Dettaglio Construction Inc Dba Dci Const
- Based in
- Alamo
- On San Francisco permits
- Mar 2010 to Jun 2022
- Last 24 months
- 0 permits filed
52 permits since 2000: 42 completed, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 21, 2022 | Completed final sign-off Sep 2022 | 388 Beale St | revision to pa 201901180804 to revised bathroom doors, eliminate wind wall adjacent to refrigerator. revise closet doors. add door uc6 and ue3 to door schedule.Details
revision to pa 201901180804 to revised bathroom doors, eliminate wind wall adjacent to refrigerator. revise closet doors. add door uc6 and ue3 to door schedule. | |
| Oct 12, 2021 | Completed final sign-off Sep 2022 | 388 Beale St | 3rd and 4th floor: as built submittal to provide new fire extinguisher cabinets and revised parking garage dimentions. ref app#201901180804Details
3rd and 4th floor: as built submittal to provide new fire extinguisher cabinets and revised parking garage dimentions. ref app#201901180804 | |
| Jun 3, 2019 | Completed final sign-off Jun 2023 | 2000 Post St | add units per ord 162-16. at existing garage, grade level, removal of parking stalls and addition 15 adu's.Details
add units per ord 162-16. at existing garage, grade level, removal of parking stalls and addition 15 adu's. | $3,500,000 |
| Jan 18, 2019 | Completed final sign-off Sep 2022 | 388 Beale St | at (e) garage levels 3 & 4; removal of parking stalls & addition of 13 dwelling units (1 adu per ordinance# 162-16 and 12 regular units).Details
at (e) garage levels 3 & 4; removal of parking stalls & addition of 13 dwelling units (1 adu per ordinance# 162-16 and 12 regular units). | $2,743,044 |
| Aug 2, 2016 | Completed final sign-off Oct 2016 | 2764 Greenwich St | to comply with board of appeals #16-080Details
to comply with board of appeals #16-080 | $150,000 |
| Feb 12, 2016 | Expired or cancelled cancelled Feb 2019 | 2764 Greenwich St | in fill lightwell, comply with 201694931. add new internal elevator to existing single family residence. elevator to comply with state and local codes and meet or exceed all asme/ansi a17.1 safety codes sec 5.3 private residences. mep and fire sprinkler sep permit. reapply per planning requestDetails
in fill lightwell, comply with 201694931. add new internal elevator to existing single family residence. elevator to comply with state and local codes and meet or exceed all asme/ansi a17.1 safety codes sec 5.3 private residences. mep and fire sprinkler sep permit. reapply per planning request | $100,000 |
| Jan 21, 2016 | Never finaled issued Jan 2016, no final | 2000 Post St | common area- revision to structural details for metal trellis structure at driveway entrance, revision to previous pa# 201501307081 r-1 & 201510230694Details
common area- revision to structural details for metal trellis structure at driveway entrance, revision to previous pa# 201501307081 r-1 & 201510230694 | |
| Oct 23, 2015 | Never finaled issued Oct 2015, no final | 2000 Post St | 4th floor: revision to pa 2015 0130 7081 r-1 structural details only for balcony guardrailsDetails
4th floor: revision to pa 2015 0130 7081 r-1 structural details only for balcony guardrails | $4,000 |
| Sep 18, 2015 | Completed final sign-off Oct 2016 | 2764 Greenwich St | add new internal 3 story elevator to (e) sfd. elevator to comply with state and local codes and meet or exceed all asme/ansi a17.1 safety codes, section 5.3 private residences. mep & sprinkler under seperate permit.Details
add new internal 3 story elevator to (e) sfd. elevator to comply with state and local codes and meet or exceed all asme/ansi a17.1 safety codes, section 5.3 private residences. mep & sprinkler under seperate permit. | $75,000 |
| Sep 17, 2015 | Completed final sign-off Sep 2016 | 1600 Geary Bl | 1st floor: change of use. going from a retail space to a nail salon.Details
1st floor: change of use. going from a retail space to a nail salon. | $118,195 |
