Block 0289, lot 004
1 Sansome St
- City’s use
- Commercial Office
- Built
- 1983
- Stories
- 41
- Building
- 611,000 sq ft
- Lot
- 16,809 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 27, 2026 | In progress issued Sep 2026 | 1 Sansome St | Skyline Construction | 29th flr: revision to bpa#: 202512101397. adminstrative permit to obtain sffd assembly.Details
29th flr: revision to bpa#: 202512101397. adminstrative permit to obtain sffd assembly. | |
| Aug 12, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | floors 24-28: men's restroom revision.202512172034, 202512172035, 20251020787709, 202512172064. includes removal of 5 urinals to provide required manuevering clearance at ada stall door.Details
floors 24-28: men's restroom revision.202512172034, 202512172035, 20251020787709, 202512172064. includes removal of 5 urinals to provide required manuevering clearance at ada stall door. | |
| Jul 15, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 29 & 30 flr: deferred structural submittal includes str support for (1) fire shutter door installed on 28/f, support on 29 flr includes str support for decorative chandelier suspended above communicting stairs between 28/f & 29/f, supported on 30/f. ref #20251129399 & 202512101397Details
29 & 30 flr: deferred structural submittal includes str support for (1) fire shutter door installed on 28/f, support on 29 flr includes str support for decorative chandelier suspended above communicting stairs between 28/f & 29/f, supported on 30/f. ref #20251129399 & 202512101397 | |
| Jun 4, 2026 | In progress issued Jul 2026 | 1 Sansome St | Skyline Construction | l28: deferred mep for pa #202512172064Details
l28: deferred mep for pa #202512172064 | $1,215,216 |
| Jun 2, 2026 | In progress issued Jun 2026 | 1 Sansome St | Fuel Oil System | install 2000 gallon fiberglass-coated-steel double wall ust in sidewalk to replace ust removal bpa 202602256471. install new pump and pipe to connect new ust to existing day tank. install new panel control and sensors for leak detection, overfill protection, and vacuum moritoringDetails
install 2000 gallon fiberglass-coated-steel double wall ust in sidewalk to replace ust removal bpa 202602256471. install new pump and pipe to connect new ust to existing day tank. install new panel control and sensors for leak detection, overfill protection, and vacuum moritoring | $100,000 |
| May 29, 2026 | In progress issued Jul 2026 | 1 Sansome St | Skyline Construction | 40th floor: revision to bpa#202512172045, includes updates to finishes, kitchen equipment, and enviroemental health notes. includes ceiling and soffit, casework modification and circulation floor transition detailsDetails
40th floor: revision to bpa#202512172045, includes updates to finishes, kitchen equipment, and enviroemental health notes. includes ceiling and soffit, casework modification and circulation floor transition details | |
| May 18, 2026 | In progress issued Jul 2026 | 1 Sansome St | Skyline Construction | level 29: revision to pa#: 202512101397. includes updates to interior finishes and environmental health notes to align with dph requirments. removal at previously indicated two-way comm devices at the horizontal exit.Details
level 29: revision to pa#: 202512101397. includes updates to interior finishes and environmental health notes to align with dph requirments. removal at previously indicated two-way comm devices at the horizontal exit. | |
| May 18, 2026 | In progress issued Jun 2026 | 1 Sansome St | Skyline Construction | 38/f: revision to pa# 202512101393 includes updates to finishes, equipment and enviormental health notes. includes additional lockers, ceiling and soffit modifications.Details
38/f: revision to pa# 202512101393 includes updates to finishes, equipment and enviormental health notes. includes additional lockers, ceiling and soffit modifications. | |
| May 11, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | floors 24,25,27,29,30,31,33,35, and 38: structural anchorage installation of pre-manufactured, single-user phone booths.Details
floors 24,25,27,29,30,31,33,35, and 38: structural anchorage installation of pre-manufactured, single-user phone booths. | $400,000 |
| May 4, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 26th flr. revision permit#: 202512172035; food service scope include finishes, equipment, and environmental health notes. revision includes ceiling and soffit modifications, and circulation floor transition details.Details
26th flr. revision permit#: 202512172035; food service scope include finishes, equipment, and environmental health notes. revision includes ceiling and soffit modifications, and circulation floor transition details. | |
| Apr 16, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | One Hat One Hand Llc | evac plan across floors 24-31, 33, 35, 38 & 40. fabricate & install signage, sffd only.Details
evac plan across floors 24-31, 33, 35, 38 & 40. fabricate & install signage, sffd only. | $6,277 |
| Apr 15, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | revision to pa 202511129399 30-31floor - food service scope includes finishes, equipments and environmental health notes. revision includes additional lockers, drinking fountain, ceiling and soffit modificationsDetails
revision to pa 202511129399 30-31floor - food service scope includes finishes, equipments and environmental health notes. revision includes additional lockers, drinking fountain, ceiling and soffit modifications | ||
| Apr 15, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | revision pa#: 202512172034. 24th-25th floor. food service scope including finishes, equipment and environmental heath notes. revision includes additional lockers, ceiling and soffiet modifications.Details
revision pa#: 202512172034. 24th-25th floor. food service scope including finishes, equipment and environmental heath notes. revision includes additional lockers, ceiling and soffiet modifications. | |
| Apr 15, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 33rd & 35th revision to pa 202511129396 food service scope including finishes, equipment and environmental health notes. revision includes additional locakers, drinking fountaint, ceiling and soffit modificationsDetails
33rd & 35th revision to pa 202511129396 food service scope including finishes, equipment and environmental health notes. revision includes additional locakers, drinking fountaint, ceiling and soffit modifications | |
| Apr 7, 2026 | In progress issued Jun 2026 | 1 Sansome St | Skyline Construction | 28th floor - revision to pa 202512172064 provide info for dph approved @ employee cafe. update to interior finishes, food service equipment, including chnges to pot and (e) strategy. addition to horizontal fire shutter at approved horizontal exit. relocation of fountain.update to circulation...Details
28th floor - revision to pa 202512172064 provide info for dph approved @ employee cafe. update to interior finishes, food service equipment, including chnges to pot and (e) strategy. addition to horizontal fire shutter at approved horizontal exit. relocation of fountain.update to circulation... | |
| Mar 31, 2026 | In progress issued Apr 2026 | 1 Sansome St | Skyline Construction | level 40: defered mep for bpa#202512172045Details
level 40: defered mep for bpa#202512172045 | $633,816 |
| Mar 31, 2026 | In progress issued Apr 2026 | 1 Sansome St | Skyline Construction | 29th/f: deferred mep for t.i. 202512101397Details
29th/f: deferred mep for t.i. 202512101397 | $1,157,328 |
| Mar 9, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 24-25/f: deferred mep for pa# 202512172034.Details
24-25/f: deferred mep for pa# 202512172034. | $2,314,656 |
| Mar 9, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 26/f: deferred mep for pa# 202512172035.Details
26/f: deferred mep for pa# 202512172035. | $1,157,328 |
| Feb 25, 2026 | In progress issued Mar 2026 | 1 Sansome St | Fuel Oil System | demo of single wall ust and temporary remote fill to serve existing day tanks only. a future period will be obtained to install a replacement double wall ustDetails
demo of single wall ust and temporary remote fill to serve existing day tanks only. a future period will be obtained to install a replacement double wall ust | $30,000 |
| Feb 11, 2026 | Completed final sign-off Aug 2026 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | l 35: sprinkler t.i. relocate 97 add 2 total 99. ref permit 202511129396Details
l 35: sprinkler t.i. relocate 97 add 2 total 99. ref permit 202511129396 | $50,985 |
| Feb 11, 2026 | Completed final sign-off May 2026 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | l 31: sprinkler t.i. relocate 93, add 3, total 96. ref pa#202511129399Details
l 31: sprinkler t.i. relocate 93, add 3, total 96. ref pa#202511129399 | $1,030 |
| Feb 11, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | l 28: sprinkler t.i. relocate 70, add 3, total 73 ref pa #202512172064Details
