Permit GraphShortlistSan Francisco building permits since 2000

Block 3516, lot 001

1501 Howard St

City’s use
Industrial
Built
1962
Stories
2
Building
7,905 sq ft
Lot
5,883 sq ft
Zoning
SLR
Construction type
C

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

17 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 10, 2026In progress
issued Nov 2026
1501 Howard Stti mechanical upgrade. mechanical unit support structural work, electrical upgrade ref pa 202609178282
Details
Permit
202611100601
Permit issued
Nov 10, 2026

ti mechanical upgrade. mechanical unit support structural work, electrical upgrade ref pa 202609178282

Open the permit page

$95,000
Oct 29, 2026In progress
issued Nov 2026
1501 Howard Stroof diaphragm stiffening work to include adding connector from wall to diaphragm, upgrade nailing of plywood, adding straps to have continuious collectors. ada upgrades under previous pa# 202609178282
Details
Permit
202610290093
Permit issued
Nov 10, 2026

roof diaphragm stiffening work to include adding connector from wall to diaphragm, upgrade nailing of plywood, adding straps to have continuious collectors. ada upgrades under previous pa# 202609178282

Open the permit page

$30,000
Sep 17, 2026In progress
issued Oct 2026
1501 Howard Sttenant improvement(ti). remodel of existing 1st floor, bathroom & kitchen to ada. relocation & remodel of bathroom & kitchentte on 2nd floor. relocation of stairs from 1st floor to 2nd floor(interior). replacement of 7 windows w/ aluminum & 1 door.
Details
Permit
202609178282
Permit issued
Oct 20, 2026

tenant improvement(ti). remodel of existing 1st floor, bathroom & kitchen to ada. relocation & remodel of bathroom & kitchentte on 2nd floor. relocation of stairs from 1st floor to 2nd floor(interior). replacement of 7 windows w/ aluminum & 1 door.

Open the permit page

$150,000
May 13, 2026In progress
issued May 2026
1501 Howard StAchill Beg Construction Incdemolition of minor interior non structural partitions from existing tenant improvement. no build out or change of use for future t.i.
Details
Permit
202605131209
Permit issued
May 13, 2026

demolition of minor interior non structural partitions from existing tenant improvement. no build out or change of use for future t.i.

Open the permit page

$10,000
Dec 15, 2025Completed
final sign-off Apr 2026
1501 Howard StRegan Constructionto comply with nov 2025-46552 to remove 1/fl non structural infill partitions, remove dropped ceiling, remove illegally installed hvac system, return space back to its pre-illegal construction condition.
Details
Permit
202512151828
Permit issued
Dec 18, 2025
Final sign-off
Apr 8, 2026

to comply with nov 2025-46552 to remove 1/fl non structural infill partitions, remove dropped ceiling, remove illegally installed hvac system, return space back to its pre-illegal construction condition.

Open the permit page

$15,000
Oct 17, 2018Completed
final sign-off Nov 2019
1501 Howard Streplace extg garage door. n/a for maher
Details
Permit
201810173485
Permit issued
Dec 6, 2018
Final sign-off
Nov 15, 2019

replace extg garage door. n/a for maher

Open the permit page

$14,000
Aug 1, 2018Never finaled
issued Mar 2019, no final
210 11th Stpaint, flooring, door hardware & interior signage. change of use from restaurant to catering.
Details
Permit
201808016158
Permit issued
Mar 19, 2019

paint, flooring, door hardware & interior signage. change of use from restaurant to catering.

Open the permit page

$4,000
Mar 4, 2016Completed
final sign-off Mar 2016
210 11th Stnon electric wall single faced sign. n/a maher ord. 155-13
Details
Permit
201603041225
Permit issued
Mar 4, 2016
Final sign-off
Mar 30, 2016

non electric wall single faced sign. n/a maher ord. 155-13

Open the permit page

$500
Aug 5, 2014Expired or cancelled
cancelled Mar 2017
210 11th StDon Meyersto erect non-electric, wall, single faced sign. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201408053015

to erect non-electric, wall, single faced sign. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$2,100
Aug 4, 2014Expired or cancelled
cancelled Mar 2017
1501 Howard StDon Meyersto erect non-electric, wall, single faced sign. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201408042952

to erect non-electric, wall, single faced sign. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$2,100
Nov 19, 2010Completed
final sign-off Mar 2011
210 11th StAir Perfection Heating & Air Conditioninstallation of new heat pumps. reference to p.a. 2010 0415 0352
Details
Permit
201011195316
Permit issued
Feb 16, 2011
Final sign-off
Mar 11, 2011

installation of new heat pumps. reference to p.a. 2010 0415 0352

Open the permit page

$3,000
Sep 10, 2010Completed
final sign-off Mar 2011
210 11th StAir Perfection Heating & Air Conditionrevision to pa#201004150352; add mechanical info including title 24 and oven 'natural draft' verification (no hood required) by mechanical engineer
Details
Permit
201009100588
Permit issued
Feb 16, 2011
Final sign-off
Mar 21, 2011

revision to pa#201004150352; add mechanical info including title 24 and oven 'natural draft' verification (no hood required) by mechanical engineer

Open the permit page

Jul 19, 2010Never finaled
issued Jul 2010, no final
210 11th Stadd new address to eleventh street side of building. existing address: 1501 howard street.
Details
Permit
M211766
Permit issued
Jul 19, 2010

add new address to eleventh street side of building. existing address: 1501 howard street.

Open the permit page

Jun 14, 2010Never finaled
issued Jun 2010, no final
1501 Howard Ststreet space and mta
Details
Permit
M206506
Permit issued
Jun 14, 2010

street space and mta

Open the permit page

Apr 16, 2010Never finaled
issued Apr 2010, no final
1501 Howard Stminor non-structural interior demolition; all work to be in compliance with sfbc ab-017
Details
Permit
201004160434
Permit issued
Apr 19, 2010

minor non-structural interior demolition; all work to be in compliance with sfbc ab-017

Open the permit page

$2,000
Apr 15, 2010Completed
final sign-off Mar 2011
210 11th StNorth Gate Builders Incconvert (e) vacant light industrial space to restaurant. new drywall partitions, accessible restrooms, finishes. note: mep on separate permits. 7/19/2010 assigned correct address to new entrance of 210 11th st
Details
Permit
201004150352
Permit issued
Jul 26, 2010
Final sign-off
Mar 21, 2011

convert (e) vacant light industrial space to restaurant. new drywall partitions, accessible restrooms, finishes. note: mep on separate permits. 7/19/2010 assigned correct address to new entrance of 210 11th st

Open the permit page

$120,000
Oct 16, 2003Expired or cancelled
expired Jan 2006
1501 Howard StDon Meyerserect sign
Details
Permit
200310167592
Permit issued
Oct 16, 2003

erect sign

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Don Meyers (3), Air Perfection Heating & Air Condition (2), Achill Beg Construction Inc, North Gate Builders Inc, Regan Construction
Architects
Michael Pitler (3), Alan Wright, Marvin Armsdrong, Roberto Quintanar
Engineers
Albert Urrutia (2), Dustin Muhn, Siu K Lee

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.