| Jul 29, 2015 | Completed final sign-off Sep 2016 | 1600 Geary Bl | 1st floor: renovation of existing ground level podiatrist medical officesDetails
1st floor: renovation of existing ground level podiatrist medical offices | $208,208 |
| Jun 3, 2015 | Never finaled issued Jun 2015, no final | 2000 Post St | replacing original siding and windows that are failing and causing safety concerns in the courtyard. not visible from street.Details
replacing original siding and windows that are failing and causing safety concerns in the courtyard. not visible from street. | $973,000 |
| Mar 4, 2015 | Completed final sign-off Jul 2015 | 747 Front St | revision to pa# 2014 0627 9711 - changes to partition plan, power & signal rlp, electrical, hvac, plumb, submitting structural drawings. maher - not req'dDetails
revision to pa# 2014 0627 9711 - changes to partition plan, power & signal rlp, electrical, hvac, plumb, submitting structural drawings. maher - not req'd | |
| Jan 30, 2015 | Never finaled issued Oct 2015, no final | 2000 Post St | replace original siding, windows & roof that are falling & causing safety concerns.Details
replace original siding, windows & roof that are falling & causing safety concerns. | $3,000,000 |
| Jan 16, 2015 | Completed final sign-off Jul 2015 | 2764 Greenwich St | revision to appl. 2014.1104.0706 & 2010.0324.8854. change rear yard exterior finishes. no change to bldg footprint and not visible to street.Details
revision to appl. 2014.1104.0706 & 2010.0324.8854. change rear yard exterior finishes. no change to bldg footprint and not visible to street. | |
| Nov 5, 2014 | Completed final sign-off Jul 2015 | 2764 Greenwich St | re: permit no. 201409035356; revise rafter depth at south end of roof from a to d.5, no changes to facade of building front.Details
re: permit no. 201409035356; revise rafter depth at south end of roof from a to d.5, no changes to facade of building front. | |
| Nov 4, 2014 | Completed final sign-off Jul 2015 | 2764 Greenwich St | revision to pa 201003248854; reconfirugre interior partitions, change to windows at lightwell & rear yard. no changes to building foot print. no changes visible to greenwhich street.Details
revision to pa 201003248854; reconfirugre interior partitions, change to windows at lightwell & rear yard. no changes to building foot print. no changes visible to greenwhich street. | $1,200 |
| Oct 2, 2014 | Completed final sign-off Sep 2015 | 747 Front St | 4th floor: mechanical and electrical work for t.i. ref arch app#201408143781. n/a for the maherDetails
4th floor: mechanical and electrical work for t.i. ref arch app#201408143781. n/a for the maher | $10,000 |
| Sep 3, 2014 | Completed final sign-off Jul 2015 | 2764 Greenwich St | revisionto to 201406239153. changes to interior partitions, changes to interior stair, ajjustment to floor to floor heightsDetails
revisionto to 201406239153. changes to interior partitions, changes to interior stair, ajjustment to floor to floor heights | $8,000 |
| Aug 14, 2014 | Completed final sign-off Jun 2015 | 747 Front St | office t.i. includes:partial non-structural demo of partitions, finishes, light fixtures. accessible upgrades to extg restrooms. addition of restrooms (2 unisex) install new partitions lights, finishes, doors, accoustical ceilings, ceilings and glazing. n/a maher.Details
office t.i. includes:partial non-structural demo of partitions, finishes, light fixtures. accessible upgrades to extg restrooms. addition of restrooms (2 unisex) install new partitions lights, finishes, doors, accoustical ceilings, ceilings and glazing. n/a maher. | $1,000,000 |
| Aug 6, 2014 | Completed final sign-off Jul 2015 | 2764 Greenwich St | revision appl. 2010.0324.8854. expansion joint at line 8 to accommodate existing encroaching foundation.Details
revision appl. 2010.0324.8854. expansion joint at line 8 to accommodate existing encroaching foundation. | |
| Aug 4, 2014 | Never finaled issued Aug 2014, no final | 417 Montgomery St | revision to 201406249297: permit revision to include installation of nanawall operable partiton at large conferenc room 711. width of wall is 16'6.Details
