Daniel Pamperin
- Listed as
- architect, engineer
- Firm
- Gensler
- Based in
- San Frnacisco
- On San Francisco permits
- Jun 2019 to Sep 2026
89 permits since 2000 (architect on 88 permits, engineer on 1 permit): 57 completed, 7 in progress, 14 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 181 Fremont St | 18th fl - installation of door hardware release of electronically locked egress doors. reference pa# 202412187109Details
18th fl - installation of door hardware release of electronically locked egress doors. reference pa# 202412187109 | $2,500 | |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 181 Fremont St | level 16: egress path revision and installation of door hardware release of electronic door lockers. (ref bpa: 2024.1218.7109 and 2024.0730.7534)Details
level 16: egress path revision and installation of door hardware release of electronic door lockers. (ref bpa: 2024.1218.7109 and 2024.0730.7534) | $5,000 | |
| Apr 22, 2025 | In progress filed Apr 2025, not yet issued | 2 Folsom St | 1st fl - egress and occupancy analysis of exising conditionsDetails
1st fl - egress and occupancy analysis of exising conditions | ||
| Apr 22, 2025 | In progress filed Apr 2025, not yet issued | 2 Folsom St | 1st fl - egress and occupancy analysis of exising conditionsDetails
1st fl - egress and occupancy analysis of exising conditions | ||
| Apr 22, 2025 | In progress filed Apr 2025, not yet issued | 2 Folsom St | 1st fl - egress and occupancy analysis of exising conditionsDetails
1st fl - egress and occupancy analysis of exising conditions | ||
| Nov 19, 2024 | Completed final sign-off Apr 2025 | 600 Harrison St | Novo Construction Inc | 4th fl - ti to include demolition and new non strutural partitions and finishes, mep under separate permitDetails
4th fl - ti to include demolition and new non strutural partitions and finishes, mep under separate permit | $500,000 |
| Oct 29, 2024 | In progress filed Oct 2024, not yet issued | 2 Folsom St | 4th fl- installation of 6 single phone booths and associated electrical & structural. no change in occupancy, use or areaDetails
4th fl- installation of 6 single phone booths and associated electrical & structural. no change in occupancy, use or area | $100,000 | |
| Sep 26, 2024 | Completed final sign-off Feb 2025 | 181 Fremont St | Sc Builders, Inc | 25th fl: construction of (n) millwork including minor non structural partitions. (e) acoustical grid, tile & gyp board ceilings. light fixtures and finishes to remain. no change in use and exit stairs. egress path elevators (deferred sprinklers, fire alarm & mep if needed)Details
25th fl: construction of (n) millwork including minor non structural partitions. (e) acoustical grid, tile & gyp board ceilings. light fixtures and finishes to remain. no change in use and exit stairs. egress path elevators (deferred sprinklers, fire alarm & mep if needed) | $188,000 |
| Aug 26, 2024 | Completed final sign-off Dec 2024 | 101 California St | Novo Construction Inc | new construction for glazing wall in existing conference room 1 green wall on th 8th fl. scope of work includes construction on on structural wall, millwork and finishes.Details
new construction for glazing wall in existing conference room 1 green wall on th 8th fl. scope of work includes construction on on structural wall, millwork and finishes. | $45,511 |
| May 29, 2024 | In progress issued Jul 2024 | 220 Montgomery St | Principal Builders Inc. | window sign "yes sf"Details
window sign "yes sf" | $100 |
| May 29, 2024 | Completed final sign-off Aug 2024 | 220 Montgomery St | Principal Builders Inc. | ground floor - ti of (e) space. minimal exterior work including new paint @ door entryway and window signage (under separate permit). no mechanical work. new autoator at frontDetails
ground floor - ti of (e) space. minimal exterior work including new paint @ door entryway and window signage (under separate permit). no mechanical work. new autoator at front | $509,609 |
| Apr 3, 2024 | Completed final sign-off Dec 2024 | 345 Spear St | Bcci Construction Company | 4th fl change door swing on restroom stall doors and install auto openers in mens and womens restroomsDetails
4th fl change door swing on restroom stall doors and install auto openers in mens and womens restrooms | $11,938 |
| Nov 20, 2023 | Completed final sign-off Oct 2024 | 181 Fremont St | Sc Builders, Inc | 7th flr: construction of new non-structural partition, gyp. bd. gyp board ceiling. (1) light fixture added (1) plumbing fixtures to be relocated, finishes to include changes to the (e) hallway 701. mep deferred for future application. no change in exit stair or elevatorDetails
