Block 0018, lot 001
1 Beach St
120 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2026 | In progress | 1 Beach St | revision to pa 202603097200 for fsd's | $10,000 | |
| Sep 25, 2026 | In progress | 1 Beach St | Turner Construction Co | deferred mep for 202608206913 suite 150. | $187,000 |
| Sep 25, 2026 | In progress | 1 Beach St | Turner Construction Co | deferred mep for pa#2026-0302-6788 suite 350. | $500,000 |
| Sep 25, 2026 | In progress | 1 Beach St | Turner Construction Co | revision to pa#: 202509084794, to separate suites 100 to 200. | |
| Aug 20, 2026 | In progress | 1 Beach St | Source Planning And Construction Inc | 1/f suite 150. including non bearing partitions, ceilings, light fixtures, doors and side lites and new finishes. mep deferred. | $574,044 |
| Jul 30, 2026 | In progress | 1 Beach St | Source Planning And Construction Inc | 3rd fl, ste 350 - revision to pa 202603026788 includes new structural partitions, ceilings, light fixtures, doors and sidelites, millwork and finishes | |
| May 29, 2026 | In progress | 1 Beach St | Terra Visual Inc | install new evacuation maps to comply with current sffd evacuation maps guidelines. map typical for floors 1-3 | $3,000 |
| May 11, 2026 | In progress | 1 Beach St | United Systems Fire And Security Llc | suite 300, as-built adding control relay module for music shutdown. addition of (3) horn strobes. | |
| Mar 9, 2026 | In progress | 1 Beach St | Turner Construction Co | ground floor: deferred mep to pa #202508294258 | $1,292,400 |
| Mar 2, 2026 | In progress | 1 Beach St | Turner Construction Co | 3rd/f ste# 350: office t.i. included non-structural partitions, millworks & finishes, modification of stairs e) enclosure on adding 2 roll down fire shutters, mep deferred | $1,809,790 |
| Jan 30, 2026 | In progress | 1 Beach St | Ayoob & Peery Plumbing Co Inc | suite 250: add 10, relocate 9 fire sprinkler per t.i. ref pa #202509084793 job #25-710 | $11,179 |
| Jan 30, 2026 | Completed | 1 Beach St | Ayoob & Peery Plumbing Co Inc | 3rd fl ref pa #2025-1124-0285: add 27, relocate 4 fire spinkler ti. job #25-710 ref# 202511240285 | $12,422 |
| Jan 28, 2026 | In progress | 1 Beach St | Turner Construction Co | ste 300 - deferred mep to 202511240285 | $700,000 |
| Jan 12, 2026 | In progress | 1 Beach St | Turner Construction Co | 2nd fl, ste 250 deferred mep for pa 202509084793 | $731,160 |
| Jan 12, 2026 | In progress | 1 Beach St | Turner Construction Co | level 1 and level 2: suites 100 and 200. deferred mep for 202509084794 | $2,146,752 |
| Jan 9, 2026 | Completed | 1 Beach St | United Systems Fire And Security Llc | suite #300: providing notification. new horn/strobe and appliances throughout per code.ref# 202511240285 | $9,236 |
| Dec 12, 2025 | Completed | 1 Beach St | United Systems Fire And Security Llc | ste 250. existing fire alarm system 15 estio1000. parking and amenities will be provided with n/notification appliances throughout per code. new power supply will be installed next to the existing fire alarm control unit. ref# 202509084793 | $9,186 |
| Dec 12, 2025 | In progress | 1 Beach St | United Systems Fire And Security Llc | suite #100: will be provided with notification appliances throughout per code. new horn/strobes & strobes will be tied to the existing power supply bps/10a spec. suite # 200:will be provided with notification appliances code on 2nd flr janitor closet. nw smoke detector above the nw power supply# | $11,490 |
