Siu K Lee
- Listed as
- engineer
- Firm
- Mhc Engineers
- Based in
- San Francisco
- On San Francisco permits
- Aug 2008 to Sep 2026
14 permits since 2000 (engineer on 14 permits): 2 completed, 11 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 563 02nd St | convert existing restaurant and brewery into office. demo kitchen and alteration of mechanical systems. lighting and controls. new water heater to comply with t24 energy standards. existing restrooms to remain.Details
convert existing restaurant and brewery into office. demo kitchen and alteration of mechanical systems. lighting and controls. new water heater to comply with t24 energy standards. existing restrooms to remain. | $100,000 | |
| Sep 11, 2026 | In progress issued Sep 2026 | 98 Battery St | Modern Construction Inc | add mechanical t24 to pa: 2026.0812.6428Details
add mechanical t24 to pa: 2026.0812.6428 | |
| Aug 25, 2026 | In progress issued Aug 2026 | 2077 Market St | E J G A | mep drawing set. main architectural design build ref pa 202606304322. interior tenant improvement for 2 new office room and 1 storage room and 1 sinkDetails
mep drawing set. main architectural design build ref pa 202606304322. interior tenant improvement for 2 new office room and 1 storage room and 1 sink | $85,000 |
| Aug 24, 2026 | In progress issued Sep 2026 | 259 Post St | Schmitt Heating Co Inc | installation of heat pump, refrigerant piping, fan coil unit, and ducting serving 2nd fl break room.Details
installation of heat pump, refrigerant piping, fan coil unit, and ducting serving 2nd fl break room. | $30,000 |
| Aug 21, 2026 | In progress filed Aug 2026, not yet issued | 2165 Lombard St | Gotham Bay Construction | repair at interior due to fire. scope includes replacement at all interior finishes, furnishings, light fixtures, kitchen equipment, plumbing fixtures. all damaged by the fire as well as structural and accessibility upgrades current codesDetails
repair at interior due to fire. scope includes replacement at all interior finishes, furnishings, light fixtures, kitchen equipment, plumbing fixtures. all damaged by the fire as well as structural and accessibility upgrades current codes | $570,000 |
| Aug 18, 2026 | In progress issued Sep 2026 | 2675 Geary Bl | Clune Construction Company L P | core and shell work to suite c-2. work includes replacement of hvac equipment, providing accessible restroom and new water connection.Details
core and shell work to suite c-2. work includes replacement of hvac equipment, providing accessible restroom and new water connection. | $46,000 |
| Jul 31, 2026 | In progress issued Aug 2026 | 555 Fulton St | I E General Const Inc | meps for permit 2025122928895 for suite bDetails
meps for permit 2025122928895 for suite b | $250,000 |
| Jul 29, 2026 | In progress filed Jul 2026, not yet issued | 563 02nd St | Kells Construction Inc. | renewal of pa 9912819 (ref 202603238054) for inpsection of as-built conditions reviewd, approved and inspected. this permit covers m.e.p work constructed w/o approval, to complete core & shell work to an (e) restaurant & brewery. food service spaces are not part of this permit.Details
renewal of pa 9912819 (ref 202603238054) for inpsection of as-built conditions reviewd, approved and inspected. this permit covers m.e.p work constructed w/o approval, to complete core & shell work to an (e) restaurant & brewery. food service spaces are not part of this permit. | |
| Jul 21, 2026 | In progress filed Jul 2026, not yet issued | 355 17th Av | Y W Builders Inc. | interior & exterior improvements to 3 story + basement. 3 bed, 3 bath sfh. proposed home is 3 story + basement, 3 bed, 4 bath, 1 half bath. no front facade improvements are proposed. 3rd floor 162 sf primary suite bathroom & closet addition is proposed as a rear vertical addition within (e) buildingDetails
interior & exterior improvements to 3 story + basement. 3 bed, 3 bath sfh. proposed home is 3 story + basement, 3 bed, 4 bath, 1 half bath. no front facade improvements are proposed. 3rd floor 162 sf primary suite bathroom & closet addition is proposed as a rear vertical addition within (e) building | $300,000 |
| Jun 26, 2026 | In progress issued Jul 2026 | 1196 Pacific Av | Big Dave's Construction Inc | supply air fan with merv-13 filters. provide new transfer fans to bring conditioned air with mixed outside air into new office and storage room. provide new all in one heatpump fan coil for space conditioned spaceDetails
supply air fan with merv-13 filters. provide new transfer fans to bring conditioned air with mixed outside air into new office and storage room. provide new all in one heatpump fan coil for space conditioned space | $15,000 |
| Jun 2, 2026 | In progress filed Jun 2026, not yet issued | 434 Ellis St | interior remodel of (e) childcare space: modification of (e) non bearing walls, (n) ff&e, (n) lighting on higlighted area on 1st and 2nd floor. accesibility upgrades serving area of work. (n) play area equipment and fininshes upgrades on roof. no changes to bldg use or occupancy. legalizing garage..Details
interior remodel of (e) childcare space: modification of (e) non bearing walls, (n) ff&e, (n) lighting on higlighted area on 1st and 2nd floor. accesibility upgrades serving area of work. (n) play area equipment and fininshes upgrades on roof. no changes to bldg use or occupancy. legalizing garage.. | $350,000 | |
| Oct 23, 2009 | Completed final sign-off Dec 2009 | 135 Cook St | E - 5 Construction Inc | revision to application 200812017539. add sprinkler head to cover windows at property line.Details
revision to application 200812017539. add sprinkler head to cover windows at property line. | $800 |
| Dec 1, 2008 | Completed final sign-off Dec 2009 | 135 Cook St | revision to 200808159248. revise fire sprinkler system to add wetted stand pipeDetails
revision to 200808159248. revise fire sprinkler system to add wetted stand pipe | $1,000 | |
| Aug 15, 2008 | Expired or cancelled expired Dec 2009 | 135 Cook St | install new fire sprinkler system for entire bldg.Details
install new fire sprinkler system for entire bldg. | $16,000 |