 | 153 Townsend St | Skyline Construction | 8th floor-installation of new roll down door , structural work for new roll down door, interior work only. refer pa# 2012-0416-8322Details
8th floor-installation of new roll down door , structural work for new roll down door, interior work only. refer pa# 2012-0416-8322 | $5,000 |
| May 15, 2012 | Completed final sign-off Jul 2012 | 153 Townsend St | Red Hawk Fire & Security Ca Llc | 8th floor fire alarm t.i. 'ancestry.com' - 2 upgrade amplifiers, 2 control relays, 1 smoke detectors, 2 wall speaker/strobes, 38 ceiling speaker/strobes, 27 ceiling speakers.Details
8th floor fire alarm t.i. 'ancestry.com' - 2 upgrade amplifiers, 2 control relays, 1 smoke detectors, 2 wall speaker/strobes, 38 ceiling speaker/strobes, 27 ceiling speakers. | $12,378 |
| Apr 30, 2012 | Completed final sign-off Mar 2013 | 153 Townsend St | Skyline Construction | mechanical and electrical for tenant improvement on the 8th floor. reference arch 201204168322Details
mechanical and electrical for tenant improvement on the 8th floor. reference arch 201204168322 | $300,000 |
| Apr 19, 2012 | Never finaled issued Apr 2012, no final | 153 Townsend St | street space permitDetails
street space permit | ||
| Apr 16, 2012 | Completed final sign-off Mar 2013 | 153 Townsend St | Skyline Construction | 8th floor-tenant improvement including new partitions, glazing, doors, millwork & mechanical. electrical, fire sprinklers & life safety under seperate permits. garage door seperate permitDetails
8th floor-tenant improvement including new partitions, glazing, doors, millwork & mechanical. electrical, fire sprinklers & life safety under seperate permits. garage door seperate permit | $1,200,000 |
| Apr 5, 2012 | Never finaled issued Apr 2012, no final | 153 Townsend St | Red Hawk Fire & Security Ca Llc | 5th floor-3 added speaker/strobes, 4 added strobesDetails
5th floor-3 added speaker/strobes, 4 added strobes | $8,000 |
| Apr 2, 2012 | Completed final sign-off Mar 2013 | 153 Townsend St | Skyline Construction | floor8, demo of non structural, non load bearing partitions, removal of all doors, frames and hardware, removal of millwork and other finishes throughout per ab017Details
floor8, demo of non structural, non load bearing partitions, removal of all doors, frames and hardware, removal of millwork and other finishes throughout per ab017 | $10,000 |
| Oct 6, 2011 | Completed final sign-off Oct 2011 | 153 Townsend St | Red Hawk Fire & Security Ca Llc | fire alarm ti 6th fl. 1 booster for new strobes, 1 synch module for booster, 2 ceiling speaker strobes, 1 relocate existing speaker/strobeDetails
fire alarm ti 6th fl. 1 booster for new strobes, 1 synch module for booster, 2 ceiling speaker strobes, 1 relocate existing speaker/strobe | $5,327 |
| Feb 8, 2011 | Completed final sign-off Apr 2011 | 153 Townsend St | Diversified Fire Products | fire alarm ti on 5th fl. 3 ceilin mounted speaker strobes, 4 ceilinh mounted strobes. ref pa# 2011.01.25.8953Details
fire alarm ti on 5th fl. 3 ceilin mounted speaker strobes, 4 ceilinh mounted strobes. ref pa# 2011.01.25.8953 | $7,523 |
| Jan 25, 2011 | Completed final sign-off Mar 2011 | 153 Townsend St | Principal Builders Inc. | demo of non structural partitions,doors frames hardware,glazing, finishes. new non structural partitions, doors, frames, harware, glazing, finishes. no change in area, use, or occupancy. fire sprinkler and fire alarm on separate permits.Details
demo of non structural partitions,doors frames hardware,glazing, finishes. new non structural partitions, doors, frames, harware, glazing, finishes. no change in area, use, or occupancy. fire sprinkler and fire alarm on separate permits. | $85,000 |