| Nov 24, 2025 | In progress | 1 Beach St | Turner Construction Co | suite 300 tenant improvement. non-structural partitions, ceilings, fixtures, doors and finishes. mep deferred. | $1,400,000 |
| Sep 8, 2025 | In progress | 1 Beach St | Turner Construction Co | 1&2/fl- ste 200/100- ti non structural partitions, ceilings, fixtues, doors, finishes. mep deferred. no change of planning use from institutional to office under this permit. | $4,266,704 |
| Sep 8, 2025 | In progress | 1 Beach St | Turner Construction Co | 2/fl- ste 250- ti non structural partitions, ceilings, fixtues, doors, finishes. mep deferred | $1,469,928 |
| Aug 29, 2025 | In progress | 1 Beach St | Turner Construction Co | g/f t.i. non-structural partitions, ceilings, restrooms, showers & lighting, new parking. office allocation & parking per 2022-009996 cua & 2022-009996 ofa. gym not for public use | $2,620,700 |
| Feb 13, 2023 | Never finaled | 1 Beach St | United Systems Fire And Security Llc | as-built permit for pa#202012161165. elevator upgrade | |
| Feb 13, 2023 | Completed | 1 Beach St | United Systems Fire And Security Llc | as-built permit for pa#202110049713 ti | |
| Dec 16, 2022 | Completed | 1 Beach St | Level 10 Construction Lp | revision to pa 2019 0923 2380: addition of handrail and wheelchair gaurd @ ramp @ roof | |
| Dec 16, 2022 | Completed | 1 Beach St | Level 10 Construction Lp | revision to pa 202012171243: partial slab flushing & construction stripe | |
| Nov 4, 2022 | Never finaled | 1 Beach St | Level 10 Construction Lp | sffd review only. revision to pa# 201909232380 s1 for clarification of elevator access hatch location and detail. | |
| Sep 30, 2022 | Completed | 1 Beach St | revision to pa#202012171243 and pa#202110140520. infill 2nd floor opening | ||
| Jul 18, 2022 | Completed | 1 Beach St | United Systems Fire And Security Llc | as-built f/a permit to 2021 1004 9713 | |
| Jul 8, 2022 | Completed | 1 Beach St | Level 10 Construction Lp | revision to pa# 202011128788. incorporate structural field changes including expansion of ground floor slab replacement in stairway between lines 3 to 4 and removal of structural styrofoam in topping slab. add grade bm. | |
| May 6, 2022 | Completed | 1 Beach St | Anderson, Rowe & Buckley, Inc. | roof: fire sprinkler only. ref pa #201909232380. relocate 14 pendents (upright) for mechanical room on the roof. | $7,000 |
| Apr 1, 2022 | Completed | 1 Beach St | Level 10 Construction Lp | evacuation map submittal associated with pa 201909232380 and pa 202110140520 | $1,000 |
| Oct 14, 2021 | Completed | 1 Beach St | Level 10 Construction Lp | revision to 2020 1217 1243 including abandannont of previously proposed infull new stair and accociated mep | |
| Oct 4, 2021 | Completed | 1 Beach St | United Systems Fire And Security Llc | install fire alarm system improvement for all 3 floors. the facu is existing. arch plans 2020 1217 1243. | $9,500 |
| Sep 14, 2021 | Completed | 1 Beach St | Level 10 Construction Lp | 3rd fl - interior non-structural demo of tenant suit per ab-017 | $60,000 |
| Aug 31, 2021 | Completed | 1 Beach St | Anderson, Rowe & Buckley, Inc. | rev to pa202101263373. demo (e) f/s system of 10 sprinklers. 3rd fl | |
| Aug 18, 2021 | Completed | 1 Beach St | Anderson, Rowe & Buckley, Inc. | 1st, 2nd, & 3rd floors: extg fire sprinkler system .ti. ; 6 added, 24 relocated on 1st floor. 10 added & 19 relocated at 2nd floor;15 added and 21 relocated on 3rd floor and roof - 2 removed. | $22,000 |
| Aug 13, 2021 | Expired or cancelled | 1 Beach St | United Systems Fire And Security Llc | interior system improvment for all 3 fls. the facu is existing all devices are new | $12,500 |