l 28: sprinkler t.i. relocate 70, add 3, total 73 ref pa #202512172064 | $37,595 |
| Feb 11, 2026 | In progress issued Feb 2026 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | l 29: sprinkler t.i. relocate 86 and add 3. total 89 ref app#202512101397Details
l 29: sprinkler t.i. relocate 86 and add 3. total 89 ref app#202512101397 | $48,835 |
| Feb 9, 2026 | Completed final sign-off Apr 2026 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | l-30 : relocate upright 9. relocate pendent 85. add upright 4. total 98. ref pa #202511129399Details
l-30 : relocate upright 9. relocate pendent 85. add upright 4. total 98. ref pa #202511129399 | $36,870 |
| Feb 9, 2026 | Completed final sign-off Aug 2026 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | l 38: relocate 107 heads. ref pa #202512101393Details
l 38: relocate 107 heads. ref pa #202512101393 | $71,070 |
| Feb 9, 2026 | Completed final sign-off May 2026 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | level 33: relocate uprights heads 4. relocate pendant 90. total 94. ref pa #202511129396Details
level 33: relocate uprights heads 4. relocate pendant 90. total 94. ref pa #202511129396 | $95,230 |
| Feb 6, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | l 27: revision to bpa202510207709. for dph approval of level27 mk. revisions also include upgraded restroom layouts, drinking fountains + misc finishes.Details
l 27: revision to bpa202510207709. for dph approval of level27 mk. revisions also include upgraded restroom layouts, drinking fountains + misc finishes. | |
| Feb 6, 2026 | Completed final sign-off Jun 2026 | 1 Sansome St | Principal Builders Inc. | 37th floor ti renovation of (e) breakroom: occ load from 23 to 32.Details
37th floor ti renovation of (e) breakroom: occ load from 23 to 32. | $109,000 |
| Feb 4, 2026 | In progress issued Feb 2026 | 1 Sansome St | Skyline Construction | 38/f: deferred mep for permit 202512101393.Details
38/f: deferred mep for permit 202512101393. | $1,158,696 |
| Jan 21, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | level 33,35 deferred mep for 202511129396Details
level 33,35 deferred mep for 202511129396 | $2,333,160 |
| Jan 21, 2026 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | l30-31 deferred mep for 202511129399Details
l30-31 deferred mep for 202511129399 | $2,347,776 |
| Dec 26, 2025 | Expired or cancelled withdrawn Sep 2026 | 1 Sansome St | 27/f. deferred permit for dph approval of food service scope: mep deffered, deffered from 202510207709Details
27/f. deferred permit for dph approval of food service scope: mep deffered, deffered from 202510207709 | ||
| Dec 18, 2025 | In progress issued Jan 2026 | 1 Sansome St | Skyline Construction | level 40th floor. core and shell structural upgrade and moditications to support t.i.Details
level 40th floor. core and shell structural upgrade and moditications to support t.i. | $50,000 |
| Dec 18, 2025 | In progress issued Feb 2026 | 1 Sansome St | Skyline Construction | 26th floor. core and shell structural upgrade and moditications to support t.i.Details
26th floor. core and shell structural upgrade and moditications to support t.i. | $100,000 |
| Dec 18, 2025 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 29th and 30th floor. core and shell structural upgrade and moditications to support t.i.Details
29th and 30th floor. core and shell structural upgrade and moditications to support t.i. | $100,000 |
| Dec 17, 2025 | In progress issued Feb 2026 | 1 Sansome St | Skyline Construction | 26/f: ti including renovations for office layout, restrooms, and break area. mep deferred. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferredDetails
26/f: ti including renovations for office layout, restrooms, and break area. mep deferred. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferred | $2,068,820 |
| Dec 17, 2025 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 24 & 25th floor; t.i. including interior renovations for office layout, restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferredDetails
24 & 25th floor; t.i. including interior renovations for office layout, restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferred | $4,137,640 |
| Dec 17, 2025 | In progress issued Feb 2026 | 1 Sansome St | Skyline Construction | level 40: tenant improvement including interior renovations for office layout, lobby, reception, meeting rooms and restrooms. mep deferred. no finish work, equipment or fixture installation in micro kitchen or food service staff restroom to occur prior to dph approved under deferred permit.Details
level 40: tenant improvement including interior renovations for office layout, lobby, reception, meeting rooms and restrooms. mep deferred. no finish work, equipment or fixture installation in micro kitchen or food service staff restroom to occur prior to dph approved under deferred permit. | $1,285,238 |
| Dec 17, 2025 | Completed final sign-off Aug 2026 | 1 Sansome St | Skyline Construction | 28/f: t.i including interior renovation for employee cafe, restrooms and horizontal exit. dph approved under deferred permit. no finish work equipment or fixture installation in food facilities or staff restroom to occur prior to dph approval uder the deferred permit. mep deferredDetails
28/f: t.i including interior renovation for employee cafe, restrooms and horizontal exit. dph approved under deferred permit. no finish work equipment or fixture installation in food facilities or staff restroom to occur prior to dph approval uder the deferred permit. mep deferred | $2,068,820 |
| Dec 16, 2025 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 27th/f: mep submittal for t.i. 202510207709Details
27th/f: mep submittal for t.i. 202510207709 | $1,157,328 |
| Dec 10, 2025 | In progress issued Feb 2026 | 1 Sansome St | Skyline Construction | 38/fl- ti of (e) office space including layout restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferredDetails
38/fl- ti of (e) office space including layout restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service staff restroom to occur prior to dph approval uder the deferred permit. mep deferred | $2,155,982 |
| Dec 10, 2025 | In progress issued Feb 2026 | 1 Sansome St | Skyline Construction | 29th/f:t.i. including interior renovations for layout, lobby, reception, 3 phone booths, multi purpose with upgrades to restrooms.no finish work equipment or fixture installation in food facilities or staff to occur prior to dph approval under defer permit.mep deferred. horizontal exit addedDetails
29th/f:t.i. including interior renovations for layout, lobby, reception, 3 phone booths, multi purpose with upgrades to restrooms.no finish work equipment or fixture installation in food facilities or staff to occur prior to dph approval under defer permit.mep deferred. horizontal exit added | $2,396,444 |
| Dec 8, 2025 | In progress issued Feb 2026 | 1 Sansome St | ground fl: new security turnstiles to lobby of existing hi-rise downtown building. work to include new partitions (electrical deferred)Details
ground fl: new security turnstiles to lobby of existing hi-rise downtown building. work to include new partitions (electrical deferred) | $332,090 | |
| Nov 12, 2025 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 33/f & 35/f: ti office layouts, restrooms, & breakroom. dph approval under deferred permit. no finish work, fixture or equipment installation in mk or food service staff restroom to occur prior to approval under the deferred permit. mep deferredDetails
33/f & 35/f: ti office layouts, restrooms, & breakroom. dph approval under deferred permit. no finish work, fixture or equipment installation in mk or food service staff restroom to occur prior to approval under the deferred permit. mep deferred | $7,400,000 |
| Nov 12, 2025 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 30/f & 31/f: ti office layouts, restrooms, & breakroom. dph approval under deferred permit. no finish work, fixture or equipment installation in mk or food service staff restroom to occur prior to approval under the deferred permit. mep deferredDetails
30/f & 31/f: ti office layouts, restrooms, & breakroom. dph approval under deferred permit. no finish work, fixture or equipment installation in mk or food service staff restroom to occur prior to approval under the deferred permit. mep deferred | $7,200,000 |
| Nov 6, 2025 | In progress issued Dec 2025 | 1 Sansome St | Skyline Construction | 28th/fl: core and shell structured upgrade and modifications required to support future t.i.Details
28th/fl: core and shell structured upgrade and modifications required to support future t.i. | $100,000 |
| Oct 20, 2025 | Completed final sign-off Sep 2026 | 1 Sansome St | Skyline Construction | 27th floor: ti -non-structural partitions, ceilings, fixtures, finishes. mep deferred.Details
