Achill Beg Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to May 2026
- Last 24 months
- 19 permits filed
241 permits since 2000: 189 completed, 20 in progress, 19 never finaled, 13 expired or cancelled.
Of the 19 never-finaled permits, 4 are 3 to 5 years old, 7 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 241.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2026 | In progress issued May 2026 | 1170 Harrison St | for evac maps only.Details
for evac maps only. | $100 |
| May 13, 2026 | In progress issued May 2026 | 1501 Howard St | demolition of minor interior non structural partitions from existing tenant improvement. no build out or change of use for future t.i.Details
demolition of minor interior non structural partitions from existing tenant improvement. no build out or change of use for future t.i. | $10,000 |
| Apr 17, 2026 | In progress issued Apr 2026 | 1310 Filbert St | addressing permit only: purpose of this permit is to create the address 1310 filbert st. link to apn 0524/009. ref pa # 2018-0502-8002Details
addressing permit only: purpose of this permit is to create the address 1310 filbert st. link to apn 0524/009. ref pa # 2018-0502-8002 | |
| Mar 12, 2026 | In progress issued Apr 2026 | 2471 Washington St | rear building: demolition of a 1-story commercial type v-b building.Details
rear building: demolition of a 1-story commercial type v-b building. | $2,500 |
| Dec 3, 2025 | In progress filed Dec 2025, not yet issued | 2471 Washington St | construction of a new 2 unit residential type-v building.Details
construction of a new 2 unit residential type-v building. | $2,400,000 |
| Nov 25, 2025 | In progress issued Dec 2025 | 1170 Harrison St | rev to pa# 2025-0910-5001: to remove 2 conf room from scope.Details
rev to pa# 2025-0910-5001: to remove 2 conf room from scope. | |
| Sep 10, 2025 | In progress issued Oct 2025 | 1170 Harrison St | interior only ti to (e) office space on all floorsDetails
interior only ti to (e) office space on all floors | $1,000,000 |
| Sep 3, 2025 | In progress issued Sep 2025 | 2407 Larkin St | revision to 201805028002. reconfiguration due to field changes.Details
revision to 201805028002. reconfiguration due to field changes. | $40,000 |
| Aug 11, 2025 | In progress issued Sep 2025 | 1170 Harrison St | fl infill of e space between 1st and 2nd fl. ada upgrades to existing restrooms on 1st and second floors.Details
fl infill of e space between 1st and 2nd fl. ada upgrades to existing restrooms on 1st and second floors. | $215,000 |
| Aug 11, 2025 | In progress issued Aug 2025 | 4100 03rd St | waterproofing of (e) basement walls and floor by adding koster vap 2000 vapor barrier and qauafin cementitous 2 coat system on wallsDetails
waterproofing of (e) basement walls and floor by adding koster vap 2000 vapor barrier and qauafin cementitous 2 coat system on walls | $20,000 |
| Jul 30, 2025 | In progress issued Dec 2025 | 4100 03rd St | this project is to implement the change of use from residential(r) & assembly(a) occupancies to business(b) occupancy. the interior only renovation will include updates to the basement, ground lvl-1 & upper lvl-2.Details
this project is to implement the change of use from residential(r) & assembly(a) occupancies to business(b) occupancy. the interior only renovation will include updates to the basement, ground lvl-1 & upper lvl-2. | $848,905 |
| Jun 26, 2025 | In progress issued Jun 2025 | 4100 03rd St | selective demolition of furring adjacent to concrete walls for waterproofing observation purposes.Details
selective demolition of furring adjacent to concrete walls for waterproofing observation purposes. | $15,000 |
| Jun 24, 2025 | Completed final sign-off Nov 2025 | 2000 Post St | retail space renovation to include selective demo. mep safe-off and removal of existing cafe finishes. electrical service upgrade to 200 amp service and installation of mini split system. frame out of eixting cmu walls. installation of new restroom access.Details
retail space renovation to include selective demo. mep safe-off and removal of existing cafe finishes. electrical service upgrade to 200 amp service and installation of mini split system. frame out of eixting cmu walls. installation of new restroom access. | $300,000 |
| Jun 10, 2025 | Completed final sign-off Jun 2025 | 388 Beale St | corrective permit for pa# 202201286896 to correct quantity of dwelling units being increased from 239 to 246. no work to be performed under this permit.Details
