Permit GraphShortlistSan Francisco building permits since 2000

Robbin Mcdonald

License
C15157
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C15157 at the Board for Professional Engineers
Listed as
architect, authorized agent-others, engineer, pmt consultant/expediter
Firm
Rmw
Based in
San Francisco
On San Francisco permits
Jun 2000 to Jun 2021

202 permits since 2000 (architect on 193 permits, authorized agent-others on 9 permits, engineer on 1 permit, pmt consultant/expediter on 1 permit): 167 completed, 12 never finaled, 23 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Richlen Construction (16), Novo Construction Inc (7), R.M.R. Construction Company (6), Skyline Construction (5), Commercial Interior Builders Inc (4), Rudolph Commercial Interiors Inc, Rci (4), Bcci Construction Company (3), Bevilacqua & Sons (3), Dome Construction Corp (3), Gci, Inc (3), Pankow Special Projects Lp (3), Plant Construction Company Lp (3), Ward Alan Emery Construction Inc. (3), 3-D Construction (2), Devcon Construction (2), Dpr Construction Inc (2), Field Construction Inc. (2), Hathaway Dinwiddie Co. (2), Peacock Construction Inc (2), Truebeck Construction (2), Ayoob & Peery Plumbing Co Inc, City Building Inc., Hillhouse Construction Company Inc, J C Morgan Builders, O'pro Construction Inc., Peacock Construction, Principal Builders Inc., Reliable Concepts Corporation, Robbins Construction Inc Dba Trevor D Ro, Stockham Construction, Team Commercial Construction Inc., Teamwrkx Construction, Timber-Rock Craftsmen
Architects
Albert Gregor (2), Hans Baldauf
Engineers
Amit Wadhwa (2), Pak Hui (2), Allen Scott Nudell, Andrew Merovich, Marc Press, Patrick Buscovich
Authorized agents
Joe Pirrone, Patrick Buscovich

Most recent permits

Showing the 100 most recent of 202.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 25, 2021Completed
final sign-off Mar 2025
2315 Sacramento StO'pro Construction Inc.4th fl: reconfigure floor plan to create living, dining and kitchen & 2 full bathrooms. 3th fl: reconfigure floor plan to create living, dining and kitchen & 2 full bathrooms. infill 4 windoss and install 6 new windows.
Details
Permit
202106253235
Permit issued
Aug 23, 2021
Final sign-off
Mar 18, 2025

4th fl: reconfigure floor plan to create living, dining and kitchen & 2 full bathrooms. 3th fl: reconfigure floor plan to create living, dining and kitchen & 2 full bathrooms. infill 4 windoss and install 6 new windows.

Open the permit page

$150,000
Jan 16, 2018Completed
final sign-off Jun 2018
45 Fremont StRichlen Constructionrestroom barrier removal work, new door signage, stall partitions finishes, countertops, light fixtures existing accessible plumbing to remain. existing gyp bd ceiling and devices to remain. existing power outlets to remain. maher n/a
Details
Permit
201801168664
Permit issued
Feb 22, 2018
Final sign-off
Jun 15, 2018

restroom barrier removal work, new door signage, stall partitions finishes, countertops, light fixtures existing accessible plumbing to remain. existing gyp bd ceiling and devices to remain. existing power outlets to remain. maher n/a

Open the permit page

$85,000
Jan 16, 2018Completed
final sign-off Jun 2018
45 Fremont StRichlen Constructionrestroom barrier removal work: new door signage stall partitions finishes, countertops and light fixtures. e accessible plumbing fixtures to remain. e gyp board ceiling and devices to remain. e power outlets to remain. new stall partitions. mep sep permit. maher n/a
Details
Permit
201801168660
Permit issued
Feb 22, 2018
Final sign-off
Jun 15, 2018

restroom barrier removal work: new door signage stall partitions finishes, countertops and light fixtures. e accessible plumbing fixtures to remain. e gyp board ceiling and devices to remain. e power outlets to remain. new stall partitions. mep sep permit. maher n/a

Open the permit page

$85,000
Jan 16, 2018Completed
final sign-off Jul 2018
45 Fremont StRichlen Constructionrestroom barrier removal work. new floor signage, finishes, countertops, sinks, faucets, light fixtures, stall partitions, duplex outlets/recept. e gyp bd ceiling devices to remain, e outlets to remain. relocate water closets in hc stall maher not req
Details
Permit
201801168663
Permit issued
Feb 22, 2018
Final sign-off
Jul 5, 2018

restroom barrier removal work. new floor signage, finishes, countertops, sinks, faucets, light fixtures, stall partitions, duplex outlets/recept. e gyp bd ceiling devices to remain, e outlets to remain. relocate water closets in hc stall maher not req

Open the permit page

$100,000
Jul 25, 2016Completed
final sign-off Nov 2016
214 Bradford StTimber-Rock Craftsmenkitchen and bathroom remodel, finsihes,fixtures, fittings. new wood backyard deck. plumbging/elec under spearate permit. minor alterations to front facade.
Details
Permit
201607253194
Permit issued
Aug 4, 2016
Final sign-off
Nov 29, 2016

kitchen and bathroom remodel, finsihes,fixtures, fittings. new wood backyard deck. plumbging/elec under spearate permit. minor alterations to front facade.

Open the permit page

$45,000
Nov 17, 2015Completed
final sign-off Mar 2016
535 Mission StPeacock Constructioninterior ti to elevator lobby, multi-tenant corridor & tenant suite; including new offices, conference room, break room, lighting & power. life safety, sprinkler under separate permit
Details
Permit
201511172800
Permit issued
Nov 23, 2015
Final sign-off
Mar 7, 2016

interior ti to elevator lobby, multi-tenant corridor & tenant suite; including new offices, conference room, break room, lighting & power. life safety, sprinkler under separate permit

Open the permit page

$325,000
Mar 15, 2013Completed
final sign-off Jan 2014
1455 Market StCity Building Inc.demolition of wall and door in storage room to extend corrider to garage and make a smaller storage room. relocate card reader, add light fixtures to corridor.
Details
Permit
201303152329
Permit issued
Apr 25, 2013
Final sign-off
Jan 3, 2014

demolition of wall and door in storage room to extend corrider to garage and make a smaller storage room. relocate card reader, add light fixtures to corridor.

Open the permit page

$118,700
Sep 5, 2012Completed
final sign-off Oct 2013
1355 Market Stdemo portion of (e) south facade ground floor windows & window openings to finish floor. remove (e) boiler file at ground & 2nd floor. remove (e) slab at 2nd floor for future stair. remove (e) louvers in (e) window openings & remove (e) windows. 2nd flooor slab removal as per strucutral drawing.
Details
Permit
201209058954
Permit issued
Feb 1, 2013
Final sign-off
Oct 16, 2013

demo portion of (e) south facade ground floor windows & window openings to finish floor. remove (e) boiler file at ground & 2nd floor. remove (e) slab at 2nd floor for future stair. remove (e) louvers in (e) window openings & remove (e) windows. 2nd flooor slab removal as per strucutral drawing.

