Block 0682, lot 010
2000 Post St
- City’s use
- Commercial Misc
- Built
- 1986
- Stories
- 3
- Building
- 143,979 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
30 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 23, 2026 | Completed final sign-off Mar 2026 | 2000 Post St | Lemus Construction Dba Cs General Buildi | awning removal located at steiner & pierce streets.Details
awning removal located at steiner & pierce streets. | $3,000 |
| Sep 1, 2022 | Never finaled issued Sep 2022, no final | 2000 Post St | Achill Beg Construction Inc | ground floor: evacuation signage for fire life safetyDetails
ground floor: evacuation signage for fire life safety | $1,500 |
| Aug 30, 2022 | Completed final sign-off May 2024 | 2000 Post St | Fire Detection Unlimited | upgrade to existing fa system for compliance with sffc 1103.7.6.1; installation of (12) new remote power supplies, new monitoring modules & new lf horns.Details
upgrade to existing fa system for compliance with sffc 1103.7.6.1; installation of (12) new remote power supplies, new monitoring modules & new lf horns. | $638,229 |
| May 4, 2022 | Never finaled issued May 2022, no final | 2000 Post St | Electrical Express Incorporated | additional fire alarm devices will be added to extg fire alarm system. new raceway,wiring, device installation and programing.Details
additional fire alarm devices will be added to extg fire alarm system. new raceway,wiring, device installation and programing. | $45,000 |
| Apr 25, 2022 | Never finaled issued Aug 2022, no final | 2000 Post St | designation of 33 intermediate length occupancy units, as allowed by planning commission motion. no 20176: no construction proposed.Details
designation of 33 intermediate length occupancy units, as allowed by planning commission motion. no 20176: no construction proposed. | ||
| Jun 3, 2019 | Completed final sign-off Jun 2023 | 2000 Post St | Achill Beg Construction Inc, Dettaglio Construction Inc Dba Dci Const | add units per ord 162-16. at existing garage, grade level, removal of parking stalls and addition 15 adu's.Details
add units per ord 162-16. at existing garage, grade level, removal of parking stalls and addition 15 adu's. | $3,500,000 |
| Aug 1, 2016 | Never finaled issued Aug 2016, no final | 2000 Post St | street space permitDetails
street space permit | ||
| Mar 21, 2016 | Never finaled issued Mar 2016, no final | 2000 Post St | street spaceDetails
street space | ||
| Jan 21, 2016 | Never finaled issued Jan 2016, no final | 2000 Post St | street space permitDetails
street space permit | ||
| Jan 21, 2016 | Never finaled issued Jan 2016, no final | 2000 Post St | Dettaglio Construction Inc Dba Dci Const | common area- revision to structural details for metal trellis structure at driveway entrance, revision to previous pa# 201501307081 r-1 & 201510230694Details
common area- revision to structural details for metal trellis structure at driveway entrance, revision to previous pa# 201501307081 r-1 & 201510230694 | |
| Jan 21, 2016 | Completed final sign-off May 2016 | 2000 Post St | Pics Dba Molinar Construction | revision to 201504284824. revision to concrete wallDetails
revision to 201504284824. revision to concrete wall | |
| Dec 28, 2015 | Never finaled issued Jan 2016, no final | 2000 Post St | Pics Dba Molinar Construction | renew permit application 200808259929, 200808118825 & 200807307946 fo final inspections only. all work is complete. (common area)Details
renew permit application 200808259929, 200808118825 & 200807307946 fo final inspections only. all work is complete. (common area) | |
| Dec 16, 2015 | Never finaled issued Dec 2015, no final | 2000 Post St | street space permitDetails
street space permit | ||
| Nov 24, 2015 | Never finaled issued Nov 2015, no final | 2000 Post St | street spaceDetails
street space | ||
| Nov 24, 2015 | Never finaled issued Nov 2015, no final | 2000 Post St | street spaceDetails
street space | ||
| Nov 3, 2015 | Completed final sign-off May 2016 | 2000 Post St | Pics Dba Molinar Construction | revision to pa 2015-0428-4824 to change pool enclosure from wood to glassDetails
revision to pa 2015-0428-4824 to change pool enclosure from wood to glass | |
| Oct 23, 2015 | Never finaled issued Oct 2015, no final | 2000 Post St | street spaceDetails
street space | ||