corrective permit for pa# 202201286896 to correct quantity of dwelling units being increased from 239 to 246. no work to be performed under this permit. | |
| May 6, 2025 | Completed final sign-off Jul 2025 | 1776 Green St | convert (e) habitable space to adu, installation of induction range with hood. all other work complete per pa# 201808016167 and 202403127605.Details
convert (e) habitable space to adu, installation of induction range with hood. all other work complete per pa# 201808016167 and 202403127605. | $10,000 |
| Nov 27, 2024 | In progress issued Mar 2025 | 600 20th St | construction of drill displacement column (ddc)ground improvement system & excavation to bottom of proposed concrete foundation elevations. the pa# for replacement building is #202110019676. ref demo pa# 202407227013.Details
construction of drill displacement column (ddc)ground improvement system & excavation to bottom of proposed concrete foundation elevations. the pa# for replacement building is #202110019676. ref demo pa# 202407227013. | $180,000 |
| Nov 25, 2024 | Completed final sign-off Jun 2026 | 572 Hill St | revision to pa# 202208160669: minor reconfiguration of flr plans & associated structural work. alteration to front door design, increase size of lightwell, new windows added at lightwell, new skylight in lightwell, fire rated glass partition added to dining room.Details
revision to pa# 202208160669: minor reconfiguration of flr plans & associated structural work. alteration to front door design, increase size of lightwell, new windows added at lightwell, new skylight in lightwell, fire rated glass partition added to dining room. | |
| Nov 12, 2024 | Completed final sign-off Jun 2025 | 388 Beale St | units 101-107-ref 202201286896- structural details for spiral stairs at unitDetails
units 101-107-ref 202201286896- structural details for spiral stairs at unit | |
| Oct 8, 2024 | Completed final sign-off Jan 2025 | 1048 Union St | remove asbestos containing stucco from the front of the building and side of the building. repair stucco in kind.Details
remove asbestos containing stucco from the front of the building and side of the building. repair stucco in kind. | $10,000 |
| Sep 30, 2024 | Expired or cancelled cancelled Jun 2026 | 572 Hill St | scope of wok includeds shoring design for pa#: 202208160669Details
scope of wok includeds shoring design for pa#: 202208160669 | $150,000 |
| Sep 4, 2024 | Completed final sign-off Jan 2025 | 1776 Green St | fire only. evac. signage for mulit-family addition building.Details
fire only. evac. signage for mulit-family addition building. | $1,000 |
| Aug 12, 2024 | In progress filed Aug 2024, not yet issued | 2525 Van Ness Av | convert vacant new tenant space to a wine and beer space with golf simulator.Details
convert vacant new tenant space to a wine and beer space with golf simulator. | $75,000 |
| Jul 31, 2024 | In progress issued Mar 2025 | 600 20th St | demolition of existing 9,200 sf commercial bldg, replacement bldg pa# 202110019676Details
demolition of existing 9,200 sf commercial bldg, replacement bldg pa# 202110019676 | $75,000 |
| Jul 29, 2024 | Completed final sign-off Apr 2025 | 1776 Green St | revision to pa#201808016167-s3. addition of a new window to exterior wall.Details
revision to pa#201808016167-s3. addition of a new window to exterior wall. | $1,000 |
| Jun 11, 2024 | In progress issued Jun 2024 | 1776 Green St | rev 201808016167-s3 and ref 202205103860- basement updated to reflect site condition for fire alarm retention tank, electrical room updates, ada bathroom in gym. no structrual elementsDetails
rev 201808016167-s3 and ref 202205103860- basement updated to reflect site condition for fire alarm retention tank, electrical room updates, ada bathroom in gym. no structrual elements | |
| May 22, 2024 | Completed final sign-off Apr 2025 | 1776 Green St | deferred stair submittal for pa# 201808016167 s3.Details
deferred stair submittal for pa# 201808016167 s3. | |
| Mar 12, 2024 | In progress issued May 2024 | 1776 Green St | revision 201808016167- build out garage space for (n) bathroomDetails
revision 201808016167- build out garage space for (n) bathroom | $35,000 |
| Mar 6, 2024 | Completed final sign-off Apr 2025 | 1144 Vallejo St | remove plywood t11 shealting at rear cottage install 9 vinal windows paper and re-side with lap siding and paint new 1x6 window trim.Details
