Block 0228, lot 015
520 Montgomery St
- City’s use
- Commercial Retail
- Built
- 1920
- Stories
- 2
- Units
- 1
- Building
- 5,310 sq ft
- Lot
- 1,770 sq ft
- Zoning
- C3O
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 23, 2026 | Completed final sign-off Feb 2026 | 520 Montgomery St | Apollo Building & Roofing Group Inc. | reroof 2300 sq ft tear off, install polyglass, hot work permit#126727Details
reroof 2300 sq ft tear off, install polyglass, hot work permit#126727 | $28,000 |
| Aug 15, 2019 | Never finaled issued Aug 2019, no final | 520 Montgomery St | street spaceDetails
street space | ||
| Jun 20, 2016 | Completed final sign-off Sep 2017 | 520 Montgomery St | Martin Sign Co Inc. | v studio salons: install non electric projecting signDetails
v studio salons: install non electric projecting sign | $2,200 |
| Dec 4, 2014 | Expired or cancelled withdrawn May 2016 | 520 Montgomery St | Garnett Signs Llc | erect 2 non electric projecting double faced banner signs; maher n/aDetails
erect 2 non electric projecting double faced banner signs; maher n/a | $1,700 |
| Jul 28, 2014 | Never finaled issued Jul 2014, no final | 520 Montgomery St | street spaceDetails
street space | ||
| Jun 11, 2014 | Expired or cancelled withdrawn Oct 2014 | 520 Montgomery St | Kevin M. Sullivan & Associates Inc | hvac ref 201309166849Details
hvac ref 201309166849 | $35,000 |
| Jun 6, 2014 | Completed final sign-off Nov 2014 | 520 Montgomery St | Dettaglio Construction Inc Dba Dci Const | new foundation elements, new basement story posts and 1st floor beam to support new level 1 topping slab. compliance with ordinance no. 155-13 not required.Details
new foundation elements, new basement story posts and 1st floor beam to support new level 1 topping slab. compliance with ordinance no. 155-13 not required. | $30,000 |
| Feb 10, 2014 | Completed final sign-off Nov 2014 | 520 Montgomery St | Dettaglio Construction Inc Dba Dci Const | 2nd fl shoring of existing beams is required to demolish the existing concrete beams and install new steel beams. compliance with ord 155-13 not reqd.Details
2nd fl shoring of existing beams is required to demolish the existing concrete beams and install new steel beams. compliance with ord 155-13 not reqd. | $25,000 |
| Feb 10, 2014 | Completed final sign-off Nov 2014 | 520 Montgomery St | Dettaglio Construction Inc Dba Dci Const | sidewalk shoring of existing sidewalk to repair existing concrete beams that are being repaired as part of the 520 montgomery ti. compliance with ord no 155-13 does not apply.Details
sidewalk shoring of existing sidewalk to repair existing concrete beams that are being repaired as part of the 520 montgomery ti. compliance with ord no 155-13 does not apply. | $19,000 |
| Nov 20, 2013 | Completed final sign-off Nov 2014 | 520 Montgomery St | Dettaglio Construction Inc Dba Dci Const | demolish existing mezzanine and stair only, demo permit only, no new construction. building is vacant, no occupants. per ab-017.Details
demolish existing mezzanine and stair only, demo permit only, no new construction. building is vacant, no occupants. per ab-017. | $25,000 |
| Sep 16, 2013 | Completed final sign-off Oct 2014 | 520 Montgomery St | Dettaglio Construction Inc Dba Dci Const | remove(e)stair & mezz.fl level,interior t/i include/n stair no change/n mezz.fl,struct.& support members/n accessible restrm at g/f,/n restrms at basemt & 2/f, no exterior wk,n interior partitns,mep under sep.permits(compl. w/maher ord. extended #155-13 not requir'd. excavation less than 50 cu. yd.)Details
remove(e)stair & mezz.fl level,interior t/i include/n stair no change/n mezz.fl,struct.& support members/n accessible restrm at g/f,/n restrms at basemt & 2/f, no exterior wk,n interior partitns,mep under sep.permits(compl. w/maher ord. extended #155-13 not requir'd. excavation less than 50 cu. yd.) | $225,000 |
| Nov 29, 2007 | Completed final sign-off Jan 2008 | 520 Montgomery St | Gee Construction | revision to approved pa# 2006.07.11.6247 r-1 ( permit# 1105691), sheets hc-1,t-1,a-1.1, a1.2. primary entrance compliance.change h.c. toilet to toilet. add autoamtic door opener for front door.Details
revision to approved pa# 2006.07.11.6247 r-1 ( permit# 1105691), sheets hc-1,t-1,a-1.1, a1.2. primary entrance compliance.change h.c. toilet to toilet. add autoamtic door opener for front door. | |
| Oct 1, 2007 | Never finaled issued Nov 2007, no final | 520 Montgomery St | install electric, single faced, wall sign.Details
install electric, single faced, wall sign. | $3,500 | |
| Jul 11, 2006 | Completed final sign-off Jan 2008 | 520 Montgomery St | re-do teller counter (surface) interior partition, construct a confrence room, carpet replacement. install handrails in stairways.Details
re-do teller counter (surface) interior partition, construct a confrence room, carpet replacement. install handrails in stairways. | $80,000 | |
| May 8, 2006 | Completed final sign-off May 2006 | 520 Montgomery St | Signs Express Manufacturing | to erect non-electric wall single faced sign.Details
to erect non-electric wall single faced sign. | |
| May 8, 2006 | Completed final sign-off May 2006 | 520 Montgomery St | Signs Express Manufacturing | to erect non-electric door / window single faced sign.Details
to erect non-electric door / window single faced sign. | |
| Apr 14, 2006 | Expired or cancelled cancelled Jul 2006 | 520 Montgomery St | Signs Express Manufacturing | erect sign for non electric, wall, single faced.Details
erect sign for non electric, wall, single faced. | |
| Apr 14, 2006 | Expired or cancelled cancelled Jul 2006 | 520 Montgomery St | Signs Express Manufacturing | erect non-electric door/window signDetails
erect non-electric door/window sign |