27th floor: ti -non-structural partitions, ceilings, fixtures, finishes. mep deferred. | $2,100,000 |
| Oct 17, 2025 | Completed final sign-off Nov 2025 | 1 Sansome St | Advanced Builders Inc | 14/f suite 1400: demolition of (2) interior non-structural, load bearing partitions.Details
14/f suite 1400: demolition of (2) interior non-structural, load bearing partitions. | $5,000 |
| Sep 17, 2025 | In progress issued Oct 2025 | 1 Sansome St | Skyline Construction | addition of (n) communicating stair connecting levels 28 and 29 to include installation of non rated smoke barriers at both levels, partition doors, and finishes with stair enclosureDetails
addition of (n) communicating stair connecting levels 28 and 29 to include installation of non rated smoke barriers at both levels, partition doors, and finishes with stair enclosure | $1,200,000 |
| Jul 16, 2025 | In progress issued Jul 2025 | 1 Sansome St | Convergint Technologies Llc | 34/f: fire alarm modification. add 20 new nac devices to conform to new floor plan. ref permit 202503132217Details
34/f: fire alarm modification. add 20 new nac devices to conform to new floor plan. ref permit 202503132217 | $10,000 |
| Jul 16, 2025 | In progress issued Jul 2025 | 1 Sansome St | Convergint Technologies Llc | 37/f: fire alarm modification to existing system. add 7 new nac devices to conform to new floor plan. ref permit 202503132215Details
37/f: fire alarm modification to existing system. add 7 new nac devices to conform to new floor plan. ref permit 202503132215 | $10,000 |
| Jul 8, 2025 | In progress issued Jul 2025 | 1 Sansome St | Phase One Fire Life Safety Systems Inc | 22nd floor - fire alarm for tenant improvement spec suite. t.i. ref# 2025-0508-6049.Details
22nd floor - fire alarm for tenant improvement spec suite. t.i. ref# 2025-0508-6049. | $19,773 |
| Jul 2, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | Mc Millan Electric | 22nd floor. lighting, lighting controls, power deferred electrical submittal. ref#: 202505086049.Details
22nd floor. lighting, lighting controls, power deferred electrical submittal. ref#: 202505086049. | $110,000 |
| May 22, 2025 | Completed final sign-off Jun 2025 | 1 Sansome St | Phase One Fire Life Safety Systems Inc | 17/f: temporary 2-way communicator call stations, ref ti pa# 202501289177Details
17/f: temporary 2-way communicator call stations, ref ti pa# 202501289177 | $15,424 |
| May 14, 2025 | Completed final sign-off Mar 2026 | 1 Sansome St | Innovative Mechanical Inc | 22nd fl ref pa # 2025-0508-6049 office suite tenant improvement in hi-rise bldg. install (2) new vav boxes and ductwork for new layoutDetails
22nd fl ref pa # 2025-0508-6049 office suite tenant improvement in hi-rise bldg. install (2) new vav boxes and ductwork for new layout | $35,000 |
| May 13, 2025 | Completed final sign-off Jul 2025 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | 2/f suite 2200 - existing fire sprinkler system. to/ 5 added. 61 relocated sprinklers, 1 removed sprinkler. ref permit 202503182433Details
2/f suite 2200 - existing fire sprinkler system. to/ 5 added. 61 relocated sprinklers, 1 removed sprinkler. ref permit 202503182433 | $18,000 |
| May 13, 2025 | Completed final sign-off Jul 2025 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | 22/f suite 2250 - tenant improvement existing fire sprinkler system. 1 added, 46 relocated. ref permit 202503242851Details
22/f suite 2250 - tenant improvement existing fire sprinkler system. 1 added, 46 relocated. ref permit 202503242851 | $1,200 |
| May 8, 2025 | In progress issued May 2025 | 1 Sansome St | Stockham Construction | 22nd floor speculative office suite t.i. in an existing hi-rise downtown building. work to include new partitions, millwork, doors, glazing, ceiling and finishes.Details
22nd floor speculative office suite t.i. in an existing hi-rise downtown building. work to include new partitions, millwork, doors, glazing, ceiling and finishes. | $296,540 |
| May 5, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | Mc Millan Electric | 22/f (ste 2200): lighting, lighting controls, power, wiring devices, deferred electrical submittal. ref pa# 202503182433Details
22/f (ste 2200): lighting, lighting controls, power, wiring devices, deferred electrical submittal. ref pa# 202503182433 | $400,000 |
| May 1, 2025 | Completed final sign-off May 2026 | 1 Sansome St | Mc Millan Electric | 17th fl: lighting, lighting controls, power, wiring devices deferred electrical submital ref pa #202501289177Details
17th fl: lighting, lighting controls, power, wiring devices deferred electrical submital ref pa #202501289177 | $375,000 |
| Apr 28, 2025 | In progress issued Apr 2025 | 1 Sansome St | Phase One Fire Life Safety Systems Inc | 22/f: fire alarm tenant improvement project consisting of (5) notification appliances and (2) duct smoke detectors to accomodate the new layout. ti ref pa# 202503242851Details
22/f: fire alarm tenant improvement project consisting of (5) notification appliances and (2) duct smoke detectors to accomodate the new layout. ti ref pa# 202503242851 | $10,163 |
| Apr 25, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | Phase One Fire Life Safety Systems Inc | 14/f - fire alarm tenant improvement project consisiting of (4) notification appliances the new layout. ref ti pa 202503263039Details
14/f - fire alarm tenant improvement project consisiting of (4) notification appliances the new layout. ref ti pa 202503263039 | $3,844 |
| Apr 25, 2025 | In progress issued Apr 2025 | 1 Sansome St | Phase One Fire Life Safety Systems Inc | 22nd floor; fire alarm tenant improvement project consisting of (22) notfitication applicances and (4) duct smoke detectors to accommodate the new layout. ref#: 202503182433/202504114203Details
22nd floor; fire alarm tenant improvement project consisting of (22) notfitication applicances and (4) duct smoke detectors to accommodate the new layout. ref#: 202503182433/202504114203 | $32,898 |
| Apr 22, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | Mc Millan Electric | 14th floor. lighting, lighting controls, power, wiring devices, deferred electrical submittal ref# 202503263039Details
14th floor. lighting, lighting controls, power, wiring devices, deferred electrical submittal ref# 202503263039 | $150,000 |
| Apr 22, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | Mc Millan Electric | 22nd floor. suite 2250. lighting, light controls, power, wiring devices. deferred electrical submittal. ref pa# 202504224989Details
22nd floor. suite 2250. lighting, light controls, power, wiring devices. deferred electrical submittal. ref pa# 202504224989 | $150,000 |
| Apr 11, 2025 | Completed final sign-off Mar 2026 | 1 Sansome St | Innovative Mechanical Inc | 14th fl work to include installing (1) new cooling only vav box and installing air distribution system and ductwork for new floor layout ref pa 202503263039Details
14th fl work to include installing (1) new cooling only vav box and installing air distribution system and ductwork for new floor layout ref pa 202503263039 | $75,000 |
| Apr 11, 2025 | Completed final sign-off Mar 2026 | 1 Sansome St | Innovative Mechanical Inc | 22nd fl suite 2200 ref pa: 2025-0318-2433 install 2 new vav box with reheat core, 1 new incline transfer exhaust fan, 4 new fire smoke detectors, air distribution and ductwork for new floor layout ref# 2025-0318- 2433(mep deffered).Details
22nd fl suite 2200 ref pa: 2025-0318-2433 install 2 new vav box with reheat core, 1 new incline transfer exhaust fan, 4 new fire smoke detectors, air distribution and ductwork for new floor layout ref# 2025-0318- 2433(mep deffered). | $50,000 |
| Apr 11, 2025 | Completed final sign-off Mar 2026 | 1 Sansome St | Innovative Mechanical Inc | 22nd fl ste 2250 deferred mechanical for pa # 2025-0324-2851. install (1) new cooling only vav box, air distribution and ductwork for new floor layout. install 2 new fire smoke dampersDetails
22nd fl ste 2250 deferred mechanical for pa # 2025-0324-2851. install (1) new cooling only vav box, air distribution and ductwork for new floor layout. install 2 new fire smoke dampers | $45,000 |
| Mar 26, 2025 | Completed final sign-off May 2026 | 1 Sansome St | Stockham Construction | 14/f: tenant improvement in an existing hight-rise downtown building. work to include new partitions, millowrk,doors, glazing, ceilings, new finishes. mep, fire life safety deferred permit. no exterior work.Details
14/f: tenant improvement in an existing hight-rise downtown building. work to include new partitions, millowrk,doors, glazing, ceilings, new finishes. mep, fire life safety deferred permit. no exterior work. | $735,550 |
| Mar 24, 2025 | Completed final sign-off Jul 2026 | 1 Sansome St | Stockham Construction | 22/f, ste 2250 tenant improvement in an existing hi-rise downtown bldg. work to include new partition, millwork, doors, glazing, ceilings. new finishes.Details