remove plywood t11 shealting at rear cottage install 9 vinal windows paper and re-side with lap siding and paint new 1x6 window trim. | $32,000 |
| Mar 6, 2024 | Completed final sign-off Sep 2024 | 2681 Mcallister St | repair stair steps and stringer on rear stairs. no more than 50% repair in kind.Details
repair stair steps and stringer on rear stairs. no more than 50% repair in kind. | $5,200 |
| Feb 8, 2024 | Completed final sign-off Apr 2025 | 1144 Vallejo St | repair stair hand rails and step. no more than 50% of existing from inspection report guide by deck and balcony inspection inc 8-12-2022Details
repair stair hand rails and step. no more than 50% of existing from inspection report guide by deck and balcony inspection inc 8-12-2022 | $6,000 |
| Nov 27, 2023 | Completed final sign-off Feb 2024 | 2525 Van Ness Av | revision to the issued pa# 201712277456: for administrative purposes only- no work is proposed: occupancy on (e) roof deck and lobby have been corrected as well as occupant loads on private terraces at rear. fire extinguisher locations and furniture layouts provided.Details
revision to the issued pa# 201712277456: for administrative purposes only- no work is proposed: occupancy on (e) roof deck and lobby have been corrected as well as occupant loads on private terraces at rear. fire extinguisher locations and furniture layouts provided. | |
| Oct 5, 2023 | Completed final sign-off Oct 2023 | 34 Steiner St | to obtain final inspection for work approved under pa#201908098403. all work is complete.Details
to obtain final inspection for work approved under pa#201908098403. all work is complete. | |
| Sep 13, 2023 | Completed final sign-off Jun 2025 | 388 Beale St | 4th fl - convert 1700 sf of storage area into an assembly area. area will consist of unfixed seating, tables, games and tvDetails
4th fl - convert 1700 sf of storage area into an assembly area. area will consist of unfixed seating, tables, games and tv | $325,000 |
| Aug 29, 2023 | Never finaled issued Sep 2023, no final | 2407 Larkin St | commencement of work not started under previously approved permit application 201709087338.Details
commencement of work not started under previously approved permit application 201709087338. | $300,000 |
| Aug 9, 2023 | Completed final sign-off Sep 2024 | 2600 Mission St | structure repair to concrete slab above basement under public row sidewalkDetails
structure repair to concrete slab above basement under public row sidewalk | $40,000 |
| Aug 3, 2023 | Completed final sign-off Apr 2025 | 1776 Green St | pid review of storm water control plumbing scope. associate with pa#201808016167Details
pid review of storm water control plumbing scope. associate with pa#201808016167 | |
| May 2, 2023 | Never finaled issued May 2023, no final | 825 De Haro St | structural upgrade of basement/street level w/new steel moment frame, plywood shearwalls, partial foundation upgrade. seismic to comply w/2022 cebc/asce 7-16 standards. no disruption to (e) parking/living spaces.Details
structural upgrade of basement/street level w/new steel moment frame, plywood shearwalls, partial foundation upgrade. seismic to comply w/2022 cebc/asce 7-16 standards. no disruption to (e) parking/living spaces. | $116,000 |
| Apr 3, 2023 | Completed final sign-off May 2025 | 50 Quint St | to comply w/# 202294504 vandalism and tenant improvement to upgrade ada compliant entry and restrooms. no change of use.Details
to comply w/# 202294504 vandalism and tenant improvement to upgrade ada compliant entry and restrooms. no change of use. | $250,000 |
| Mar 23, 2023 | Completed final sign-off Jan 2024 | 1950 Sacramento St | rev to pa# 2022-0516-4277 & 2022-1102-5735: to reflect (e) as-built conditions at ground fl. remodel w/ horizontal expansion to garage space below (e) habitable space & stair within an (e) light wellDetails
rev to pa# 2022-0516-4277 & 2022-1102-5735: to reflect (e) as-built conditions at ground fl. remodel w/ horizontal expansion to garage space below (e) habitable space & stair within an (e) light well | $25,000 |
| Mar 20, 2023 | Completed final sign-off May 2023 | 127 Buchanan St | sheatrock (600 sf) repair new flooring and paint from water leaks from stormDetails
sheatrock (600 sf) repair new flooring and paint from water leaks from storm | $25,000 |
| Jan 12, 2023 | Completed final sign-off Jun 2023 | 2436 Greenwich St | replace stucco at front facade in kind. approx 600 sqftDetails
