Block 3717, lot 012
135 Main St
- City’s use
- Commercial Office
- Lot
- 12,603 sq ft
- Zoning
- C3O
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 15, 2026 | In progress issued Sep 2026 | 135 Main St | Field Construction Inc. | to obtain final inspection under pa#: 202405142070. all work is complete.Details
to obtain final inspection under pa#: 202405142070. all work is complete. | |
| Aug 26, 2026 | In progress issued Aug 2026 | 135 Main St | Field Construction Inc. | to obtain final inspection for work approved under pa# 202503031385. all work is complete.Details
to obtain final inspection for work approved under pa# 202503031385. all work is complete. | |
| Mar 12, 2026 | Completed final sign-off Mar 2026 | 135 Main St | Bilcor Inc | 7/f: two way ecs installation per fire comment on fire-26-119. install (1) cornell call station with signage. arch ref 202511200104.Details
7/f: two way ecs installation per fire comment on fire-26-119. install (1) cornell call station with signage. arch ref 202511200104. | $3,000 |
| Feb 12, 2026 | Completed final sign-off Apr 2026 | 135 Main St | Skyline Construction | 7th floor: revision to pa#202511200104 to remove originally purposed drinking fountain, change layout of office 733, change copy room 729 to storage.Details
7th floor: revision to pa#202511200104 to remove originally purposed drinking fountain, change layout of office 733, change copy room 729 to storage. | |
| Feb 12, 2026 | Completed final sign-off Apr 2026 | 135 Main St | Skyline Construction | 7th floor: mechanical and electrical work for t.i. ref arch #202511200104Details
7th floor: mechanical and electrical work for t.i. ref arch #202511200104 | $145,000 |
| Jan 30, 2026 | Completed final sign-off Mar 2026 | 135 Main St | Pioneer Fire Inc. | 7th floor. relocate (24) pendants. add (14) pendents. ref pa# 202511200104Details
7th floor. relocate (24) pendants. add (14) pendents. ref pa# 202511200104 | $9,500 |
| Jan 29, 2026 | In progress filed Jan 2026, not yet issued | 135 Main St | Martin Sign Co Inc. | the fabrication and installation of (1) aluminum sign onto exterior building glass. (public open space)Details
the fabrication and installation of (1) aluminum sign onto exterior building glass. (public open space) | $3,900 |
| Nov 20, 2025 | Completed final sign-off Apr 2026 | 135 Main St | Skyline Construction | 7/f: architectural only office ti. new partitions, offices, and conference rooms. mep deferred.Details
7/f: architectural only office ti. new partitions, offices, and conference rooms. mep deferred. | $750,000 |
| Jul 17, 2025 | Completed final sign-off Jul 2025 | 135 Main St | Bilcor Inc | 8th floor, suite 800. install 11 ceiing mount speaker - strobes and relocate 1 smoke detector. arch ref#: 202507019885. mech ref#: 202507019885.Details
8th floor, suite 800. install 11 ceiing mount speaker - strobes and relocate 1 smoke detector. arch ref#: 202507019885. mech ref#: 202507019885. | $6,600 |
| Jul 1, 2025 | Completed final sign-off Oct 2025 | 135 Main St | Skyline Construction | suite 800: mechanical, electrical, and plumbing for t.i. on the 8th floor. t.i. #202505156521.Details
suite 800: mechanical, electrical, and plumbing for t.i. on the 8th floor. t.i. #202505156521. | $120,000 |
| Jun 23, 2025 | Completed final sign-off Jul 2025 | 135 Main St | Pioneer Fire Inc. | suite 800: relocate (6) sprinkler heads. add (1) sprinkler head. referecne ti # 202505156521Details
suite 800: relocate (6) sprinkler heads. add (1) sprinkler head. referecne ti # 202505156521 | $1,750 |
| Jun 18, 2025 | In progress issued Jun 2025 | 135 Main St | Bilcor Inc | install 16 control relays to shunt power to new electric controls for vav. ref mech pa 202405142070.Details
install 16 control relays to shunt power to new electric controls for vav. ref mech pa 202405142070. | $12,654 |
| May 29, 2025 | Completed final sign-off Jun 2025 | 135 Main St | Bilcor Inc | install 8 ceiling mount speaker strobe. arch ref #202503263082 and mech ref #202505196786Details
install 8 ceiling mount speaker strobe. arch ref #202503263082 and mech ref #202505196786 | $5,328 |
| May 27, 2025 | Completed final sign-off Sep 2025 | 135 Main St | Peacock Construction | 19th fl- upgrades to 19th fl multi use restrooms. accessibility upgrades. new finishes, fixtures and lightingDetails
19th fl- upgrades to 19th fl multi use restrooms. accessibility upgrades. new finishes, fixtures and lighting | $153,022 |
| May 19, 2025 | Completed final sign-off Jul 2025 | 135 Main St | Skyline Construction | 19/f suite 1950 - electrical work for t.i. ref permit 202503263082Details
19/f suite 1950 - electrical work for t.i. ref permit 202503263082 | $45,000 |
| May 19, 2025 | Completed final sign-off Jul 2025 | 135 Main St | Skyline Construction | 19/f suite 1950 - mechanical work for t.i. ref permit 202503263082Details
19/f suite 1950 - mechanical work for t.i. ref permit 202503263082 | $75,000 |
| May 15, 2025 | Completed final sign-off Oct 2025 | 135 Main St | Skyline Construction | 8th floor: t.i. : removal of non-structural partitions, new partitions and finishes. restroom accessibility upgrades. mep, life safety and sprinkler under seperate permit.Details
8th floor: t.i. : removal of non-structural partitions, new partitions and finishes. restroom accessibility upgrades. mep, life safety and sprinkler under seperate permit. | $300,000 |
| Apr 2, 2025 | Completed final sign-off May 2025 | 135 Main St | Pioneer Fire Inc. | suite 1950; relocate (19) pendents gc ti#: 202503263082Details
suite 1950; relocate (19) pendents gc ti#: 202503263082 | $2,000 |
| Mar 26, 2025 | Completed final sign-off Jul 2025 | 135 Main St | Skyline Construction | suite #1950: t.i. on the 19th floor to include removal of non-structural partitions, new partitions, fixtures, finishes and restroom accessiblity upgrades. mechanical and electrical under seperateDetails
suite #1950: t.i. on the 19th floor to include removal of non-structural partitions, new partitions, fixtures, finishes and restroom accessiblity upgrades. mechanical and electrical under seperate | $650,000 |
| Mar 7, 2025 | In progress issued Mar 2025 | 135 Main St | Bilcor Inc | 4th and 5th fl:relocate (2) plenum smoke detectors.install (2) plenum smoke detectors install (9) duct detectors install (2) control relay modules mech ref:2025-0303-1385Details
4th and 5th fl:relocate (2) plenum smoke detectors.install (2) plenum smoke detectors install (9) duct detectors install (2) control relay modules mech ref:2025-0303-1385 | $9,990 |
| Mar 3, 2025 | In progress issued Mar 2025 | 135 Main St | Field Construction Inc. | 4th & 5th fl - existing fire/smoke damper replacement are part of existing smoke controls upgrades. no changes made to existing smoke control system under proposed work scope.Details
4th & 5th fl - existing fire/smoke damper replacement are part of existing smoke controls upgrades. no changes made to existing smoke control system under proposed work scope. | $20,000 |
| Dec 19, 2024 | Completed final sign-off Jan 2025 | 135 Main St | Bilcor Inc | 3/fl-ste. 300- ref 202407257231 and 202410223428- install (19) ceiling mount speaker strobe and (3) weatherproof ceiling mount speaker strobe, install (1) control relayDetails
3/fl-ste. 300- ref 202407257231 and 202410223428- install (19) ceiling mount speaker strobe and (3) weatherproof ceiling mount speaker strobe, install (1) control relay | $15,318 |
| Oct 22, 2024 | Completed final sign-off Jan 2025 | 135 Main St | Skyline Construction | 3/fl-ref 202407257231- electrical dn plumbing work for tiDetails
3/fl-ref 202407257231- electrical dn plumbing work for ti | $150,000 |
| Sep 13, 2024 | Completed final sign-off Nov 2024 | 135 Main St | Pioneer Fire Inc. | 3/fl-ti 202407257231- relocate (37) pendentsDetails
3/fl-ti 202407257231- relocate (37) pendents | $4,000 |
| Jul 25, 2024 | Completed final sign-off Jan 2025 | 135 Main St | Skyline Construction | 3rd fl - removal of non-structural partitions and finishes. new partitions, finishes and lighting restroom upgrades. mep, life safety under separate permitDetails
3rd fl - removal of non-structural partitions and finishes. new partitions, finishes and lighting restroom upgrades. mep, life safety under separate permit | $975,000 |
| May 30, 2024 | In progress issued May 2024 | 135 Main St | Bilcor Inc | 12/f - fire only: install (11) new ceiling mount speaker- strobes: install (1) smoke detector: arch ref# 2024-0329-8905 and mech ref# 2024-0430-1042. 31 may '24 - speaker strobe count modified to 10 devices.Details
12/f - fire only: install (11) new ceiling mount speaker- strobes: install (1) smoke detector: arch ref# 2024-0329-8905 and mech ref# 2024-0430-1042. 31 may '24 - speaker strobe count modified to 10 devices. | $7,992 |
| May 29, 2024 | In progress issued Apr 2025 | 135 Main St | Field Construction Inc. | changes made to the smoke control system by controls project.electronically controlled actuator added.a relay has been added which will drop power to these actuators.convert fan powered vav electronic control.relay to be added to each fl which will drop power to all the vav's.Details