Open the permit page

$375,000
Feb 22, 2012Completed
final sign-off Jun 2013
201 03rd StTruebeck Constructionbarrier removal, new van stall in loading dock area per ab-007.
Details
Permit
201202224583
Permit issued
Mar 6, 2012
Final sign-off
Jun 7, 2013

barrier removal, new van stall in loading dock area per ab-007.

Open the permit page

$24,000
May 18, 2011Completed
final sign-off Nov 2011
731 Market StPeacock Construction Inc4th floor- demo walls, ceiling & lighting in 2 suites, per ab-017
Details
Permit
201105186332
Permit issued
May 19, 2011
Final sign-off
Nov 2, 2011

4th floor- demo walls, ceiling & lighting in 2 suites, per ab-017

Open the permit page

$9,850
May 18, 2011Completed
final sign-off Jun 2011
201 03rd StReliable Concepts Corporation7th floor-relocate 1 wall & provide new reception desk
Details
Permit
201105186329
Permit issued
May 23, 2011
Final sign-off
Jun 21, 2011

7th floor-relocate 1 wall & provide new reception desk

Open the permit page

$30,000
May 11, 2011Completed
final sign-off Nov 2011
505 Montgomery StGci, Incfloor 10th & 11th minor t.i. work to existing tenant space to add new non load bearing partition & finishes.
Details
Permit
201105115830
Permit issued
Jun 8, 2011
Final sign-off
Nov 2, 2011

floor 10th & 11th minor t.i. work to existing tenant space to add new non load bearing partition & finishes.

Open the permit page

$175,000
May 3, 2011Completed
final sign-off May 2012
1 Montgomery StGci, Incconstruct conference rooms, open office environment, training room, copy rooms, break room, communication stair, new finishes throughout.
Details
Permit
201105035202
Permit issued
Jul 29, 2011
Final sign-off
May 2, 2012

construct conference rooms, open office environment, training room, copy rooms, break room, communication stair, new finishes throughout.

Open the permit page

$1,300,000
Apr 14, 2011Completed
final sign-off May 2011
111 Sutter StSkyline Constructiondivide 1 large office into 2 offices, relocate existing electrical outlets, demolish 1 light fixture
Details
Permit
201104144046
Permit issued
Apr 20, 2011
Final sign-off
May 5, 2011

divide 1 large office into 2 offices, relocate existing electrical outlets, demolish 1 light fixture

Open the permit page

$5,000
Apr 8, 2011Completed
final sign-off Jun 2011
475 Sansome StWard Alan Emery Construction Inc.5th floor-construct new server closet in suite 510, 5th floor.
Details
Permit
201104083734
Permit issued
Apr 15, 2011
Final sign-off
Jun 14, 2011

5th floor-construct new server closet in suite 510, 5th floor.

Open the permit page

$46,112
Mar 23, 2011Completed
final sign-off Jun 2011
235 Montgomery StR.M.R. Construction Companysuite 400:new interior office and conference rooms, new finish, lighting, power, new millwork, sink. mep and fire. life safety under separate permit
Details
Permit
201103232632
Permit issued
Mar 25, 2011
Final sign-off
Jun 3, 2011

suite 400:new interior office and conference rooms, new finish, lighting, power, new millwork, sink. mep and fire. life safety under separate permit

Open the permit page

$100,000
Mar 4, 2011Completed
final sign-off Apr 2011
100 California StPeacock Construction Inc7th floor - demo of interior partitions, door & sidelite, build back interior partition, new finishes.
Details
Permit
201103041411
Permit issued
Mar 4, 2011
Final sign-off
Apr 14, 2011

7th floor - demo of interior partitions, door & sidelite, build back interior partition, new finishes.

Open the permit page

$17,500
Feb 3, 2011Completed
final sign-off Oct 2011
235 Montgomery StR.M.R. Construction Companybarrier removal of parking cashier booth & adjoining area - new doors & wall finishes in waiting area of garage, mail room & cashier lobby. mep & fire sprinkler under separate permit.new doors and wall finishes in waiting area of garage, mailroom, and cashier lobby.
Details
Permit
201102039575
Permit issued
Mar 1, 2011
Final sign-off
Oct 25, 2011

barrier removal of parking cashier booth & adjoining area - new doors & wall finishes in waiting area of garage, mail room & cashier lobby. mep & fire sprinkler under separate permit.new doors and wall finishes in waiting area of garage, mailroom, and cashier lobby.

Open the permit page

$96,447
Feb 1, 2011Completed
final sign-off Mar 2011
201 03rd StPlant Construction Company Lprevision to appl #201012146697- architectural only - layout of game room revised door & wall removed from scope, paint locations revised, ceiling plan added.
Details
Permit
201102019433
Permit issued
Feb 3, 2011
Final sign-off
Mar 8, 2011

revision to appl #201012146697- architectural only - layout of game room revised door & wall removed from scope, paint locations revised, ceiling plan added.

Open the permit page

Dec 23, 2010Completed
final sign-off Sep 2011
275 Battery StHathaway Dinwiddie Co.demolition of non structural partitions. construction of conference rooms, private offices,open office area and accessory rooms. new finishes throughout. mep & life safety systems under seperate permit, design build.
Details
Permit
201012237267
Permit issued
Dec 27, 2010
Final sign-off
Sep 27, 2011

demolition of non structural partitions. construction of conference rooms, private offices,open office area and accessory rooms. new finishes throughout. mep & life safety systems under seperate permit, design build.

Open the permit page

$300,000
Dec 17, 2010Never finaled
issued Dec 2010, no final
111 Sutter StBevilacqua & Sonsdemolition of ground floor space . no occupants!, no structural, per ab-017.
Details
Permit
201012176945
Permit issued
Dec 22, 2010

demolition of ground floor space . no occupants!, no structural, per ab-017.

Open the permit page

$22,000
Dec 16, 2010Completed
final sign-off Sep 2011
275 Battery StHathaway Dinwiddie Co.construction of conference rooms,private offices,open office enviornment, copy/mial rooms break room, new finishes throughout on 13th floor. hvac electrical, plumbing, fire sprinkler design bld under seperate permit.
Details
Permit
201012166838
Permit issued
Dec 27, 2010
Final sign-off
Sep 27, 2011

construction of conference rooms,private offices,open office enviornment, copy/mial rooms break room, new finishes throughout on 13th floor. hvac electrical, plumbing, fire sprinkler design bld under seperate permit.