7th flr: construction of new non-structural partition, gyp. bd. gyp board ceiling. (1) light fixture added (1) plumbing fixtures to be relocated, finishes to include changes to the (e) hallway 701. mep deferred for future application. no change in exit stair or elevator | $175,000 |
| Nov 6, 2023 | Completed final sign-off Jul 2024 | 345 Spear St | Bcci Construction Company | 4th fl-revision to permit 2022-1128-7247 & 202308164561. revising stair core #2 and stair core #3. interior only.Details
4th fl-revision to permit 2022-1128-7247 & 202308164561. revising stair core #2 and stair core #3. interior only. | |
| Oct 3, 2023 | Completed final sign-off May 2024 | 1563 Mission St | Swinerton Builders | 4th floor: construction of new non-structural partions, acoustical grid and tile drywall ceilings, light fixtures, mill work and finishes. also includes upgraded meps.Details
4th floor: construction of new non-structural partions, acoustical grid and tile drywall ceilings, light fixtures, mill work and finishes. also includes upgraded meps. | $2,907,146 |
| Aug 16, 2023 | Completed final sign-off Apr 2024 | 888 Brannan St | Hathaway Dinwiddie Co. | 4th fl - ti including construction of new non-structural partitions, new accoustical grid & tile ceilings & gyp board ceilings; new electrical & lighting, new finishes throughout, new mech, electrical & plumbing equipmentDetails
4th fl - ti including construction of new non-structural partitions, new accoustical grid & tile ceilings & gyp board ceilings; new electrical & lighting, new finishes throughout, new mech, electrical & plumbing equipment | $1,500,000 |
| Aug 16, 2023 | Completed final sign-off Jul 2024 | 345 Spear St | Bcci Construction Company | 4th flr - revision to pa#2022-1128-7247. demo of (e) non-structural partitions, acoustical grid & tile and gyp, ceilings, light fixtures and millwork, increasing vestibule & door sizes at (2) egress stairs, structural changes includes.Details
4th flr - revision to pa#2022-1128-7247. demo of (e) non-structural partitions, acoustical grid & tile and gyp, ceilings, light fixtures and millwork, increasing vestibule & door sizes at (2) egress stairs, structural changes includes. | |
| Jun 21, 2023 | Completed final sign-off Jul 2024 | 345 Spear St | Bcci Construction Company | 4th flr. revision to pa#: 202211106283. demo of west side only of existing non-structural partitions, ceilings, light fixtures, millwor and finishes. per ab-017. no work oon east side of the floorDetails
4th flr. revision to pa#: 202211106283. demo of west side only of existing non-structural partitions, ceilings, light fixtures, millwor and finishes. per ab-017. no work oon east side of the floor | |
| Mar 9, 2023 | Expired or cancelled expired Apr 2026 | 510 Townsend St | Bcci Construction Company | 1st fl - revision to pa 2022-1223-9141. new all gender resroom, security office, non egress door swingDetails
1st fl - revision to pa 2022-1223-9141. new all gender resroom, security office, non egress door swing | $90,000 |
| Mar 6, 2023 | Never finaled issued Mar 2023, no final | 510 Townsend St | Bcci Construction Company | 6/f: rev to pa# 2022-0801-9661: build a security vestiblule at entance/exit of (e) convenience stairDetails
6/f: rev to pa# 2022-0801-9661: build a security vestiblule at entance/exit of (e) convenience stair | $95,000 |
| Feb 14, 2023 | Expired or cancelled cancelled Jan 2026 | 345 Spear St | Bcci Construction Company | 4th fl guard, handrail modification to existing stair (convenience stair) replace portion of existing wall with a glazed fire barrier assembly and automatic sprinklerDetails
4th fl guard, handrail modification to existing stair (convenience stair) replace portion of existing wall with a glazed fire barrier assembly and automatic sprinkler | $185,000 |
| Jan 20, 2023 | Never finaled issued Mar 2023, no final | 510 Townsend St | Bcci Construction Company | basement - revision to previously approved arch pa 2022-0712-8306. add bike storage and food service storage. electrical deferredDetails
basement - revision to previously approved arch pa 2022-0712-8306. add bike storage and food service storage. electrical deferred | $30,000 |
| Dec 23, 2022 | Completed final sign-off Aug 2023 | 510 Townsend St | Bcci Construction Company | 3rd fl: phase 3. office tenant improvement. new non-structural partitions, light fixtures, and finishes. mep included. rev to 2022 0728 9493Details
3rd fl: phase 3. office tenant improvement. new non-structural partitions, light fixtures, and finishes. mep included. rev to 2022 0728 9493 | $400,000 |