replace stucco at front facade in kind. approx 600 sqft | $5,000 |
| Nov 14, 2022 | Completed final sign-off Dec 2022 | 2519 Van Ness Av | to remove 2 existing brick fireplaces boxes. non functioning fire place. insulate exteriro and interior walls and 2x4 framing and sheetrockDetails
to remove 2 existing brick fireplaces boxes. non functioning fire place. insulate exteriro and interior walls and 2x4 framing and sheetrock | $6,000 |
| Nov 2, 2022 | Completed final sign-off Jan 2024 | 1950 Sacramento St | new half bath and new utility sink on the first floor.Details
new half bath and new utility sink on the first floor. | $20,000 |
| Sep 1, 2022 | Never finaled issued Sep 2022, no final | 2000 Post St | ground floor: evacuation signage for fire life safetyDetails
ground floor: evacuation signage for fire life safety | $1,500 |
| Aug 26, 2022 | In progress issued Apr 2026 | 2471 Washington St | demolish a 1 story, no basement, detached garageDetails
demolish a 1 story, no basement, detached garage | |
| Aug 16, 2022 | Completed final sign-off Jun 2026 | 572 Hill St | horizontal addition, addition of a garage and interior remodel.Details
horizontal addition, addition of a garage and interior remodel. | $571,845 |
| Aug 10, 2022 | Completed final sign-off Feb 2024 | 2525 Van Ness Av | rev pa201712277456-s2: level 1 ne retail storefront has been revised to accomodate the revised location of pge transformer vault in s/w.gas meter location and retail storefront entry door were flipped in order to maintain clearance requirements for the revised pg&e vault. relocating storefrontDetails
rev pa201712277456-s2: level 1 ne retail storefront has been revised to accomodate the revised location of pge transformer vault in s/w.gas meter location and retail storefront entry door were flipped in order to maintain clearance requirements for the revised pg&e vault. relocating storefront | |
| Aug 5, 2022 | Completed final sign-off Apr 2023 | 1950 Sacramento St | unit #1: remodel (e) kitchen in kind. nov not on this permit.Details
unit #1: remodel (e) kitchen in kind. nov not on this permit. | $10,000 |
| Jul 12, 2022 | Completed final sign-off Apr 2025 | 1776 Green St | shoring related pa 201808016167. install soldier piles & underpinning piers & bracesDetails
shoring related pa 201808016167. install soldier piles & underpinning piers & braces | |
| Jul 8, 2022 | Completed final sign-off Jul 2022 | 1425 Illinois St | recommencement and completion of work approved under pa# 201806010830.Details
recommencement and completion of work approved under pa# 201806010830. | $8,000 |
| Jun 10, 2022 | Completed final sign-off Apr 2023 | 1950 Sacramento St | new roof top deck to unit #5 new ight well in fill at east side light courts. remodel kitchen area at unit 5Details
new roof top deck to unit #5 new ight well in fill at east side light courts. remodel kitchen area at unit 5 | $40,000 |
| May 16, 2022 | Completed final sign-off Apr 2023 | 1950 Sacramento St | to comply with nov# 201989502. revision to soft story pa# 201704143976. remodel existing ground floor level. upgrade (e) substandard foundation at 1/f and garage. modify garage for car parking. provide new egress path. add stairs at (e) light courts for exiting.Details
to comply with nov# 201989502. revision to soft story pa# 201704143976. remodel existing ground floor level. upgrade (e) substandard foundation at 1/f and garage. modify garage for car parking. provide new egress path. add stairs at (e) light courts for exiting. | $120,000 |
| May 10, 2022 | Completed final sign-off Apr 2025 | 1776 Green St | administrative permit to correct use and occupancy under permit 2018-0801-6167 as residential (r-2) and residential parking (s-2) only no commercial use is proposed as approvedDetails
administrative permit to correct use and occupancy under permit 2018-0801-6167 as residential (r-2) and residential parking (s-2) only no commercial use is proposed as approved | |
| Apr 29, 2022 | Completed final sign-off Jul 2022 | 1170 Harrison St | revision to pa 2016-0811-4745 addendum 2 - eliminate hoistway smoke doorsDetails
revision to pa 2016-0811-4745 addendum 2 - eliminate hoistway smoke doors | |
| Apr 14, 2022 | Completed final sign-off Apr 2023 | 1950 Sacramento St | units 1,3,5: remodel of interior three units at front (south side) at 2nd, 3rd, and 4th levels (units 1,3, & 5) remodel 3 baths, add 3 baths. add new partition walls at living to create new bed rooms and remodel extg bed rooms. all interior work only. no exterior work.Details