Open the permit page

$400,000
Nov 30, 2010Completed
final sign-off Feb 2011
685 Market StCommercial Interior Builders Incbarrier removal and remodel of mens and womens restrooms on 1st floor, electrical and mechanical under separate permit.
Details
Permit
201011305747
Permit issued
Nov 30, 2010
Final sign-off
Feb 22, 2011

barrier removal and remodel of mens and womens restrooms on 1st floor, electrical and mechanical under separate permit.

Open the permit page

$65,000
Oct 21, 2010Completed
final sign-off Mar 2012
1 Montgomery StGci, Inc26th & 27th floor: construction of conference rooms, private offices, open office environment, copy rooms, break rooms, new finishes throughout. mech & electrical included . sp & ls separate permit
Details
Permit
201010213480
Permit issued
Nov 8, 2010
Final sign-off
Mar 1, 2012

26th & 27th floor: construction of conference rooms, private offices, open office environment, copy rooms, break rooms, new finishes throughout. mech & electrical included . sp & ls separate permit

Open the permit page

$2,800,000
Oct 6, 2010Completed
final sign-off May 2011
221 Main StPankow Special Projects Lp6th floor-t.i. of (e) office space-open floor plan with some exterior offices (full height walls), 1 kitchen/break room will be added. work will includes demo of (e) gyp walls, installation of new gyp walls, carpet, millwork (limited) & electrical
Details
Permit
201010062409
Permit issued
Oct 6, 2010
Final sign-off
May 9, 2011

6th floor-t.i. of (e) office space-open floor plan with some exterior offices (full height walls), 1 kitchen/break room will be added. work will includes demo of (e) gyp walls, installation of new gyp walls, carpet, millwork (limited) & electrical

Open the permit page

$375,000
Sep 29, 2010Completed
final sign-off Dec 2010
475 Sansome StNovo Construction Inc17th floor tenant improvements including minor demolition & build back. new carpet & paint. mep,ls and sp separate permit
Details
Permit
201009291824
Permit issued
Oct 1, 2010
Final sign-off
Dec 2, 2010

17th floor tenant improvements including minor demolition & build back. new carpet & paint. mep,ls and sp separate permit

Open the permit page

$90,000
Aug 18, 2010Completed
final sign-off Jul 2011
1 Sansome StStockham Constructiondemo of 1 wall, install new doors (2), new plumbing for small kitchen, replace existing light fixtures with new
Details
Permit
201008188999
Permit issued
Sep 14, 2010
Final sign-off
Jul 20, 2011

demo of 1 wall, install new doors (2), new plumbing for small kitchen, replace existing light fixtures with new

Open the permit page

$68,000
Aug 13, 2010Completed
final sign-off Feb 2011
685 Market StCommercial Interior Builders Incbarrier removal and remodel of men's and womens restrooms on the 7th floor.
Details
Permit
201008138791
Permit issued
Sep 23, 2010
Final sign-off
Feb 22, 2011

barrier removal and remodel of men's and womens restrooms on the 7th floor.

Open the permit page

$65,000
Aug 13, 2010Completed
final sign-off Oct 2010
685 Market StRichlen Constructionrelocate front entry doors,rotate exg conference room at 5th floor.
Details
Permit
201008138790
Permit issued
Aug 19, 2010
Final sign-off
Oct 19, 2010

relocate front entry doors,rotate exg conference room at 5th floor.

Open the permit page

$25,000
Aug 5, 2010Completed
final sign-off Oct 2013
505 Montgomery StNovo Construction Incground floor-bldg lobby-construct new guards desk, flip door swing, install new turnstiles. mechanical & plumbing not required. electrical under seperate permit
Details
Permit
201008058166
Permit issued
Jun 20, 2011
Final sign-off
Oct 28, 2013

ground floor-bldg lobby-construct new guards desk, flip door swing, install new turnstiles. mechanical & plumbing not required. electrical under seperate permit

Open the permit page

$75,000
Jul 22, 2010Completed
final sign-off Aug 2010
111 Sutter StBevilacqua & Sons8th floor- construct one work room by building one wall w/entry door. no mechanical or plumbing work. electrical permit to be filed separately.
Details
Permit
201007227198
Permit issued
Jul 26, 2010
Final sign-off
Aug 27, 2010

8th floor- construct one work room by building one wall w/entry door. no mechanical or plumbing work. electrical permit to be filed separately.

Open the permit page

$10,000
Jul 22, 2010Completed
final sign-off Aug 2010
111 Sutter StBevilacqua & Sons15th floor - demolition of one wall in open office space. patch and finish.
Details
Permit
201007227200
Permit issued
Jul 26, 2010
Final sign-off
Aug 27, 2010

15th floor - demolition of one wall in open office space. patch and finish.

Open the permit page

$5,000
Jul 19, 2010Completed
final sign-off Oct 2010
717 Market StNovo Construction Incoffice ti on the 4th fl. demo of interior non load bearing partitions and door assemblies. construction of new partitions and door assemblies. mep, fire and ls under separate permit
Details
Permit
201007196906
Permit issued
Jul 19, 2010
Final sign-off
Oct 5, 2010

office ti on the 4th fl. demo of interior non load bearing partitions and door assemblies. construction of new partitions and door assemblies. mep, fire and ls under separate permit

Open the permit page

$47,500
Jul 2, 2010Completed
final sign-off Nov 2010
100 California StPankow Special Projects Lpoffice tenant on floor 11. provide new gyp bd partitions, glazing doors, frames, hardware , electrical mep design build under separate permit
Details
Permit
201007025882
Permit issued
Aug 17, 2010
Final sign-off
Nov 19, 2010

office tenant on floor 11. provide new gyp bd partitions, glazing doors, frames, hardware , electrical mep design build under separate permit

Open the permit page

$74,000
Jul 2, 2010Completed
final sign-off Nov 2010
100 California StPankow Special Projects Lpoffice tenant on the 6th floor. new gyp bd partitions, glazing, doors, frames, hardware, electrical, mep design build under seoarate permit
Details
Permit
201007025880
Permit issued
Aug 17, 2010
Final sign-off
Nov 19, 2010

office tenant on the 6th floor. new gyp bd partitions, glazing, doors, frames, hardware, electrical, mep design build under seoarate permit

Open the permit page

$200,000
Jun 21, 2010Expired or cancelled
cancelled Jan 2026
505 Montgomery Strevision to p.a.#200910290133. minor revisions to floor layout. structural plans for infill of stair opening.
Details
Permit
201006214912

revision to p.a.#200910290133. minor revisions to floor layout. structural plans for infill of stair opening.

Open the permit page

Jun 11, 2010Completed
final sign-off Mar 2011
180 Sansome StSkyline Constructionti 4th fl - incl rated elevator lobby with fire rated won door, non bearing partitions & millwork. ada accessible restrooms.
Details
Permit
201006114296
Permit issued
Sep 10, 2010
Final sign-off
Mar 7, 2011

ti 4th fl - incl rated elevator lobby with fire rated won door, non bearing partitions & millwork. ada accessible restrooms.