changes made to the smoke control system by controls project.electronically controlled actuator added.a relay has been added which will drop power to these actuators.convert fan powered vav electronic control.relay to be added to each fl which will drop power to all the vav's. | $100,000 |
| Apr 30, 2024 | Completed final sign-off Jun 2024 | 135 Main St | Pioneer Fire Inc. | ref ti 202403298905- suite 1250 fire only to relocate (8) pendents, convert (9) uprights to pendents, add (5) pendentsDetails
ref ti 202403298905- suite 1250 fire only to relocate (8) pendents, convert (9) uprights to pendents, add (5) pendents | $9,500 |
| Apr 30, 2024 | Completed final sign-off Nov 2024 | 135 Main St | Skyline Construction | 12/f suite 1250: mechanical and electrical work for ti permit 202403298905.Details
12/f suite 1250: mechanical and electrical work for ti permit 202403298905. | $125,000 |
| Apr 26, 2024 | Completed final sign-off Jun 2024 | 135 Main St | Bilcor Inc | ref pa# 2024-0321-8322 relocate (2) smoke detectors install (2) smoke detectors, (6) duct detectors & (2) control relay modulesDetails
ref pa# 2024-0321-8322 relocate (2) smoke detectors install (2) smoke detectors, (6) duct detectors & (2) control relay modules | $7,992 |
| Mar 29, 2024 | Completed final sign-off Nov 2024 | 135 Main St | Skyline Construction | 12th floor office ti to include soft demo to remove and add new partition walls. includes replacing fixtures and finishes. mep and fire sprinkler under separte permitsDetails
12th floor office ti to include soft demo to remove and add new partition walls. includes replacing fixtures and finishes. mep and fire sprinkler under separte permits | $650,000 |
| Mar 21, 2024 | Completed final sign-off Jun 2024 | 135 Main St | Field Construction Inc. | fsd replacement existing fire/smoke dampers replacement are part of existing smoke control upgrade systemDetails
fsd replacement existing fire/smoke dampers replacement are part of existing smoke control upgrade system | $20,000 |
| Jun 14, 2023 | Completed final sign-off Nov 2023 | 135 Main St | Bilcor Inc | install (5) duct detectors, (2) smoke detectors, (2) control relays on the 8th and 9th fl. mech ref pa# 202305228237Details
install (5) duct detectors, (2) smoke detectors, (2) control relays on the 8th and 9th fl. mech ref pa# 202305228237 | $10,560 |
| May 22, 2023 | Completed final sign-off Dec 2023 | 135 Main St | Field Construction Inc. | existing fire/smoke dampers replacement are part of existing smoke control upgrades. no changes made to existing smoke control system under proposed scope of workDetails
existing fire/smoke dampers replacement are part of existing smoke control upgrades. no changes made to existing smoke control system under proposed scope of work | $15,000 |
| Apr 19, 2023 | Completed final sign-off May 2023 | 135 Main St | Bilcor Inc | 12/f: fire alarm, install 17 ceiling mount speaker/strobes, install 1 smoke detector, architectural ref 202302131868, mechanical ref 202304105371.Details
12/f: fire alarm, install 17 ceiling mount speaker/strobes, install 1 smoke detector, architectural ref 202302131868, mechanical ref 202304105371. | $11,880 |
| Apr 10, 2023 | Completed final sign-off May 2023 | 135 Main St | Skyline Construction | 12/f - suite 1200: mechanical & electrical work for t.i. ref arch 202302131868.Details
12/f - suite 1200: mechanical & electrical work for t.i. ref arch 202302131868. | $150,000 |
| Feb 23, 2023 | Completed final sign-off Mar 2023 | 135 Main St | Pioneer Fire Inc. | 12/f: relocate 29 pendents add 3 pendents, ref pa# 202302131868Details
12/f: relocate 29 pendents add 3 pendents, ref pa# 202302131868 | $12,500 |
| Feb 13, 2023 | Completed final sign-off May 2023 | 135 Main St | Skyline Construction | 12/flr: removal of no-structural partitions, millwork & finishes, new partitions, finishes and light, minor accessibility upgrades to the restrooms. mep, life safety and sprinklers under separate permit.Details
12/flr: removal of no-structural partitions, millwork & finishes, new partitions, finishes and light, minor accessibility upgrades to the restrooms. mep, life safety and sprinklers under separate permit. | $750,000 |
| Nov 18, 2022 | Completed final sign-off Jan 2023 | 135 Main St | Bilcor Inc | suite 1700: install (13) ceiling mount speaker strobes. ref arch bpa#202205255010, mech bpa#202210194704Details
suite 1700: install (13) ceiling mount speaker strobes. ref arch bpa#202205255010, mech bpa#202210194704 | $8,580 |
| Oct 19, 2022 | Completed final sign-off Mar 2023 | 135 Main St | Skyline Construction | mechanical and electrical for tenant improvement on the 17th floor ref arch 202205255010Details
mechanical and electrical for tenant improvement on the 17th floor ref arch 202205255010 | $195,000 |
| Sep 26, 2022 | Completed final sign-off Oct 2022 | 135 Main St | Pioneer Fire Inc. | 17th fl - relocate 45 pendents, add 6 pendents and remove 3 pendents. ref pa 2022-0525-5010Details
17th fl - relocate 45 pendents, add 6 pendents and remove 3 pendents. ref pa 2022-0525-5010 | $10,200 |
| Aug 16, 2022 | Completed final sign-off Oct 2022 | 135 Main St | R L H Fire Protection Inc | elevator modification remove sprinklers from machine room and top of hoistway. no other work to system.Details
elevator modification remove sprinklers from machine room and top of hoistway. no other work to system. | $1,000 |
| Jul 15, 2022 | Never finaled issued Jul 2022, no final | 135 Main St | Bilcor Inc | 10/f & 11/f: install (6) duct detectors, (2) control relay modules, (2) plenum smoke detector. ref bpa#202206035545Details
10/f & 11/f: install (6) duct detectors, (2) control relay modules, (2) plenum smoke detector. ref bpa#202206035545 | $7,260 |
| Jun 3, 2022 | Completed final sign-off Sep 2022 | 135 Main St | Field Construction Inc. | 10th & 11th fl - fsd replacementDetails
10th & 11th fl - fsd replacement | |
| May 25, 2022 | Completed final sign-off Mar 2023 | 135 Main St | Skyline Construction | ste 1700: interior ti demo non structural paritions, finishes. lighting plumbing. build out non structural partitions finishes, lighting, plumbing, minor accessibility upgrades to the 17th floor restrooms. deferred mep.Details
ste 1700: interior ti demo non structural paritions, finishes. lighting plumbing. build out non structural partitions finishes, lighting, plumbing, minor accessibility upgrades to the 17th floor restrooms. deferred mep. | $587,000 |
| Feb 4, 2022 | Never finaled issued Feb 2022, no final | 135 Main St | Bilcor Inc | 9/f: install 28 ceiling mounte speaker strobes fire alarms, 1 smoke detectors, 2 control relays and 1 call station. ref t.i. pa202111152375 & 2-way pa201903084755.Details
9/f: install 28 ceiling mounte speaker strobes fire alarms, 1 smoke detectors, 2 control relays and 1 call station. ref t.i. pa202111152375 & 2-way pa201903084755. | $21,120 |
| Jan 27, 2022 | Never finaled issued Feb 2022, no final | 135 Main St | Pioneer Fire Inc. | 9/f: relocate pendent sprinklers using 1' outlet. ref gcti permit 202111152375.Details
9/f: relocate pendent sprinklers using 1' outlet. ref gcti permit 202111152375. | $10,000 |
| Nov 30, 2021 | Never finaled issued Feb 2022, no final | 135 Main St | Skyline Construction | mep for t.i. on 9th fl. ref to 202111152375.Details
mep for t.i. on 9th fl. ref to 202111152375. | |
| Nov 15, 2021 | Never finaled issued Nov 2021, no final | 135 Main St | Skyline Construction | 9/f: reuse of (e) conditions, partial demo of non-structural elements including interior partitions, doors, finishes, ceilings, lighting, mech and elec. outlets and switches. addition of new int. partitions, doors, and finishes. modification of lighting and mep to accommodate new layout.Details
9/f: reuse of (e) conditions, partial demo of non-structural elements including interior partitions, doors, finishes, ceilings, lighting, mech and elec. outlets and switches. addition of new int. partitions, doors, and finishes. modification of lighting and mep to accommodate new layout. | $2,400,000 |
| Mar 11, 2021 | Completed final sign-off Jun 2021 | 135 Main St | Skyline Construction | ste 1875: mechanical and electrical work for tenant improvement. ref arch pa# 202012231596.Details
ste 1875: mechanical and electrical work for tenant improvement. ref arch pa# 202012231596. | $20,000 |
| Feb 25, 2021 | Completed final sign-off May 2021 | 135 Main St | Bilcor Inc | fire life saftey: 12th, 13th & 17th floors install (4) smoke detectorsw/base, (6) duct detectors, (3) control relays relocate (3) smoke detectors. reference ti #2021-0129-3662Details
fire life saftey: 12th, 13th & 17th floors install (4) smoke detectorsw/base, (6) duct detectors, (3) control relays relocate (3) smoke detectors. reference ti #2021-0129-3662 | $8,580 |
| Feb 11, 2021 | Completed final sign-off Apr 2021 | 135 Main St | Bilcor Inc | fire life safety: install (8) ceiling mount speaker strobes reference ti#2020-1223-1596Details