| Sep 3, 2010 | Completed final sign-off Oct 2010 | 160 King St | create (39) evacuation map signsDetails
create (39) evacuation map signs | $6,000 | |
| Sep 2, 2010 | Completed final sign-off Sep 2010 | 153 Townsend St | Turner Construction Co | revision to 201006023632 to remove mechanical work from the scope. not required per attached letter from haiDetails
revision to 201006023632 to remove mechanical work from the scope. not required per attached letter from hai | $1,000 |
| Jun 30, 2010 | Completed final sign-off Sep 2010 | 153 Townsend St | Allied Fire Protection | add 4 fire sprinklers,relocate 5 fire sprinkler heads to accomodate the new fire stair enclosure on floors 8 and 9. stair enclosed under app#201006023632.Details
add 4 fire sprinklers,relocate 5 fire sprinkler heads to accomodate the new fire stair enclosure on floors 8 and 9. stair enclosed under app#201006023632. | $4,500 |
| Jun 30, 2010 | Completed final sign-off Aug 2010 | 153 Townsend St | Diversified Fire Products | 5th floor-fire alarm ti for suite 570. adding 2 speaker/strobesDetails
5th floor-fire alarm ti for suite 570. adding 2 speaker/strobes | $7,038 |
| Jun 15, 2010 | Completed final sign-off Sep 2010 | 153 Townsend St | Diversified Fire Products | fire alarm ti fo rthe 9th floor stairwell. addition of 1 strobe.Details
fire alarm ti fo rthe 9th floor stairwell. addition of 1 strobe. | $2,083 |
| Jun 7, 2010 | Completed final sign-off Aug 2010 | 153 Townsend St | Principal Builders Inc. | interior tenant improvment. new conference room, new finishes, electrical, life safety under separate permitDetails
interior tenant improvment. new conference room, new finishes, electrical, life safety under separate permit | $85,000 |
| Jun 2, 2010 | Completed final sign-off Sep 2010 | 153 Townsend St | Turner Construction Co | office ti on the 9th fl. enclose communicating stairwell on 9th floor to 8th floor to separate 2 tenants with non-rated and non-smoke barrier construction. electrical and fire life saftey- design and sprinkler and mechanical plans build under separate permitDetails
office ti on the 9th fl. enclose communicating stairwell on 9th floor to 8th floor to separate 2 tenants with non-rated and non-smoke barrier construction. electrical and fire life saftey- design and sprinkler and mechanical plans build under separate permit | $21,000 |
| Mar 11, 2010 | Expired or cancelled cancelled Jul 2013 | 153 Townsend St | install one illuminated wall sign " greenburg traurig"Details
install one illuminated wall sign " greenburg traurig" | $12,000 | |
| Apr 3, 2009 | Completed final sign-off Dec 2009 | 160 King St | Anderson, Rowe & Buckley, Inc. | renew pa# 2006/10/05/4310 to obtain final inspection. all work has been completed.Details
renew pa# 2006/10/05/4310 to obtain final inspection. all work has been completed. | |
| Mar 20, 2009 | Never finaled issued Mar 2009, no final | 153 Townsend St | street space permit only.Details
street space permit only. | ||
| Sep 2, 2008 | Completed final sign-off Oct 2008 | 153 Townsend St | Diversified Fire Products | fire alarm ti for brown and toland, suite 640. relocateion of 1 speaker strobeDetails
fire alarm ti for brown and toland, suite 640. relocateion of 1 speaker strobe | $2,965 |
| May 30, 2008 | Completed final sign-off Oct 2008 | 153 Townsend St | R L H Fire Protection Inc | 6th floor-t.i. upgrade of (e) sprinkler system: relocate 5 pendent heads and add 1 pendent headDetails
6th floor-t.i. upgrade of (e) sprinkler system: relocate 5 pendent heads and add 1 pendent head | $5,500 |
| Apr 23, 2008 | Completed final sign-off Oct 2008 | 153 Townsend St | 6th floor-tenant improvements-revision to approved plans, ref pa# 200804089118-meeting rooms to be used as offices. no life safety or mechanical work required.Details