Open the permit page

$250,000
Apr 22, 2010Completed
final sign-off Jul 2010
685 Market StCommercial Interior Builders Inc4th floor ada upgrade to the men's & women's retrooms. voluntary barrier removal.
Details
Permit
201004220901
Permit issued
Apr 23, 2010
Final sign-off
Jul 12, 2010

4th floor ada upgrade to the men's & women's retrooms. voluntary barrier removal.

Open the permit page

$65,000
Feb 2, 2010Completed
final sign-off Dec 2010
475 Sansome StNovo Construction Incfloor 18th base bldg improvements - finish upgrade to elevator lobby & multi tenant corridors, code & finish upgrades to men's & women's restroom, fire sprinklers, plbg & electrical drawings under separate permit, existing mechanical system to remain.
Details
Permit
201002025719
Permit issued
Feb 25, 2010
Final sign-off
Dec 13, 2010

floor 18th base bldg improvements - finish upgrade to elevator lobby & multi tenant corridors, code & finish upgrades to men's & women's restroom, fire sprinklers, plbg & electrical drawings under separate permit, existing mechanical system to remain.

Open the permit page

$160,000
Feb 2, 2010Completed
final sign-off Dec 2010
475 Sansome StNovo Construction Incfloor 17th - base bldg improvements - finish upgrade to elevator lobby & multi tenant corridors, code & finish upgrades to men's & women's restroom, fire sprinklers, plbg & electrical drawings under separate permit, existing mechanical system to remain.
Details
Permit
201002025722
Permit issued
Feb 25, 2010
Final sign-off
Dec 2, 2010

floor 17th - base bldg improvements - finish upgrade to elevator lobby & multi tenant corridors, code & finish upgrades to men's & women's restroom, fire sprinklers, plbg & electrical drawings under separate permit, existing mechanical system to remain.

Open the permit page

$160,000
Dec 7, 2009Completed
final sign-off Feb 2010
1 California Stremodel existing tenant improvements to rebuild 4 offices and 1 storage room and conference room
Details
Permit
200912072698
Permit issued
Jan 12, 2010
Final sign-off
Feb 11, 2010

remodel existing tenant improvements to rebuild 4 offices and 1 storage room and conference room

Open the permit page

$62,000
Oct 30, 2009Completed
final sign-off Jan 2010
2 Henry Adams St4th floor-tenant improvements-selective demolition, construct new corridor, new finishes for corridor. mechanical, electrical under seperate permit
Details
Permit
200910300229
Permit issued
Nov 5, 2009
Final sign-off
Jan 25, 2010

4th floor-tenant improvements-selective demolition, construct new corridor, new finishes for corridor. mechanical, electrical under seperate permit

Open the permit page

$49,000
Oct 29, 2009Expired or cancelled
cancelled Jan 2026
505 Montgomery St23rd floor-selective demolition (gyp board partitions, glazing, doors, frames & hardward). paint (e) partitions. demo to comply with ab-017
Details
Permit
200910290135

23rd floor-selective demolition (gyp board partitions, glazing, doors, frames & hardward). paint (e) partitions. demo to comply with ab-017

Open the permit page

$35,000
Oct 29, 2009Expired or cancelled
cancelled Jan 2026
505 Montgomery St6th floor-spec suite, demo internal stairs, selective demolition with the suite & new finishes. mechanical & electrical under a seperate permit
Details
Permit
200910290133

6th floor-spec suite, demo internal stairs, selective demolition with the suite & new finishes. mechanical & electrical under a seperate permit

Open the permit page

$175,000
Oct 29, 2009Expired or cancelled
cancelled Jan 2026
505 Montgomery St24th floor-demolition (light fixtures, millwork & finishes). paint (e) partitions & selective ceiling tile, install new light fixtures.
Details
Permit
200910290136

24th floor-demolition (light fixtures, millwork & finishes). paint (e) partitions & selective ceiling tile, install new light fixtures.

Open the permit page

$15,000
Aug 26, 2009Completed
final sign-off Mar 2010
300 Montgomery StHillhouse Construction Company Inc3rd fl. minor demolition & construction of 3rd floor elevator lobbies & partial corridor. mep & fire sprinkler under separate permit.
Details
Permit
200908265566
Permit issued
Sep 18, 2009
Final sign-off
Mar 5, 2010

3rd fl. minor demolition & construction of 3rd floor elevator lobbies & partial corridor. mep & fire sprinkler under separate permit.

Open the permit page

$87,687
Jul 13, 2009Completed
final sign-off Sep 2009
1 Bush StSkyline Construction12th floor interior demolition of partition, mep, fire sprinkelr & life safety under separate permit.-
Details
Permit
200907132446
Permit issued
Jul 13, 2009
Final sign-off
Sep 21, 2009

12th floor interior demolition of partition, mep, fire sprinkelr & life safety under separate permit.-

Open the permit page

$3,000
Jun 29, 2009Completed
final sign-off Oct 2009
620 Folsom StSkyline Construction2nd floor demolition of existing work surfaces in private offices. relocate break room millwork, ne wfinishes. upgrade existing restrooms, mechanical & electrical included.
Details
Permit
200906291494
Permit issued
Jun 30, 2009
Final sign-off
Oct 8, 2009

2nd floor demolition of existing work surfaces in private offices. relocate break room millwork, ne wfinishes. upgrade existing restrooms, mechanical & electrical included.

Open the permit page

$350,000
May 27, 2009Completed
final sign-off Sep 2009
685 Market StCommercial Interior Builders Incada upgrade to mens and womens restroom on the 6th floor
Details
Permit
200905279182
Permit issued
May 29, 2009
Final sign-off
Sep 2, 2009

ada upgrade to mens and womens restroom on the 6th floor

Open the permit page

$120,000
May 8, 2009Completed
final sign-off Sep 2009
50 California StSkyline Construction8th floor-construction new 1 hour rated multi-tenant corridor, management training area & le spec suites. permit application includes mechanical, electrical & plumbing
Details
Permit
200905088017
Permit issued
Jun 8, 2009
Final sign-off
Sep 25, 2009

8th floor-construction new 1 hour rated multi-tenant corridor, management training area & le spec suites. permit application includes mechanical, electrical & plumbing

Open the permit page

$670,000
Apr 9, 2009Never finaled
issued Apr 2009, no final
1 Sansome StBcci Construction Company29th floor -revision to appl #200809111324 to relcoate stall partition door & install new paper cup dispenser in response to request from the field inspector.
Details
Permit
200904095922
Permit issued
Apr 10, 2009

29th floor -revision to appl #200809111324 to relcoate stall partition door & install new paper cup dispenser in response to request from the field inspector.

