Block 3516, lot 001
1501 Howard St
- City’s use
- Industrial
- Built
- 1962
- Stories
- 2
- Building
- 7,905 sq ft
- Lot
- 5,883 sq ft
- Zoning
- SLR
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 1501 Howard St | tenant improvement(ti). remodel of existing 1st floor, bathroom & kitchen to ada. relocation & remodel of bathroom & kitchentte on 2nd floor. relocation of strairs from 1st floor to 2nd floor(interior)Details
tenant improvement(ti). remodel of existing 1st floor, bathroom & kitchen to ada. relocation & remodel of bathroom & kitchentte on 2nd floor. relocation of strairs from 1st floor to 2nd floor(interior) | $150,000 | |
| May 13, 2026 | In progress issued May 2026 | 1501 Howard St | Achill Beg Construction Inc | demolition of minor interior non structural partitions from existing tenant improvement. no build out or change of use for future t.i.Details
demolition of minor interior non structural partitions from existing tenant improvement. no build out or change of use for future t.i. | $10,000 |
| Dec 15, 2025 | Completed final sign-off Apr 2026 | 1501 Howard St | Regan Construction | to comply with nov 2025-46552 to remove 1/fl non structural infill partitions, remove dropped ceiling, remove illegally installed hvac system, return space back to its pre-illegal construction condition.Details
to comply with nov 2025-46552 to remove 1/fl non structural infill partitions, remove dropped ceiling, remove illegally installed hvac system, return space back to its pre-illegal construction condition. | $15,000 |
| Oct 17, 2018 | Completed final sign-off Nov 2019 | 1501 Howard St | replace extg garage door. n/a for maherDetails
replace extg garage door. n/a for maher | $14,000 | |
| Aug 1, 2018 | Never finaled issued Mar 2019, no final | 210 11th St | paint, flooring, door hardware & interior signage. change of use from restaurant to catering.Details
paint, flooring, door hardware & interior signage. change of use from restaurant to catering. | $4,000 | |
| Mar 4, 2016 | Completed final sign-off Mar 2016 | 210 11th St | non electric wall single faced sign. n/a maher ord. 155-13Details
non electric wall single faced sign. n/a maher ord. 155-13 | $500 | |
| Aug 5, 2014 | Expired or cancelled cancelled Mar 2017 | 210 11th St | Don Meyers | to erect non-electric, wall, single faced sign. ** maher: compliance with ordinance no# 155-13 not required **Details
to erect non-electric, wall, single faced sign. ** maher: compliance with ordinance no# 155-13 not required ** | $2,100 |
| Aug 4, 2014 | Expired or cancelled cancelled Mar 2017 | 1501 Howard St | Don Meyers | to erect non-electric, wall, single faced sign. ** maher: compliance with ordinance no# 155-13 not required **Details
to erect non-electric, wall, single faced sign. ** maher: compliance with ordinance no# 155-13 not required ** | $2,100 |
| Nov 19, 2010 | Completed final sign-off Mar 2011 | 210 11th St | Air Perfection Heating & Air Condition | installation of new heat pumps. reference to p.a. 2010 0415 0352Details
installation of new heat pumps. reference to p.a. 2010 0415 0352 | $3,000 |
| Sep 10, 2010 | Completed final sign-off Mar 2011 | 210 11th St | Air Perfection Heating & Air Condition | revision to pa#201004150352; add mechanical info including title 24 and oven 'natural draft' verification (no hood required) by mechanical engineerDetails
revision to pa#201004150352; add mechanical info including title 24 and oven 'natural draft' verification (no hood required) by mechanical engineer | |
| Jul 19, 2010 | Never finaled issued Jul 2010, no final | 210 11th St | add new address to eleventh street side of building. existing address: 1501 howard street.Details
add new address to eleventh street side of building. existing address: 1501 howard street. | ||
| Jun 14, 2010 | Never finaled issued Jun 2010, no final | 1501 Howard St | street space and mtaDetails
street space and mta | ||
| Apr 16, 2010 | Never finaled issued Apr 2010, no final | 1501 Howard St | minor non-structural interior demolition; all work to be in compliance with sfbc ab-017Details
minor non-structural interior demolition; all work to be in compliance with sfbc ab-017 | $2,000 | |
| Apr 15, 2010 | Completed final sign-off Mar 2011 | 210 11th St | North Gate Builders Inc | convert (e) vacant light industrial space to restaurant. new drywall partitions, accessible restrooms, finishes. note: mep on separate permits. 7/19/2010 assigned correct address to new entrance of 210 11th stDetails
convert (e) vacant light industrial space to restaurant. new drywall partitions, accessible restrooms, finishes. note: mep on separate permits. 7/19/2010 assigned correct address to new entrance of 210 11th st | $120,000 |
| Oct 16, 2003 | Expired or cancelled expired Jan 2006 | 1501 Howard St | Don Meyers | erect signDetails
erect sign |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Don Meyers (3), Air Perfection Heating & Air Condition (2), Achill Beg Construction Inc, North Gate Builders Inc, Regan Construction
- Architects
- Mike Pitler (2), Alan Wright, Marvin Armsdrong, Roberto Quintanar
- Engineers
- Dustin Muhn
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.