| Dec 23, 2022 | Never finaled issued Jan 2023, no final | 510 Townsend St | Bcci Construction Company | 1/flr: phase 2 ti new non-structrual partitions, light fixtures and finshes, mep includedDetails
1/flr: phase 2 ti new non-structrual partitions, light fixtures and finshes, mep included | $500,000 |
| Dec 23, 2022 | Never finaled issued Jan 2023, no final | 510 Townsend St | Bcci Construction Company | 2nd fl: phase 2. office tenant improvement. new non-structural partitions, light fixtures, and finishes. mep included.Details
2nd fl: phase 2. office tenant improvement. new non-structural partitions, light fixtures, and finishes. mep included. | $400,000 |
| Dec 19, 2022 | Completed final sign-off Dec 2024 | 345 Spear St | Bcci Construction Company | 4th fl new non structural partitions, ceiling, light fixtures, millwork, finishes. no exterior work. mep deferredDetails
4th fl new non structural partitions, ceiling, light fixtures, millwork, finishes. no exterior work. mep deferred | $5,000,000 |
| Nov 29, 2022 | Expired or cancelled expired Apr 2026 | 510 Townsend St | Bcci Construction Company | security gates at front adn rear of the property. not in public right of way. ref 202207128306Details
security gates at front adn rear of the property. not in public right of way. ref 202207128306 | $20,000 |
| Nov 28, 2022 | Completed final sign-off Dec 2024 | 345 Spear St | Bcci Construction Company | 4/f: tenant improvement and structural to support demo permit. new partitions, ceilings, fixtures, millwork and finishes. ref demo permit 202211106283. mep deferred.Details
4/f: tenant improvement and structural to support demo permit. new partitions, ceilings, fixtures, millwork and finishes. ref demo permit 202211106283. mep deferred. | $2,100,000 |
| Nov 10, 2022 | Completed final sign-off Dec 2024 | 345 Spear St | Bcci Construction Company | 4th fl - floor and ceiling demo of office per ab-017. sprinkler ref 2022-1109-6161Details
4th fl - floor and ceiling demo of office per ab-017. sprinkler ref 2022-1109-6161 | $50,000 |
| Oct 19, 2022 | Completed final sign-off Mar 2023 | 2 Folsom St | Swinerton Builders | rev to pa# 2021-1006-9889: lobby permit revision added av scope behind security desk, added av scope between entrance to main elevator banks scope revisions to remove permitted all gender restroom, barrier removal at womens accessible stallDetails
rev to pa# 2021-1006-9889: lobby permit revision added av scope behind security desk, added av scope between entrance to main elevator banks scope revisions to remove permitted all gender restroom, barrier removal at womens accessible stall | |
| Jun 27, 2022 | Completed final sign-off Oct 2022 | 1 Sansome St | Hp Build | 34th floor: t.i. : no change of use or occupancy. new non load bearing partitions, doors, electrical, mechanical air distribution, plmg, ceiling, lighting, and associated finishes. (life safty and sprinkler deffeed submittals)Details
34th floor: t.i. : no change of use or occupancy. new non load bearing partitions, doors, electrical, mechanical air distribution, plmg, ceiling, lighting, and associated finishes. (life safty and sprinkler deffeed submittals) | $739,000 |
| Apr 12, 2022 | Expired or cancelled cancelled Jan 2026 | 525 Market St | revision to permit # 202109108159. revised location of phone rooms. no mep or change of use. interior onlyDetails
revision to permit # 202109108159. revised location of phone rooms. no mep or change of use. interior only | ||
| Apr 12, 2022 | Expired or cancelled cancelled Jan 2026 | 525 Market St | revision to 202109108179. ervised location of phone rooms. no mep or change of me interior only.Details
revision to 202109108179. ervised location of phone rooms. no mep or change of me interior only. | ||
| Apr 5, 2022 | Completed final sign-off Apr 2023 | 601 Townsend St | Bcci Construction Company | rev to pa 202102114531. reversed door 1010 swing, revised egress thru 1010, removed illuminated exit sign above door 1343c, revised occupant loads @ exit components on rest of level 1. no changes to occupant loads per room, area or level. occupant loads on level 1 onlyDetails
rev to pa 202102114531. reversed door 1010 swing, revised egress thru 1010, removed illuminated exit sign above door 1343c, revised occupant loads @ exit components on rest of level 1. no changes to occupant loads per room, area or level. occupant loads on level 1 only | $5,000 |
| Mar 29, 2022 | Expired or cancelled cancelled Jan 2026 | 2 Folsom St | Build Group Inc. | 1/f: revision to permit 202109158456. added storage room 0144d, updated egress plan and finishes.Details
1/f: revision to permit 202109158456. added storage room 0144d, updated egress plan and finishes. | $10,000 |