22/f, ste 2250 tenant improvement in an existing hi-rise downtown bldg. work to include new partition, millwork, doors, glazing, ceilings. new finishes. | $414,090 |
| Mar 18, 2025 | Completed final sign-off Jul 2026 | 1 Sansome St | Stockham Construction | 22nd/fl, ste 2200: tenant improvement in existing hi-rise downtown building. work to include, new partitions, millwork, doors, glazing, ceilings, light fixtures, and new finishes. mep deferred.Details
22nd/fl, ste 2200: tenant improvement in existing hi-rise downtown building. work to include, new partitions, millwork, doors, glazing, ceilings, light fixtures, and new finishes. mep deferred. | $484,750 |
| Mar 13, 2025 | Completed final sign-off Aug 2025 | 1 Sansome St | Principal Builders Inc. | 34/f: ti - non-structural partitions, doors, ceilings, and finishes, and mep.Details
34/f: ti - non-structural partitions, doors, ceilings, and finishes, and mep. | $717,359 |
| Mar 13, 2025 | Completed final sign-off Sep 2025 | 1 Sansome St | Principal Builders Inc. | 37/f: ti - non-structural partitions, doors, ceilings, and finishes, and mep.Details
37/f: ti - non-structural partitions, doors, ceilings, and finishes, and mep. | $281,817 |
| Mar 11, 2025 | Completed final sign-off Apr 2025 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system ti improvements 1 added, 6 relocated & 12 changed out & relocated sprinklers ref pa 202502079857Details
existing fire sprinkler system ti improvements 1 added, 6 relocated & 12 changed out & relocated sprinklers ref pa 202502079857 | $5,200 |
| Feb 28, 2025 | Completed final sign-off Mar 2025 | 1 Sansome St | Phase One Fire Life Safety Systems Inc | 15/f: fire alarm ti project consisting of 4 new notification appliances ref pa 202502079857Details
15/f: fire alarm ti project consisting of 4 new notification appliances ref pa 202502079857 | $3,844 |
| Feb 25, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | Mc Millan Electric | 15th fl - lighting, lighting controls, power outlets. reference#2025-0207-9857Details
15th fl - lighting, lighting controls, power outlets. reference#2025-0207-9857 | $28,000 |
| Feb 21, 2025 | Completed final sign-off Mar 2026 | 1 Sansome St | Innovative Mechanical Inc | install (1) new vav box with reheat coil install (1) inline exhaust fan air distribution and duct work for new floor planDetails
install (1) new vav box with reheat coil install (1) inline exhaust fan air distribution and duct work for new floor plan | $50,000 |
| Feb 14, 2025 | Completed final sign-off Mar 2026 | 1 Sansome St | Innovative Mechanical Inc | modify existing hvac system encluding new duct work and grilles. tenant improvement ref pa#202502079857Details
modify existing hvac system encluding new duct work and grilles. tenant improvement ref pa#202502079857 | $25,000 |
| Feb 7, 2025 | Completed final sign-off Apr 2026 | 1 Sansome St | Stockham Construction | 15th fl - ti in an existing hi-rise downtown bldg. work to include new partitions, millwork, doors, glazing, ceilings, light fixtures, new finishes. electrical, lighting, plumbing and hvac deferred.Details
15th fl - ti in an existing hi-rise downtown bldg. work to include new partitions, millwork, doors, glazing, ceilings, light fixtures, new finishes. electrical, lighting, plumbing and hvac deferred. | $197,500 |
| Jan 28, 2025 | Completed final sign-off May 2026 | 1 Sansome St | Stockham Construction | 17th fl- interior remodel of (e) suite in an (e) hi rise downtown building. work to include new partitions, millwork, doors, glazing, ceilings, light fixtures. new finishes, electrical lighting, plumbing & hvacDetails
17th fl- interior remodel of (e) suite in an (e) hi rise downtown building. work to include new partitions, millwork, doors, glazing, ceilings, light fixtures. new finishes, electrical lighting, plumbing & hvac | $723,450 |
| Dec 6, 2024 | Completed final sign-off Dec 2024 | 1 Sansome St | Convergint Technologies Llc | ti on 9th fl: modifying (e) fire alarm system. (16) new speaker strobes. (3) new strobes. (1) control relay for security door release. bpa# 202408098305.Details
ti on 9th fl: modifying (e) fire alarm system. (16) new speaker strobes. (3) new strobes. (1) control relay for security door release. bpa# 202408098305. | $10,000 |
| Oct 18, 2024 | Completed final sign-off Oct 2024 | 1 Sansome St | Convergint Technologies Llc | fire alarm modification 19th fl elevator lobby corridor replace speaker strobes ref 202404089506Details
fire alarm modification 19th fl elevator lobby corridor replace speaker strobes ref 202404089506 | $5,000 |
| Oct 17, 2024 | Completed final sign-off Dec 2024 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | 9th floor: existing fire sprinkler system . ti to add 2 and relocate 67 sprinklers. ref pa #202408098305Details
9th floor: existing fire sprinkler system . ti to add 2 and relocate 67 sprinklers. ref pa #202408098305 | $17,000 |
| Sep 27, 2024 | In progress issued Sep 2024 | 1 Sansome St | Mc Millan Electric | 19th fl ref pa 2024-0408-9506 new lighting, lighting controls in elevator lobby & common corridors. deferred mech permit to be covered by another permit.Details
19th fl ref pa 2024-0408-9506 new lighting, lighting controls in elevator lobby & common corridors. deferred mech permit to be covered by another permit. | $81,000 |
| Sep 26, 2024 | In progress issued Sep 2024 | 1 Sansome St | Innovative Mechanical Inc | 9th floor. demo (1) vav (varirable air volume box) install (1) new vav. modify duct distribution. upgrade (13) vav's to ddc. ref: 202408098305Details
9th floor. demo (1) vav (varirable air volume box) install (1) new vav. modify duct distribution. upgrade (13) vav's to ddc. ref: 202408098305 | $50,000 |
| Sep 4, 2024 | Completed final sign-off Oct 2024 | 1 Sansome St | Ayoob & Peery Plumbing Co Inc | 19/fl-ref 202404109678- record as built for 202405021222 updated drawing for adjusted piping plan and final sprinklers head positions per inspectors requestDetails
19/fl-ref 202404109678- record as built for 202405021222 updated drawing for adjusted piping plan and final sprinklers head positions per inspectors request | |
| Aug 9, 2024 | Completed final sign-off Dec 2024 | 1 Sansome St | Singular Builders | interior remoel of 9th fl. ti in an (e) high rise work to include new partitions, doors, glazing, new suspended ceiling with new light fuxtures, new finishes, electrical, lighting and hvac and plumbingDetails
interior remoel of 9th fl. ti in an (e) high rise work to include new partitions, doors, glazing, new suspended ceiling with new light fuxtures, new finishes, electrical, lighting and hvac and plumbing | $658,252 |
| May 2, 2024 | Completed final sign-off Oct 2024 | 1 Sansome St | Ayoob & Peery Plumbing Co Inc | 19/f: add 28, relocate 82 fire sprinklers per t.i # 202404109678. job #24-629Details
19/f: add 28, relocate 82 fire sprinklers per t.i # 202404109678. job #24-629 | $68,321 |
| Apr 10, 2024 | Completed final sign-off Nov 2024 | 1 Sansome St | Mc Carthy Building Companies Inc | suite 1900: interior office remodel. new non structural walls, new electrical, new millwork, rework existing mechanical, flooring, new ceiling, breakroom.Details
suite 1900: interior office remodel. new non structural walls, new electrical, new millwork, rework existing mechanical, flooring, new ceiling, breakroom. | $3,100,000 |
| Apr 8, 2024 | In progress issued May 2024 | 1 Sansome St | Stockham Construction | 19/f: interior remodel of common areas in an (e) hi-rise downtown building. work to include new partitions, doors, glazing. new suspended ceiling with new light fixtures, new finishes, (electrical, lighting, and hvac deferred submittal).Details
19/f: interior remodel of common areas in an (e) hi-rise downtown building. work to include new partitions, doors, glazing. new suspended ceiling with new light fixtures, new finishes, (electrical, lighting, and hvac deferred submittal). | $135,300 |
| Mar 11, 2024 | Completed final sign-off Nov 2024 | 1 Sansome St | Mc Carthy Building Companies Inc | suite 1900: interior office demo of non structural paritions, ceiling, flooring, some mech and elec work. existing egress not impacted by demo work. existing sprinklers to remain.Details
suite 1900: interior office demo of non structural paritions, ceiling, flooring, some mech and elec work. existing egress not impacted by demo work. existing sprinklers to remain. | $95,000 |
| Feb 12, 2024 | In progress issued Feb 2024 | 1 Sansome St | revision to pa# 202307242855, path of travel through gym space revised.Details
revision to pa# 202307242855, path of travel through gym space revised. | ||
| Dec 15, 2023 | Completed final sign-off Dec 2023 | 1 Sansome St | Peacock Construction | ste 3630 - revision to pa# 202212057635. storage room omitted from project and wall type change to expand breakroom to greater than 49 occupant load.Details
