Urs Reist
- License
- C24945
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C24945 at the Board for Professional Engineers
- Listed as
- architect, engineer
- Firm
- Hurkes Harris Design
- Based in
- Sacramento
- On San Francisco permits
- Feb 2013 to Oct 2025
5 permits since 2000 (architect on 4 permits, engineer on 1 permit): 3 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Dettaglio Construction Inc Dba Dci Const (2), Peacock Construction (2), Advanced Builders Inc
- Engineers
- Dennis Cheung (2), Meng-Hsiu Chen (2)
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 17, 2025 | Completed final sign-off Nov 2025 | 1 Sansome St | Advanced Builders Inc | 14/f suite 1400: demolition of (2) interior non-structural, load bearing partitions.Details
14/f suite 1400: demolition of (2) interior non-structural, load bearing partitions. | $5,000 |
| Sep 1, 2020 | Never finaled issued Oct 2020, no final | 100 Pine St | Peacock Construction | 1/f: t.i. to (e) commercial office, no change in use. revision to bpa#201912260696: demo, new partitions, electrical/mechanical duct work only. plumbing, new finishes & structural modification to slabDetails
1/f: t.i. to (e) commercial office, no change in use. revision to bpa#201912260696: demo, new partitions, electrical/mechanical duct work only. plumbing, new finishes & structural modification to slab | |
| Dec 26, 2019 | Never finaled issued Jun 2020, no final | 100 Pine St | Peacock Construction | ground fl: ti scope to include demo, new partitions, mep (duct work only), new finishes. maher naDetails
ground fl: ti scope to include demo, new partitions, mep (duct work only), new finishes. maher na | $565,930 |
| Jul 18, 2013 | Completed final sign-off Dec 2013 | 1 Beach St | Dettaglio Construction Inc Dba Dci Const | revision to pa# 2013-0219-0431-change of building type & exit plan.Details
revision to pa# 2013-0219-0431-change of building type & exit plan. | |
| Feb 19, 2013 | Completed final sign-off Dec 2013 | 1 Beach St | Dettaglio Construction Inc Dba Dci Const | 1st & 3rd floor restroom remodel - new fixtures, finishes & restroom partitions, new finishes at common area.Details
1st & 3rd floor restroom remodel - new fixtures, finishes & restroom partitions, new finishes at common area. | $600,000 |