revision to 201406249297: permit revision to include installation of nanawall operable partiton at large conferenc room 711. width of wall is 16'6. | |
| Jun 27, 2014 | Completed final sign-off Jul 2015 | 747 Front St | 2nd fl:demo & construction of non-structural interior partitions, doors, frames, hardware, millwork, drywall & accoustic ceiling finishes, mech, electrical & plumbing. deferred submittal fire/life safety, atrium openings & guardrails. n/a ordinance #155-13.Details
2nd fl:demo & construction of non-structural interior partitions, doors, frames, hardware, millwork, drywall & accoustic ceiling finishes, mech, electrical & plumbing. deferred submittal fire/life safety, atrium openings & guardrails. n/a ordinance #155-13. | $536,235 |
| Jun 27, 2014 | Completed final sign-off Apr 2015 | 747 Front St | demo & construction of non-structural interior partitions, doors, frames, hardware, millwork, drywall & accoustic ceiling finishes, mech, electrical & plumbing. deferred submittal fire/life safety, atrium openings & guardrails. n/a ordinance #155-13.Details
demo & construction of non-structural interior partitions, doors, frames, hardware, millwork, drywall & accoustic ceiling finishes, mech, electrical & plumbing. deferred submittal fire/life safety, atrium openings & guardrails. n/a ordinance #155-13. | $536,235 |
| Jun 26, 2014 | Completed final sign-off Jul 2015 | 2764 Greenwich St | revision to app#201003248854 shoring plan for temporary use during constructionDetails
revision to app#201003248854 shoring plan for temporary use during construction | |
| Jun 24, 2014 | Completed final sign-off Jan 2015 | 417 Montgomery St | minor demo of partitions, doors, ceiling/lighting, hvac, millwork, finishes. new work consists of new partitons, doors, frames, hardware, millwork, power data, plumbinb, finishes, new ceiling, lighting throughout. space unoccupied. sprinkler, ls, mep sep permitDetails
minor demo of partitions, doors, ceiling/lighting, hvac, millwork, finishes. new work consists of new partitons, doors, frames, hardware, millwork, power data, plumbinb, finishes, new ceiling, lighting throughout. space unoccupied. sprinkler, ls, mep sep permit | $350,000 |
| Jun 23, 2014 | Completed final sign-off Jul 2015 | 2764 Greenwich St | revision to pa #201003248854. reconfigure interior partitions, resize windows at lightwell and rear yard.Details
revision to pa #201003248854. reconfigure interior partitions, resize windows at lightwell and rear yard. | $20,000 |
| Jun 20, 2014 | Completed final sign-off Jul 2015 | 2764 Greenwich St | revision to pa#201003248854, revise foundation to mat-slab at rear.Details
revision to pa#201003248854, revise foundation to mat-slab at rear. | |
| Jun 17, 2014 | Completed final sign-off Sep 2014 | 825 Van Ness Av | 6th flr: demolition of non structural partitions, associated electrical, finishes, new partitions, doors, suite #602/603, mep and life safety under separate permitDetails
6th flr: demolition of non structural partitions, associated electrical, finishes, new partitions, doors, suite #602/603, mep and life safety under separate permit | $77,000 |
| Jun 6, 2014 | Completed final sign-off Nov 2014 | 520 Montgomery St | new foundation elements, new basement story posts and 1st floor beam to support new level 1 topping slab. compliance with ordinance no. 155-13 not required.Details
new foundation elements, new basement story posts and 1st floor beam to support new level 1 topping slab. compliance with ordinance no. 155-13 not required. | $30,000 |
| May 22, 2014 | Completed final sign-off Sep 2014 | 180 Sansome St | disabled access barrier removal on the 11th floor of 180 sansome. demolition of current non-compliant restroom and construction of 2 new single-occupancy restrooms one mens and one womens. n/a for the maher ordinance #155-133Details