6th floor-tenant improvements-revision to approved plans, ref pa# 200804089118-meeting rooms to be used as offices. no life safety or mechanical work required. | ||
| Apr 8, 2008 | Completed final sign-off Oct 2008 | 153 Townsend St | tenant improvements-demo interior partitions for open office space, build floor to ceiling partition to divide (e) space into 2 offices. mep under seperate permitDetails
tenant improvements-demo interior partitions for open office space, build floor to ceiling partition to divide (e) space into 2 offices. mep under seperate permit | $79,000 | |
| Feb 1, 2008 | Completed final sign-off May 2008 | 153 Townsend St | Anderson, Rowe & Buckley, Inc. | 5th floor - tenant improvements to existing fire sprinkler system, relocated 3 new pendents.Details
5th floor - tenant improvements to existing fire sprinkler system, relocated 3 new pendents. | $1,000 |
| Jan 17, 2008 | Completed final sign-off May 2008 | 153 Townsend St | 5th flr non structural demolition partition walls. install acoustic ceiling perimeter bracing. reverse door swing of accessable restroom stall.Details
5th flr non structural demolition partition walls. install acoustic ceiling perimeter bracing. reverse door swing of accessable restroom stall. | $25,000 | |
| Jan 17, 2008 | Completed final sign-off May 2008 | 153 Townsend St | Diversified Fire Products | fire alarm t.i. liebert cassidy whitmore, 5th floor @ 153 townsend; includes audible/visual notification appliances to tie into (e) power supply. (3) horn/strobes and (2) ceiling mount speakers.Details
fire alarm t.i. liebert cassidy whitmore, 5th floor @ 153 townsend; includes audible/visual notification appliances to tie into (e) power supply. (3) horn/strobes and (2) ceiling mount speakers. | $13,968 |
| Jan 16, 2008 | Expired or cancelled cancelled Jan 2026 | 153 Townsend St | 5th floor - revision to p/a #2007.11.19.8556. deleting compartment wall & door. add acoustical ceiling perimeter bracing. reverse sing of accessible stall doors. no increase in floor area.Details
5th floor - revision to p/a #2007.11.19.8556. deleting compartment wall & door. add acoustical ceiling perimeter bracing. reverse sing of accessible stall doors. no increase in floor area. | $25,000 | |
| Nov 19, 2007 | Completed final sign-off May 2008 | 153 Townsend St | non-structural demo. new non-ratted, non structural partiitons, new doors, sipelights, finishes, outlets, lighting, compartmentalization of new expanded tenant space. non increase in floor area.Details
non-structural demo. new non-ratted, non structural partiitons, new doors, sipelights, finishes, outlets, lighting, compartmentalization of new expanded tenant space. non increase in floor area. | $100,000 | |
| May 7, 2007 | Completed final sign-off May 2007 | 160 King St | Thomas Swan Sign Co Inc | change lighting system of signage from neon to l.e.d per app#200611016610.Details
change lighting system of signage from neon to l.e.d per app#200611016610. | |
| Mar 1, 2007 | Never finaled issued Mar 2007, no final | 153 Townsend St | street spaceDetails
street space | ||
| Nov 1, 2006 | Completed final sign-off May 2007 | 160 King St | Thomas Swan Sign Co Inc | to erect electric, wall, single faced sign.Details
to erect electric, wall, single faced sign. | |
| Oct 13, 2006 | Completed final sign-off Jan 2007 | 160 King St | Cannon Constructors North Inc | renewal for final only. pa# 2005/06/29/6316.Details
renewal for final only. pa# 2005/06/29/6316. | |
| Oct 5, 2006 | Expired or cancelled expired Jul 2008 | 160 King St | Anderson, Rowe & Buckley, Inc. | t.i. (e) fire sprinkler system-4 new heads below.Details
t.i. (e) fire sprinkler system-4 new heads below. | $1,000 |