Open the permit page

$2,700
Feb 26, 2009Completed
final sign-off Jul 2009
100 California StRichlen Constructionrevision to 200901129970: deduct exhaust fan from hvac scope of work
Details
Permit
200902262950
Permit issued
Feb 26, 2009
Final sign-off
Jul 10, 2009

revision to 200901129970: deduct exhaust fan from hvac scope of work

Open the permit page

Feb 26, 2009Completed
final sign-off Jul 2015
1355 Market StTruebeck Constructionvoluntary seismic rehabilitation to meet the life safety performanc level as required by the procedures of asce seismic rehabilitation of extg bldg as refrenced in cbc 2007 edition. rehab program consists of new concrete shear core surrounding future elevators from basement through 11th floor.
Details
Permit
200902262951
Permit issued
Jul 15, 2011
Final sign-off
Jul 10, 2015

voluntary seismic rehabilitation to meet the life safety performanc level as required by the procedures of asce seismic rehabilitation of extg bldg as refrenced in cbc 2007 edition. rehab program consists of new concrete shear core surrounding future elevators from basement through 11th floor.

Open the permit page

$4,800,000
Feb 9, 2009Completed
final sign-off Feb 2009
300 Montgomery St3-D Constructiondisable access 20% rule, remove signage from multiple accomodation toilets & provide new signs at each toilet directing person to single occupancy accesible facilities <150' on floor unreasonable hardship request ab-006. 2nd fl. separate accessible toilet facilities.
Details
Permit
200902091721
Permit issued
Feb 17, 2009
Final sign-off
Feb 18, 2009

disable access 20% rule, remove signage from multiple accomodation toilets & provide new signs at each toilet directing person to single occupancy accesible facilities <150' on floor unreasonable hardship request ab-006. 2nd fl. separate accessible toilet facilities.

Open the permit page

$600
Jan 29, 2009Completed
final sign-off Dec 2009
425 Market StR.M.R. Construction Company9th floor-new storage room cabinets & finishes. no mep., life safety or sprinklers on this permit.
Details
Permit
200901291023
Permit issued
Jan 29, 2009
Final sign-off
Dec 8, 2009

9th floor-new storage room cabinets & finishes. no mep., life safety or sprinklers on this permit.

Open the permit page

$18,000
Jan 28, 2009Completed
final sign-off Mar 2009
50 California StTeamwrkx Construction16th floor-tenant improvement, suite #1600 including minor demolition & construction of grid high suite partitions, move lights as required.
Details
Permit
200901281004
Permit issued
Feb 10, 2009
Final sign-off
Mar 12, 2009

16th floor-tenant improvement, suite #1600 including minor demolition & construction of grid high suite partitions, move lights as required.

Open the permit page

$20,000
Jan 23, 2009Completed
final sign-off Mar 2009
875 Stevenson StPlant Construction Company Lpti floor 3: minor demolition, new partitions and finishes for portion of 3rd fl. elec outlets and lighting rearrangement, relocate door frames and install security locks at existing doors. mep, fire protection/life safety separate permit
Details
Permit
200901230739
Permit issued
Jan 27, 2009
Final sign-off
Mar 25, 2009

ti floor 3: minor demolition, new partitions and finishes for portion of 3rd fl. elec outlets and lighting rearrangement, relocate door frames and install security locks at existing doors. mep, fire protection/life safety separate permit

Open the permit page

$500,000
Jan 12, 2009Completed
final sign-off Jul 2009
100 California StRichlen Construction11th fl, suite 1100 & 1125 - architectural pa# 2008-1202-7575-electrical & hvac scope of work: install new lighting & electrical for 2 suites. install new vav boxes with t-stats. install new supply & return grilles, transfer fans & exhaust fans. comp 200854764-pid.
Details
Permit
200901129970
Permit issued
Jan 12, 2009
Final sign-off
Jul 10, 2009

11th fl, suite 1100 & 1125 - architectural pa# 2008-1202-7575-electrical & hvac scope of work: install new lighting & electrical for 2 suites. install new vav boxes with t-stats. install new supply & return grilles, transfer fans & exhaust fans. comp 200854764-pid.

Open the permit page

$139,000
Dec 2, 2008Completed
final sign-off Jul 2009
100 California StRichlen Constructionsuite 1110: remodel of 6851 sf of space, demo partitions, replace within new partitions, ceiling, light fixtures, furnishes, doors, sidelights, hardware. suite 1125: remodel 1492 sf of space, demo partitions, replace with new partitions, ceiling,lt fix,doors,sidelights,hardware,mep sep permit
Details
Permit
200812027575
Permit issued
Dec 2, 2008
Final sign-off
Jul 10, 2009

suite 1110: remodel of 6851 sf of space, demo partitions, replace within new partitions, ceiling, light fixtures, furnishes, doors, sidelights, hardware. suite 1125: remodel 1492 sf of space, demo partitions, replace with new partitions, ceiling,lt fix,doors,sidelights,hardware,mep sep permit

Open the permit page

$200,000
Nov 10, 2008Completed
final sign-off Mar 2009
601 Montgomery StDome Construction Corp19th floor-tenant improvements in 7711 usf on 19th floor of 601 montgomery consisting of minor demolition and construction of partitions for office space. scope includes minor electrical and mechanical work throughout the space to accomodate new spaces. m.e.p, sp and ls to be separate permits.
Details
Permit
200811106266
Permit issued
Dec 4, 2008
Final sign-off
Mar 4, 2009

19th floor-tenant improvements in 7711 usf on 19th floor of 601 montgomery consisting of minor demolition and construction of partitions for office space. scope includes minor electrical and mechanical work throughout the space to accomodate new spaces. m.e.p, sp and ls to be separate permits.

Open the permit page

$295,000
Oct 24, 2008Completed
final sign-off Nov 2008
1 Sansome StRichlen Constructionarch pa# 2008-0812-8987-flr lighting & power, connecting power to new/relocated light fixtures, power outlets & tenant equipment. add 2 cooling vav & 2 vav heating boxes, relocate one heat pump & 1 condenser water circulating pump from 8th to 7th flrs, add ceiling supply diffusers & return air gri
Details
Permit
200810245045
Permit issued
Oct 28, 2008
Final sign-off
Nov 25, 2008

arch pa# 2008-0812-8987-flr lighting & power, connecting power to new/relocated light fixtures, power outlets & tenant equipment. add 2 cooling vav & 2 vav heating boxes, relocate one heat pump & 1 condenser water circulating pump from 8th to 7th flrs, add ceiling supply diffusers & return air gri

Open the permit page

$100,000
Oct 21, 2008Completed
final sign-off Mar 2009
201 03rd StField Construction Inc.3/f -removal of gyp bd partions - construction of gyp bd patitions, glazing partitions, doors frames hardware, new electrical, plumbing & mechanical & millwork. electrical, plumbing, mechanical & life safety under separate permit.
Details
Permit
200810214674
Permit issued
Oct 22, 2008
Final sign-off
Mar 25, 2009

3/f -removal of gyp bd partions - construction of gyp bd patitions, glazing partitions, doors frames hardware, new electrical, plumbing & mechanical & millwork. electrical, plumbing, mechanical & life safety under separate permit.