| Jan 26, 2021 | Completed | 1 Beach St | Anderson, Rowe & Buckley, Inc. | tenant imrpovements - existing fire sprinkler system 1st relocate sprinklers - 157 - shell protection 2nd relocate sprinklers - 204 - shell protection 3rd relocate sprinklers - 69 - shell protection | |
| Dec 17, 2020 | Completed | 1 Beach St | Level 10 Construction Lp | interior core & shell improvements. remodel grnd flr main lobby, (n) cut-out. infill of 2nd flr openings. cosmetic upgrade of (e) egress stairs, (n) restrooms on level 01-03. no change of use; no new office use | $300,000 |
| Dec 16, 2020 | Never finaled | 1 Beach St | United Systems Fire And Security Llc | service panel upgrade. | $4,000 |
| Dec 16, 2020 | Completed | 1 Beach St | United Systems Fire And Security Llc | elevator upgrade. fire alarm monitoring/control | $2,000 |
| Dec 9, 2020 | Expired or cancelled | 1 Beach St | Level 10 Construction Lp | adding ramp, canopy & construction of rooftop appurtenance for future use. no sprinkler & plumbing work. no elevator is included. | $40,000 |
| Nov 12, 2020 | Completed | 1 Beach St | replacement of 1st floor slab on grad with reinforce concrete structural slab. interior structural work only all other work under pa# 2019-0923-2380. | $400,000 | |
| Nov 4, 2020 | Completed | 1 Beach St | Level 10 Construction Lp | interior demo of non-structural partitions, ceilings and finishes on levels 01, 02 and 03. no exterior work per ab-017. no change of use under this permit. | $120,000 |
| Sep 23, 2019 | Completed | 1 Beach St | Level 10 Construction Lp | remodel of interior ground floor entrance lobby to 2 floor hgh space & addition of new roof deck. extension of elevator stop to roof & extension of stair to roof. seismic upgrade. ** maher: n/a ** | $1,200,000 |
| Jan 18, 2018 | Completed | 1 Beach St | Red Hawk Fire & Security Ca Llc | 1st floor suite 101 fire alarm t.i. - add 3 horn strobes & remove 1 strobe. ref #201708104446. n/a maher ordinance | $1,500 |
| Dec 11, 2017 | Completed | 1 Beach St | Source Planning And Construction Inc | 1st fl, ste 101 electrical for permit 2017-0810-4446 | |
| Dec 8, 2017 | Completed | 1 Beach St | R L H Fire Protection Inc | fire sprinkler ti delete 1 upright and add 1 pendent. ref pa 2017-0810-4446 | $3,937 |
| Aug 10, 2017 | Completed | 1 Beach St | Source Planning And Construction Inc | 1st fl: office ti - remodel work stations, office rooms, breakroom & kitchen. maher na | $300,000 |
| Sep 9, 2016 | Completed | 1 Beach St | Red Hawk Fire & Security Ca Llc | 1st floor: t.i. to relocate 2 notification devices and relocate one pull station. ref app#201606291146 for revision and 201605096870 for original ti. n/a for maher | $1,600 |
| Aug 12, 2016 | Never finaled | 1 Beach St | Golden Gate Fire Protection Inc | 1st floor fire sprinklers - relocate 4 pendent sprinklers, relocate 1 upright sprinkler. ref t.i. #2016-0629-1146. n/a maher ordinance | $2,625 |
| Jun 29, 2016 | Completed | 1 Beach St | Peacock Construction | ground floor work - architectural revision to arch permit 2016 0509 6870 - office area only - no a-3 work; mechanical and electrical plans for ti - no new fsd's' ref pa # 2016 0509 6870; maher na | |
| May 9, 2016 | Completed | 1 Beach St | Peacock Construction | 1st fl: tenant improvement to include demolition of non-structural partitions, changes to existing lighting and hvac. sprinkler deferred. | $15,000 |