fire life safety: install (8) ceiling mount speaker strobes reference ti#2020-1223-1596 | $5,280 |
| Feb 4, 2021 | Completed final sign-off Apr 2021 | 135 Main St | Pioneer Fire Inc. | relocate (16) pendent sprinkler heads remove (4) pendent sprinkler heads gc ti# 2020-1223-1596Details
relocate (16) pendent sprinkler heads remove (4) pendent sprinkler heads gc ti# 2020-1223-1596 | |
| Jan 29, 2021 | Completed final sign-off May 2021 | 135 Main St | Field Construction Inc. | floors 12,13 &17 fsd replacementDetails
floors 12,13 &17 fsd replacement | |
| Jan 14, 2021 | Completed final sign-off Mar 2021 | 135 Main St | Bilcor Inc | fire life safety: 3rd fl install (2) smoke detector with base, (2) duct detectors, (1) control relay reference ti # 2020-1229-1870Details
fire life safety: 3rd fl install (2) smoke detector with base, (2) duct detectors, (1) control relay reference ti # 2020-1229-1870 | $3,300 |
| Dec 29, 2020 | Completed final sign-off Apr 2021 | 135 Main St | Field Construction Inc. | 3/f: fire/smoke damper replacement of (e); part of (e) "smoke control" upgrade system under proposed scope of work. no change to (e) smoke control system. maher n/a.Details
3/f: fire/smoke damper replacement of (e); part of (e) "smoke control" upgrade system under proposed scope of work. no change to (e) smoke control system. maher n/a. | $55,000 |
| Dec 23, 2020 | Completed final sign-off Jun 2021 | 135 Main St | Skyline Construction | ste # 1875: tenant improvement to include new non-structural partitions, finishes, and fixtures. mep, lift safety and sprinklers under separate permit.Details
ste # 1875: tenant improvement to include new non-structural partitions, finishes, and fixtures. mep, lift safety and sprinklers under separate permit. | $375,000 |
| Jul 13, 2020 | Completed final sign-off Aug 2020 | 135 Main St | Bilcor Inc | 14th, 15th, 16th, & 18th floors: fire life safety: relocate 4 smoke detectors with base, install 4 smoke detectors with base, install 8 duct detectors, install 4 control relay modules. ref app#202002275542Details
14th, 15th, 16th, & 18th floors: fire life safety: relocate 4 smoke detectors with base, install 4 smoke detectors with base, install 8 duct detectors, install 4 control relay modules. ref app#202002275542 | $10,560 |
| Feb 27, 2020 | Completed final sign-off Jul 2020 | 135 Main St | Field Construction Inc. | replacement of existing fire/smoke dampers on floors 14,15,16 and 18.Details
replacement of existing fire/smoke dampers on floors 14,15,16 and 18. | $197,500 |
| Feb 3, 2020 | Completed final sign-off Jun 2020 | 135 Main St | Skyline Construction | suite #2150: redistribute existing ductwork for new floor layout. install (1) 2 pipe fan coil. reference pa #2019-1126-8174Details
suite #2150: redistribute existing ductwork for new floor layout. install (1) 2 pipe fan coil. reference pa #2019-1126-8174 | $75,000 |
| Jan 24, 2020 | Completed final sign-off Apr 2020 | 135 Main St | Bilcor Inc | fire alarm for 21st fl, suite 2150: install 12 ceiling ount speaker stroves, install 1 ceiling mount speaker, install 1 smoke detector with base. ref ti #201911268174Details
fire alarm for 21st fl, suite 2150: install 12 ceiling ount speaker stroves, install 1 ceiling mount speaker, install 1 smoke detector with base. ref ti #201911268174 | $9,240 |
| Jan 7, 2020 | Completed final sign-off Feb 2020 | 135 Main St | Pioneer Fire Inc. | suite 2150: relocate 43 pendetns, add 1 pendent, remove 2 pendents 201911268174Details
suite 2150: relocate 43 pendetns, add 1 pendent, remove 2 pendents 201911268174 | $17,669 |
| Dec 10, 2019 | Never finaled issued Dec 2019, no final | 135 Main St | Bilcor Inc | 19th - 22nd fl - fire alarm relocate 4 smoke detectors, install 4 smoke detectors, install 8 duct detectors, install 4 control relay modules. ref pa 2019-0731-7403Details
19th - 22nd fl - fire alarm relocate 4 smoke detectors, install 4 smoke detectors, install 8 duct detectors, install 4 control relay modules. ref pa 2019-0731-7403 | $13,200 |
| Nov 26, 2019 | Completed final sign-off Jun 2020 | 135 Main St | Skyline Construction | 21st fl tenant improvement including new non structural partitions, finishes, ceilings. mep fire life safety and sprinlker under sep permitDetails
21st fl tenant improvement including new non structural partitions, finishes, ceilings. mep fire life safety and sprinlker under sep permit | $600,000 |
| Nov 14, 2019 | Completed final sign-off Nov 2019 | 135 Main St | Bilcor Inc | fire alarm safety suite 1120 on 11th fl: install 2 ceiling mount speakers, relocate 1 existing ceiling mount speaker strobe. ref ti #201909202204.Details
fire alarm safety suite 1120 on 11th fl: install 2 ceiling mount speakers, relocate 1 existing ceiling mount speaker strobe. ref ti #201909202204. | $1,980 |
| Sep 20, 2019 | Completed final sign-off Oct 2019 | 135 Main St | Bilcor Inc | 8th fl - fls ti ref pa 2019-0206-2175. remove & re-install 5 ceiling mount speaker-strobes; remove & re-install 6 ceiling mount smoke detectorsDetails
8th fl - fls ti ref pa 2019-0206-2175. remove & re-install 5 ceiling mount speaker-strobes; remove & re-install 6 ceiling mount smoke detectors | $7,260 |
| Sep 20, 2019 | Completed final sign-off Nov 2019 | 135 Main St | Rossi Builders Inc. | 11th fl. interior office t.i.workspace, reception area open office area, and private offices, no change existing copy room server room, and break room at the back of office.Details
11th fl. interior office t.i.workspace, reception area open office area, and private offices, no change existing copy room server room, and break room at the back of office. | $235,000 |
| Sep 16, 2019 | Completed final sign-off Nov 2019 | 135 Main St | Golden Gate Fire Protection Inc | fire sprinkler only. relocate 11 pendents, add 1 pendent for gi partners on the 11 th flDetails
fire sprinkler only. relocate 11 pendents, add 1 pendent for gi partners on the 11 th fl | $6,000 |
| Sep 4, 2019 | Completed final sign-off Dec 2019 | 135 Main St | Skyline Construction | 8th fl - electrical work for ti ref pa 201902062175Details
8th fl - electrical work for ti ref pa 201902062175 | $5,000 |
| Sep 4, 2019 | Completed final sign-off Sep 2019 | 135 Main St | Pioneer Fire Inc. | 8th floor: relocate 10 pendents and remove 2 pendents. n/a for maher. t.i. app#201902062175Details
8th floor: relocate 10 pendents and remove 2 pendents. n/a for maher. t.i. app#201902062175 | $5,500 |
| Aug 12, 2019 | Completed final sign-off Sep 2019 | 135 Main St | Skyline Construction | 21st floor: electrial work for tenant improvement on the 21st floor. ref 2019-0125-1244Details
21st floor: electrial work for tenant improvement on the 21st floor. ref 2019-0125-1244 | $8,000 |
| Jul 31, 2019 | Completed final sign-off Mar 2020 | 135 Main St | Field Construction Inc. | replacement of (e) fire/smk dampers on floors 19-22Details
replacement of (e) fire/smk dampers on floors 19-22 | $197,317 |
| May 10, 2019 | Never finaled issued May 2019, no final | 135 Main St | Field Construction Inc. | evacuation signage (3) for 22nd floor.Details
evacuation signage (3) for 22nd floor. | $1,000 |
| Apr 30, 2019 | Completed final sign-off May 2019 | 135 Main St | Bilcor Inc | 21st floor core area - install 7 ceiling mount speaker strobes. ref t.i. pa201901251244. maher n/a.Details
21st floor core area - install 7 ceiling mount speaker strobes. ref t.i. pa201901251244. maher n/a. | $4,200 |
| Apr 23, 2019 | Completed final sign-off May 2019 | 135 Main St | Pioneer Fire Inc. | 21/f: relocate 8 pendent and add 4 pendentDetails
21/f: relocate 8 pendent and add 4 pendent | $6,000 |
| Apr 23, 2019 | Completed final sign-off Apr 2019 | 135 Main St | Bilcor Inc | 21f - 22/f: install 37 ceiling speaker strobes, 2 smk det , 15 cpontrol relays, 4 duct det 1 call station. maher n/a.Details
21f - 22/f: install 37 ceiling speaker strobes, 2 smk det , 15 cpontrol relays, 4 duct det 1 call station. maher n/a. | $24,000 |
| Apr 10, 2019 | Completed final sign-off May 2019 | 135 Main St | Acco Engineered Systems Inc. Dba Acco En | 18th fl: rework duct/rebalance grilles to new tenant layout. ref ti #201810163277.Details
18th fl: rework duct/rebalance grilles to new tenant layout. ref ti #201810163277. | $30,000 |
| Mar 29, 2019 | Never finaled issued Mar 2019, no final | 135 Main St | Pioneer Fire Inc. | floors 21 & 22, relocate (114) pendents, remove (8) pendents ti 201901110214Details
floors 21 & 22, relocate (114) pendents, remove (8) pendents ti 201901110214 | $54,405 |
| Mar 27, 2019 | Completed final sign-off May 2019 | 135 Main St | C B F Inc | new lighting system, receptacles and furniture feeds maher naDetails
new lighting system, receptacles and furniture feeds maher na | $50,000 |
| Mar 21, 2019 | Completed final sign-off Nov 2019 | 135 Main St | Field Construction Inc. | 15th flr. revision to pa 201810233913. replace unrated glass doors at elevator lobby w/ rated wood-glass door in hollow metal frameDetails
15th flr. revision to pa 201810233913. replace unrated glass doors at elevator lobby w/ rated wood-glass door in hollow metal frame | $7,000 |