ste 3630 - revision to pa# 202212057635. storage room omitted from project and wall type change to expand breakroom to greater than 49 occupant load. | |
| Sep 5, 2023 | Completed final sign-off Feb 2024 | 1 Sansome St | Bevilacqua & Sons | revision to 202207188670 to remove (e) basement bathrooms upgrades from scope of work.Details
revision to 202207188670 to remove (e) basement bathrooms upgrades from scope of work. | |
| Jul 24, 2023 | Never finaled issued Aug 2023, no final | 1 Sansome St | demo existing non-compliant basement bathrooms & construction of new bathrooms & gym, all mep permits to followDetails
demo existing non-compliant basement bathrooms & construction of new bathrooms & gym, all mep permits to follow | $1,000,000 | |
| Jul 5, 2023 | Completed final sign-off Aug 2023 | 1 Sansome St | Golden Gate Fire Protection Inc | fire sprinklers: relocate 2 concealed pendent sprinklers on the 36th floor. ref t.i. pa 202306301270Details
fire sprinklers: relocate 2 concealed pendent sprinklers on the 36th floor. ref t.i. pa 202306301270 | $1,240 |
| Jun 6, 2023 | Never finaled issued Sep 2023, no final | 1 Sansome St | Principal Builders Inc. | change of exterior door swing barrier removal only.Details
change of exterior door swing barrier removal only. | $20,000 |
| May 17, 2023 | Never finaled issued May 2023, no final | 1 Sansome St | to obtain final inspection for work approved under pa# 201809261434. all work is complete.Details
to obtain final inspection for work approved under pa# 201809261434. all work is complete. | ||
| May 17, 2023 | Never finaled issued May 2023, no final | 1 Sansome St | to obtain final inspection for work approved under pa#201909232398. all work is complete.Details
to obtain final inspection for work approved under pa#201909232398. all work is complete. | ||
| Feb 27, 2023 | Never finaled issued Jul 2023, no final | 1 Sansome St | Principal Builders Inc. | floors 22-27: existing tenant space demo and new ada bathrooms. (ref pa#s 202302272649 & 202302272651 for fire sprinklers)Details
floors 22-27: existing tenant space demo and new ada bathrooms. (ref pa#s 202302272649 & 202302272651 for fire sprinklers) | $420,000 |
| Feb 16, 2023 | Completed final sign-off Jun 2023 | 1 Sansome St | Aaa Restaurant Fire Control/Dba Aaa Fire | finish & install (1) ansul r-102 hood and duct fire suppression system in the main kitchen area. ground floor. ref pa# 202207188670Details
finish & install (1) ansul r-102 hood and duct fire suppression system in the main kitchen area. ground floor. ref pa# 202207188670 | $12,000 |
| Dec 13, 2022 | Completed final sign-off May 2023 | 1 Sansome St | Peacock Construction | provide existing ada elevator access to basement. all mep permits to follow.Details
provide existing ada elevator access to basement. all mep permits to follow. | $80,000 |
| Nov 16, 2022 | Never finaled filed Nov 2022, never issued | 1 Sansome St | R L H Fire Protection Inc | basement and 1st floor: fire sprinkler permit. relocate 22, add 18 and delete 8 pendent sprinklers. relocate 15, add 37 and delete 9 sidewall sprinklers on the floor. t.i. 202207188670Details
basement and 1st floor: fire sprinkler permit. relocate 22, add 18 and delete 8 pendent sprinklers. relocate 15, add 37 and delete 9 sidewall sprinklers on the floor. t.i. 202207188670 | $15,000 |
| Nov 8, 2022 | Completed final sign-off Apr 2023 | 1 Sansome St | Peacock Construction | absorbative acoustic material in consevatory space.Details
absorbative acoustic material in consevatory space. | $150,000 |
| Oct 25, 2022 | Completed final sign-off Apr 2023 | 1 Sansome St | Peacock Construction | ground floor:electrical onlyDetails
ground floor:electrical only | $15,000 |
| Oct 19, 2022 | Completed final sign-off May 2023 | 1 Sansome St | Field Construction Inc. | 15/f: mechanical and electrical portion of t.i. ref pa# 2022-0718-8654Details
15/f: mechanical and electrical portion of t.i. ref pa# 2022-0718-8654 | $197,879 |
| Oct 4, 2022 | Completed final sign-off May 2023 | 1 Sansome St | Peacock Construction | electrical work for tenant improvement on 17th fl. new lighting, branch circuiting to e panel. new power and signal. ref 202207128237.Details
electrical work for tenant improvement on 17th fl. new lighting, branch circuiting to e panel. new power and signal. ref 202207128237. | $60,000 |
| Oct 4, 2022 | Completed final sign-off Feb 2024 | 1 Sansome St | Peacock Construction | electrical work for tenant improvement. provide new lighting and branch circuiting to e panel. new power and signal. ref 202204182385.Details
electrical work for tenant improvement. provide new lighting and branch circuiting to e panel. new power and signal. ref 202204182385. | $20,000 |
| Sep 30, 2022 | Completed final sign-off Dec 2022 | 1 Sansome St | R L H Fire Protection Inc | tenant improvement to suite 1550 only. relocate 44 e sprinlers. add 4.no other work to system. red 202207188654Details
tenant improvement to suite 1550 only. relocate 44 e sprinlers. add 4.no other work to system. red 202207188654 | $2,000 |
| Sep 27, 2022 | Completed final sign-off Jul 2023 | 1 Sansome St | Peacock Construction | mech-hvac modifications to support ti reference 202207128237Details
mech-hvac modifications to support ti reference 202207128237 | $100,000 |
| Aug 10, 2022 | Never finaled issued Aug 2022, no final | 1 Sansome St | Golden Gate Fire Protection Inc | fire sprinklers: relocate 30 pendent sprinkers on the 34/f. t.i ref pa# 202206277178 & 202208049629Details
fire sprinklers: relocate 30 pendent sprinkers on the 34/f. t.i ref pa# 202206277178 & 202208049629 | $15,750 |
| Aug 1, 2022 | Completed final sign-off Oct 2022 | 1 Sansome St | Hp Build | 34/f: rev to pa202206277178: minor reduction of scope. maintain non-load bearing partition as per plan. this permit including the projects mech and electrical. maher n/a.Details
34/f: rev to pa202206277178: minor reduction of scope. maintain non-load bearing partition as per plan. this permit including the projects mech and electrical. maher n/a. | |
| Jul 12, 2022 | Completed final sign-off Jul 2023 | 1 Sansome St | Peacock Construction | 17th fl spec suite interior renovation to include demo, new walls, doors, ceilings, finishes, millwork, hvac, electrical work and plumbing. mep under separate permitDetails
17th fl spec suite interior renovation to include demo, new walls, doors, ceilings, finishes, millwork, hvac, electrical work and plumbing. mep under separate permit | $1,800,000 |
| Jun 27, 2022 | Completed final sign-off Oct 2022 | 1 Sansome St | Hp Build | 34th floor: t.i. : no change of use or occupancy. new non load bearing partitions, doors, electrical, mechanical air distribution, plmg, ceiling, lighting, and associated finishes. (life safty and sprinkler deffeed submittals)Details
34th floor: t.i. : no change of use or occupancy. new non load bearing partitions, doors, electrical, mechanical air distribution, plmg, ceiling, lighting, and associated finishes. (life safty and sprinkler deffeed submittals) | $739,000 |
| May 17, 2022 | Never finaled issued Aug 2022, no final | 1 Sansome St | Peacock Construction | 1/f: remove (e) column on ground floor, future bar area (bar t.i. under separate permit)Details
1/f: remove (e) column on ground floor, future bar area (bar t.i. under separate permit) | $150,000 |
| Mar 28, 2022 | Completed final sign-off May 2022 | 1 Sansome St | Principal Builders Inc. | rev to 202201256588 to provide a new partition that complies with cbc 11b-604.8.1.4 for toe space in women's restroomon the 34th floorDetails
rev to 202201256588 to provide a new partition that complies with cbc 11b-604.8.1.4 for toe space in women's restroomon the 34th floor | $1,000 |
| Feb 4, 2022 | Completed final sign-off Apr 2023 | 1 Sansome St | re-establish a-2 use fo north lobby space and conservatory & provide revised whole floor egress drawings for all spaces to verify ground floor egress. change future tenant improvement m occupancy space to a-2 for future restaurant under seperate permit.Details
re-establish a-2 use fo north lobby space and conservatory & provide revised whole floor egress drawings for all spaces to verify ground floor egress. change future tenant improvement m occupancy space to a-2 for future restaurant under seperate permit. | ||
| Jan 25, 2022 | Completed final sign-off May 2022 | 1 Sansome St | Principal Builders Inc. | 34/f: interior t.i. work includes non-load bearing partitionis, doors & associated finishes and mep.Details
34/f: interior t.i. work includes non-load bearing partitionis, doors & associated finishes and mep. | $800,000 |
| Nov 4, 2021 | Completed final sign-off Jun 2023 | 1 Sansome St | Peacock Construction | 17th fl: demo (e) floor for future t.i. under separate permit. make (e) bathrooms ada compliant.Details
