Huntsman Ag
- License
- CA223
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, designer
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to May 2015
3 permits since 2000 (architect on 2 permits, designer on 1 permit): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Field Construction Inc., Skyline Construction, Source Planning And Construction Inc
- Architects
- George Soskin
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 28, 2015 | Never finaled issued May 2015, no final | 1160 Battery St | Source Planning And Construction Inc | revision to 201504072922: new non rated idf room and new non structural partition at reception. new finishes to match. n/a for maher.Details
revision to 201504072922: new non rated idf room and new non structural partition at reception. new finishes to match. n/a for maher. | |
| Jun 26, 2014 | Completed final sign-off Feb 2015 | 135 Main St | Skyline Construction | 19/f: non structural demo, new non structural partitions, finishes, elec, and ceiling. no change in occupancy, use, area. mep and life safety under sep permit. compliance with ordinance no. 155-13 not required.Details
19/f: non structural demo, new non structural partitions, finishes, elec, and ceiling. no change in occupancy, use, area. mep and life safety under sep permit. compliance with ordinance no. 155-13 not required. | $21,735 |
| Mar 1, 2005 | Completed final sign-off Mar 2005 | 1 Embarcadero Center | Field Construction Inc. | oti-4, 22nd floor, ls.Details
oti-4, 22nd floor, ls. | $3,000 |