| Dec 18, 2015 | Completed | 1 Beach St | Rockaway Construction Inc. | suite 300 improvement to existing interior only, minor demolitoin of non-load bearing partitions, doors, frames, & hardward & construction of non load bearing partitoins, new doors, frames glazing & select finishes. n/a maher ordinance | $50,000 |
| Apr 29, 2014 | Never finaled | 1 Beach St | street space permit | ||
| Jul 18, 2013 | Completed | 1 Beach St | Dettaglio Construction Inc Dba Dci Const | revision to pa# 2013-0219-0431-change of building type & exit plan. | |
| Apr 16, 2013 | Never finaled | 1 Beach St | Cci Com'l Constr & Improv**See 985808*** | tenant improvement of school. 2xwall removal. 1xdoor relocation. 1xpartial wall addition. 1x door removal; no changes to (e) lighting and hvac | $55,000 |
| Apr 2, 2013 | Completed | 1 Beach St | Red Hawk Fire & Security Ca Llc | 1st & 3rd floor fire alarm tenant improvement - adding 3 notification devices to the 1st floor, adding 4 notification devices to the 3rd floor. ref #2013.02.19.0431 | $3,500 |
| Mar 21, 2013 | Completed | 1 Beach St | Ayoob & Peery Plumbing Co Inc | 1st & 3rd floors-relocate fire sprinkler heads at remodel bathrooms, total of 16 relocated heads. | $8,200 |
| Mar 1, 2013 | Never finaled | 1 Beach St | Dettaglio Construction Inc Dba Dci Const | type 11-a /w automatic fire sprinkler system substitued for 1 hr f.r. construction. revision to app#2012-0227-4931. no work at (e) corridor | |
| Feb 19, 2013 | Completed | 1 Beach St | Dettaglio Construction Inc Dba Dci Const | 1st & 3rd floor restroom remodel - new fixtures, finishes & restroom partitions, new finishes at common area. | $600,000 |
| Jan 30, 2013 | Never finaled | 1 Beach St | R.M.R. Construction Company | 1st floor suite #101 minor t.i. in a suite. removal of door in rated wall; filling in w/rated wall. removal of interior non-rated partitions, door and windows. minor electrical work for (n) furniture layout. no str. work, no plumbing, no mech & no fire sprnklr work, f/a under separate permit. | $97,956 |
| Sep 4, 2012 | Completed | 1 Beach St | Dettaglio Construction Inc Dba Dci Const | revision to app#201202274931 to add moveable partition to multi purpuse room c100. new exit from multipurpuse. structural work included. fire sprinklers and fire alarm separate permit. | $50,000 |
| Aug 30, 2012 | Never finaled | 1 Beach St | Acco Engineered Systems Inc. Dba Acco En | revision to structural drawing. permit app#2012-0703-3984. revise structural calulation and drawings. | |
| Aug 13, 2012 | Completed | 1 Beach St | Ayoob & Peery Plumbing Co Inc | add & relocate fire sprinkler heads per t.i. 84 reloate, 5 add. ref to pa# 201202274931 | $45,000 |
| Jul 31, 2012 | Completed | 1 Beach St | Red Hawk Fire & Security Ca Llc | install 7 horn/strobes, 7 strobe only, 14 duct detectors. work done on 1st and 2nd floors. t.i. pa#201202274931 | $10,000 |
| Jul 3, 2012 | Never finaled | 1 Beach St | Acco Engineered Systems Inc. Dba Acco En | roof level-remove (e) boiler & hot water pump & install new boiler & hot water pump | $30,000 |
| May 3, 2012 | Expired or cancelled | 1 Beach St | replace extg boiler with 2 new boilers (same location). replace extg pump with 2 new pumps. | $30,000 | |
| Feb 27, 2012 | Completed | 1 Beach St | Dettaglio Construction Inc Dba Dci Const | tenant improvement; change offices into classrooms; remodel (e) classrooms into offices. including associated change of use. life safety separate | $150,000 |
| Oct 20, 2011 | Completed | 1 Beach St | Starlite Electric Inc. | life safety t.i. - install 4 horn/strobe, 2 smoke detectors on all floors. | $3,000 |