17th fl: demo (e) floor for future t.i. under separate permit. make (e) bathrooms ada compliant. | $80,000 |
| Nov 3, 2021 | Never finaled issued Jan 2022, no final | 1 Sansome St | Stockham Construction | demising of 40th floor for 2 future tenants - under separate ti permits. all mep to follow.Details
demising of 40th floor for 2 future tenants - under separate ti permits. all mep to follow. | $110,000 |
| Oct 18, 2021 | Completed final sign-off Dec 2021 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | 39/f: t.i. to (e) fire sprinkler system. add 15 & relocate 14 relocated sprinlkers. maher n/a. ref 2021 0913 8241Details
39/f: t.i. to (e) fire sprinkler system. add 15 & relocate 14 relocated sprinlkers. maher n/a. ref 2021 0913 8241 | $15,000 |
| Oct 14, 2021 | Completed final sign-off Dec 2021 | 1 Sansome St | Clune Construction Company L P | 23rd fl - remove mechanical scope from 2018-0926-1516Details
23rd fl - remove mechanical scope from 2018-0926-1516 | |
| Aug 13, 2021 | Never finaled issued Aug 2021, no final | 1 Sansome St | Innovative Mechanical Inc | install one variable air volume box with hot water reheat coil and ddc controls. ref app#201812057541Details
install one variable air volume box with hot water reheat coil and ddc controls. ref app#201812057541 | $37,250 |
| Jul 17, 2020 | Never finaled issued Jan 2021, no final | 1 Sansome St | street spaceDetails
street space | ||
| Jun 13, 2020 | Never finaled issued Jun 2020, no final | 1 Sansome St | street spaceDetails
street space | ||
| Dec 10, 2019 | Never finaled issued Dec 2019, no final | 1 Sansome St | Stockham Construction | to obtain a final inspection for work approved under previous permit pa.201406309964. all work is complete.Details
to obtain a final inspection for work approved under previous permit pa.201406309964. all work is complete. | |
| Nov 22, 2019 | Never finaled issued Nov 2019, no final | 1 Sansome St | street spaceDetails
street space | ||
| Nov 18, 2019 | Never finaled issued Nov 2019, no final | 1 Sansome St | Stockham Construction | to obtain final inspection for work approved under pa # 201209058934 all work is complete. 39th flrDetails
to obtain final inspection for work approved under pa # 201209058934 all work is complete. 39th flr | |
| Nov 18, 2019 | Completed final sign-off Nov 2019 | 1 Sansome St | Stockham Construction | to obtain final inspection for work approved under pa # 201102230823 all work is complete. main lobbyDetails
to obtain final inspection for work approved under pa # 201102230823 all work is complete. main lobby | |
| Sep 23, 2019 | Never finaled issued Oct 2019, no final | 1 Sansome St | Stockham Construction | basement:interior renovation of extg bart tunnel ceiling and lighting. all electrical permits to follow.Details
basement:interior renovation of extg bart tunnel ceiling and lighting. all electrical permits to follow. | $80,000 |
| Jul 15, 2019 | Never finaled issued Jul 2019, no final | 1 Sansome St | Innovative Mechanical Inc | replace extg hvac system. ref app#201811135738Details
replace extg hvac system. ref app#201811135738 | $10,000 |
| Jun 6, 2019 | Never finaled issued Jun 2019, no final | 1 Sansome St | scaffolding only - street spaceDetails
scaffolding only - street space | ||
| Jun 4, 2019 | Completed final sign-off Sep 2019 | 1 Sansome St | Convergint Technologies Llc | 31st floor: ref f/a app#201809180593 and t.i. #201807164603. as built: add 1 elevator landing call station per acceptance letter dated 4/11/19. n/a for maherDetails
31st floor: ref f/a app#201809180593 and t.i. #201807164603. as built: add 1 elevator landing call station per acceptance letter dated 4/11/19. n/a for maher | $1,000 |
| Feb 15, 2019 | Completed final sign-off Feb 2019 | 1 Sansome St | Stockham Construction | to obtain a final inspection fo work approved under pa201508214943. all work is completeDetails
to obtain a final inspection fo work approved under pa201508214943. all work is complete | |
| Jan 28, 2019 | Never finaled issued Jan 2019, no final | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | 10th fl - ref pa 2018-0522-9775 existing fire sprinkler system ti. relocate 5 sprinklers and add 1Details
10th fl - ref pa 2018-0522-9775 existing fire sprinkler system ti. relocate 5 sprinklers and add 1 | $3,500 |
| Dec 5, 2018 | Completed final sign-off Mar 2019 | 1 Sansome St | R L H Fire Protection Inc | fire sprinkler permit relocate 18 and 9 pendent sprinklers on the 23rd fl ref 201809261516Details
fire sprinkler permit relocate 18 and 9 pendent sprinklers on the 23rd fl ref 201809261516 | $8,500 |
| Nov 13, 2018 | Never finaled issued Apr 2019, no final | 1 Sansome St | Stockham Construction | relocate (e) fire command center toom. all mep to followDetails
relocate (e) fire command center toom. all mep to follow | $15,000 |
| Sep 26, 2018 | Never finaled issued Feb 2019, no final | 1 Sansome St | Stockham Construction | remodel of (e) doors to (e) bart tunnel connection door and vestibule.Details
remodel of (e) doors to (e) bart tunnel connection door and vestibule. | $80,000 |
| Sep 26, 2018 | Never finaled issued Oct 2018, no final | 1 Sansome St | Clune Construction Company L P | 23rd flr - partial renovation of (e) office space. ti work includes constructio of non bearing partitions, ceiling system with new lighting, doors and frames, carpet and paint finishes. mep deferred maher naDetails
23rd flr - partial renovation of (e) office space. ti work includes constructio of non bearing partitions, ceiling system with new lighting, doors and frames, carpet and paint finishes. mep deferred maher na | $250,000 |
| Sep 18, 2018 | Never finaled issued Sep 2018, no final | 1 Sansome St | R.M.R. Construction Company | 29th fl: t.i. in casework for kitchen, ceiling light.Details
29th fl: t.i. in casework for kitchen, ceiling light. | $200,000 |
| Sep 5, 2018 | Never finaled issued Sep 2018, no final | 1 Sansome St | Skyline Construction | 31st floor: electrical work for t.i. ref app#201807164603Details
31st floor: electrical work for t.i. ref app#201807164603 | $15,000 |
| Jul 24, 2018 | Never finaled issued Jul 2018, no final | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system- t.i relocated 5 sprinklersDetails
existing fire sprinkler system- t.i relocated 5 sprinklers | $2,500 |
| Jul 6, 2018 | Never finaled issued Sep 2018, no final | 1 Sansome St | Stockham Construction | 30th fl: demo of single floor office space (n) ada compliant bathrooms. all mep permits to follow.Details
30th fl: demo of single floor office space (n) ada compliant bathrooms. all mep permits to follow. | $50,000 |
| Jun 19, 2018 | Never finaled issued Sep 2018, no final | 1 Sansome St | Stockham Construction | demo e single floor office space for tenant improvement under separate permit. remodel bathrooms w/ all mep to follow for bathroom scopeDetails
demo e single floor office space for tenant improvement under separate permit. remodel bathrooms w/ all mep to follow for bathroom scope | $50,000 |
| May 22, 2018 | Completed final sign-off Mar 2019 | 1 Sansome St | Stockham Construction | 10th floor: remodel of extg conference room and break room in extg office space. mep to follow.Details
10th floor: remodel of extg conference room and break room in extg office space. mep to follow. | $80,000 |
| Dec 18, 2017 | Never finaled issued Jan 2018, no final | 1 Sansome St | Novo Construction Inc | 21/f: tenant improvementto consist of demo of existing non load bearing partitionsj, new finishes, new non load bearing partitions, finishes. maher n/a.Details
21/f: tenant improvementto consist of demo of existing non load bearing partitionsj, new finishes, new non load bearing partitions, finishes. maher n/a. | $600,000 |
| Dec 5, 2017 | Completed final sign-off Dec 2017 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | 21st flr: fire sprinkler ti - relocate 4 heads in the restroomDetails
21st flr: fire sprinkler ti - relocate 4 heads in the restroom | $2,080 |
| Aug 4, 2017 | Completed final sign-off Oct 2017 | 1 Sansome St | Convergint Technologies Llc | 36th fl ste 3630: fire alarm ti: including 2 strobes. ref pa #201706220033. maher naDetails
36th fl ste 3630: fire alarm ti: including 2 strobes. ref pa #201706220033. maher na | $8,000 |
| Jul 18, 2017 | Completed final sign-off Sep 2017 | 1 Sansome St | Skyline Construction | 36/f: mechanical and electrical work for t.i. redistribute ductwork (7) new vav, new electrical. ref t.i. pa#2017-0622-0033. life safety deferred if required.Details
36/f: mechanical and electrical work for t.i. redistribute ductwork (7) new vav, new electrical. ref t.i. pa#2017-0622-0033. life safety deferred if required. | $10,000 |
| Jul 11, 2017 | Completed final sign-off Aug 2017 | 1 Sansome St | Golden Gate Fire Protection Inc | 36/f suite 3630- fire sprinkler only, relocate 13 sprinkler pendents; ref pa 2017-0622-0033Details