Open the permit page

$350,000
Oct 10, 2008Completed
final sign-off Dec 2008
160 Pine StRichlen Construction6th fl tenant improvement: construction of 1 private office, demolition of 2 walls to create open work area
Details
Permit
200810103884
Permit issued
Oct 10, 2008
Final sign-off
Dec 12, 2008

6th fl tenant improvement: construction of 1 private office, demolition of 2 walls to create open work area

Open the permit page

$18,000
Oct 8, 2008Completed
final sign-off Nov 2008
1 Sansome StAyoob & Peery Plumbing Co Increlocate fire sprinklers heads per tenant imp. 40 relocated, and 11 removed.
Details
Permit
200810083706
Permit issued
Oct 8, 2008
Final sign-off
Nov 24, 2008

relocate fire sprinklers heads per tenant imp. 40 relocated, and 11 removed.

Open the permit page

$8,000
Sep 29, 2008Completed
final sign-off Oct 2013
1355 Market StPlant Construction Company Lpconstruction of new spread footings and mat foundation only, for new concrete shearwalls. a new pilelap & micropile foundation system will be received at one location, all above work is for voluntary strengthening of (e) bldg. superstructure to be submitted as a separate permit.
Details
Permit
200809292954
Permit issued
Feb 5, 2009
Final sign-off
Oct 23, 2013

construction of new spread footings and mat foundation only, for new concrete shearwalls. a new pilelap & micropile foundation system will be received at one location, all above work is for voluntary strengthening of (e) bldg. superstructure to be submitted as a separate permit.

Open the permit page

$670,000
Sep 15, 2008Completed
final sign-off Mar 2009
425 Market StR.M.R. Construction Companyminor non-structural interior demo. 11th fl. all work performed in accordance per ab-17.
Details
Permit
200809151614
Permit issued
Sep 16, 2008
Final sign-off
Mar 23, 2009

minor non-structural interior demo. 11th fl. all work performed in accordance per ab-17.

Open the permit page

$11,000
Aug 29, 2008Completed
final sign-off Oct 2008
260 California StJ C Morgan Buildersrevision to application 200804210161 to comply with w/vhr3, replace restroom accessibility sheet.
Details
Permit
200808290400
Permit issued
Aug 29, 2008
Final sign-off
Oct 30, 2008

revision to application 200804210161 to comply with w/vhr3, replace restroom accessibility sheet.

Open the permit page

Aug 22, 2008Never finaled
issued Aug 2008, no final
300 Montgomery St3-D Construction3rd floor: interior demo of non load bearing interior partitons and finishes. (12,750 sf) per ab-017
Details
Permit
200808229899
Permit issued
Aug 25, 2008

3rd floor: interior demo of non load bearing interior partitons and finishes. (12,750 sf) per ab-017

Open the permit page

$69,040
Aug 15, 2008Completed
final sign-off Jan 2009
2 Embarcadero CenterBcci Construction Company4th floor-revision to pa# 2008-0730-8001-to the mechanical plan to include the revise of (e) hvac boxes in lieu of all new vav boxes
Details
Permit
200808159295
Permit issued
Aug 15, 2008
Final sign-off
Jan 23, 2009

4th floor-revision to pa# 2008-0730-8001-to the mechanical plan to include the revise of (e) hvac boxes in lieu of all new vav boxes

Open the permit page

$500
Aug 12, 2008Completed
final sign-off Feb 2009
1 Sansome StRichlen Construction7th floor-tenant improvements: new millwork, plumbing, partitions, doors, fame, hadware, electrical outlets, new ceiling grid & light fixtures
Details
Permit
200808128987
Permit issued
Aug 29, 2008
Final sign-off
Feb 11, 2009

7th floor-tenant improvements: new millwork, plumbing, partitions, doors, fame, hadware, electrical outlets, new ceiling grid & light fixtures

Open the permit page

$325,000
Jul 24, 2008Completed
final sign-off Apr 2009
1 Embarcadero CenterField Construction Inc.28th & 29th floors - tenant improvements of 5743 sf on 28th fl and communicating stair to 29th floor with 2 hr rated door. create lawyer offices and breakroom. bathroom upgrade under separate permit.
Details
Permit
200807247564
Permit issued
Jul 30, 2008
Final sign-off
Apr 6, 2009

28th & 29th floors - tenant improvements of 5743 sf on 28th fl and communicating stair to 29th floor with 2 hr rated door. create lawyer offices and breakroom. bathroom upgrade under separate permit.

Open the permit page

$631,730
Jul 17, 2008Never finaled
issued Jul 2008, no final
49 Stevenson StWard Alan Emery Construction Inc.at 2nd fl: rvision to pa #200806063854, replace existing woment's rm sink for accessibility.
Details
Permit
200807176974
Permit issued
Jul 22, 2008

at 2nd fl: rvision to pa #200806063854, replace existing woment's rm sink for accessibility.

Open the permit page

$2,960
Jul 9, 2008Completed
final sign-off Mar 2009
1 Bush StDome Construction Corp7th & 8th floors-stair demolition and infill slab between the 7th & 8th floors. occupancy and final certificate of occupancy allowed after umbrella permit approved.
Details
Permit
200807096237
Permit issued
Jul 14, 2008
Final sign-off
Mar 30, 2009

7th & 8th floors-stair demolition and infill slab between the 7th & 8th floors. occupancy and final certificate of occupancy allowed after umbrella permit approved.

Open the permit page

$143,000
Jul 3, 2008Completed
final sign-off May 2009
717 Market StNovo Construction Incdemo some interior non-load bearing partition walls and door assemblies. construct new partition walls and door assemblies, provide new finishes throughout. mep and fire safety will be under a separate permit.
Details
Permit
200807035994
Permit issued
Jul 8, 2008
Final sign-off
May 13, 2009

demo some interior non-load bearing partition walls and door assemblies. construct new partition walls and door assemblies, provide new finishes throughout. mep and fire safety will be under a separate permit.

Open the permit page

$90,000
Jun 26, 2008Completed
final sign-off Sep 2008
731 Market StRudolph Commercial Interiors Inc, Rci6th floor: barrier removal, relocate plumbing fixtures. repair automatic door opener.
Details
Permit
200806265475
Permit issued
Jul 8, 2008
Final sign-off
Sep 10, 2008

6th floor: barrier removal, relocate plumbing fixtures. repair automatic door opener.