| Sep 7, 2006 | Completed final sign-off Nov 2006 | 153 Townsend St | Dpw Inc. | modify existing core sprinkler system for new tenant expansion on 6th floor onlyDetails
modify existing core sprinkler system for new tenant expansion on 6th floor only | $5,000 |
| Aug 9, 2006 | Completed final sign-off Nov 2006 | 153 Townsend St | Cannon Constructors North Inc | oti-2 6th fl el, me brown and tolandDetails
oti-2 6th fl el, me brown and toland | $58,000 |
| Aug 8, 2006 | Completed final sign-off Nov 2006 | 153 Townsend St | Siemens Industry, Inc. | 6th floor-addition of one smoke detector above an electrical distribution panel, and relocation of 2 speaker/strobes and one strobe for the 6th floor "brown & toland" tenant office remodel.Details
6th floor-addition of one smoke detector above an electrical distribution panel, and relocation of 2 speaker/strobes and one strobe for the 6th floor "brown & toland" tenant office remodel. | $1,100 |
| Jul 20, 2006 | Completed final sign-off Nov 2006 | 153 Townsend St | Cannon Constructors North Inc | tenant improvement, minor demolition to remove (e) interior partitions, build newDetails
tenant improvement, minor demolition to remove (e) interior partitions, build new | $85,000 |
| Jun 27, 2006 | Completed final sign-off Jun 2007 | 153 Townsend St | Principal Builders Inc. | interior office tiDetails
interior office ti | $40,000 |
| Jun 22, 2006 | Completed final sign-off Jul 2006 | 160 King St | Dpr Construction Inc | to final pa# 2003/07/25/0359 which has expired.Details
to final pa# 2003/07/25/0359 which has expired. | |
| Nov 30, 2005 | Completed final sign-off Jan 2006 | 153 Townsend St | Siemens Industry, Inc. | relocation of (e) speaker/strobes for the floor 5"dla piper" remodel. no new devices added. the (e) space has been remodeled at 2 areas as indicated on drawing "fa-05"Details
relocation of (e) speaker/strobes for the floor 5"dla piper" remodel. no new devices added. the (e) space has been remodeled at 2 areas as indicated on drawing "fa-05" | $2,200 |
| Nov 10, 2005 | Completed final sign-off Nov 2005 | 153 Townsend St | Siemens Industry, Inc. | relocation of (e) speaker/strobes and strobes for floor 6 "kling architects"Details
relocation of (e) speaker/strobes and strobes for floor 6 "kling architects" | $1,200 |
| Nov 3, 2005 | Completed final sign-off Nov 2005 | 153 Townsend St | Anderson, Rowe & Buckley, Inc. | t.i existing fire spkr. syst. 3 relocated spkrs 1 new spkr. no increase in size.Details
t.i existing fire spkr. syst. 3 relocated spkrs 1 new spkr. no increase in size. | $900 |
| Oct 21, 2005 | Completed final sign-off Oct 2005 | 160 King St | Cannon Constructors North Inc | submitted as built drawings #200411179442 for roof toop secondary containment for 7th flr generator.Details
submitted as built drawings #200411179442 for roof toop secondary containment for 7th flr generator. | |
| Oct 6, 2005 | Completed final sign-off Jan 2006 | 153 Townsend St | Anderson, Rowe & Buckley, Inc. | (e) sprinkler system expansion, 24 new sprinklersDetails
(e) sprinkler system expansion, 24 new sprinklers | $4,000 |
| Oct 4, 2005 | Expired or cancelled expired Jul 2006 | 160 King St | Siemens Industry, Inc. | addition of 26 smoke detectors for the exit corridor path in lieu of fire rating the new walls created by the office remodel addsDetails
addition of 26 smoke detectors for the exit corridor path in lieu of fire rating the new walls created by the office remodel adds | $7,800 |
| Sep 8, 2005 | Completed final sign-off Nov 2005 | 153 Townsend St | Anderson, Rowe & Buckley, Inc. | existing spkrs. tenant improvement 47 new pendents 3008 sqft. no increase in size.Details