| Mar 21, 2019 | Completed final sign-off Jul 2019 | 135 Main St | Field Construction Inc. | 15th flr. evacuation sign onlyDetails
15th flr. evacuation sign only | $3,500 |
| Mar 11, 2019 | Never finaled issued Apr 2019, no final | 135 Main St | Field Construction Inc. | 21st & 22nd flr. mep for tenant improvement. ref pa 201901110214Details
21st & 22nd flr. mep for tenant improvement. ref pa 201901110214 | |
| Mar 8, 2019 | Never finaled issued Mar 2019, no final | 135 Main St | Bilcor Inc | two way communication backrone; install 1 2-way communication main panel, install 2 expansion module, install 3 power supply, insatll 1 dual monitor module n/a maherDetails
two way communication backrone; install 1 2-way communication main panel, install 2 expansion module, install 3 power supply, insatll 1 dual monitor module n/a maher | $4,620 |
| Feb 13, 2019 | Never finaled issued Feb 2019, no final | 135 Main St | Bilcor Inc | 15th flr. fire alarm tenant improvement. install 20 ceiling speaker strobes, 6 ceiling strobes, 1 weatherproof ceiling strobe, 1 smoke detector. ref t.i pa 201810233913Details
15th flr. fire alarm tenant improvement. install 20 ceiling speaker strobes, 6 ceiling strobes, 1 weatherproof ceiling strobe, 1 smoke detector. ref t.i pa 201810233913 | $19,600 |
| Feb 6, 2019 | Completed final sign-off Oct 2019 | 135 Main St | Skyline Construction | interior tenant inprovement new finishes and lighting at multi-tenant coridor and lobby life safery & fire sprinkler under sep permitDetails
interior tenant inprovement new finishes and lighting at multi-tenant coridor and lobby life safery & fire sprinkler under sep permit | $220,000 |
| Jan 25, 2019 | Completed final sign-off Sep 2019 | 135 Main St | Skyline Construction | new multi tenant corridor and elevator lobby upgrades, mep life safety and sprinkler under sep permitDetails
new multi tenant corridor and elevator lobby upgrades, mep life safety and sprinkler under sep permit | $100,000 |
| Jan 16, 2019 | Never finaled issued Jan 2019, no final | 135 Main St | Skyline Construction | electrical work for ti on 13th flDetails
electrical work for ti on 13th fl | $2,500 |
| Jan 11, 2019 | Completed final sign-off May 2019 | 135 Main St | Field Construction Inc. | 21st and 22nd fl. construction of new non structural partitions, acoustical grid/tile gype bd, baffle ceilings ets. non sep accessory a use space 21st fl less than 10% of overall floor meps, ls, sprinklers sep permitDetails
21st and 22nd fl. construction of new non structural partitions, acoustical grid/tile gype bd, baffle ceilings ets. non sep accessory a use space 21st fl less than 10% of overall floor meps, ls, sprinklers sep permit | $1,175,328 |
| Dec 21, 2018 | Never finaled issued Jan 2019, no final | 135 Main St | Skyline Construction | t.i. new millwork and finishes, mep and fire life safety under separate permitDetails
t.i. new millwork and finishes, mep and fire life safety under separate permit | $150,000 |
| Dec 21, 2018 | Never finaled issued Jan 2019, no final | 135 Main St | Pioneer Fire Inc. | relocate 74 pendants, remove 1 pendant. ti 201810233913Details
relocate 74 pendants, remove 1 pendant. ti 201810233913 | $30,212 |
| Dec 12, 2018 | Completed final sign-off May 2019 | 135 Main St | Field Construction Inc. | 21st and 22nd floor: interior tenant improvement demo only; per ab-017 defer accessibility compliance and remain vacant until separate tenant improvement permit is completed to provide accessibility compliance.Details
21st and 22nd floor: interior tenant improvement demo only; per ab-017 defer accessibility compliance and remain vacant until separate tenant improvement permit is completed to provide accessibility compliance. | $91,000 |
| Dec 7, 2018 | Completed final sign-off Feb 2019 | 135 Main St | Bilcor Inc | 18th flr - fire alarm t.i. install 8 ceiling mount speaker-strobes. ref t.i 201810163277Details
18th flr - fire alarm t.i. install 8 ceiling mount speaker-strobes. ref t.i 201810163277 | $4,800 |
| Nov 7, 2018 | Completed final sign-off Dec 2018 | 135 Main St | H & M Fire Protection, Inc. | 18th flr fire sprinkler t.i. relocate 24 sprinklers + add 5. ref arch permit 201810163277Details
18th flr fire sprinkler t.i. relocate 24 sprinklers + add 5. ref arch permit 201810163277 | $13,600 |
| Nov 5, 2018 | Completed final sign-off Nov 2018 | 135 Main St | Pioneer Fire Inc. | #550 2 relocated pendent and relocate 1 upright ref 201809139996 maher naDetails
#550 2 relocated pendent and relocate 1 upright ref 201809139996 maher na | $4,680 |
| Oct 23, 2018 | Completed final sign-off Nov 2019 | 135 Main St | Field Construction Inc. | ti on 15th flr including new walls, demo, ceiling, doors. millworkDetails
ti on 15th flr including new walls, demo, ceiling, doors. millwork | $1,353,000 |
| Oct 16, 2018 | Completed final sign-off May 2019 | 135 Main St | Charles Pankow Builders Ltd | 18th flr. light demo of (e) partitions, (n) walls constructed, (n) finishes and appliances addedDetails
18th flr. light demo of (e) partitions, (n) walls constructed, (n) finishes and appliances added | $190,000 |
| Oct 3, 2018 | Completed final sign-off Dec 2018 | 135 Main St | Bcci Construction Company | 20th fl: ref pa# 201807023493: for technical infeasibility regarding toilet location.Details
20th fl: ref pa# 201807023493: for technical infeasibility regarding toilet location. | |
| Sep 13, 2018 | Never finaled issued Sep 2018, no final | 135 Main St | Skyline Construction | ti suite 550-1)adding a glass division and wood door. 2)extend 2 walls in meeting room. 3)adding a counter in kitchen area (island)- sprinklers, fire alarm and mep separate permit.Details
ti suite 550-1)adding a glass division and wood door. 2)extend 2 walls in meeting room. 3)adding a counter in kitchen area (island)- sprinklers, fire alarm and mep separate permit. | $138,000 |
| Sep 5, 2018 | Completed final sign-off Oct 2018 | 135 Main St | Bilcor Inc | 20th floor- fire alarm tenant improvement install 2 ceiling mount strobes, 2 ceiling mount speaker strobes, 2 duct detectors w/ sampling tube, 2 control relay modules, relocate 1 celing mount speaker strobe. n/a for maher.Details
20th floor- fire alarm tenant improvement install 2 ceiling mount strobes, 2 ceiling mount speaker strobes, 2 duct detectors w/ sampling tube, 2 control relay modules, relocate 1 celing mount speaker strobe. n/a for maher. | $4,000 |
| Aug 29, 2018 | Completed final sign-off May 2019 | 135 Main St | Charles Pankow Builders Ltd | demo/removing of all interior non-bearing walls and partial removal of drop ceiling. no electrical or plumbing work under this permit.Details
demo/removing of all interior non-bearing walls and partial removal of drop ceiling. no electrical or plumbing work under this permit. | $5,000 |
| Aug 29, 2018 | Completed final sign-off Oct 2018 | 135 Main St | Ayoob & Peery Plumbing Co Inc | relocate (87), add (19) and plug (18) sprinkers per tenent improvements on 20th floor.Details
relocate (87), add (19) and plug (18) sprinkers per tenent improvements on 20th floor. | $28,200 |
| Jul 20, 2018 | Completed final sign-off Dec 2018 | 135 Main St | Bcci Construction Company | revision to previous permit 2018-0702-3493, regarding technical infeasibility of restroom ref: 2017-1023-1897 & 2018-0615-2009Details
revision to previous permit 2018-0702-3493, regarding technical infeasibility of restroom ref: 2017-1023-1897 & 2018-0615-2009 | |
| Jul 20, 2018 | Completed final sign-off May 2019 | 135 Main St | Bcci Construction Company | deferred permit set to previous approved archtectural set ref 2018-0720-5097, slective demo of ductwork, fans & speed controller (ref 2018-0702-3493)Details
deferred permit set to previous approved archtectural set ref 2018-0720-5097, slective demo of ductwork, fans & speed controller (ref 2018-0702-3493) | $115,000 |
| Jul 2, 2018 | Completed final sign-off Apr 2019 | 135 Main St | Bcci Construction Company | 20th fl - tenant improvement to include new partitions, phone rooms, conference rooms and pantry. mep deferred. maher naDetails
20th fl - tenant improvement to include new partitions, phone rooms, conference rooms and pantry. mep deferred. maher na | $780,000 |
| Jun 28, 2018 | Completed final sign-off Jul 2018 | 135 Main St | Bilcor Inc | units 1140 & 1145: fire alarm ti install 2 ceiling mount speaker strobes. ref pa 2018-0614-1847Details
units 1140 & 1145: fire alarm ti install 2 ceiling mount speaker strobes. ref pa 2018-0614-1847 | $1,000 |
| Jun 15, 2018 | Completed final sign-off Jul 2018 | 135 Main St | Skyline Construction | rev to pa# 201710231897; approval of tech. infeasibility request, existing building plumb riser stack cannot be relocated preventing the toliet from being located farthest from the ada stall doorDetails
rev to pa# 201710231897; approval of tech. infeasibility request, existing building plumb riser stack cannot be relocated preventing the toliet from being located farthest from the ada stall door | |