| Mar 17, 2022 | Expired or cancelled cancelled Jan 2026 | 2 Folsom St | Build Group Inc. | lobby: revision to permit 202110069889. added av scope behind the security desk. remove all gender restroom scope of work from original permit.Details
lobby: revision to permit 202110069889. added av scope behind the security desk. remove all gender restroom scope of work from original permit. | $1,000 |
| Mar 17, 2022 | Expired or cancelled cancelled Jan 2026 | 2 Folsom St | Build Group Inc. | 1/f: revision to permit 202110069959. added scope in studio 1 and 2 broadcast room.Details
1/f: revision to permit 202110069959. added scope in studio 1 and 2 broadcast room. | $100 |
| Dec 16, 2021 | Completed final sign-off May 2022 | 2 Folsom St | Swinerton Builders | 6th fl - revision to pa 2021-1007-0031 change of egress, additional structural scope and new partitionsDetails
6th fl - revision to pa 2021-1007-0031 change of egress, additional structural scope and new partitions | |
| Dec 16, 2021 | Completed final sign-off May 2022 | 2 Folsom St | Swinerton Builders | 8th fl - revision to pa 2021-0923-9023 additional structural scope and new partitionsDetails
8th fl - revision to pa 2021-0923-9023 additional structural scope and new partitions | |
| Oct 6, 2021 | Completed final sign-off Sep 2022 | 2 Folsom St | Build Group Inc. | 1st fl - selective demo of (e) partitions, ceiling tiles, millwork & light fixtures; construction of new partitions ceiling tiles & light fixturesDetails
1st fl - selective demo of (e) partitions, ceiling tiles, millwork & light fixtures; construction of new partitions ceiling tiles & light fixtures | $300,000 |
| Sep 23, 2021 | Completed final sign-off Jun 2022 | 2 Folsom St | Swinerton Builders | fl/8: - select demo (e) walls, light fixtures & flr finishes (n) interior partitions, finishes, light, fixtures, mep, structural support & update restrm. fl/7: selective demo of (1) (e) walls,light fixtures, (n) mother's room. upgrade restrooms.Details
fl/8: - select demo (e) walls, light fixtures & flr finishes (n) interior partitions, finishes, light, fixtures, mep, structural support & update restrm. fl/7: selective demo of (1) (e) walls,light fixtures, (n) mother's room. upgrade restrooms. | $300,000 |
| Sep 15, 2021 | Completed final sign-off Sep 2022 | 2 Folsom St | Build Group Inc. | selective demo of (e) office space. non-load bearimg wall construct & interior finishes) related mep demo. new construction of employee only publc offce bar space. included non load bearing, interior construction & finishes. related kitchen quipment. temp system, no change in occupancy/exit routeDetails
selective demo of (e) office space. non-load bearimg wall construct & interior finishes) related mep demo. new construction of employee only publc offce bar space. included non load bearing, interior construction & finishes. related kitchen quipment. temp system, no change in occupancy/exit route | $300,000 |
| Sep 10, 2021 | Never finaled issued Mar 2022, no final | 525 Market St | Skyline Construction | 25th fl - minor ti to (e) space. revised furniture layouts, modified and new furniture demountable partitions. minor electrical and mechanical work as required. will be submitted on separate permit.Details
25th fl - minor ti to (e) space. revised furniture layouts, modified and new furniture demountable partitions. minor electrical and mechanical work as required. will be submitted on separate permit. | $1,126,600 |
| Sep 10, 2021 | Never finaled issued Mar 2022, no final | 525 Market St | Skyline Construction | 26th fl - minor ti to (e) space. revised furniture layouts, modified and new furniture demountable partitions. minor electrical and mechanical work as required. will be submitted on separate permit.Details
26th fl - minor ti to (e) space. revised furniture layouts, modified and new furniture demountable partitions. minor electrical and mechanical work as required. will be submitted on separate permit. | $1,126,600 |
| Jun 11, 2021 | Completed final sign-off Jan 2022 | 101 02nd St | Skyline Construction | 18th flr - construction of non-structural partitions. office front glazing system. acoustical grid tile & gyp board ceilings, light fixtures, millwork restroom finishes. mep included.Details
18th flr - construction of non-structural partitions. office front glazing system. acoustical grid tile & gyp board ceilings, light fixtures, millwork restroom finishes. mep included. | |