existing spkrs. tenant improvement 47 new pendents 3008 sqft. no increase in size. | $9,000 |
| Sep 8, 2005 | Completed final sign-off Nov 2005 | 153 Townsend St | Principal Builders Inc. | oti-2, 6th floor, el, me.Details
oti-2, 6th floor, el, me. | $10,000 |
| Sep 1, 2005 | Completed final sign-off Nov 2005 | 153 Townsend St | Principal Builders Inc. | demo interior partitions, build one conference roomDetails
demo interior partitions, build one conference room | $20,000 |
| Aug 17, 2005 | Completed final sign-off Jan 2006 | 153 Townsend St | Principal Builders Inc. | oti-2, 5th floor, el, me.Details
oti-2, 5th floor, el, me. | $75,000 |
| Aug 17, 2005 | Completed final sign-off Jan 2006 | 153 Townsend St | Principal Builders Inc. | oti-1 at 5th fl, el, me, ls, sp.Details
oti-1 at 5th fl, el, me, ls, sp. | $220,000 |
| Aug 17, 2005 | Completed final sign-off Nov 2005 | 153 Townsend St | Principal Builders Inc. | 8th floor - electrical - demo lights, add fixtures & outlets.Details
8th floor - electrical - demo lights, add fixtures & outlets. | $50,000 |
| Jun 29, 2005 | Expired or cancelled expired Jan 2007 | 160 King St | Dpw Inc. | modify (e) sprinkler system for new ceiling on 6/f only. add 4 heads for new t-bar ceilingDetails
modify (e) sprinkler system for new ceiling on 6/f only. add 4 heads for new t-bar ceiling | $3,000 |
| Jun 28, 2005 | Completed final sign-off May 2006 | 153 Townsend St | Principal Builders Inc. | oti-1, 9th floor, el, me, ls, sp.Details
oti-1, 9th floor, el, me, ls, sp. | $100,000 |
| Jun 28, 2005 | Completed final sign-off Nov 2005 | 153 Townsend St | Principal Builders Inc. | oti-2, 9th floor, el, me.Details
oti-2, 9th floor, el, me. | $50,000 |
| Jun 9, 2005 | Completed final sign-off May 2006 | 157 Townsend St | Principal Builders Inc. | interior demolition.t.i under additional permit.Details
interior demolition.t.i under additional permit. | $5,000 |
| Feb 17, 2005 | Completed final sign-off Mar 2005 | 160 King St | Principal Builders Inc. | cosmetic ceiling in ofices (ceiling grid)Details
cosmetic ceiling in ofices (ceiling grid) | $20,000 |
| Jan 4, 2005 | Never finaled issued Jan 2005, no final | 160 King St | streetspaceDetails
streetspace | ||
| Nov 17, 2004 | Completed final sign-off Jul 2005 | 160 King St | Cannon Constructors North Inc | back up generator installation/mech/elec. & plumbing fill pipeDetails
back up generator installation/mech/elec. & plumbing fill pipe | $216,750 |
| Nov 2, 2004 | Completed final sign-off Nov 2004 | 160 King St | Cannon Constructors North Inc | app 200305215186-200304182624-200310157567- for final inspectionDetails
app 200305215186-200304182624-200310157567- for final inspection | |
| Aug 10, 2004 | Never finaled issued Oct 2004, no final | 160 King St | provide shoring per planDetails
provide shoring per plan | $9,000 | |
| Oct 15, 2003 | Expired or cancelled expired Sep 2004 | 160 King St | Cannon Constructors North Inc | rev to 200303210325, modify (e)glass doors for security card readers on 7th flrDetails
rev to 200303210325, modify (e)glass doors for security card readers on 7th flr | |
| Oct 8, 2003 | Completed final sign-off Jan 2004 | 160 King St | Cannon Constructors North Inc | oti-3 rev, 6th flr meDetails
oti-3 rev, 6th flr me | |
| Sep 11, 2003 | Completed final sign-off Oct 2003 | 160 King St | Cannon Constructors North Inc | ot-2, rev 6th floor, elDetails
ot-2, rev 6th floor, el | $1,750 |
| Sep 11, 2003 | Completed final sign-off Oct 2003 | 160 King St | Cannon Constructors North Inc | oti-1, rev 6th floor, elDetails
oti-1, rev 6th floor, el | $1,750 |
| Sep 11, 2003 | Completed final sign-off Oct 2003 | 160 King St | Cannon Constructors North Inc | oti-3 6th floor, me, spDetails
oti-3 6th floor, me, sp | $21,700 |
