Asheshh Saheba
- Listed as
- architect
- Firm
- Steinberg Hart
- Based in
- San Francisco
- On San Francisco permits
- Feb 2011 to Sep 2026
18 permits since 2000 (architect on 18 permits): 6 completed, 6 in progress, 6 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 3700 California St | b2: construction of a new 8 story over 3 basement, type i-a, residential - mixed use building with 36 residential dwelling units.Details
b2: construction of a new 8 story over 3 basement, type i-a, residential - mixed use building with 36 residential dwelling units. | $93,000,000 | |
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 3700 California St | b1: construction of a new 8 story over 3 basement, type i-a, residential - mixed use building with 214 residential dwelling units.Details
b1: construction of a new 8 story over 3 basement, type i-a, residential - mixed use building with 214 residential dwelling units. | $93,000,000 | |
| Sep 24, 2026 | In progress issued Oct 2026 | 98 Battery St | Modern Construction Inc | revision 3 to pa 202510298348: outside protal material cladding change new framing added at the exterior in order to support sheet metal. existing to be removedDetails
revision 3 to pa 202510298348: outside protal material cladding change new framing added at the exterior in order to support sheet metal. existing to be removed | |
| Sep 11, 2026 | In progress issued Sep 2026 | 98 Battery St | Modern Construction Inc | add mechanical t24 to pa: 2026.0812.6428Details
add mechanical t24 to pa: 2026.0812.6428 | |
| Aug 12, 2026 | In progress issued Aug 2026 | 98 Battery St | Modern Construction Inc | revise pa#2025-1029-8348 to document actual field conditions, no material changes to project or construction scope.Details
revise pa#2025-1029-8348 to document actual field conditions, no material changes to project or construction scope. | $60,000 |
| Oct 29, 2025 | In progress issued Jan 2026 | 98 Battery St | Modern Construction Inc | single story non-structural commercial t.i. project entry finishes, storefront, and exterior lighting to be replaced in kind. interior finishes and lighting to be replaced. no structural work. ref. permit 201912119260Details
single story non-structural commercial t.i. project entry finishes, storefront, and exterior lighting to be replaced in kind. interior finishes and lighting to be replaced. no structural work. ref. permit 201912119260 | $60,000 |
| Dec 30, 2019 | Completed final sign-off Jul 2021 | 50 08th St | change of use. hotel offices to exercise rooms at 4/fl. provide structural strengthening at slabs and beams. seperate applications for mep & fire life safety.Details
change of use. hotel offices to exercise rooms at 4/fl. provide structural strengthening at slabs and beams. seperate applications for mep & fire life safety. | $20,000 | |
| Dec 17, 2019 | Never finaled issued Jun 2020, no final | 4101 03rd St | to erect a 5-story, type 1a/3a, mixed use bldg w/ 32 residential units and 1 basement.**comply w/ maher ord# 155-13, route to health**Details
to erect a 5-story, type 1a/3a, mixed use bldg w/ 32 residential units and 1 basement.**comply w/ maher ord# 155-13, route to health** | $7,000,000 | |
| May 24, 2019 | Never finaled issued Jun 2019, no final | 50 08th St | Angotti & Reilly Inc. | remodel interior. construction non structural wall. convert (e) hotel suite to 2 hotel guestrooms. remodel (e) guestrooms & bathrooms. revision to 201904238756Details
remodel interior. construction non structural wall. convert (e) hotel suite to 2 hotel guestrooms. remodel (e) guestrooms & bathrooms. revision to 201904238756 | $50,000 |
| Apr 23, 2019 | Completed final sign-off Sep 2021 | 50 08th St | Angotti & Reilly Inc. | construct glass door entry to 2 offices located on 4th fl. of an (e) tourist hotel, non structural demo of interior wall rev. to 2019 0228 4112Details
construct glass door entry to 2 offices located on 4th fl. of an (e) tourist hotel, non structural demo of interior wall rev. to 2019 0228 4112 | $50,000 |
| Feb 28, 2019 | Completed final sign-off Sep 2021 | 50 08th St | Cahill Contractors Llc., Angotti & Reilly Inc. | 4/f: demolish interior non-structural partitions, construct egress doors, infill swimming poool w/structural foam (eps). remove & replace pool tile trim, remove pool equipment install 1 tree, install irrigation system. under separate permit mep & fire safetyDetails
4/f: demolish interior non-structural partitions, construct egress doors, infill swimming poool w/structural foam (eps). remove & replace pool tile trim, remove pool equipment install 1 tree, install irrigation system. under separate permit mep & fire safety | $50,000 |
| Aug 29, 2018 | Completed final sign-off May 2019 | 135 Main St | Charles Pankow Builders Ltd | demo/removing of all interior non-bearing walls and partial removal of drop ceiling. no electrical or plumbing work under this permit.Details
demo/removing of all interior non-bearing walls and partial removal of drop ceiling. no electrical or plumbing work under this permit. | $5,000 |
| Jul 25, 2018 | Never finaled issued Sep 2018, no final | 50 08th St | Build Group Inc. | g/f: demolition & replacement of store front doors & windows. dmeo of non-structurual partitions; construction of new interior partitions; replacement of exterior facade. f/s-f/a under sep permits. maher n/a.Details
g/f: demolition & replacement of store front doors & windows. dmeo of non-structurual partitions; construction of new interior partitions; replacement of exterior facade. f/s-f/a under sep permits. maher n/a. | $500,000 |
| Jul 25, 2018 | Never finaled issued Sep 2018, no final | 50 08th St | Build Group Inc. | g/f: renovation of hotel lobby; registration & officies; restaurant dining room & bar; meeting rooms, elevator cabs. removing non-structural walls & ceilings. interior only. maher n/a. fire/life safety sep permits.Details
g/f: renovation of hotel lobby; registration & officies; restaurant dining room & bar; meeting rooms, elevator cabs. removing non-structural walls & ceilings. interior only. maher n/a. fire/life safety sep permits. | $7,500,000 |
| May 1, 2018 | Never finaled issued Feb 2019, no final | 110 05th St | demolish existing generator and install new emergency generator. construct (n) generator room & mep system to service the (n) roomDetails
demolish existing generator and install new emergency generator. construct (n) generator room & mep system to service the (n) room | $975,000 | |
| Jan 25, 2018 | Never finaled issued Aug 2018, no final | 50 08th St | Build Group Inc. | voluntary structural upgrade, minor structural modification of the building structure demolition of interior walls to access structural system.Details
voluntary structural upgrade, minor structural modification of the building structure demolition of interior walls to access structural system. | $5,000,000 |
| Dec 28, 2015 | Completed final sign-off Mar 2022 | 737 Buena Vista West Av | Redhorse Constructors Inc., Northgate Scaffold Inc, Bill Brown Construction | construct a 3 story horizontal addition including master bedrooms, 2 bedrooms, kitchen, family room, great room & garage to (e) 4 story house & interior remodel.Details
construct a 3 story horizontal addition including master bedrooms, 2 bedrooms, kitchen, family room, great room & garage to (e) 4 story house & interior remodel. | $2,270,000 |
| Feb 23, 2011 | Completed final sign-off Apr 2014 | 4366 26th St | Van Der Sterre Construction | extension of ground floor towards rear yard and addition of partial 3rd level below ground level, minor renovation of kitchen, reconfiguration of deck & stairs.Details
extension of ground floor towards rear yard and addition of partial 3rd level below ground level, minor renovation of kitchen, reconfiguration of deck & stairs. | $105,000 |