| Jun 14, 2018 | Never finaled issued Jun 2018, no final | 135 Main St | Skyline Construction | minor interior demo in break area. new demising wall between 1145 and 1140. new millwork. mep/fire under separate permitsDetails
minor interior demo in break area. new demising wall between 1145 and 1140. new millwork. mep/fire under separate permits | $75,000 |
| Mar 19, 2018 | Completed final sign-off Jul 2018 | 135 Main St | Novo Construction Inc | electrical work for ti architectural revision. ref pa 2018-0228-2431Details
electrical work for ti architectural revision. ref pa 2018-0228-2431 | $5,000 |
| Feb 28, 2018 | Completed final sign-off Jul 2018 | 135 Main St | Novo Construction Inc | 8/f: ti of 3 spaces for a single tenant to include new non-load bearing partitions. maher naDetails
8/f: ti of 3 spaces for a single tenant to include new non-load bearing partitions. maher na | $5,000 |
| Feb 20, 2018 | Expired or cancelled cancelled Jan 2026 | 135 Main St | Novo Construction Inc | suite 800: tenant improvement of 3 spaces for single tenant to include non load bearing partitions, ceiling floor finishes. mep, life safety, and fire sprinkler under sep permitDetails
suite 800: tenant improvement of 3 spaces for single tenant to include non load bearing partitions, ceiling floor finishes. mep, life safety, and fire sprinkler under sep permit | |
| Dec 15, 2017 | Completed final sign-off Jan 2018 | 135 Main St | Bilcor Inc | 11th floor ste 1130 fire alarm tenant improvement - install 8 ceiling mount speaker strobes, install 1 ceiling mount strobe. ref ti #201710231897. n/a maher ordinanceDetails
11th floor ste 1130 fire alarm tenant improvement - install 8 ceiling mount speaker strobes, install 1 ceiling mount strobe. ref ti #201710231897. n/a maher ordinance | $4,500 |
| Nov 29, 2017 | Completed final sign-off Jul 2018 | 135 Main St | Skyline Construction | ste 1130: mechanical and electrical work for ti, new lighting, rebalance (5) existing vav boxes and redistribute ductwork. ref 2017102131897. maher n/aDetails
ste 1130: mechanical and electrical work for ti, new lighting, rebalance (5) existing vav boxes and redistribute ductwork. ref 2017102131897. maher n/a | $10,000 |
| Oct 23, 2017 | Completed final sign-off Jul 2018 | 135 Main St | Skyline Construction | suite 1130 -demo of ti to including non-load bearing partitions. new partitions to create private office, breakroom, conference. mep, life safety, fire sprinkler under separate permitDetails
suite 1130 -demo of ti to including non-load bearing partitions. new partitions to create private office, breakroom, conference. mep, life safety, fire sprinkler under separate permit | $350,000 |
| Jun 23, 2017 | Completed final sign-off Mar 2018 | 135 Main St | Walschon Fire Protection Inc | basement: replacement of extg fire pumps: phase 1 replace electrical pump. phase 2 replace diesel pump. n/a for maher.Details
basement: replacement of extg fire pumps: phase 1 replace electrical pump. phase 2 replace diesel pump. n/a for maher. | $100,000 |
| Jun 2, 2016 | Expired or cancelled withdrawn Sep 2016 | 135 Main St | roof: (n) exterior permanent monorail track to install with monorail trolleys & a one-man workcage, etc. n/a maher ordinanceDetails
roof: (n) exterior permanent monorail track to install with monorail trolleys & a one-man workcage, etc. n/a maher ordinance | ||
| Nov 17, 2015 | Completed final sign-off Nov 2015 | 135 Main St | Bilcor Inc | fire life safety ti. 21 ceiling mount speaker-strobes, 2 duct detectors, 4 control relays. n/a ordinance #155-13Details
fire life safety ti. 21 ceiling mount speaker-strobes, 2 duct detectors, 4 control relays. n/a ordinance #155-13 | $9,200 |
| Oct 19, 2015 | Completed final sign-off Nov 2015 | 135 Main St | Golden Gate Fire Protection Inc | ref pa 2015-0710-1158 fire sprinkler relocate 21 pendents, add 29 pendents, relocate 60 uprights, add 2 uprights remove 16 sprinkler heads. 112 heads total. maher naDetails
ref pa 2015-0710-1158 fire sprinkler relocate 21 pendents, add 29 pendents, relocate 60 uprights, add 2 uprights remove 16 sprinkler heads. 112 heads total. maher na | $56,000 |
| Jul 10, 2015 | Completed final sign-off May 2016 | 135 Main St | Gci, Inc | 4th floor - full floor t.i. including demo, electrical & mechanical work. n/a maher ordinanceDetails
4th floor - full floor t.i. including demo, electrical & mechanical work. n/a maher ordinance | $750,000 |
| Apr 13, 2015 | Completed final sign-off Apr 2015 | 135 Main St | Bilcor Inc | fire alarm ti for 16th floor construction plan 201406208941- adding 13 ceiling speaker strobes all different candella; maher n/aDetails
fire alarm ti for 16th floor construction plan 201406208941- adding 13 ceiling speaker strobes all different candella; maher n/a | $5,200 |
| Jan 28, 2015 | Completed final sign-off Feb 2015 | 135 Main St | Skyline Construction | suite #1950: revision to app#201406269530 to remove one private office from scope of work.Details
suite #1950: revision to app#201406269530 to remove one private office from scope of work. | |
| Sep 24, 2014 | Completed final sign-off Sep 2014 | 135 Main St | Pioneer Fire Inc. | 3rd flr: relocate 2 pendants, remove 1 pendant, ref. ti 201406269535; maher n/aDetails
3rd flr: relocate 2 pendants, remove 1 pendant, ref. ti 201406269535; maher n/a | $3,256 |
| Sep 23, 2014 | Completed final sign-off Oct 2014 | 135 Main St | Bilcor Inc | remove one ceiling mount speaker-strobe. remove one ceiling mount strobe. install two ceiling mount speaker strobes. on 8th fl. ref. ti #2014-0630-9925 & 2014-0623-9057Details
remove one ceiling mount speaker-strobe. remove one ceiling mount strobe. install two ceiling mount speaker strobes. on 8th fl. ref. ti #2014-0630-9925 & 2014-0623-9057 | $1,600 |
| Sep 17, 2014 | Expired or cancelled cancelled Sep 2023 | 135 Main St | Bilcor Inc | remove (1) ceiling mount speaker-strobe, remove (1) ceiling mount strobe, install 2 ceiling mount speaker-strobes, t.i. 201406309925; maher n/aDetails
remove (1) ceiling mount speaker-strobe, remove (1) ceiling mount strobe, install 2 ceiling mount speaker-strobes, t.i. 201406309925; maher n/a | $1,600 |
| Aug 26, 2014 | Completed final sign-off Sep 2014 | 135 Main St | Pioneer Fire Inc. | relocate 2 pendents and add 2 pendents on 8th floor (suite 850). n/a ordinance #155-13, t.i. pa#201406239057Details
relocate 2 pendents and add 2 pendents on 8th floor (suite 850). n/a ordinance #155-13, t.i. pa#201406239057 | $5,652 |
| Jul 30, 2014 | Completed final sign-off Aug 2014 | 135 Main St | Pioneer Fire Inc. | 16th floor fire sprinkler relocate 11 pendents, add 2 pendents, remove 3. maher naDetails
16th floor fire sprinkler relocate 11 pendents, add 2 pendents, remove 3. maher na | $3,105 |
| Jul 30, 2014 | Completed final sign-off Aug 2014 | 135 Main St | Pioneer Fire Inc. | 19th floor fire sprinkler, relocate 5 pendents & and 1 added head. t.i. #2014.0620.8939. n/a maher ordinanceDetails
19th floor fire sprinkler, relocate 5 pendents & and 1 added head. t.i. #2014.0620.8939. n/a maher ordinance | $5,991 |
| Jul 30, 2014 | Completed final sign-off Aug 2014 | 135 Main St | Pioneer Fire Inc. | 17th floor fire sprinkler: relocate 1 pendant. ref #2014.0616.8519Details
17th floor fire sprinkler: relocate 1 pendant. ref #2014.0616.8519 | $3,105 |
| Jul 28, 2014 | Completed final sign-off Aug 2014 | 135 Main St | Bilcor Inc | suite #1900: relocate 5 ceiling mount speakers/strobes. install 5 ceiling mount speaker/strobes. ref. t.i. ref. appl. 2014.0626.9530. maher n/a.Details
suite #1900: relocate 5 ceiling mount speakers/strobes. install 5 ceiling mount speaker/strobes. ref. t.i. ref. appl. 2014.0626.9530. maher n/a. | $4,000 |
| Jul 24, 2014 | Completed final sign-off Aug 2014 | 135 Main St | Bilcor Inc | fire alarm ti 16th floor: install 9 ceiling mount speaker strobes ref app #201406208941Details
fire alarm ti 16th floor: install 9 ceiling mount speaker strobes ref app #201406208941 | $3,600 |
| Jun 30, 2014 | Completed final sign-off Sep 2014 | 135 Main St | Skyline Construction | 16th floor: mechanical and electrical for t.i. improvement. new vav zones and new lighting. ref arch app# 201406208941 n/a for the maher ordinance #155-13Details
16th floor: mechanical and electrical for t.i. improvement. new vav zones and new lighting. ref arch app# 201406208941 n/a for the maher ordinance #155-13 | $25,000 |
| Jun 30, 2014 | Completed final sign-off Nov 2014 | 135 Main St | Skyline Construction | 8th floor: mechanical and electrical for t.i. improvement. ref arch app# 201406239057.n/a for the maher ordinance #155-13Details
8th floor: mechanical and electrical for t.i. improvement. ref arch app# 201406239057.n/a for the maher ordinance #155-13 | $20,000 |
| Jun 30, 2014 | Completed final sign-off Nov 2014 | 135 Main St | Skyline Construction | 3rd floor: mechanical and electrical for t.i. improvement. ref arch app#201406269535. n/a for the maher ordinance #155-13Details
3rd floor: mechanical and electrical for t.i. improvement. ref arch app#201406269535. n/a for the maher ordinance #155-13 | $75,000 |