| Aug 19, 2003 | Completed final sign-off Oct 2003 | 160 King St | Cannon Constructors North Inc | oti-2 6th floor el lsDetails
oti-2 6th floor el ls | $25,488 |
| Aug 13, 2003 | Completed final sign-off Aug 2003 | 160 King St | structural details to awning permitted under 200205065757Details
structural details to awning permitted under 200205065757 | $7,000 | |
| Jul 25, 2003 | Expired or cancelled expired Jul 2006 | 160 King St | Dpr Construction Inc | add smoke detector to 8th & 9th floor, elevator lobbiesDetails
add smoke detector to 8th & 9th floor, elevator lobbies | $2,000 |
| Jul 22, 2003 | Completed final sign-off Nov 2003 | 160 King St | renew 200210118867 &200205065757 for final inspectionDetails
renew 200210118867 &200205065757 for final inspection | ||
| Jun 25, 2003 | Completed final sign-off Oct 2003 | 160 King St | Cannon Constructors North Inc | oti-1 6th floor-el, me, ls, spDetails
oti-1 6th floor-el, me, ls, sp | $30,000 |
| Jun 23, 2003 | Completed final sign-off Sep 2003 | 160 King St | Cannon Constructors North Inc | revision to app #200303210325Details
revision to app #200303210325 | $4,500 |
| Jun 11, 2003 | Completed final sign-off Sep 2003 | 160 King St | Cupertino Electric Inc. | oti-3 6th floor l/sDetails
oti-3 6th floor l/s | $10,300 |
| Jun 11, 2003 | Completed final sign-off Sep 2003 | 160 King St | Cupertino Electric Inc. | oti-3 7th fl lsDetails
oti-3 7th fl ls | $19,900 |
| Jun 10, 2003 | Completed final sign-off Sep 2003 | 160 King St | Cannon Constructors North Inc | oti-2, 6th floor, sp revision.Details
oti-2, 6th floor, sp revision. | $6,600 |
| Jun 10, 2003 | Completed final sign-off Sep 2003 | 160 King St | Cannon Constructors North Inc | oti-2, 7th floor, sp revision.Details
oti-2, 7th floor, sp revision. | $15,400 |
| May 27, 2003 | Completed final sign-off Oct 2003 | 153 Townsend St | Thomas Swan Sign Co Inc | erect sign for electric, wall, single facedDetails
erect sign for electric, wall, single faced | |
| May 23, 2003 | Completed final sign-off Sep 2003 | 160 King St | Cannon Constructors North Inc | rev#200303210325. remove sht. note. requiring smoke detectors on omit 3 non rated doors at toilet rmDetails
rev#200303210325. remove sht. note. requiring smoke detectors on omit 3 non rated doors at toilet rm | |
| May 21, 2003 | Expired or cancelled expired Aug 2004 | 160 King St | Cannon Constructors North Inc | oti-4 (5th fl) meDetails
oti-4 (5th fl) me | $34,800 |
| May 2, 2003 | Completed final sign-off May 2003 | 160 King St | Siemens Industry, Inc. | addition of speaker/strobes to common deck and speakers to private decks. all to be installed outdooDetails
addition of speaker/strobes to common deck and speakers to private decks. all to be installed outdoo | $3,400 |
| Apr 24, 2003 | Completed final sign-off Sep 2003 | 160 King St | Cannon Constructors North Inc | oti-1 rev. 5th floor to appl#200303179869Details
oti-1 rev. 5th floor to appl#200303179869 | $18,000 |
| Apr 18, 2003 | Expired or cancelled expired Feb 2005 | 160 King St | Cannon Constructors North Inc | office t.i., hvac for new layout, ref. appl#200303200216Details
office t.i., hvac for new layout, ref. appl#200303200216 | $41,580 |
| Apr 15, 2003 | Completed final sign-off Sep 2003 | 160 King St | Cannon Constructors North Inc | oti-3 5th fl, spDetails
oti-3 5th fl, sp | $2,900 |
| Apr 10, 2003 | Expired or cancelled expired Sep 2004 | 160 King St | Intelligent Technologies & Services Inc | oti-3 7/f spDetails
oti-3 7/f sp | $10,000 |
| Apr 4, 2003 | Completed final sign-off May 2003 | 160 King St | Cannon Constructors North Inc | 6/f- t.i.: sprinkler modifications fore new wall layout, ref. to appl#200303200216Details