| Oct 4, 2011 | Expired or cancelled | 1 Beach St | install 4 horn strobes and 2 smoke detectors | $3,000 | |
| Aug 16, 2011 | Expired or cancelled | 1 Beach St | install 4 horn/strobes, 1 smoke detector and 1 heat detector on 1st , 2nd , 3rd and mech penthouse | $2,500 | |
| Dec 9, 2008 | Completed | 1 Beach St | Starlite Electric Inc. | #301- revision to 200809222247, install 2 smoke detectors and 2 door holders | $1,200 |
| Oct 16, 2008 | Completed | 1 Beach St | R.M.R. Construction Company | electrical only/revision to app #200808118857 - provides information missing on original permit application. | |
| Oct 3, 2008 | Completed | 1 Beach St | R L H Fire Protection Inc | t.i. upgrade of existing fire sprinkler system,. relocate 22 heads, add 2 delete 3 heads. | $4,400 |
| Sep 25, 2008 | Never finaled | 1 Beach St | street space only. | ||
| Sep 22, 2008 | Never finaled | 1 Beach St | Starlite Electric Inc. | remove and replace: 1 horn/strobe, 1 strobe. install 6 horn strobes. 1 strobes, 1 smoke detector. connect new notification devices to extg nac. program new smoke into system | $6,000 |
| Aug 11, 2008 | Completed | 1 Beach St | ste. 101, 1 hr rated & non rated metal studs w/ gyp bd, partitions, electrical power date & lighting, minor hvac, mill work & finishes. | $385,000 | |
| Jul 16, 2008 | Never finaled | 1 Beach St | street space | ||
| Apr 29, 2008 | Never finaled | 1 Beach St | street space | ||
| Nov 29, 2007 | Never finaled | 1 Beach St | street space permit | ||
| Jun 5, 2007 | Completed | 1 Beach St | Polytec Construction Co.*** See Notes* | suite# 103. renew for expire pa# 2001/12/19/5570 for final inspection. | |
| Oct 6, 2005 | Never finaled | 1 Beach St | low partitions (non rated electrical for tel/date & power. fufrniture and cabinetry/mill work. (all non structural.) | $25,000 | |
| Aug 26, 2005 | Never finaled | 1 Beach St | R L H Fire Protection Inc | fire sprinkler t.i. add 2 relocate 1 on 3/f | $500 |
| Aug 10, 2005 | Never finaled | 1 Beach St | Turner Construction Co | oti-1-3rd/fl. ls, me, ls, sp. ref#2002/11/27/2423. | $90,000 |
| Jul 13, 2004 | Completed | 1 Beach St | Decker Electric Co Inc Electrical Contra | fire alarm renovation/remodel to existing fire alarm system-on portion of first & portion of 2nd flr | $20,000 |
| Jun 14, 2004 | Completed | 1 Beach St | addendum,revise means of egress rev.to appl#200403229291 44"x44"exterior landing @door from | $500 | |
| Jun 9, 2004 | Expired or cancelled | 1 Beach St | enlarge (e) opening in conc.slab, movable partition mounting detail. additional structural submital | $4,000 | |
| May 18, 2004 | Completed | 1 Beach St | R L H Fire Protection Inc | fire sprinkler tenant improvement to partial ground and 2nd floors/addition, relocation, deletion | $30,200 |
| May 17, 2004 | Completed | 1 Beach St | mechanical/electrical & plumbing.architectural appl#200403229291 | $100,000 | |
| Mar 22, 2004 | Completed | 1 Beach St | interior ti incl drywall,elec,mech&plum.interior finishes. | $950,000 | |
| Feb 23, 2004 | Completed | 1 Beach St | interior non-structural demolition.all h.c.upgrading to be part of const.permit | $50,000 | |
| Jan 9, 2004 | Completed | 1 Beach St | Decker Electric Co Inc Electrical Contra | modify fire alarm sys to accom new office layout.4 new horn &strobe devices are being add to2nd fl. | $5,500 |
| Dec 15, 2003 | Completed | 1 Beach St | R L H Fire Protection Inc | fire sprinkler tenant improvements- addition/relocation/deletion total- 70 heads- 2nd floor only | $10,500 |