disabled access barrier removal on the 11th floor of 180 sansome. demolition of current non-compliant restroom and construction of 2 new single-occupancy restrooms one mens and one womens. n/a for the maher ordinance #155-133 | $90,000 |
| Apr 10, 2014 | Never finaled issued May 2014, no final | 445 Bush St | infill of extg floor opening at extg in suite stair. n/a for the maher ordinance #155-13Details
infill of extg floor opening at extg in suite stair. n/a for the maher ordinance #155-13 | $2,000 |
| Mar 24, 2014 | Completed final sign-off May 2014 | 100 Montgomery St | #2000- tenant improvement, non-structural interior demolition & construction in existing tenant space. na ordinance #155-13.Details
#2000- tenant improvement, non-structural interior demolition & construction in existing tenant space. na ordinance #155-13. | $92,000 |
| Feb 10, 2014 | Completed final sign-off Nov 2014 | 520 Montgomery St | sidewalk shoring of existing sidewalk to repair existing concrete beams that are being repaired as part of the 520 montgomery ti. compliance with ord no 155-13 does not apply.Details
sidewalk shoring of existing sidewalk to repair existing concrete beams that are being repaired as part of the 520 montgomery ti. compliance with ord no 155-13 does not apply. | $19,000 |
| Feb 10, 2014 | Completed final sign-off Nov 2014 | 520 Montgomery St | 2nd fl shoring of existing beams is required to demolish the existing concrete beams and install new steel beams. compliance with ord 155-13 not reqd.Details
2nd fl shoring of existing beams is required to demolish the existing concrete beams and install new steel beams. compliance with ord 155-13 not reqd. | $25,000 |
| Feb 10, 2014 | Completed final sign-off Apr 2014 | 44 Montgomery St | interior ti for existing tenant suite to include demo of partition and new new partitions mech and electrical included compliance with ord 155-13Details
interior ti for existing tenant suite to include demo of partition and new new partitions mech and electrical included compliance with ord 155-13 | $92,000 |
| Nov 20, 2013 | Completed final sign-off Nov 2014 | 520 Montgomery St | demolish existing mezzanine and stair only, demo permit only, no new construction. building is vacant, no occupants. per ab-017.Details
demolish existing mezzanine and stair only, demo permit only, no new construction. building is vacant, no occupants. per ab-017. | $25,000 |
| Sep 16, 2013 | Completed final sign-off Oct 2014 | 520 Montgomery St | remove(e)stair & mezz.fl level,interior t/i include/n stair no change/n mezz.fl,struct.& support members/n accessible restrm at g/f,/n restrms at basemt & 2/f, no exterior wk,n interior partitns,mep under sep.permits(compl. w/maher ord. extended #155-13 not requir'd. excavation less than 50 cu. yd.)Details
remove(e)stair & mezz.fl level,interior t/i include/n stair no change/n mezz.fl,struct.& support members/n accessible restrm at g/f,/n restrms at basemt & 2/f, no exterior wk,n interior partitns,mep under sep.permits(compl. w/maher ord. extended #155-13 not requir'd. excavation less than 50 cu. yd.) | $225,000 |
| Aug 22, 2013 | Completed final sign-off Nov 2015 | 550 Montgomery St | 11th fl: construct roof deck w/a occupancy on existing roof accessibility upgrade to roof access, guardrail installation and deck surface. ref pa# 201210172221Details
11th fl: construct roof deck w/a occupancy on existing roof accessibility upgrade to roof access, guardrail installation and deck surface. ref pa# 201210172221 | $80,000 |
| Jul 31, 2013 | Completed final sign-off Dec 2013 | 2 Harrison St | 3rd floor-restroom upgradesDetails
3rd floor-restroom upgrades | $30,000 |
| Jul 18, 2013 | Completed final sign-off Dec 2013 | 1 Beach St | revision to pa# 2013-0219-0431-change of building type & exit plan.Details
revision to pa# 2013-0219-0431-change of building type & exit plan. | |
| Apr 24, 2013 | Completed final sign-off Aug 2013 | 30 Hotaling Pl | 2nd floor-demolition of (e) ceiling height partitions, construction of full height partitions for tenant improvementDetails