36/f suite 3630- fire sprinkler only, relocate 13 sprinkler pendents; ref pa 2017-0622-0033 | $3,250 |
| Jul 10, 2017 | Completed final sign-off Sep 2017 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | grd fl: existing fire sprinkler system - tenant improvements, 47 added uprights. maher na. ref 2015-1210-4709.Details
grd fl: existing fire sprinkler system - tenant improvements, 47 added uprights. maher na. ref 2015-1210-4709. | $23,500 |
| Jun 22, 2017 | Completed final sign-off Sep 2017 | 1 Sansome St | Skyline Construction | ste 3630 - interior ti including removal of existing full and ceiling. new interior non-structural partitions, new glazing doors & hardwareDetails
ste 3630 - interior ti including removal of existing full and ceiling. new interior non-structural partitions, new glazing doors & hardware | $500,000 |
| May 12, 2017 | Never finaled issued May 2017, no final | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | 3rd flr: (e) fire sprinklers. relocate 5. ti 201512104709. maher naDetails
3rd flr: (e) fire sprinklers. relocate 5. ti 201512104709. maher na | $1,250 |
| May 10, 2017 | Never finaled issued May 2017, no final | 1 Sansome St | Clune Construction Company L P | 24th floor - demolition only of non-load bearing/ non structural partitions on single tenant floor. n/a for maher.Details
24th floor - demolition only of non-load bearing/ non structural partitions on single tenant floor. n/a for maher. | $1,000 |
| Apr 24, 2017 | Completed final sign-off May 2017 | 1 Sansome St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 42nd fl add 5 speaker strobes, 2 smoke det, 5 duct detectors with monitoring relays, 2 relocation of speaker strobes. amep ref pa 201605106998 maher not reqDetails
fire alarm ti on 42nd fl add 5 speaker strobes, 2 smoke det, 5 duct detectors with monitoring relays, 2 relocation of speaker strobes. amep ref pa 201605106998 maher not req | $8,000 |
| Mar 17, 2017 | Completed final sign-off May 2017 | 1 Sansome St | Ayoob & Peery Plumbing Co Inc | 42nd floor - add, relocate &remove fire sprinklers per tenant improvements - 7 add, 13 relcoate, 2 remove . ref pa #201605106998. n/a maher ordinanceDetails
42nd floor - add, relocate &remove fire sprinklers per tenant improvements - 7 add, 13 relcoate, 2 remove . ref pa #201605106998. n/a maher ordinance | $10,500 |
| Feb 21, 2017 | Expired or cancelled cancelled Jan 2026 | 1 Sansome St | R.M.R. Construction Company | non-structural demo of extg non-structural marble facade for structural investigation for upcoming work under permit #201609087165. n/a for maher.Details
non-structural demo of extg non-structural marble facade for structural investigation for upcoming work under permit #201609087165. n/a for maher. | $25,000 |
| Feb 17, 2017 | Completed final sign-off Aug 2017 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | 3rd floor extg fire sprinkler system. t.i. 142 relocated sprinklers and 22 added sprinklers. ref app#201512104709. n/a maherDetails
3rd floor extg fire sprinkler system. t.i. 142 relocated sprinklers and 22 added sprinklers. ref app#201512104709. n/a maher | $42,000 |
| Dec 29, 2016 | Never finaled issued Mar 2017, no final | 1 Sansome St | Acco Engineered Systems Inc. Dba Acco En | mechanical plans for cooling towers (roof location) replacement. replace 2 existing cooling towers and water pumps with new new equipment like for like (electrical permit under separate permit)Details
mechanical plans for cooling towers (roof location) replacement. replace 2 existing cooling towers and water pumps with new new equipment like for like (electrical permit under separate permit) | $300,000 |
| Dec 28, 2016 | Never finaled issued Mar 2017, no final | 1 Sansome St | R.M.R. Construction Company | 3rd floor: interior remodel of extg office space.Details
3rd floor: interior remodel of extg office space. | $1,000,000 |
| Sep 8, 2016 | Never finaled issued Apr 2017, no final | 1 Sansome St | R.M.R. Construction Company | 3/fl. infill of 1,822 sf of double height space w/n floor slab. addition of windows to (e) conservatory - requires planning review w/sprot team - elizabeth watty - mep under separate permitDetails
3/fl. infill of 1,822 sf of double height space w/n floor slab. addition of windows to (e) conservatory - requires planning review w/sprot team - elizabeth watty - mep under separate permit | $300,000 |
| Jul 25, 2016 | Completed final sign-off Feb 2017 | 1 Sansome St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 1st floor. add (3) speaker strobes in restrooms & 3 weatherproof speaker strobes in shower area. ref pa 2015-0821-4943Details
fire alarm ti on 1st floor. add (3) speaker strobes in restrooms & 3 weatherproof speaker strobes in shower area. ref pa 2015-0821-4943 | $3,000 |
| Jun 21, 2016 | Completed final sign-off Jul 2016 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | 1st floor: 7 fire sprinklers ref pa 2015 0821 4943 maher naDetails
1st floor: 7 fire sprinklers ref pa 2015 0821 4943 maher na | $3,500 |
| May 10, 2016 | Completed final sign-off Aug 2017 | 1 Sansome St | Novo Construction Inc | 42nd floor: ti new interior partitions, new and relocated mep distribution, new finishes.Details
42nd floor: ti new interior partitions, new and relocated mep distribution, new finishes. | $200,000 |
| Mar 17, 2016 | Completed final sign-off Oct 2016 | 1 Sansome St | Red Hawk Fire & Security Ca Llc | 41st floor: fire alarm t.i. add 19 speaker/strobes, 4 strobes, 3 control relays for hvac/security interface, 4 duct detectors for heat pumps and fsd. ref app#201512306105Details
41st floor: fire alarm t.i. add 19 speaker/strobes, 4 strobes, 3 control relays for hvac/security interface, 4 duct detectors for heat pumps and fsd. ref app#201512306105 | $15,000 |
| Mar 16, 2016 | Never finaled issued Apr 2016, no final | 1 Sansome St | Stockham Construction | 41,42nd flrs: revision to 2015-0527-7290 per sffd request, smoke narrative revisedDetails
41,42nd flrs: revision to 2015-0527-7290 per sffd request, smoke narrative revised | |
| Dec 30, 2015 | Completed final sign-off Dec 2016 | 1 Sansome St | Novo Construction Inc | 41st flr: new interior non-structural partitions, new & relocated mep distribution, new lighting & ceilings, new doors & hardware,new casework, new finishes; maher n/aDetails
41st flr: new interior non-structural partitions, new & relocated mep distribution, new lighting & ceilings, new doors & hardware,new casework, new finishes; maher n/a | $1,850,000 |
| Dec 14, 2015 | Completed final sign-off Mar 2016 | 1 Sansome St | Red Hawk Fire & Security Ca Llc | 38th floor: fire alarm t.i. on 38th floor. add 30 speaker strobes. 4 duct detectors with relays and one smoke detector. ref app#201509015751. n/a for maher.Details
38th floor: fire alarm t.i. on 38th floor. add 30 speaker strobes. 4 duct detectors with relays and one smoke detector. ref app#201509015751. n/a for maher. | $20,000 |
| Dec 10, 2015 | Never finaled issued Dec 2015, no final | 1 Sansome St | Stockham Construction | 3rd floor interior infill of double height atrium & new ada bathrooms - addition of 3,354 sq ft. all mep permits to follow.Details
3rd floor interior infill of double height atrium & new ada bathrooms - addition of 3,354 sq ft. all mep permits to follow. | $600,000 |
| Dec 2, 2015 | Completed final sign-off Jan 2016 | 1 Sansome St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 1 fire sprinkler pendent in new ceiling. ref pa 2015-1013-9492 maher naDetails
fire sprinkler only - relocate 1 fire sprinkler pendent in new ceiling. ref pa 2015-1013-9492 maher na | $500 |
| Nov 12, 2015 | Completed final sign-off Nov 2015 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | 40th flr: existing fire sprinkler system, tenant improvements, 4 heads; maher n/a ref pa 2015-0527-7290 (elevator installation)Details
40th flr: existing fire sprinkler system, tenant improvements, 4 heads; maher n/a ref pa 2015-0527-7290 (elevator installation) | $2,500 |
| Nov 5, 2015 | Never finaled issued Nov 2015, no final | 1 Sansome St | Red Hawk Fire & Security Ca Llc | fire alarm ti 201509046182 37th fl add 15 speaker/strobes. ref pa# 201509046182Details
fire alarm ti 201509046182 37th fl add 15 speaker/strobes. ref pa# 201509046182 | $10,000 |
| Nov 5, 2015 | Completed final sign-off Mar 2016 | 1 Sansome St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 16th fl add 6 speaker strobesDetails
fire alarm ti on 16th fl add 6 speaker strobes | $6,000 |
| Nov 2, 2015 | Completed final sign-off Dec 2015 | 1 Sansome St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 93 pendents; add 24 pendents for wish.com (total 117 heads). ref pa 2015-0901-5751Details
fire sprinkler only - relocate 93 pendents; add 24 pendents for wish.com (total 117 heads). ref pa 2015-0901-5751 | $58,500 |