units 1,3,5: remodel of interior three units at front (south side) at 2nd, 3rd, and 4th levels (units 1,3, & 5) remodel 3 baths, add 3 baths. add new partition walls at living to create new bed rooms and remodel extg bed rooms. all interior work only. no exterior work. | $120,000 |
| Apr 11, 2022 | Completed final sign-off Sep 2022 | 1288 Howard St | installation of an operable gate at each end of the mid-block alley that will be in closed position only from 10pm to 6am daily, (ref pa# 2014-0606-7752s)Details
installation of an operable gate at each end of the mid-block alley that will be in closed position only from 10pm to 6am daily, (ref pa# 2014-0606-7752s) | $5,000 |
| Apr 4, 2022 | Completed final sign-off Dec 2022 | 2148 Union St | replace (3) windows in kind, warranty work, second floor winwods from unit #3. street visible.Details
replace (3) windows in kind, warranty work, second floor winwods from unit #3. street visible. | $8,000 |
| Mar 30, 2022 | Completed final sign-off Apr 2023 | 2436 Greenwich St | remodel (4) kitchens and (4) bathrooms- replace kitchen cabinets, counter tops and fixtures. replace all fixtures, and finish at bathrooms. rewire as required- remove gyp bd for dryrot repair and investigation- replace w/ 5/8 " gyp bd type-x. upgrade extg plumbing.Details
remodel (4) kitchens and (4) bathrooms- replace kitchen cabinets, counter tops and fixtures. replace all fixtures, and finish at bathrooms. rewire as required- remove gyp bd for dryrot repair and investigation- replace w/ 5/8 " gyp bd type-x. upgrade extg plumbing. | $80,000 |
| Feb 25, 2022 | Never finaled issued Aug 2023, no final | 2677 Mcallister St | construct new roof deck. inverted stairs to top floor unit only. provide 5/8" gyp @ ground floor passageway on the interior wall side. provide 60-minute rear doors @ 2nd & 3rd floors. provide 2nd means of egress for roof deck to rear balcony.Details
construct new roof deck. inverted stairs to top floor unit only. provide 5/8" gyp @ ground floor passageway on the interior wall side. provide 60-minute rear doors @ 2nd & 3rd floors. provide 2nd means of egress for roof deck to rear balcony. | $30,000 |
| Feb 15, 2022 | Completed final sign-off May 2023 | 600 20th St | exploritory demolition of sheetrock at property line walls. two-four feet above foundation for dry-rot damage at property walls. approx 200-600 sq ft total area- less than 33% removal.Details
exploritory demolition of sheetrock at property line walls. two-four feet above foundation for dry-rot damage at property walls. approx 200-600 sq ft total area- less than 33% removal. | $2,000 |
| Feb 11, 2022 | Completed final sign-off May 2023 | 600 20th St | remove non-structural partitions from t.i. build out. per ab-017Details
remove non-structural partitions from t.i. build out. per ab-017 | $15,000 |
| Jan 28, 2022 | Completed final sign-off Jun 2025 | 388 Beale St | change of use - retail to apartments. add 7 units w/ 4 mezz units & (3) 2-story units. 7 units are studios and 1-two bedrm. (n) units are added within envelope at ground level. retain (e) openings, replace (e) storefront glazing w/ new, keep (e) design intent.Details
change of use - retail to apartments. add 7 units w/ 4 mezz units & (3) 2-story units. 7 units are studios and 1-two bedrm. (n) units are added within envelope at ground level. retain (e) openings, replace (e) storefront glazing w/ new, keep (e) design intent. | $2,661,221 |
| Jan 19, 2022 | Completed final sign-off Jun 2023 | 2436 Greenwich St | addition of one adu unit at the ground floor under the local adu program.Details
addition of one adu unit at the ground floor under the local adu program. | $50,000 |
| Dec 20, 2021 | Completed final sign-off Mar 2022 | 3747 Jackson St | kitchen renovation. add 1 sink, 1 dishwasher, and 1 pendant light fixture.Details
kitchen renovation. add 1 sink, 1 dishwasher, and 1 pendant light fixture. | $5,000 |
| Oct 1, 2021 | In progress issued Mar 2025 | 600 20th St | to construct a 5-story, type 1b, mixed use building with office/lab use at levels 1-4 and a residential dwelling unit at level 5. **comply w/ maher ord# 155-13, route to dph**Details