Open the permit page

$30,000
Jun 26, 2008Completed
final sign-off Sep 2008
731 Market StRudolph Commercial Interiors Inc, Rci4th floor: barrier removal, restrooms- new gyp board partition door, frame, hardware, relocate plumbing fixtures.
Details
Permit
200806265471
Permit issued
Jul 8, 2008
Final sign-off
Sep 10, 2008

4th floor: barrier removal, restrooms- new gyp board partition door, frame, hardware, relocate plumbing fixtures.

Open the permit page

$30,000
Jun 26, 2008Completed
final sign-off Oct 2008
731 Market StRudolph Commercial Interiors Inc, Rci2nd floor: tenant improvement, barrier removal - restrooms new gyp borad partition, door, frame, hardware. relocate (e) toilet accessories.
Details
Permit
200806265466
Permit issued
Jul 8, 2008
Final sign-off
Oct 17, 2008

2nd floor: tenant improvement, barrier removal - restrooms new gyp borad partition, door, frame, hardware. relocate (e) toilet accessories.

Open the permit page

$10,000
Jun 26, 2008Completed
final sign-off Sep 2008
731 Market StRudolph Commercial Interiors Inc, Rci5th floor: barrier removal - create new unisex restroom, add door frame + hardware & plumbing fixtures.
Details
Permit
200806265473
Permit issued
Jul 8, 2008
Final sign-off
Sep 10, 2008

5th floor: barrier removal - create new unisex restroom, add door frame + hardware & plumbing fixtures.

Open the permit page

$25,000
Jun 19, 2008Never finaled
issued Jun 2008, no final
685 Market StRichlen Constructionsuite 600, 6th fl: minor tenant improvments. minor demolition and construction to interior open office space. ada restroom upgrades. mep separate permit.
Details
Permit
200806194829
Permit issued
Jun 19, 2008

suite 600, 6th fl: minor tenant improvments. minor demolition and construction to interior open office space. ada restroom upgrades. mep separate permit.

Open the permit page

$90,000
Jun 19, 2008Never finaled
issued Jun 2008, no final
685 Market StRichlen Construction7th fl: minor tenant improvements to the 7th floor. removeal of wall, additon of a door and 3 form panel room divider. ada restroom upgrades. mep separate permit
Details
Permit
200806194835
Permit issued
Jun 19, 2008

7th fl: minor tenant improvements to the 7th floor. removeal of wall, additon of a door and 3 form panel room divider. ada restroom upgrades. mep separate permit

Open the permit page

$50,000
Jun 19, 2008Completed
final sign-off Aug 2008
49 Stevenson StRichlen Constructionreuse and relocated existing 2x4 and 2x2 fixtures. add new downlights. ref arch: 200804240504
Details
Permit
200806194822
Permit issued
Jun 19, 2008
Final sign-off
Aug 28, 2008

reuse and relocated existing 2x4 and 2x2 fixtures. add new downlights. ref arch: 200804240504

Open the permit page

$60,000
Jun 11, 2008Completed
final sign-off Nov 2008
235 Montgomery StR.M.R. Construction Companyrev. to pa# 2007.11.07.7583 to document hardware group and specs of glass door (already installed w/out permit)to be fail safe, magnetic lock w/ motion sensor and lock release switch. access-controlled egress devices to doors to be installed under seperate permit no. 200806093888. by j. darmanin
Details
Permit
200806114210
Permit issued
Jun 13, 2008
Final sign-off
Nov 5, 2008

rev. to pa# 2007.11.07.7583 to document hardware group and specs of glass door (already installed w/out permit)to be fail safe, magnetic lock w/ motion sensor and lock release switch. access-controlled egress devices to doors to be installed under seperate permit no. 200806093888. by j. darmanin

Open the permit page

$100
Jun 9, 2008Completed
final sign-off May 2009
717 Market StNovo Construction Inc6th floor-tenant improvement works: construct new ceiling height for new offices, equipment room, new sink and millwork. adjust hvac per new layout, m.e.p., life safety will be under seperate permits
Details
Permit
200806093986
Permit issued
Jun 16, 2008
Final sign-off
May 13, 2009

6th floor-tenant improvement works: construct new ceiling height for new offices, equipment room, new sink and millwork. adjust hvac per new layout, m.e.p., life safety will be under seperate permits

Open the permit page

$50,000
Jun 6, 2008Completed
final sign-off Jan 2009
601 Townsend StDevcon Construction2nd floor-provide/install electrical infrastructure to support new engineering lab including 1 225 kva transformer, 1 800 amp 208v dist. board, 1 200 amp 480 v feeder, 2 200 amp 208 v panels, relocate (e) fixtures
Details
Permit
200806063833
Permit issued
Jun 6, 2008
Final sign-off
Jan 12, 2009

2nd floor-provide/install electrical infrastructure to support new engineering lab including 1 225 kva transformer, 1 800 amp 208v dist. board, 1 200 amp 480 v feeder, 2 200 amp 208 v panels, relocate (e) fixtures

Open the permit page

$210,000
Jun 6, 2008Completed
final sign-off Jan 2009
601 Townsend StDevcon Constructionadd 1 new ac unit to 24/7 load. 2nd flr ti. 24/7 ac for server lab. ti permit 200806063807
Details
Permit
200806063824
Permit issued
Jun 6, 2008
Final sign-off
Jan 12, 2009

add 1 new ac unit to 24/7 load. 2nd flr ti. 24/7 ac for server lab. ti permit 200806063807

Open the permit page

$165,000
May 15, 2008Completed
final sign-off Jun 2009
160 Sansome StTeam Commercial Construction Inc.14th floor-ti including rated elevator lobby with rated won door, non-bearing partitions, millwork and ada accessible restrooms. sprinklers and fire alarm separate permit. sprinkler system is completed throughout building- umbrella permit to be signed off before occupancy can be granted.
Details
Permit
200805152128
Permit issued
Jun 10, 2008
Final sign-off
Jun 2, 2009

14th floor-ti including rated elevator lobby with rated won door, non-bearing partitions, millwork and ada accessible restrooms. sprinklers and fire alarm separate permit. sprinkler system is completed throughout building- umbrella permit to be signed off before occupancy can be granted.

Open the permit page

$500,000
May 8, 2008Completed
final sign-off Sep 2008
685 Market Stto renew app#2005/11/04/7410 (for ab-056 building disabled access compliance) for final inspection only.
Details
Permit
200805081557
Permit issued
May 8, 2008
Final sign-off
Sep 23, 2008

to renew app#2005/11/04/7410 (for ab-056 building disabled access compliance) for final inspection only.