2nd floor-demolition of (e) ceiling height partitions, construction of full height partitions for tenant improvement | $264,497 |
| Mar 1, 2013 | Never finaled issued Mar 2013, no final | 1 Beach St | type 11-a /w automatic fire sprinkler system substitued for 1 hr f.r. construction. revision to app#2012-0227-4931. no work at (e) corridorDetails
type 11-a /w automatic fire sprinkler system substitued for 1 hr f.r. construction. revision to app#2012-0227-4931. no work at (e) corridor | |
| Feb 27, 2013 | Completed final sign-off Jun 2013 | 30 Hotaling Pl | t.i to include (8) private offices, new casework at reception area, copy and storage, conversion of two conference rooms to private offices, mep, life safety and fire sprinkler under sep permit.Details
t.i to include (8) private offices, new casework at reception area, copy and storage, conversion of two conference rooms to private offices, mep, life safety and fire sprinkler under sep permit. | $175,000 |
| Feb 19, 2013 | Completed final sign-off Jun 2013 | 30 Hotaling Pl | 3rd floor interior non-structural demolition per ab-017.Details
3rd floor interior non-structural demolition per ab-017. | $2,500 |
| Feb 19, 2013 | Completed final sign-off Dec 2013 | 1 Beach St | 1st & 3rd floor restroom remodel - new fixtures, finishes & restroom partitions, new finishes at common area.Details
1st & 3rd floor restroom remodel - new fixtures, finishes & restroom partitions, new finishes at common area. | $600,000 |
| Dec 4, 2012 | Completed final sign-off Feb 2013 | 450 Sansome St | 7th floor: minor wall demo and construction of 2 walls and 2 doors. new finishes and light fixtures throughout suite is currently unoccupied. mep, life safety and sprinkler modification are under seperate permit.Details
7th floor: minor wall demo and construction of 2 walls and 2 doors. new finishes and light fixtures throughout suite is currently unoccupied. mep, life safety and sprinkler modification are under seperate permit. | $25,000 |
| Sep 4, 2012 | Completed final sign-off Mar 2013 | 1 Beach St | revision to app#201202274931 to add moveable partition to multi purpuse room c100. new exit from multipurpuse. structural work included. fire sprinklers and fire alarm separate permit.Details
revision to app#201202274931 to add moveable partition to multi purpuse room c100. new exit from multipurpuse. structural work included. fire sprinklers and fire alarm separate permit. | $50,000 |
| Aug 23, 2012 | Never finaled issued Jan 2013, no final | 450 Sansome St | create a hallway across the rear of a vacant tenant space to allow landlords access to elevator equipment; close off a stairway that is not needed by code.Details
create a hallway across the rear of a vacant tenant space to allow landlords access to elevator equipment; close off a stairway that is not needed by code. | $10,000 |
| Feb 27, 2012 | Completed final sign-off Mar 2013 | 1 Beach St | tenant improvement; change offices into classrooms; remodel (e) classrooms into offices. including associated change of use. life safety separateDetails
tenant improvement; change offices into classrooms; remodel (e) classrooms into offices. including associated change of use. life safety separate | $150,000 |
| Aug 5, 2010 | Expired or cancelled expired Oct 2013 | 301 Bryant St | unit #202 interior remodel of existing ktichen, guest bathroom & master bathroom.Details
unit #202 interior remodel of existing ktichen, guest bathroom & master bathroom. | $50,000 |
| Mar 24, 2010 | Completed final sign-off Jul 2015 | 2764 Greenwich St | horizontal addition, rear yard addition on all floors.horizontal addition to (e) 3rd floor at front of property. the addition includes a (n) living room and bedrooms.Details
horizontal addition, rear yard addition on all floors.horizontal addition to (e) 3rd floor at front of property. the addition includes a (n) living room and bedrooms. | $350,000 |