Achill Beg Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to May 2026
- Last 24 months
- 19 permits filed
241 permits since 2000: 189 completed, 20 in progress, 19 never finaled, 13 expired or cancelled.
Of the 19 never-finaled permits, 4 are 3 to 5 years old, 7 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
39 kitchen remodel permits: 37 completed, 2 never finaled. Typically 0 days from filing to permit and 210 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2022 | Completed final sign-off Apr 2023 | 1950 Sacramento St | unit #1: remodel (e) kitchen in kind. nov not on this permit.Details
unit #1: remodel (e) kitchen in kind. nov not on this permit. | $10,000 |
| Jun 10, 2022 | Completed final sign-off Apr 2023 | 1950 Sacramento St | new roof top deck to unit #5 new ight well in fill at east side light courts. remodel kitchen area at unit 5Details
new roof top deck to unit #5 new ight well in fill at east side light courts. remodel kitchen area at unit 5 | $40,000 |
| Mar 30, 2022 | Completed final sign-off Apr 2023 | 2436 Greenwich St | remodel (4) kitchens and (4) bathrooms- replace kitchen cabinets, counter tops and fixtures. replace all fixtures, and finish at bathrooms. rewire as required- remove gyp bd for dryrot repair and investigation- replace w/ 5/8 " gyp bd type-x. upgrade extg plumbing.Details
remodel (4) kitchens and (4) bathrooms- replace kitchen cabinets, counter tops and fixtures. replace all fixtures, and finish at bathrooms. rewire as required- remove gyp bd for dryrot repair and investigation- replace w/ 5/8 " gyp bd type-x. upgrade extg plumbing. | $80,000 |
| Dec 20, 2021 | Completed final sign-off Mar 2022 | 3747 Jackson St | kitchen renovation. add 1 sink, 1 dishwasher, and 1 pendant light fixture.Details
kitchen renovation. add 1 sink, 1 dishwasher, and 1 pendant light fixture. | $5,000 |
| Apr 20, 2021 | Completed final sign-off May 2022 | 42 Otis St | alteration to the approved s-2 architectural addendum for pa #201703302802-s2 - updated kitchen layouts in all units on the floor plans and reflected ceiling plans to match the s-3 mep drawing. add access hatch and hatch-detail to the elevator shaft & a letter from schindler, elevator subcontractorDetails
alteration to the approved s-2 architectural addendum for pa #201703302802-s2 - updated kitchen layouts in all units on the floor plans and reflected ceiling plans to match the s-3 mep drawing. add access hatch and hatch-detail to the elevator shaft & a letter from schindler, elevator subcontractor | |
| Jul 28, 2020 | Completed final sign-off Oct 2020 | 2964 Pine St | replace (e) kitchen, cabinet & countertops in kind.no changes to (e) petition. install new bath tub, retile bath tub & surrounding area & floor. install new bathroom vanity in existing location.Details
replace (e) kitchen, cabinet & countertops in kind.no changes to (e) petition. install new bath tub, retile bath tub & surrounding area & floor. install new bathroom vanity in existing location. | $30,000 |
| May 21, 2019 | Never finaled issued May 2019, no final | 2286 Jackson St | apt#8 remove kitchen cabinets & replace with new cabinets & countertop & full kitchen remodel. n/a for maher.Details
apt#8 remove kitchen cabinets & replace with new cabinets & countertop & full kitchen remodel. n/a for maher. | $20,000 |
| Sep 5, 2018 | Completed final sign-off Apr 2019 | 2677 Mcallister St | fill in (e) 1st floor porch. interior remodel of flats - including 3 kitchens, 3 bathrooms and 3 brand new baths, partial seismic stregthening at rear of building.Details
fill in (e) 1st floor porch. interior remodel of flats - including 3 kitchens, 3 bathrooms and 3 brand new baths, partial seismic stregthening at rear of building. | $50,000 |
| Jun 14, 2018 | Completed final sign-off Jan 2019 | 1117 Ocean Av | unit: r/r kitchen cbinets and countertops. r/r bathroom tileat 2 bathrooms. no mod of walls or layout.Details