to construct a 5-story, type 1b, mixed use building with office/lab use at levels 1-4 and a residential dwelling unit at level 5. **comply w/ maher ord# 155-13, route to dph** | $4,668,513 |
| Sep 27, 2021 | Completed final sign-off Nov 2023 | 2525 Van Ness Av | tower crane safety plan per ab-023. freestanding tower crane to be erected & used for approx 8 months & dismantled afterward. 20ft tower crane mast section to be installed in base prior to main erection. main erection will take place over 2 days. mast & jib installed together. ref pa# 201712277456.Details
tower crane safety plan per ab-023. freestanding tower crane to be erected & used for approx 8 months & dismantled afterward. 20ft tower crane mast section to be installed in base prior to main erection. main erection will take place over 2 days. mast & jib installed together. ref pa# 201712277456. | $582,707 |
| Sep 10, 2021 | Expired or cancelled expired May 2025 | 239 Ordway St | revision to rear retaining walls @ rear yard of new construction, extension of 18' toward rear property line. ref bpa#201605258264Details
revision to rear retaining walls @ rear yard of new construction, extension of 18' toward rear property line. ref bpa#201605258264 | $8,000 |
| Aug 6, 2021 | In progress issued Jun 2025 | 2407 Larkin St | (n) 1082 sf roof deck over existing garageDetails
(n) 1082 sf roof deck over existing garage | $12,000 |
| Aug 5, 2021 | Completed final sign-off Jan 2022 | 338 Duncan St | to correct record from last issued permit pa 2020-1020-6986 reflected as 4 stories, should be 3 stories. to reflect as built condidions. add fire pit and bbq at roof. add bbq at lower patio & provide stair from rear yard to 2nd story balconyDetails
to correct record from last issued permit pa 2020-1020-6986 reflected as 4 stories, should be 3 stories. to reflect as built condidions. add fire pit and bbq at roof. add bbq at lower patio & provide stair from rear yard to 2nd story balcony | $14,000 |
| May 3, 2021 | Expired or cancelled withdrawn Apr 2025 | 1140 Vallejo St | rear building/cottage/1144 vallejo: replace in-kind (e) rear exterior stairs & deck. repair & structural strengthening of (e) enclosed porch. replace (e) siding in-kind at rear.Details
rear building/cottage/1144 vallejo: replace in-kind (e) rear exterior stairs & deck. repair & structural strengthening of (e) enclosed porch. replace (e) siding in-kind at rear. | $35,000 |
| Apr 20, 2021 | Completed final sign-off May 2022 | 42 Otis St | alteration to the approved s-2 architectural addendum for pa #201703302802-s2 - updated kitchen layouts in all units on the floor plans and reflected ceiling plans to match the s-3 mep drawing. add access hatch and hatch-detail to the elevator shaft & a letter from schindler, elevator subcontractorDetails
alteration to the approved s-2 architectural addendum for pa #201703302802-s2 - updated kitchen layouts in all units on the floor plans and reflected ceiling plans to match the s-3 mep drawing. add access hatch and hatch-detail to the elevator shaft & a letter from schindler, elevator subcontractor | |
| Dec 17, 2020 | Completed final sign-off Jun 2022 | 1298 Howard St | underground fire service piping for new construction pa # 2014-0606-7752 s.Details
underground fire service piping for new construction pa # 2014-0606-7752 s. | |
| Dec 16, 2020 | Expired or cancelled expired May 2025 | 239 Ordway St | re 2016-0525-8264 test piers and temporary grading for site access rampDetails
re 2016-0525-8264 test piers and temporary grading for site access ramp | |
| Jul 28, 2020 | Completed final sign-off Dec 2021 | 34 Steiner St | dryrock repair,remove stucco on herman street property line wall, remove damage framing & mudsill. re-sheet with plywood & restucco in kind, 60 feet long(not visible from stree)Details
dryrock repair,remove stucco on herman street property line wall, remove damage framing & mudsill. re-sheet with plywood & restucco in kind, 60 feet long(not visible from stree) | $35,000 |
| Jul 28, 2020 | Completed final sign-off Oct 2020 | 2964 Pine St | replace (e) kitchen, cabinet & countertops in kind.no changes to (e) petition. install new bath tub, retile bath tub & surrounding area & floor. install new bathroom vanity in existing location.Details
replace (e) kitchen, cabinet & countertops in kind.no changes to (e) petition. install new bath tub, retile bath tub & surrounding area & floor. install new bathroom vanity in existing location. | $30,000 |