| Jun 30, 2014 | Completed final sign-off Feb 2015 | 135 Main St | Skyline Construction | 19th floor: mechanical and electrical for t.i. improvement. ref arch app#201406269530. n/a for the maher ordinance #155-13Details
19th floor: mechanical and electrical for t.i. improvement. ref arch app#201406269530. n/a for the maher ordinance #155-13 | $75,000 |
| Jun 30, 2014 | Completed final sign-off Oct 2014 | 135 Main St | Skyline Construction | 17th floor: mechanical and electrical for t.i. improvement. ref arch app# 201406168519. n/a for the maher ordinance #155-13Details
17th floor: mechanical and electrical for t.i. improvement. ref arch app# 201406168519. n/a for the maher ordinance #155-13 | $15,000 |
| Jun 30, 2014 | Completed final sign-off Sep 2014 | 135 Main St | Skyline Construction | 19th floor: mechanical and electrical for t.i. improvement. ref arch app# 201406208939. n/a for the maher ordinance #155-13Details
19th floor: mechanical and electrical for t.i. improvement. ref arch app# 201406208939. n/a for the maher ordinance #155-13 | $20,000 |
| Jun 26, 2014 | Completed final sign-off Feb 2015 | 135 Main St | Skyline Construction | 19/f: non structural demo, new non structural partitions, finishes, elec, and ceiling. no change in occupancy, use, area. mep and life safety under sep permit. compliance with ordinance no. 155-13 not required.Details
19/f: non structural demo, new non structural partitions, finishes, elec, and ceiling. no change in occupancy, use, area. mep and life safety under sep permit. compliance with ordinance no. 155-13 not required. | $21,735 |
| Jun 26, 2014 | Completed final sign-off Nov 2014 | 135 Main St | Skyline Construction | 3rd floor:non structural demo. new non structural partitons, finishes. elec and minor relocation of light fixtures. mep sep permitDetails
3rd floor:non structural demo. new non structural partitons, finishes. elec and minor relocation of light fixtures. mep sep permit | $34,155 |
| Jun 23, 2014 | Completed final sign-off Nov 2014 | 135 Main St | Skyline Construction | 8/f -minor tenant improvement on the 8th fl. selective demo of non structural partitions, construct non structural paritions, new finishes, relocation of light fixtures and minor elec. mep fire sep permits. maher 155-13 not requiredDetails
8/f -minor tenant improvement on the 8th fl. selective demo of non structural partitions, construct non structural paritions, new finishes, relocation of light fixtures and minor elec. mep fire sep permits. maher 155-13 not required | $283,000 |
| Jun 20, 2014 | Completed final sign-off Sep 2014 | 135 Main St | Skyline Construction | non structural demo. new non structural partitions, finishes, electrical, millwork. no change in occupancy, use, area. mep sep permit maher 155-13 not requiredDetails
non structural demo. new non structural partitions, finishes, electrical, millwork. no change in occupancy, use, area. mep sep permit maher 155-13 not required | $269,430 |
| Jun 20, 2014 | Completed final sign-off Oct 2014 | 135 Main St | Skyline Construction | 19th floor:non structural demo. new non structural partitions, finishes, electrical.no change in occupancy, use, area. mep sep permit maher 155-13 not requiredDetails
19th floor:non structural demo. new non structural partitions, finishes, electrical.no change in occupancy, use, area. mep sep permit maher 155-13 not required | $163,490 |
| Jun 16, 2014 | Completed final sign-off Oct 2014 | 135 Main St | Skyline Construction | office renovations:add 4 small meeting rooms to open office area, extent extg walls of conference rooms to improve acoustical privacy change out carpet and new paint. mep under separate permit. n/a for the maher ordinance #155-13Details
office renovations:add 4 small meeting rooms to open office area, extent extg walls of conference rooms to improve acoustical privacy change out carpet and new paint. mep under separate permit. n/a for the maher ordinance #155-13 | $110,000 |
| Mar 19, 2014 | Never finaled issued Mar 2014, no final | 135 Main St | street spaceDetails
street space | ||
| Mar 8, 2013 | Completed final sign-off Apr 2013 | 135 Main St | Siemens Industry, Inc. | addition of 3 smoke detectors, 1 duct detector, 8 speakers 6 speaker/strobes, 11 strobes & 2 relay modules for the first solar remodel on floor 6. all devices connect onto the existing life safety systemDetails
addition of 3 smoke detectors, 1 duct detector, 8 speakers 6 speaker/strobes, 11 strobes & 2 relay modules for the first solar remodel on floor 6. all devices connect onto the existing life safety system | $15,000 |
| Feb 26, 2013 | Never finaled issued Mar 2013, no final | 135 Main St | Pioneer Fire Inc. | 6th floor fire sprinkler. relocate or add fire sprinklers to accomodate new build out.Details
6th floor fire sprinkler. relocate or add fire sprinklers to accomodate new build out. | $28,304 |
| Jan 17, 2013 | Completed final sign-off Feb 2013 | 135 Main St | Siemens Industry, Inc. | addition of 2 smoke detectors, 13 speakers/strobes, and 4 strobes for the "modis/corridor" remodels on floor 10. all devices connect onto the life safety system.Details
addition of 2 smoke detectors, 13 speakers/strobes, and 4 strobes for the "modis/corridor" remodels on floor 10. all devices connect onto the life safety system. | $9,500 |
| Jan 15, 2013 | Completed final sign-off May 2013 | 135 Main St | Skyline Construction | involves demolition construction of non-load bearing partitions. new celing grid, fixts, doors & millwork. (n) electrical & mechanical modified to reflect new layout. breakroom plumbing.Details
involves demolition construction of non-load bearing partitions. new celing grid, fixts, doors & millwork. (n) electrical & mechanical modified to reflect new layout. breakroom plumbing. | $460,000 |
| Jan 9, 2013 | Completed final sign-off Feb 2013 | 135 Main St | Anderson, Rowe & Buckley, Inc. | 10th floor-tenant improvements-(e) fire sprinkler system-27 relocated sprinklers, 2 removed sprinklers & 9 added sprinklers. ti pa# 2012-1129-5090Details
10th floor-tenant improvements-(e) fire sprinkler system-27 relocated sprinklers, 2 removed sprinklers & 9 added sprinklers. ti pa# 2012-1129-5090 | $18,000 |
| Nov 29, 2012 | Completed final sign-off Mar 2013 | 135 Main St | Skyline Construction | #1010- t.i. on 10th floor extg restrooms to be upgraded to title 24 requirements. mep,t24, lifesafty, fire alarm, and fire sprinkler to be submitted under seperate permit.Details
#1010- t.i. on 10th floor extg restrooms to be upgraded to title 24 requirements. mep,t24, lifesafty, fire alarm, and fire sprinkler to be submitted under seperate permit. | $305,350 |
| Oct 30, 2012 | Never finaled issued Oct 2012, no final | 135 Main St | Dng Cummings Inc/Dba Action Sign Systems | to erect wall sign. single faced non illuminated new sign.Details
to erect wall sign. single faced non illuminated new sign. | $1,716 |
| Aug 17, 2012 | Expired or cancelled withdrawn Dec 2012 | 135 Main St | this proj is an interior t.i on the 10th fl & a new 20% elevator lobby upgrade. (e) restrooms to remian.construction of a new demising wall. there will be no change in occupancy & no change in floor area. mep drawings, lifesafety work, firealarm & fire sprinkler will be submitted under separateDetails
this proj is an interior t.i on the 10th fl & a new 20% elevator lobby upgrade. (e) restrooms to remian.construction of a new demising wall. there will be no change in occupancy & no change in floor area. mep drawings, lifesafety work, firealarm & fire sprinkler will be submitted under separate | $36,316 | |
| Aug 17, 2012 | Completed final sign-off Mar 2013 | 135 Main St | Skyline Construction | work at 16th floor: demolition of existing restroom + upgrade to full t24 compliance. tenant improvement under seperate permit. mep + t24 will be submitted under separate permit.Details
work at 16th floor: demolition of existing restroom + upgrade to full t24 compliance. tenant improvement under seperate permit. mep + t24 will be submitted under separate permit. | $60,000 |
| Jul 17, 2012 | Completed final sign-off Jan 2015 | 135 Main St | Turner Construction Co | ground floor. to obtain final inspection for work approved under app#200701161685. all work is complete.Details
ground floor. to obtain final inspection for work approved under app#200701161685. all work is complete. | |
| Jul 17, 2012 | Completed final sign-off Jan 2013 | 135 Main St | Turner Construction Co | ground floor-obtain final inspection for work approved under pa# 2006-1025-6028. all work is completeDetails
ground floor-obtain final inspection for work approved under pa# 2006-1025-6028. all work is complete | |
| Jul 17, 2012 | Completed final sign-off Jan 2013 | 135 Main St | Turner Construction Co | to renew 200703297559. all work is completeDetails
to renew 200703297559. all work is complete | |
| Jul 17, 2012 | Completed final sign-off Oct 2012 | 135 Main St | Turner Construction Co | to renew 200709273951. all work is completeDetails
to renew 200709273951. all work is complete | |