unit: r/r kitchen cbinets and countertops. r/r bathroom tileat 2 bathrooms. no mod of walls or layout. | $35,000 |
| Jun 14, 2018 | Completed final sign-off Jan 2019 | 1117 Ocean Av | unit 309: r/r kitchen cbinets and countertops. r/r bathroom tileat 2 bathrooms. no mod of walls or layout.Details
unit 309: r/r kitchen cbinets and countertops. r/r bathroom tileat 2 bathrooms. no mod of walls or layout. | $35,000 |
| Jun 14, 2018 | Completed final sign-off Jan 2019 | 1117 Ocean Av | unit 305: r/r kitchen cbinets and countertops. r/r bathroom tileat 2 bathrooms. no mod of walls or layout.Details
unit 305: r/r kitchen cbinets and countertops. r/r bathroom tileat 2 bathrooms. no mod of walls or layout. | $35,000 |
| Jun 14, 2018 | Completed final sign-off Jan 2019 | 1117 Ocean Av | unit 306: r/r kitchen cbinets and countertops. r/r bathroom tileat 2 bathrooms. no mod of walls or layout.Details
unit 306: r/r kitchen cbinets and countertops. r/r bathroom tileat 2 bathrooms. no mod of walls or layout. | $35,000 |
| Jun 14, 2018 | Completed final sign-off Jan 2019 | 1117 Ocean Av | unit 204: r/r kitchen cbinets and countertops. r/r bathroom tile at 2 bathrooms. no mod of walls or layout.Details
unit 204: r/r kitchen cbinets and countertops. r/r bathroom tile at 2 bathrooms. no mod of walls or layout. | $35,000 |
| Jun 11, 2018 | Completed final sign-off Jan 2019 | 1117 Ocean Av | unit 307: remove/replace kitchen cabinets & counter tops; remove/replace bathtub tile @ (2) bathroomsDetails
unit 307: remove/replace kitchen cabinets & counter tops; remove/replace bathtub tile @ (2) bathrooms | $35,000 |
| Jun 11, 2018 | Completed final sign-off Jan 2019 | 1117 Ocean Av | unit 308: remove/replace kitchen cabinets & counter tops; remove/replace bathtub tile @ (2) bathroomsDetails
unit 308: remove/replace kitchen cabinets & counter tops; remove/replace bathtub tile @ (2) bathrooms | $35,000 |
| Jun 11, 2018 | Completed final sign-off Jan 2019 | 1117 Ocean Av | unit 304: remove/replace kitchen cabinets & counter tops; remove/replace bathtub tile @ (2) bathroomsDetails
unit 304: remove/replace kitchen cabinets & counter tops; remove/replace bathtub tile @ (2) bathrooms | $35,000 |
| Jun 11, 2018 | Completed final sign-off Jan 2019 | 1117 Ocean Av | unit 202: remove/replace kitchen cabinets & counter tops; remove/replace bathtub tile @ (2) bathroomsDetails
unit 202: remove/replace kitchen cabinets & counter tops; remove/replace bathtub tile @ (2) bathrooms | $35,000 |
| Jun 11, 2018 | Completed final sign-off Jan 2019 | 1117 Ocean Av | unit 201: remove/replace kitchen cabinets & counter tops; remove/replace bathtub tile @ (2) bathroomsDetails
unit 201: remove/replace kitchen cabinets & counter tops; remove/replace bathtub tile @ (2) bathrooms | $35,000 |
| Apr 20, 2018 | Completed final sign-off Aug 2018 | 673 Haight St | revisions to 201803305078: 673-675 haight st - remodel kitchen layout and bathrooms at the 2nd and 3rd floor levels for 2 units. infill three windows & reduce height of 2 windows at the kitchen at east wall. replace wood windows in kindDetails
revisions to 201803305078: 673-675 haight st - remodel kitchen layout and bathrooms at the 2nd and 3rd floor levels for 2 units. infill three windows & reduce height of 2 windows at the kitchen at east wall. replace wood windows in kind | $50,000 |
| Apr 9, 2018 | Completed final sign-off Jun 2018 | 1142 Vallejo St | demo kitchen new cabinets and counter tops. demo bath new fixtures and tile. kitchen and bath remodel in kindDetails
demo kitchen new cabinets and counter tops. demo bath new fixtures and tile. kitchen and bath remodel in kind | $40,000 |
| Mar 30, 2018 | Completed final sign-off Aug 2018 | 673 Haight St | remodel 2 kitchens, cabinets & counters. upper & lower (673&675 haight). remodel 2 bathrooms, new fixtures & tile & upper & lower. (673&675 haight)Details