| Jun 20, 2020 | Completed final sign-off Sep 2022 | 1298 Howard St | revision to issued pa# 201406067752-s2 (arch/mech); provide ventilation for corridors, community spaces, residential units & storage rooms, provide variable-speed parking garage ventilation with co-sensor countrols, provide ducted heating & cooling for all residential units. ** maher: n/a **Details
revision to issued pa# 201406067752-s2 (arch/mech); provide ventilation for corridors, community spaces, residential units & storage rooms, provide variable-speed parking garage ventilation with co-sensor countrols, provide ducted heating & cooling for all residential units. ** maher: n/a ** | $300,000 |
| Feb 26, 2020 | Completed final sign-off Nov 2023 | 2525 Van Ness Av | install temporary shoring & underpinning along property lines to allow excavation for new construction pa #2017-1227-7456 s.Details
install temporary shoring & underpinning along property lines to allow excavation for new construction pa #2017-1227-7456 s. | $400,000 |
| Jan 23, 2020 | Completed final sign-off Feb 2021 | 1184 Harrison St | permeation & grouting along eastern property line.Details
permeation & grouting along eastern property line. | |
| Dec 31, 2019 | Completed final sign-off Jul 2020 | 3620 Cesar Chavez St | first time ti - trade office. new mechanical, electrical, service counter, toilet and storefront under bldg permit.Details
first time ti - trade office. new mechanical, electrical, service counter, toilet and storefront under bldg permit. | $30,000 |
| Oct 29, 2019 | Completed final sign-off Dec 2021 | 34 Steiner St | revision to 201908098403 grade beams in lieu of concrete mat at approved adu wall locationsDetails
revision to 201908098403 grade beams in lieu of concrete mat at approved adu wall locations | $50,000 |
| Sep 12, 2019 | Completed final sign-off Dec 2021 | 34 Steiner St | (3) new accessory dwelling units (adu) in the (e) basement space for a total of (12) units per ord no. 162-16. (previous alteration of units w/ an additional (1) unit on each (e) floors 2 & 3 under separate bpa #2018-0912-9872.)Details
(3) new accessory dwelling units (adu) in the (e) basement space for a total of (12) units per ord no. 162-16. (previous alteration of units w/ an additional (1) unit on each (e) floors 2 & 3 under separate bpa #2018-0912-9872.) | $300,000 |
| Jun 3, 2019 | Completed final sign-off Jun 2023 | 2000 Post St | add units per ord 162-16. at existing garage, grade level, removal of parking stalls and addition 15 adu's.Details
add units per ord 162-16. at existing garage, grade level, removal of parking stalls and addition 15 adu's. | $3,500,000 |
| May 30, 2019 | Completed final sign-off Jul 2022 | 1170 Harrison St | demo grading excavation & shoring, demo of (e) concrete fl. slab & (e) interior partitions, excavation shoring of adjacent building & (e) structure in preparaton for structural workDetails
demo grading excavation & shoring, demo of (e) concrete fl. slab & (e) interior partitions, excavation shoring of adjacent building & (e) structure in preparaton for structural work | $500,000 |
| May 21, 2019 | Never finaled issued May 2019, no final | 2286 Jackson St | apt#8 remove kitchen cabinets & replace with new cabinets & countertop & full kitchen remodel. n/a for maher.Details
apt#8 remove kitchen cabinets & replace with new cabinets & countertop & full kitchen remodel. n/a for maher. | $20,000 |
| Apr 25, 2019 | Expired or cancelled cancelled Jan 2026 | 901 Tennessee St | revision to pa 20160428599053. rain water treatment systemDetails
revision to pa 20160428599053. rain water treatment system | $15,000 |
| Apr 25, 2019 | Never finaled issued May 2019, no final | 901 Tennessee St | revision to pa 201604285990 s4. for installing fire alarm system and elev landing two-way communication systemDetails
revision to pa 201604285990 s4. for installing fire alarm system and elev landing two-way communication system | |
| Mar 29, 2019 | Never finaled issued Apr 2019, no final | 901 Tennessee St | rev to pa201604285990: add elevator lobby 2-hr rated with 90min. rated door & removal of hoistway smoke door. reconfiguration of f/a alarm control room. adding 2-hr rated assembly.Details
rev to pa201604285990: add elevator lobby 2-hr rated with 90min. rated door & removal of hoistway smoke door. reconfiguration of f/a alarm control room. adding 2-hr rated assembly. | $5,000 |