| Nov 24, 2003 | Completed | 1 Beach St | Pankow Special Projects Lp | mechnical & electrical work on 2nd fl rerouting elect. & mech. mech. based on architectural permit# | $65,000 |
| Nov 5, 2003 | Completed | 1 Beach St | Pankow Special Projects Lp | oti-3 1st fl. ls | $9,000 |
| Oct 31, 2003 | Completed | 1 Beach St | Pankow Special Projects Lp | oti-2 1st floor, el, me, sp | $25,000 |
| Oct 23, 2003 | Completed | 1 Beach St | Pankow Special Projects Lp | 2/f- relocate partitions & workstations in tenant space on 2/f. mech/lighting under seperate permit | $300,000 |
| Oct 14, 2003 | Completed | 1 Beach St | Pankow Special Projects Lp | oti-1 1st fl. el, me, ls, sp | $87,364 |
| Sep 9, 2003 | Completed | 1 Beach St | Pankow Special Projects Lp | enhancement (voluntary upgrade) of 2/f tube steel bracing (e)by filling w/grout, 2/f office currentl | $27,000 |
| Jun 23, 2003 | Completed | 1 Beach St | Decker Electric Co Inc Electrical Contra | rev. appl#200302147545 correct fire alarm system operation matrix build in does not have elevator | |
| Jun 23, 2003 | Completed | 1 Beach St | Decker Electric Co Inc Electrical Contra | rev. appl#200302288503 correct fire alarm system operation matrix build in does not have elevator | |
| Mar 26, 2003 | Completed | 1 Beach St | Scott Co Of California | modify xisting fire sprinkler system for new tenant 30 sprinkler heads total-3rd flr comon areas | $5,500 |
| Feb 28, 2003 | Completed | 1 Beach St | Decker Electric Co Inc Electrical Contra | tenant upgrade add strobe & horn strobves(fire alarm plan only under this) | $8,900 |
| Feb 26, 2003 | Completed | 1 Beach St | Turner Construction**See 210639**** | new roof deck with guardrail | $30,000 |
| Feb 14, 2003 | Completed | 1 Beach St | Decker Electric Co Inc Electrical Contra | install life safety devices in ti space on 3rd flr.7 horn strobes. 4 strober 4 smoilles, 4 hold open | $8,500 |
| Jan 22, 2003 | Completed | 1 Beach St | R L H Fire Protection Inc | oti-3, 3rd fl, sp. | $16,200 |
| Jan 17, 2003 | Completed | 1 Beach St | Scott Co Of California | modify existing fire sprinkler system for new tenant 3rd floor partial floor total 142 heads 3rd fl | $26,500 |
| Jan 16, 2003 | Completed | 1 Beach St | Turner Construction Co | oti-1, rev. 3rd floor. | $100 |
| Jan 16, 2003 | Completed | 1 Beach St | Turner Construction Co | oti-2, 3rd floor, el, me. | $100 |
| Jan 15, 2003 | Completed | 1 Beach St | Turner Construction Co | oti-2 3rd floor, el, mech | $350,000 |
| Dec 23, 2002 | Expired or cancelled | 1 Beach St | Turner Construction Co | structural demolition & reinforcement of (e) concrete vault on 3/fl. | $30,000 |
| Nov 27, 2002 | Never finaled | 1 Beach St | street space | ||
| Nov 27, 2002 | Completed | 1 Beach St | Turner Construction Co | oti-1 3/f el me ls sp | $600,000 |
| Oct 30, 2002 | Never finaled | 1 Beach St | street space | ||
| Oct 8, 2002 | Completed | 1 Beach St | Turner Construction Co | selective demolition of interior partition & ceilings and finishes on 3rd floor | $15,000 |
| Oct 8, 2002 | Completed | 1 Beach St | Turner Construction Co | demolition of existing space on 3/f to include non str'l walls ceilings and all interior finishes as | $60,000 |
| Sep 18, 2002 | Completed | 1 Beach St | Turner Construction Co | oti-1 3rd floor,el,me, ls,sp | $400,000 |
| Dec 19, 2001 | Expired or cancelled | 1 Beach St | interior renovation of existing office space, drywall, lights, interior finish at ground floor only | $30,000 |