| Jul 17, 2012 | Completed final sign-off Jan 2013 | 135 Main St | Turner Construction Co | ground floor. to obtain final inspection for work approved under app#200608169645. all work is complete.Details
ground floor. to obtain final inspection for work approved under app#200608169645. all work is complete. | |
| Jul 17, 2012 | Completed final sign-off Jan 2013 | 135 Main St | Turner Construction Co | to obtain final inspection for work approved under pa#200702274947. all work is complete.Details
to obtain final inspection for work approved under pa#200702274947. all work is complete. | |
| Jul 17, 2012 | Completed final sign-off Jan 2013 | 135 Main St | Turner Construction Co | ground floor. to obtain final inspection for work approved under app#200711299256. all work is complete.Details
ground floor. to obtain final inspection for work approved under app#200711299256. all work is complete. | |
| Jul 17, 2012 | Completed final sign-off Jan 2015 | 135 Main St | Turner Construction Co | ground floor. to obtain final inspection for work approved under app#200704269743. all work is complete.Details
ground floor. to obtain final inspection for work approved under app#200704269743. all work is complete. | |
| Jul 17, 2012 | Completed final sign-off Oct 2012 | 135 Main St | Turner Construction Co | to obtain final inspection for work approved under pa#200605080979. all work is complete.Details
to obtain final inspection for work approved under pa#200605080979. all work is complete. | |
| Jul 17, 2012 | Completed final sign-off Jan 2013 | 135 Main St | Turner Construction Co | ground floor-obtain final inspection for work approved under pa# 2006-1023-5788. all work is completeDetails
ground floor-obtain final inspection for work approved under pa# 2006-1023-5788. all work is complete | |
| Jul 5, 2012 | Never finaled issued Jul 2012, no final | 135 Main St | Siemens Industry, Inc. | addition of 3 speakers, 3 speaker strobes, and 6 strobes for the spec suite remodel on floor 5. all devices connect onto the life system.Details
addition of 3 speakers, 3 speaker strobes, and 6 strobes for the spec suite remodel on floor 5. all devices connect onto the life system. | $5,100 |
| Jul 2, 2012 | Completed final sign-off Jan 2013 | 135 Main St | Skyline Construction | 5th floor tenant improvement to consist of reconfigurign of existing house van & hot water fan coil, add 3 new cooling van boxes, add 2 new transfer fans, ref pa #2012.06.04.1763. rev. to arch to show unrated partition at corridor.Details
5th floor tenant improvement to consist of reconfigurign of existing house van & hot water fan coil, add 3 new cooling van boxes, add 2 new transfer fans, ref pa #2012.06.04.1763. rev. to arch to show unrated partition at corridor. | $25,000 |
| Jun 13, 2012 | Never finaled issued Jun 2012, no final | 135 Main St | Pioneer Fire Inc. | 5th floor - relocate 13 pendent sprinklersDetails
5th floor - relocate 13 pendent sprinklers | $3,000 |
| Jun 4, 2012 | Never finaled issued Jun 2012, no final | 135 Main St | Skyline Construction | 5th floor-remodel of (e) unfinished tenant improvement including addition of full height non load bearing partitions, ceiling & millworkDetails
5th floor-remodel of (e) unfinished tenant improvement including addition of full height non load bearing partitions, ceiling & millwork | $250,000 |
| May 25, 2012 | Completed final sign-off Jun 2012 | 135 Main St | Siemens Industry, Inc. | addition of 3 speaker/strobe, 1 strobe, 1 smoke, 1 smoke dectector, and the relocation of 1 smoke detectors, for the floor 11 "common corridor" remodel. all devices connect onto the life safety system.Details
addition of 3 speaker/strobe, 1 strobe, 1 smoke, 1 smoke dectector, and the relocation of 1 smoke detectors, for the floor 11 "common corridor" remodel. all devices connect onto the life safety system. | $2,500 |
| Mar 2, 2012 | Completed final sign-off Jun 2012 | 135 Main St | Skyline Construction | 11th floor demolition and construction of new elevator lobby and multi-tenant corridor. mep, life safety and t24 under separate permit.Details
11th floor demolition and construction of new elevator lobby and multi-tenant corridor. mep, life safety and t24 under separate permit. | $120,000 |
| Feb 17, 2012 | Completed final sign-off Jan 2013 | 135 Main St | Skyline Construction | tenant improvement on the 12th floor, and new restroom upgrade. demo and construction of new double door entry. mep, t24, life safety, fire alarm and sprinkler under separate permit.Details
tenant improvement on the 12th floor, and new restroom upgrade. demo and construction of new double door entry. mep, t24, life safety, fire alarm and sprinkler under separate permit. | $115,000 |
| Jun 15, 2011 | Completed final sign-off Jul 2011 | 135 Main St | Siemens Industry, Inc. | 19th floor-addition of 1 speaker/strobe in the conference room for the "aspen insurance" tenant space expansion. the new devices connect onto the (e) life safety systemDetails
19th floor-addition of 1 speaker/strobe in the conference room for the "aspen insurance" tenant space expansion. the new devices connect onto the (e) life safety system | $800 |
| May 31, 2011 | Never finaled issued May 2011, no final | 135 Main St | Dng Cummings Inc/Dba Action Sign Systems | install one non illuminated wall sign - epicDetails
install one non illuminated wall sign - epic | $1,217 |
| May 19, 2011 | Completed final sign-off Jul 2011 | 135 Main St | Pioneer Fire Inc. | relocate 6 fire sprinklers, add 2 fire sprinklers on the 19th floorDetails
relocate 6 fire sprinklers, add 2 fire sprinklers on the 19th floor | $4,000 |
| May 10, 2011 | Completed final sign-off Jul 2012 | 135 Main St | Skyline Construction | office ti on the 19th floor. demo of non struc partitions and construction of new non struc wall partitions, doors, side lights, millwork and finsihes. mep, life saftey and fire sprinkler under separate permitDetails
office ti on the 19th floor. demo of non struc partitions and construction of new non struc wall partitions, doors, side lights, millwork and finsihes. mep, life saftey and fire sprinkler under separate permit | $124,269 |
| Mar 9, 2011 | Completed final sign-off Apr 2011 | 135 Main St | Siemens Industry, Inc. | addition of (6) smoke detectors, 3 delay modules, 13 speaker/strobes, & 3 strobes for the "babson college" remodel on floor 3. all new devices connect into the existing life safety system.Details
addition of (6) smoke detectors, 3 delay modules, 13 speaker/strobes, & 3 strobes for the "babson college" remodel on floor 3. all new devices connect into the existing life safety system. | $7,200 |
| Feb 22, 2011 | Completed final sign-off Apr 2011 | 135 Main St | Skyline Construction | 19th floor-revision to architectural pa# 2010-1229-7542-mechanical & electrical work for t.i to include installing new supply & return grilles per plan. new transfer fan & new lightingDetails
19th floor-revision to architectural pa# 2010-1229-7542-mechanical & electrical work for t.i to include installing new supply & return grilles per plan. new transfer fan & new lighting | $30,000 |
| Feb 22, 2011 | Completed final sign-off Apr 2011 | 135 Main St | Skyline Construction | 3rd floor-revision to architectural pa# 2011-0106-7949-new structural & mechanical, electrical work for t.i.Details
3rd floor-revision to architectural pa# 2011-0106-7949-new structural & mechanical, electrical work for t.i. | $75,000 |
| Feb 16, 2011 | Completed final sign-off Mar 2011 | 135 Main St | Pioneer Fire Inc. | 19th floor:relocate 19, add 2 and remove 2 fire sprinklers- new seimic calculationsDetails
19th floor:relocate 19, add 2 and remove 2 fire sprinklers- new seimic calculations | $6,800 |
| Feb 9, 2011 | Completed final sign-off Apr 2011 | 135 Main St | Siemens Industry, Inc. | addition of 1 smoke detector, 1 relay module, 4 speaker/strobes, and 2 strobes for the aspen insuranc.remodel on 19th floor. all new devices connect onto the extg life safety system.Details
addition of 1 smoke detector, 1 relay module, 4 speaker/strobes, and 2 strobes for the aspen insuranc.remodel on 19th floor. all new devices connect onto the extg life safety system. | $3,900 |
| Jan 20, 2011 | Completed final sign-off May 2011 | 135 Main St | Pioneer Fire Inc. | relocate 54 fire sprinklers. remove 5 fire sprinklersDetails
relocate 54 fire sprinklers. remove 5 fire sprinklers | $15,000 |
| Jan 6, 2011 | Completed final sign-off Apr 2011 | 135 Main St | Skyline Construction | change of occupancy form b to a-3. 3rd floor upgrade restrooms for ada. tenant improvement to existing office space, construction of non-structural partitions lighting & electrical, no structural work, no new office space added. m.e.p., life safety, fire alarm & fire sprinkler under separate permit.Details
change of occupancy form b to a-3. 3rd floor upgrade restrooms for ada. tenant improvement to existing office space, construction of non-structural partitions lighting & electrical, no structural work, no new office space added. m.e.p., life safety, fire alarm & fire sprinkler under separate permit. | $500,000 |