| Feb 12, 2019 | Completed final sign-off Jul 2021 | 865 Duncan St | comply w/ nov #2019-19065 to legalize unit per ord #43-14 at (e) detached structure at rear currently used as illegal dwelling. remodel of storage structure w/ bath, utility sink counter approved under pa #2012-0611-2316.Details
comply w/ nov #2019-19065 to legalize unit per ord #43-14 at (e) detached structure at rear currently used as illegal dwelling. remodel of storage structure w/ bath, utility sink counter approved under pa #2012-0611-2316. | $300 |
| Nov 15, 2018 | Completed final sign-off Jan 2022 | 338 Duncan St | revision to 201607182651. modify floor plan at lower level. remove basement level as approved, remove additional parking space- one car garage. provide sliding roof hatch for roof accessDetails
revision to 201607182651. modify floor plan at lower level. remove basement level as approved, remove additional parking space- one car garage. provide sliding roof hatch for roof access | |
| Nov 9, 2018 | Never finaled issued Nov 2018, no final | 2677 Mcallister St | street spaceDetails
street space | |
| Nov 9, 2018 | Never finaled issued Nov 2018, no final | 3620 Cesar Chavez St | street spaceDetails
street space | |
| Nov 5, 2018 | Never finaled issued Dec 2018, no final | 901 Tennessee St | storm water drainage.Details
storm water drainage. | $12,000 |
| Oct 17, 2018 | Completed final sign-off Apr 2019 | 901 Tennessee St | revision to 201604285990. change of cladding material on south facade from cement plaster to cement panelsDetails
revision to 201604285990. change of cladding material on south facade from cement plaster to cement panels | $28,000 |
| Oct 9, 2018 | Completed final sign-off Aug 2020 | 338 Duncan St | revision to app#201607182651. new sidewalk encroachment for driveway entrance.no other work 20% landscape and 50% permeable surface.Details
revision to app#201607182651. new sidewalk encroachment for driveway entrance.no other work 20% landscape and 50% permeable surface. | |
| Sep 12, 2018 | Completed final sign-off Dec 2021 | 34 Steiner St | internal renovation of 3 story residential structure to add 2 dwelling units within (e)envelope & allowable density(not adu's). new roof deck w/ no bldg expansion for open space for new dwelling units. remodel front facade & steps. remove(e)stair penthouse on roof. basemet to be excavate for storageDetails
internal renovation of 3 story residential structure to add 2 dwelling units within (e)envelope & allowable density(not adu's). new roof deck w/ no bldg expansion for open space for new dwelling units. remodel front facade & steps. remove(e)stair penthouse on roof. basemet to be excavate for storage | $1,600,000 |
| Sep 5, 2018 | Completed final sign-off Apr 2019 | 2677 Mcallister St | fill in (e) 1st floor porch. interior remodel of flats - including 3 kitchens, 3 bathrooms and 3 brand new baths, partial seismic stregthening at rear of building.Details
fill in (e) 1st floor porch. interior remodel of flats - including 3 kitchens, 3 bathrooms and 3 brand new baths, partial seismic stregthening at rear of building. | $50,000 |
| Aug 23, 2018 | Completed final sign-off Feb 2024 | 2525 Van Ness Av | to demolish 2-story commercial building. ** maher: n/a **Details
to demolish 2-story commercial building. ** maher: n/a ** | $105,000 |
| Aug 1, 2018 | Completed final sign-off Apr 2025 | 1776 Green St | proposal is to maintain (e) garage walls & construct (5) (n) residential units within (e) structure & in a two-story vertical addition. (1) neighborhood serving commercial space will be @ the ground flr. **comply w/ maher ord, kto dph**Details
proposal is to maintain (e) garage walls & construct (5) (n) residential units within (e) structure & in a two-story vertical addition. (1) neighborhood serving commercial space will be @ the ground flr. **comply w/ maher ord, kto dph** | $2,900,000 |
| Jun 14, 2018 | Completed final sign-off Jan 2019 | 1117 Ocean Av | unit 309: r/r kitchen cbinets and countertops. r/r bathroom tileat 2 bathrooms. no mod of walls or layout.Details
unit 309: r/r kitchen cbinets and countertops. r/r bathroom tileat 2 bathrooms. no mod of walls or layout. | $35,000 |
| Jun 14, 2018 | Completed final sign-off Jan 2019 | 1117 Ocean Av | unit 305: r/r kitchen cbinets and countertops. r/r bathroom tileat 2 bathrooms. no mod of walls or layout.Details
unit 305: r/r kitchen cbinets and countertops. r/r bathroom tileat 2 bathrooms. no mod of walls or layout. | $35,000 |