| Oct 23, 2015 | Never finaled issued Oct 2016, no final | 1 Sansome St | Red Hawk Fire & Security Ca Llc | floor 40, 41 & 42. add 8 smoke detectors, add 3 duct detectors, add 8 relay modules, add 19 monitor modules, add 7 speaker/strobes, add 1 strobeDetails
floor 40, 41 & 42. add 8 smoke detectors, add 3 duct detectors, add 8 relay modules, add 19 monitor modules, add 7 speaker/strobes, add 1 strobe | $25,000 |
| Oct 20, 2015 | Never finaled issued Oct 2015, no final | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | 16th floor: fire sprinklers for ref pa 2015 0611 8691, relocate 17 and add 25. maher naDetails
16th floor: fire sprinklers for ref pa 2015 0611 8691, relocate 17 and add 25. maher na | $21,800 |
| Oct 13, 2015 | Completed final sign-off Dec 2015 | 1 Sansome St | Novo Construction Inc | 17th floor: mechanical work got ti . relocate of diffusers & grilles and themostates ref pa 2015 0820 4800Details
17th floor: mechanical work got ti . relocate of diffusers & grilles and themostates ref pa 2015 0820 4800 | $50,000 |
| Oct 8, 2015 | Completed final sign-off Nov 2015 | 1 Sansome St | Stockham Construction, Ca United Mechanical, Inc | 37th floor: upgrade of (e) hvac including new vav's. rebalance of (e) vavs' & new air outlets. ref pa 2015 0904 6182 & 1369906Details
37th floor: upgrade of (e) hvac including new vav's. rebalance of (e) vavs' & new air outlets. ref pa 2015 0904 6182 & 1369906 | $25,000 |
| Oct 7, 2015 | Never finaled issued Oct 2015, no final | 1 Sansome St | C B F Inc | title 24 lighting compliance to pa#201505216886 lobby & bath improvements.Details
title 24 lighting compliance to pa#201505216886 lobby & bath improvements. | |
| Oct 7, 2015 | Never finaled issued Oct 2015, no final | 1 Sansome St | C B F Inc | title 24 lighting compliance to pa#201503191391 lobby & bath improvements.Details
title 24 lighting compliance to pa#201503191391 lobby & bath improvements. | |
| Oct 7, 2015 | Never finaled issued Oct 2015, no final | 1 Sansome St | C B F Inc | title 24 lighting compliance to pa#201506037935 bathroom improvements.Details
title 24 lighting compliance to pa#201506037935 bathroom improvements. | |
| Sep 25, 2015 | Never finaled issued Sep 2015, no final | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | 37th flr: fire sprinklers - relocate 39, add 7 ref pa 2015 0904 6182 maher naDetails
37th flr: fire sprinklers - relocate 39, add 7 ref pa 2015 0904 6182 maher na | $23,830 |
| Sep 17, 2015 | Never finaled issued Oct 2015, no final | 1 Sansome St | Deb Construction Llc | 31st floor, office ti/demising wall. maher na. sprinkler & alarm under deferred submittal.Details
31st floor, office ti/demising wall. maher na. sprinkler & alarm under deferred submittal. | $200,000 |
| Sep 4, 2015 | Completed final sign-off Apr 2016 | 1 Sansome St | Stockham Construction | 37th floor - ti in (e) multi-tenant. floor previously demo'd space (all mep permits to follow)Details
37th floor - ti in (e) multi-tenant. floor previously demo'd space (all mep permits to follow) | $325,000 |
| Sep 1, 2015 | Completed final sign-off Oct 2016 | 1 Sansome St | Novo Construction Inc | 38th floor tenant improvement - new non-structural partitions, new & relocated mep distribution, new lighting ceilings, new doors, casework & finishes.Details
38th floor tenant improvement - new non-structural partitions, new & relocated mep distribution, new lighting ceilings, new doors, casework & finishes. | $1,000,000 |
| Aug 21, 2015 | Never finaled issued Sep 2015, no final | 1 Sansome St | Stockham Construction | installation of new ada compliant men & women's bathrooms & shower stall to support the lobby, all mep. permit & sprinkler to follow.Details
installation of new ada compliant men & women's bathrooms & shower stall to support the lobby, all mep. permit & sprinkler to follow. | $50,000 |
| Aug 20, 2015 | Completed final sign-off Dec 2015 | 1 Sansome St | Novo Construction Inc | 17th flr, suite 1700: demo of interior partitions. construct new non load bearing partitions. new finishes. maher naDetails
17th flr, suite 1700: demo of interior partitions. construct new non load bearing partitions. new finishes. maher na | $497,437 |
| Aug 11, 2015 | Never finaled issued Aug 2015, no final | 1 Sansome St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. on 37th and 38th floor corridor. add total 9 speaker one strobes. t.i. for 37th floor: 201506260095 and t.i. for 38th floor: 201506037935. n/a for maher.Details
fire alarm t.i. on 37th and 38th floor corridor. add total 9 speaker one strobes. t.i. for 37th floor: 201506260095 and t.i. for 38th floor: 201506037935. n/a for maher. | $4,000 |
| Aug 6, 2015 | Completed final sign-off Oct 2015 | 1 Sansome St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 39th floor - ref 201506229596. add (13) speaker/strobes, 4 speakers, 1 smoke detector & 1 control relay. maher n/aDetails
fire alarm ti on 39th floor - ref 201506229596. add (13) speaker/strobes, 4 speakers, 1 smoke detector & 1 control relay. maher n/a | $6,000 |
| Aug 5, 2015 | Completed final sign-off Sep 2015 | 1 Sansome St | Golden Gate Fire Protection Inc | fire sprinkler only, add 76 sprinkler pendents for h.i.g. on 37th floor. t.i. pa#201506260095. n/a ordinance #155-13Details
fire sprinkler only, add 76 sprinkler pendents for h.i.g. on 37th floor. t.i. pa#201506260095. n/a ordinance #155-13 | $38,000 |
| Jul 31, 2015 | Completed final sign-off Oct 2015 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | fire sprinkler ti add 4, relocate 46, total 50. reference ti 2015.0622.9596Details
fire sprinkler ti add 4, relocate 46, total 50. reference ti 2015.0622.9596 | $11,300 |
| Jul 30, 2015 | Completed final sign-off Oct 2015 | 1 Sansome St | Red Hawk Fire & Security Ca Llc | 37th floor: fire alarm t.i. add 13 speaker/strobes, 1 strobe, 5 speakers and 1 smoke detector in idf room. ref. appl. 201506260095. maher n/a.Details
37th floor: fire alarm t.i. add 13 speaker/strobes, 1 strobe, 5 speakers and 1 smoke detector in idf room. ref. appl. 201506260095. maher n/a. | $8,000 |
| Jul 23, 2015 | Completed final sign-off Sep 2015 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | fire sprinkler ti add 22 fire sprinklers, 6 fire sprinklers, 28 fire sprinklersDetails
fire sprinkler ti add 22 fire sprinklers, 6 fire sprinklers, 28 fire sprinklers | $14,500 |
| Jun 26, 2015 | Completed final sign-off Dec 2015 | 1 Sansome St | Bcci Construction Company | 37th floor: t.i. including new non-load bearing partitions, doors, electrical, mech, air distribution, plumbing, ceiling and lighting elements and finishes. life safty under seperate permit. n/a for maher.Details
37th floor: t.i. including new non-load bearing partitions, doors, electrical, mech, air distribution, plumbing, ceiling and lighting elements and finishes. life safty under seperate permit. n/a for maher. | $1,195,000 |
| Jun 22, 2015 | Completed final sign-off Jul 2015 | 1 Sansome St | Anderson, Rowe & Buckley, Inc. | fire sprinkler ti, relocate 14 heads corridor. reference ti 2015.0521.6886 . maher not reqDetails
fire sprinkler ti, relocate 14 heads corridor. reference ti 2015.0521.6886 . maher not req | $7,250 |
| Jun 11, 2015 | Completed final sign-off Jun 2016 | 1 Sansome St | Stockham Construction | 16th floor: t.i. for 2813 sq ft of space including new partitions, new ductwork, and new mep. n/a for the maher. new clouded ceilings class c.Details
16th floor: t.i. for 2813 sq ft of space including new partitions, new ductwork, and new mep. n/a for the maher. new clouded ceilings class c. | $300,000 |
| Jun 3, 2015 | Never finaled issued Jun 2015, no final | 1 Sansome St | Stockham Construction | 38th floor: interior demo of extg office space and ada bathroom upgrade. lobby upgrade. all mep permit to follow.Details
38th floor: interior demo of extg office space and ada bathroom upgrade. lobby upgrade. all mep permit to follow. | $250,000 |
| May 27, 2015 | Never finaled issued Jul 2015, no final | 1 Sansome St | Stockham Construction | 40th-42nd floors: new elevators to 42nd floor for ada access prevouslty not provided. (n) vav boxes and duct distribution at the 42nd floor (n) exit access stair to 41st floor. n/a for the maher.Details
40th-42nd floors: new elevators to 42nd floor for ada access prevouslty not provided. (n) vav boxes and duct distribution at the 42nd floor (n) exit access stair to 41st floor. n/a for the maher. | $500,000 |
| May 21, 2015 | Never finaled issued Jun 2015, no final | 1 Sansome St | Stockham Construction | t.i. & demo of (e) offices & partitions & (e) stair. (n) ada compliant bathrooms. (n) elevator lobbies. (n) demising walls for future tenants 1 & 1. all mep under seperate permit.Details
t.i. & demo of (e) offices & partitions & (e) stair. (n) ada compliant bathrooms. (n) elevator lobbies. (n) demising walls for future tenants 1 & 1. all mep under seperate permit. | $400,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.