| Oct 23, 2015 | Never finaled issued Oct 2015, no final | 2000 Post St | Dettaglio Construction Inc Dba Dci Const | 4th floor: revision to pa 2015 0130 7081 r-1 structural details only for balcony guardrailsDetails
4th floor: revision to pa 2015 0130 7081 r-1 structural details only for balcony guardrails | $4,000 |
| Sep 28, 2015 | Never finaled issued Sep 2015, no final | 2000 Post St | street spaceDetails
street space | ||
| Aug 27, 2015 | Never finaled issued Aug 2015, no final | 2000 Post St | street spaceDetails
street space | ||
| Jul 29, 2015 | Never finaled issued Jul 2015, no final | 2000 Post St | street spaceDetails
street space | ||
| Jul 9, 2015 | Never finaled issued Jul 2015, no final | 2000 Post St | street spaceDetails
street space | ||
| Jun 3, 2015 | Never finaled issued Jun 2015, no final | 2000 Post St | Dettaglio Construction Inc Dba Dci Const | replacing original siding and windows that are failing and causing safety concerns in the courtyard. not visible from street.Details
replacing original siding and windows that are failing and causing safety concerns in the courtyard. not visible from street. | $973,000 |
| Jun 1, 2015 | Never finaled issued Jun 2015, no final | 2000 Post St | street spacew permitDetails
street spacew permit | ||
| May 14, 2015 | Completed final sign-off Aug 2015 | 2000 Post St | Bay City Mechanical Inc | install 3 exhaust fans, 1 supply fan, 2 condensing units, 5 fan coils, & 2 branch selector boxes. ref #2014.1212.3625.Details
install 3 exhaust fans, 1 supply fan, 2 condensing units, 5 fan coils, & 2 branch selector boxes. ref #2014.1212.3625. | $675,000 |
| May 7, 2015 | Completed final sign-off Apr 2016 | 2000 Post St | Allcom Electric Inc. | 1st floor: reconfigure fire alarm. ref. t.i. appl. 2014.1212.3625. 14 horn/strobes 14 appliances.Details
1st floor: reconfigure fire alarm. ref. t.i. appl. 2014.1212.3625. 14 horn/strobes 14 appliances. | $2,700 |
| Apr 28, 2015 | Completed final sign-off May 2016 | 2000 Post St | Pics Dba Molinar Construction | refurbishment and repair to existing landscaping, replacement of freestanding bbqs with built in bbqs, removal and replacement of existing spa and repairs to existing pool decking. not visible from the streetDetails
refurbishment and repair to existing landscaping, replacement of freestanding bbqs with built in bbqs, removal and replacement of existing spa and repairs to existing pool decking. not visible from the street | $553,508 |
| Mar 30, 2015 | Completed final sign-off Apr 2016 | 2000 Post St | Aaa Restaurant Fire Control/Dba Aaa Fire | relocate 21 existing fire sprinklers, add 7 pendent sprinklers on 1st floor lobby area. t.i. pa# 201412123625.Details
relocate 21 existing fire sprinklers, add 7 pendent sprinklers on 1st floor lobby area. t.i. pa# 201412123625. | $1,200 |
| Jan 30, 2015 | Never finaled issued Oct 2015, no final | 2000 Post St | Dettaglio Construction Inc Dba Dci Const | replace original siding, windows & roof that are falling & causing safety concerns.Details
replace original siding, windows & roof that are falling & causing safety concerns. | $3,000,000 |
| Dec 12, 2014 | Never finaled issued Apr 2015, no final | 2000 Post St | Pics Dba Molinar Construction | repair & renovation deferred maintenance of leasing office. repair deferred maintenance in fitness center space & renovate to resident common area. repair & renovate current maintenance storage to accomodate fitness equip. mepfs is design build and work will be submitted or filed seperately.Details
repair & renovation deferred maintenance of leasing office. repair deferred maintenance in fitness center space & renovate to resident common area. repair & renovate current maintenance storage to accomodate fitness equip. mepfs is design build and work will be submitted or filed seperately. | $675,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Dettaglio Construction Inc Dba Dci Const (5), Pics Dba Molinar Construction (5), Achill Beg Construction Inc (2), Aaa Restaurant Fire Control/Dba Aaa Fire, Allcom Electric Inc., Bay City Mechanical Inc, Electrical Express Incorporated, Fire Detection Unlimited, Lemus Construction Dba Cs General Buildi
- Architects
- Michael Gould, Shari Van Dorn
- Engineers
- Joaquim Roberts, Najib Anwary, Theodore G. Garcia
Find contractors for work like this