| Dec 29, 2010 | Expired or cancelled cancelled Jan 2026 | 135 Main St | 3rd floor-demo under pa# 2009-1028-0077-change of use from b(office) to b (school, over 12th grade). construct new partitions, doors, sidelights, millwork, lighting, power, finishes & elevator lobby. restrm upgrades. m.e.p, t-24, life safety, fire alarm & fire sprinkler on seperate permit.Details
3rd floor-demo under pa# 2009-1028-0077-change of use from b(office) to b (school, over 12th grade). construct new partitions, doors, sidelights, millwork, lighting, power, finishes & elevator lobby. restrm upgrades. m.e.p, t-24, life safety, fire alarm & fire sprinkler on seperate permit. | $404,478 | |
| Dec 29, 2010 | Completed final sign-off Mar 2011 | 135 Main St | Skyline Construction | 19th floor-demo & construction of new partitions, doors, sidelights, millwork, lighting, power, finishes & elevator lobby. restrm upgrades. m.e.p, t-24, life safety, fire alarm & fire sprinkler on seperate permit.Details
19th floor-demo & construction of new partitions, doors, sidelights, millwork, lighting, power, finishes & elevator lobby. restrm upgrades. m.e.p, t-24, life safety, fire alarm & fire sprinkler on seperate permit. | $207,207 |
| Dec 14, 2010 | Expired or cancelled cancelled Feb 2011 | 135 Main St | C B F Inc | 21st & 22nd floors-electrical portion of tenant improvement on 21st and 22nd floors to include installation of 375 lights, 81 motion sensors, 26 switches, 17s receptacles, 4 poke thrusDetails
21st & 22nd floors-electrical portion of tenant improvement on 21st and 22nd floors to include installation of 375 lights, 81 motion sensors, 26 switches, 17s receptacles, 4 poke thrus | $310,000 |
| Nov 30, 2010 | Never finaled issued Nov 2010, no final | 135 Main St | Siemens Industry, Inc. | 22nd floor-addition of 15 speaker/strobes, 1 strobe, 2 smoke detectors for the "epic" tenant remodel. all new devices connect onto (e) life safety systemDetails
22nd floor-addition of 15 speaker/strobes, 1 strobe, 2 smoke detectors for the "epic" tenant remodel. all new devices connect onto (e) life safety system | $8,940 |
| Nov 30, 2010 | Completed final sign-off Sep 2011 | 135 Main St | Siemens Industry, Inc. | 21st floor-addition of 14 speaker/strobes, 3 strobes, 3 smoke detectors for the "epic" tenant remodel. all new devices connect onto (e) life safety systemDetails
21st floor-addition of 14 speaker/strobes, 3 strobes, 3 smoke detectors for the "epic" tenant remodel. all new devices connect onto (e) life safety system | $10,325 |
| Oct 27, 2010 | Completed final sign-off Jun 2011 | 135 Main St | Bcci Construction Company | mechanical, electrical, and lighting work associated with approved app #201009291837Details
mechanical, electrical, and lighting work associated with approved app #201009291837 | $350,000 |
| Oct 26, 2010 | Never finaled issued Oct 2010, no final | 135 Main St | Ayoob & Peery Plumbing Co Inc | 21st & 22nd floors- 21st floor -relocae, add & removed fire sprinkler heads per tenant improvement-92 relocated, 6 added, 7 removed; 22nd floor - relocate, add & removed fire sprinkelr heads per t.i. 85 relocate, 6 add, 7 removed.Details
21st & 22nd floors- 21st floor -relocae, add & removed fire sprinkler heads per tenant improvement-92 relocated, 6 added, 7 removed; 22nd floor - relocate, add & removed fire sprinkelr heads per t.i. 85 relocate, 6 add, 7 removed. | $47,000 |
| Oct 21, 2010 | Completed final sign-off Nov 2010 | 135 Main St | Siemens Industry, Inc. | 18th floor-addition of 2 smoke detectors, 1 relay module, 3 speaker/strobes, 2 strobes for suite #1800. these new devices connect onto (e) life safety circuitsDetails
18th floor-addition of 2 smoke detectors, 1 relay module, 3 speaker/strobes, 2 strobes for suite #1800. these new devices connect onto (e) life safety circuits | $2,860 |
| Oct 21, 2010 | Completed final sign-off Nov 2010 | 135 Main St | Siemens Industry, Inc. | 17th floor-addition of 4 speaker/strobes for suite #1750. these devices connect onto (e) life safety circuitsDetails
17th floor-addition of 4 speaker/strobes for suite #1750. these devices connect onto (e) life safety circuits | $1,400 |
| Oct 1, 2010 | Completed final sign-off Nov 2010 | 135 Main St | Pioneer Fire Inc. | 17th & 18th floors - relocate 27 fire sprinklers.Details
17th & 18th floors - relocate 27 fire sprinklers. | $5,600 |
| Sep 29, 2010 | Completed final sign-off Jan 2011 | 135 Main St | R L H Fire Protection Inc | 12th floor t.i. upgrade on the (e) fire sprinkler system (black letter discovery), relocate 2 heads , add 1 head, delete 1 head total 3 heads.Details
12th floor t.i. upgrade on the (e) fire sprinkler system (black letter discovery), relocate 2 heads , add 1 head, delete 1 head total 3 heads. | $900 |
| Sep 29, 2010 | Completed final sign-off May 2011 | 135 Main St | Bcci Construction Company | 21st & 22nd floors-t.i including non-structural interior work, new partitions, new fixtures & millwork. m.e.p, fire, life safety under seperate permitDetails
21st & 22nd floors-t.i including non-structural interior work, new partitions, new fixtures & millwork. m.e.p, fire, life safety under seperate permit | $1,000,000 |
| Sep 17, 2010 | Completed final sign-off Nov 2010 | 135 Main St | Skyline Construction | 4th floor-commercial tenant improvement which includes non structural partitions, ceiling & finishes.Details
4th floor-commercial tenant improvement which includes non structural partitions, ceiling & finishes. | $310,000 |
| Jul 20, 2010 | Completed final sign-off Jan 2011 | 135 Main St | Gci, Inc | remodel of (e) tenant improvement, area of new work includes adding demountable accoustical partitions with doors up to (e) ceiling to seperate work groups. same tenant throughout whole floorDetails
remodel of (e) tenant improvement, area of new work includes adding demountable accoustical partitions with doors up to (e) ceiling to seperate work groups. same tenant throughout whole floor | $2,500 |
| May 19, 2010 | Completed final sign-off Nov 2010 | 135 Main St | Siemens Industry, Inc. | floor 11. addition of 3 speaker/strobes and 1 smoke detector ( at held open doors) onto the existing life safety system for the 'comsys' tenant remodel on floor 11Details
floor 11. addition of 3 speaker/strobes and 1 smoke detector ( at held open doors) onto the existing life safety system for the 'comsys' tenant remodel on floor 11 | $1,800 |
| Apr 29, 2010 | Completed final sign-off Nov 2010 | 135 Main St | Skyline Construction | 11th floor ste 1120: demolition of non-structural partitions & construction of new non-structural partitions, new ceiling tile & grid, millwork, doors & finsihes. mep, life safety & sprinkler under separate permit.Details
11th floor ste 1120: demolition of non-structural partitions & construction of new non-structural partitions, new ceiling tile & grid, millwork, doors & finsihes. mep, life safety & sprinkler under separate permit. | $113,228 |
| Nov 18, 2009 | Completed final sign-off Jan 2010 | 135 Main St | Siemens Industry, Inc. | 20th fl. addition of 1 smoke detector, 5 speakers/strobes for partial floor. remodel of (e) "bh&p" tenant space on 20th fl. all new devices convert onto (e) life safety system circuits.Details
20th fl. addition of 1 smoke detector, 5 speakers/strobes for partial floor. remodel of (e) "bh&p" tenant space on 20th fl. all new devices convert onto (e) life safety system circuits. | $2,800 |
| Oct 28, 2009 | Completed final sign-off Jul 2010 | 135 Main St | tenant improvement consists of demolition of non structural partitions, removal of finishes, demolition light fixtures, per ab-017. affected area is about 2,300 sf (ceiling to remain)Details
tenant improvement consists of demolition of non structural partitions, removal of finishes, demolition light fixtures, per ab-017. affected area is about 2,300 sf (ceiling to remain) | $100,000 | |
| Oct 1, 2009 | Completed final sign-off Jan 2010 | 135 Main St | Siemens Industry, Inc. | 18th floor-addition of 16 speakers/strobes, 3 strobes, 2 smoke detectors & a relay module for the bh & p/corridor, remodel on floor 18. all new devices connect onto the (e) life safety systemDetails
18th floor-addition of 16 speakers/strobes, 3 strobes, 2 smoke detectors & a relay module for the bh & p/corridor, remodel on floor 18. all new devices connect onto the (e) life safety system | $8,500 |
| Sep 21, 2009 | Completed final sign-off Jan 2010 | 135 Main St | Ayoob & Peery Plumbing Co Inc | relocate 27 and remove 1 fire sprinkler for tenant improvementDetails
relocate 27 and remove 1 fire sprinkler for tenant improvement | $4,000 |
| Sep 2, 2009 | Completed final sign-off Jan 2010 | 135 Main St | Ayoob & Peery Plumbing Co Inc | add, relocate and remove fire sprinklers on 18th floor. 19 add, 27 relocate, 4 remote. calculated system and new bracing calc'sDetails
add, relocate and remove fire sprinklers on 18th floor. 19 add, 27 relocate, 4 remote. calculated system and new bracing calc's | $7,470 |