remodel 2 kitchens, cabinets & counters. upper & lower (673&675 haight). remodel 2 bathrooms, new fixtures & tile & upper & lower. (673&675 haight) | $40,000 |
| Mar 6, 2018 | Completed final sign-off Apr 2018 | 2425 Larkin St | apt. #4: replace kitchen counter. replace kitchen window to light well in same location and same size. u-factor =0.32Details
apt. #4: replace kitchen counter. replace kitchen window to light well in same location and same size. u-factor =0.32 | $20,000 |
| Jul 20, 2016 | Completed final sign-off Dec 2016 | 1221 Greenwich St | unit #8, demo kitchen, new cabinets and countertop, sheetrock. paint kitchen remodel; demo 3 bathrooms, new fixtures, tile, sheet rock and paint for bathroom remodelDetails
unit #8, demo kitchen, new cabinets and countertop, sheetrock. paint kitchen remodel; demo 3 bathrooms, new fixtures, tile, sheet rock and paint for bathroom remodel | $50,000 |
| Jul 18, 2016 | Completed final sign-off Jan 2022 | 338 Duncan St | horizontal & vertical addition, remodel (e) sfr, add new bthrooms, new bedrooms, new room down, relocate kitchen, new roof deck, new stair penthouse access, rebuild stair to rear yard, new interior stairs, modify wall layout, and new garage at (e) 1st floor & new driveway.Details
horizontal & vertical addition, remodel (e) sfr, add new bthrooms, new bedrooms, new room down, relocate kitchen, new roof deck, new stair penthouse access, rebuild stair to rear yard, new interior stairs, modify wall layout, and new garage at (e) 1st floor & new driveway. | $60,000 |
| Jun 30, 2016 | Completed final sign-off Mar 2018 | 2761 Pine St | remodel (e) unit residence - relocate unit at 3rd floor down to 1st floor. combine 2nd and 3rd floor as one unit. infill below habitable space & reduce building depth . remodel all levels, relocate kitchens, add additional bathrooms, bedrooms & reconfigure walls. provide new entry at ground levelDetails
remodel (e) unit residence - relocate unit at 3rd floor down to 1st floor. combine 2nd and 3rd floor as one unit. infill below habitable space & reduce building depth . remodel all levels, relocate kitchens, add additional bathrooms, bedrooms & reconfigure walls. provide new entry at ground level | $150,000 |
| Apr 7, 2016 | Completed final sign-off Nov 2016 | 1829 Church St | revision to pa 2014-0207-8054 revise plan layout at 2nd floor @ area between entry and kitchenDetails
revision to pa 2014-0207-8054 revise plan layout at 2nd floor @ area between entry and kitchen | |
| Sep 30, 2015 | Completed final sign-off Jun 2017 | 1129 Stanyan St | add unit per ordinance #30-15. dwelling unit addition at garage floor. addition of a new bathroom, kitchen & bedroom.Details
add unit per ordinance #30-15. dwelling unit addition at garage floor. addition of a new bathroom, kitchen & bedroom. | $60,000 |
| Jul 27, 2015 | Completed final sign-off Mar 2016 | 2565 Larkin St | remove old kitchen cabinets and counter top and replace with new. sam layout. non structural.Details
remove old kitchen cabinets and counter top and replace with new. sam layout. non structural. | $11,000 |
| Feb 24, 2015 | Never finaled issued Feb 2015, no final | 645 Elizabeth St | remove old kitchen cabinets and sheet rock. new cabnets and counter. remove old bathroom tile, new tub shower, tile and toilet.Details
remove old kitchen cabinets and sheet rock. new cabnets and counter. remove old bathroom tile, new tub shower, tile and toilet. | $32,000 |
| Jan 20, 2015 | Completed final sign-off Apr 2016 | 256 Chenery St | remodel extg s.f.d. modify extg walls. replace foundations and retaining walls at rear. upgrade substandard walls at property line add laundry room, bath. remodel bathrooms and kitchen. modify framing , add dormers and roof deck at rear.Details