Open the permit page

May 7, 2008Completed
final sign-off Jul 2008
100 California StRichlen Constructionbasement-new drywall, walls & metal gates walls. hvac and electrical to be filed seperately
Details
Permit
200805071535
Permit issued
May 13, 2008
Final sign-off
Jul 29, 2008

basement-new drywall, walls & metal gates walls. hvac and electrical to be filed seperately

Open the permit page

$100,000
May 1, 2008Completed
final sign-off Oct 2008
235 Montgomery StR.M.R. Construction Companyrevision to pa#2008/02/28/5889 to modify ex. stairwell (exit). wall to maintain 2hr rating.
Details
Permit
200805011010
Permit issued
May 15, 2008
Final sign-off
Oct 28, 2008

revision to pa#2008/02/28/5889 to modify ex. stairwell (exit). wall to maintain 2hr rating.

Open the permit page

$26,000
Apr 28, 2008Expired or cancelled
expired Sep 2009
1 Bush StDome Construction Corpminor demolition of e walls. new ceiling height partition walls, relocate e double doors. mep included
Details
Permit
200804280717
Permit issued
Apr 28, 2008

minor demolition of e walls. new ceiling height partition walls, relocate e double doors. mep included

Open the permit page

$195,000
Apr 24, 2008Completed
final sign-off Aug 2008
49 Stevenson StRichlen Construction4th floor tenant improvement: office expansion from multi-tenant floor to single tenant flr; new ceiling height partitions with doors & sidelites/ upgrade restrooms on this floor. minor lighting layout and hvac modifications per new floor plan will be under separate permit.
Details
Permit
200804240504
Permit issued
May 1, 2008
Final sign-off
Aug 28, 2008

4th floor tenant improvement: office expansion from multi-tenant floor to single tenant flr; new ceiling height partitions with doors & sidelites/ upgrade restrooms on this floor. minor lighting layout and hvac modifications per new floor plan will be under separate permit.

Open the permit page

$100,000
Apr 22, 2008Completed
final sign-off Nov 2008
101 Spear StBcci Construction Companyti to adjust/reocate of 4th floor toilet partition and toilet accessories to comply with code requirements.
Details
Permit
200804220382
Permit issued
Jun 13, 2008
Final sign-off
Nov 4, 2008

ti to adjust/reocate of 4th floor toilet partition and toilet accessories to comply with code requirements.

Open the permit page

$12,808
Apr 10, 2008Completed
final sign-off Nov 2008
400 Montgomery StRobbins Construction Inc Dba Trevor D Ro6th floor: tenant improvement with minor demolition of partitions; provide new partitions, and install sink/coffee bar.this project requires the demo of 2 existing doors in the path of egress leading to the exist fire escape; add permanent signage to demising wall doors to "keep clear at all times"
Details
Permit
200804109409
Permit issued
Apr 16, 2008
Final sign-off
Nov 17, 2008

6th floor: tenant improvement with minor demolition of partitions; provide new partitions, and install sink/coffee bar.this project requires the demo of 2 existing doors in the path of egress leading to the exist fire escape; add permanent signage to demising wall doors to "keep clear at all times"

Open the permit page

$82,000
Apr 10, 2008Expired or cancelled
expired Mar 2010
781 Beach StWard Alan Emery Construction Inc.3rd floor-provide new unisex accessible restrooms with shower, new finishes and ceiling in restrooms. relocate suite entry door. mep under seperate permit
Details
Permit
200804109395
Permit issued
Apr 15, 2008

3rd floor-provide new unisex accessible restrooms with shower, new finishes and ceiling in restrooms. relocate suite entry door. mep under seperate permit

Open the permit page

$50,000
Mar 31, 2008Never finaled
issued Apr 2008, no final
120 Howard StDpr Construction Incdemolition of non-load bearing interior partitions & door assemblie & interior finishes, suite 600 -ab017 used.
Details
Permit
200803318376
Permit issued
Apr 1, 2008

demolition of non-load bearing interior partitions & door assemblie & interior finishes, suite 600 -ab017 used.

Open the permit page

$12,000
Mar 26, 2008Completed
final sign-off Jun 2008
120 Howard StDpr Construction Inct.i. fl. 6, demolition to existing interior partitions and door assemblies, construct new interior partitions with new door and glazing assemblies. provide new interior finishes. mep under separate permit.
Details
Permit
200803268068
Permit issued
Apr 7, 2008
Final sign-off
Jun 2, 2008

t.i. fl. 6, demolition to existing interior partitions and door assemblies, construct new interior partitions with new door and glazing assemblies. provide new interior finishes. mep under separate permit.

Open the permit page

$250,000
Mar 18, 2008Completed
final sign-off Aug 2008
475 Sansome StPrincipal Builders Inc.5th floor-hvac remodel of an (e) office space including installation of new ductwork and installation of new diffusers pa# 2007-0114-2444
Details
Permit
200803187361
Permit issued
Mar 18, 2008
Final sign-off
Aug 4, 2008

5th floor-hvac remodel of an (e) office space including installation of new ductwork and installation of new diffusers pa# 2007-0114-2444

Open the permit page

$26,000
Mar 7, 2008Expired or cancelled
expired Nov 2009
766 Harrison Strevision: demise 1st floor into 5 areas : (4) b use, (1) a-2 use. additional address at rizal st and @ harrision st for a-2 use . 2 sinks in a2, partial ceiling @ a-2. convert 2 toilets to 3. revise entry lobby windows. 4 hr wall @ sw prop line.revise mech system and sprkl system. workroom @ bsmt
Details
Permit
200803076666
Permit issued
May 8, 2008

revision: demise 1st floor into 5 areas : (4) b use, (1) a-2 use. additional address at rizal st and @ harrision st for a-2 use . 2 sinks in a2, partial ceiling @ a-2. convert 2 toilets to 3. revise entry lobby windows. 4 hr wall @ sw prop line.revise mech system and sprkl system. workroom @ bsmt

Open the permit page

$20,000
Feb 21, 2008Completed
final sign-off May 2008
50 California Sttenant improvement to include minor construction & demolition of non-bearing, grid high partitions, construction of millwork base cabinet, and minor electrical work. mep under seperate permit, #2310
Details
Permit
200802215217
Permit issued
Feb 25, 2008
Final sign-off
May 5, 2008

tenant improvement to include minor construction & demolition of non-bearing, grid high partitions, construction of millwork base cabinet, and minor electrical work. mep under seperate permit, #2310

Open the permit page

$40,000
Feb 12, 2008Completed
final sign-off Mar 2008
1 Sansome StRichlen Construction7th floor: revision to appl #200709142665 - change in the overall scope of work, (reduce scope of work) change in the office layout in suite 710, added finish information.
Details
Permit
200802124633
Permit issued
Feb 13, 2008
Final sign-off
Mar 3, 2008

7th floor: revision to appl #200709142665 - change in the overall scope of work, (reduce scope of work) change in the office layout in suite 710, added finish information.

Open the permit page