6/f- t.i.: sprinkler modifications fore new wall layout, ref. to appl#200303200216 | $8,500 |
| Apr 4, 2003 | Completed final sign-off Sep 2003 | 160 King St | Cannon Constructors North Inc | oti-2 5th floor, el, lsDetails
oti-2 5th floor, el, ls | $32,950 |
| Apr 4, 2003 | Completed final sign-off May 2003 | 160 King St | Cannon Constructors North Inc | oti-3 6th floor, el, meDetails
oti-3 6th floor, el, me | $116,700 |
| Mar 31, 2003 | Completed final sign-off May 2003 | 160 King St | Cannon Constructors North Inc | tenant improvement, wall revision (6th floor)Details
tenant improvement, wall revision (6th floor) | |
| Mar 27, 2003 | Completed final sign-off Sep 2003 | 160 King St | Cannon Constructors North Inc | oti-2 7/f el me spDetails
oti-2 7/f el me sp | $700,000 |
| Mar 27, 2003 | Completed final sign-off Sep 2003 | 160 King St | Cannon Constructors North Inc | oti-2, 6th floor, el, me, spDetails
oti-2, 6th floor, el, me, sp | $300,000 |
| Mar 27, 2003 | Completed final sign-off May 2003 | 160 King St | Cannon Constructors North Inc | this application is for electrical and life safety for architectural pa#2003/03/20/0216Details
this application is for electrical and life safety for architectural pa#2003/03/20/0216 | $36,728 |
| Mar 27, 2003 | Completed final sign-off May 2003 | 160 King St | Cannon Constructors North Inc | oti-2 6/f spDetails
oti-2 6/f sp | $5,610 |
| Mar 24, 2003 | Completed final sign-off May 2003 | 160 King St | Sierra Electric Co | install f/a devices in tenant spaceDetails
install f/a devices in tenant space | $6,000 |
| Mar 21, 2003 | Completed final sign-off Sep 2003 | 160 King St | Cannon Constructors North Inc | oti-1 7th floor, el, me, ls, sp.Details
oti-1 7th floor, el, me, ls, sp. | $605,000 |
| Mar 20, 2003 | Completed final sign-off May 2003 | 160 King St | t/i on 6/f include new full height partition doors hardware acoustic ceiling flooring and finishesDetails
t/i on 6/f include new full height partition doors hardware acoustic ceiling flooring and finishes | $225,000 | |
| Mar 19, 2003 | Completed final sign-off Sep 2003 | 160 King St | Cannon Constructors North Inc | oti-1, 6th floor, el, me, ls, spDetails
oti-1, 6th floor, el, me, ls, sp | $225,000 |
| Mar 17, 2003 | Expired or cancelled expired Mar 2004 | 151 Townsend St | Discount Signs & Neon Inc | erect:non-electirc,wall, single-faced, non-illuminated new signDetails
erect:non-electirc,wall, single-faced, non-illuminated new sign | $1,000 |
| Mar 17, 2003 | Completed final sign-off Sep 2003 | 160 King St | Cannon Constructors North Inc | oti-1 5th fl,el,me,ls,spDetails
oti-1 5th fl,el,me,ls,sp | $190,108 |
| Mar 17, 2003 | Completed final sign-off May 2003 | 160 King St | Cannon Constructors North Inc | oti-5 5th floor, meDetails
oti-5 5th floor, me | $42,397 |
| Mar 14, 2003 | Completed final sign-off May 2003 | 160 King St | Cannon Constructors North Inc | oti-4, 5th floor, ls.Details
oti-4, 5th floor, ls. | $7,500 |
| Mar 13, 2003 | Completed final sign-off May 2003 | 160 King St | Cannon Constructors North Inc | oti-3 5th fl-elDetails
oti-3 5th fl-el | $38,000 |
| Mar 12, 2003 | Completed final sign-off May 2003 | 160 King St | Cannon Constructors North Inc | oti-2, 5th fl, sp.Details
oti-2, 5th fl, sp. | $6,100 |
| Feb 24, 2003 | Completed final sign-off May 2003 | 160 King St | Cannon Constructors North Inc | oti-1, 6th floor, el, me, ls, spDetails
oti-1, 6th floor, el, me, ls, sp | $175,000 |
| Feb 20, 2003 | Completed final sign-off Mar 2003 | 160 King St | Cannon Constructors North Inc | oti-3 6th fl, el,lsDetails
oti-3 6th fl, el,ls | $22,905 |
| Feb 20, 2003 | Completed final sign-off Mar 2003 | 160 King St | Cannon Constructors North Inc | oti-4 6th fl, meDetails
oti-4 6th fl, me | $25,845 |