remodel extg s.f.d. modify extg walls. replace foundations and retaining walls at rear. upgrade substandard walls at property line add laundry room, bath. remodel bathrooms and kitchen. modify framing , add dormers and roof deck at rear. | $125,000 |
| Aug 28, 2014 | Completed final sign-off Jun 2015 | 2104 Bush St | remove old sheatrock old kitchen cabinets. new electrical & plumbing re sheat rock. new cabinets & counters and paint.Details
remove old sheatrock old kitchen cabinets. new electrical & plumbing re sheat rock. new cabinets & counters and paint. | $20,100 |
| Mar 11, 2014 | Completed final sign-off Feb 2015 | 311 Scott St | remodel existing single family dwelling modify (e) walls, add bathroom ,bedroom & roof deck at rear, remodel (e) bathrooms & kitchen.Details
remodel existing single family dwelling modify (e) walls, add bathroom ,bedroom & roof deck at rear, remodel (e) bathrooms & kitchen. | $70,000 |
| Feb 7, 2014 | Completed final sign-off Nov 2016 | 1829 Church St | remodel front elevation. rear yard 3 story additon incl roof deck, new bath, bedroom, family room at 1st floor. provide vanity & family room & remodel kitchen at 2nd floor. new master bedroom & bath 3rd floor.Details
remodel front elevation. rear yard 3 story additon incl roof deck, new bath, bedroom, family room at 1st floor. provide vanity & family room & remodel kitchen at 2nd floor. new master bedroom & bath 3rd floor. | $400,000 |
| Jun 13, 2013 | Completed final sign-off May 2014 | 691 Marina Bl | remodel kitchen and lower level laundry areaDetails
remodel kitchen and lower level laundry area | $16,000 |
| Sep 28, 2012 | Completed final sign-off Sep 2013 | 507 Capp St | remodel of 3 story extg single family dwelling. new dormer,balcony at roof, new windows and doors at exterior, 2 new bathrooms. remodel extg bathrooms. remove extg partition walls. new partition walls. remodel kitchen, rebuild deck and stairs at rear.Details
remodel of 3 story extg single family dwelling. new dormer,balcony at roof, new windows and doors at exterior, 2 new bathrooms. remodel extg bathrooms. remove extg partition walls. new partition walls. remodel kitchen, rebuild deck and stairs at rear. | $120,000 |
| Jun 2, 2011 | Completed final sign-off Nov 2011 | 2028 Beach St | demo kitchen, new cabinet, lights and range. at least 50% high efficiency (he) lighting cec 150(k). demo bathroom, new bath & fixtures, tile paint sheatrock. he lighting or occupancy sensor.Details
demo kitchen, new cabinet, lights and range. at least 50% high efficiency (he) lighting cec 150(k). demo bathroom, new bath & fixtures, tile paint sheatrock. he lighting or occupancy sensor. | $21,000 |
| Dec 15, 2010 | Completed final sign-off Mar 2011 | 1382 05th Av | unit #5: demo 1 bathroom, new bath fixtures, remodel demo 1 kitchen cabinets and fixtures, remodel unit #5 only; no change to walls windows or doors, lighting changes to comply with cec 150(k)Details
unit #5: demo 1 bathroom, new bath fixtures, remodel demo 1 kitchen cabinets and fixtures, remodel unit #5 only; no change to walls windows or doors, lighting changes to comply with cec 150(k) | $18,500 |
| Jun 11, 2010 | Completed final sign-off Sep 2010 | 665 Elizabeth St | demolish select (e) partition, doors & kitchen in (e) admin. offices. build (n) partitions, doors & partial accessible upgrades @ bldg. entry.Details
demolish select (e) partition, doors & kitchen in (e) admin. offices. build (n) partitions, doors & partial accessible upgrades @ bldg. entry. | $20,000 |
| Jun 3, 2009 | Completed final sign-off Aug 2010 | 60 Cerritos Av | const of two story addition @ rear of build to enlarge existing kitchen & to enlarge existing rear bedroom into new master bedrm suite w/ new -Details
const of two story addition @ rear of build to enlarge existing kitchen & to enlarge existing rear bedroom into new master bedrm suite w/ new - | $130,000 |