| Jun 10, 2021 | Completed final sign-off May 2022 | 2 Folsom St | Swinerton Builders | 10/fl: select demo (e) partitions, kitchenette, ceilings, light fixs, & flr finish. const of new partitions, kitchenette, ceilings, flr fin & light fixs. restroom updates. conver of copy rm to mothers rm. lumi egress markings at egress stairs & exit passageways. fire alarm/sprink under sep permits.Details
10/fl: select demo (e) partitions, kitchenette, ceilings, light fixs, & flr finish. const of new partitions, kitchenette, ceilings, flr fin & light fixs. restroom updates. conver of copy rm to mothers rm. lumi egress markings at egress stairs & exit passageways. fire alarm/sprink under sep permits. | $300,000 |
| Apr 26, 2021 | Expired or cancelled cancelled Jan 2026 | 2 Folsom St | Swinerton Builders | 6th fl: construction of new partitions, ceilings, floor finishes + light fixtures. conversion of (e) men's restroom to all gender restroom. update of all other restrooms. conversion of copy room to mother's room. luminous egress path. marrings at egress stairs + exit passage way.Details
6th fl: construction of new partitions, ceilings, floor finishes + light fixtures. conversion of (e) men's restroom to all gender restroom. update of all other restrooms. conversion of copy room to mother's room. luminous egress path. marrings at egress stairs + exit passage way. | $850,000 |
| Apr 22, 2021 | Completed final sign-off May 2022 | 2 Folsom St | Swinerton Builders | level 4: selective demolition of (e) partitions, ceilings, light fixtures, and flr finish. construction of new partitions, ceilings, flr finishes and ligth fixtures. update of all restrooms per plan.Details
level 4: selective demolition of (e) partitions, ceilings, light fixtures, and flr finish. construction of new partitions, ceilings, flr finishes and ligth fixtures. update of all restrooms per plan. | $900,000 |
| Apr 22, 2021 | Expired or cancelled cancelled Jan 2026 | 2 Folsom St | Swinerton Builders | level 5: selective demolition of (e) partitions, ceilings, light fixtures, and flr finish. construction of new partitions, ceilings, flr finishes and ligth fixtures. convert (e) men's restrm to all gender restrm. update of all other restrooms. convert copy rm to mother's room.Details
level 5: selective demolition of (e) partitions, ceilings, light fixtures, and flr finish. construction of new partitions, ceilings, flr finishes and ligth fixtures. convert (e) men's restrm to all gender restrm. update of all other restrooms. convert copy rm to mother's room. | $900,000 |
| Apr 5, 2021 | Completed final sign-off May 2022 | 2 Folsom St | Swinerton Builders | level 2 selective demo of (e) partitions, light fixtures & floor finish. construction of (n) partitions, ceilings, fl finishes, pantry upgrade, restroom upgrade, new mother's room & structural suppoert for high density storage. luminous egress markings at egress stairs & exit passageways.Details
level 2 selective demo of (e) partitions, light fixtures & floor finish. construction of (n) partitions, ceilings, fl finishes, pantry upgrade, restroom upgrade, new mother's room & structural suppoert for high density storage. luminous egress markings at egress stairs & exit passageways. | $1,204,000 |
| Apr 2, 2021 | Completed final sign-off May 2022 | 2 Folsom St | Swinerton Builders | level 3: selective demolition of (e) partitions, light fixtures, and flr finish. construction of new partitions, flr finishes and ligth fixtures. crestroom upgrades, pantry upgrades, new structural supports for shelving,luminuous egress markings at egress stairs and exit passageways. mech and elecDetails
level 3: selective demolition of (e) partitions, light fixtures, and flr finish. construction of new partitions, flr finishes and ligth fixtures. crestroom upgrades, pantry upgrades, new structural supports for shelving,luminuous egress markings at egress stairs and exit passageways. mech and elec | $900,000 |
| Feb 12, 2021 | Completed final sign-off Oct 2024 | 2 Folsom St | Swinerton Builders | 6th fl: soft demo (no structural work) per ab-017. selective demolition of (e) partitions, ceilings, light fixtures, and floor finishes to prepare for future improvements.Details
6th fl: soft demo (no structural work) per ab-017. selective demolition of (e) partitions, ceilings, light fixtures, and floor finishes to prepare for future improvements. | $100,000 |
| Feb 12, 2021 | Completed final sign-off May 2022 | 2 Folsom St | Swinerton Builders | 10th fl: soft demo (no structural work) per ab-017. selective demolition of (e) partitions, ceilings, light fixtures, and floor finishes to prepare for future improvements.Details
10th fl: soft demo (no structural work) per ab-017. selective demolition of (e) partitions, ceilings, light fixtures, and floor finishes to prepare for future improvements. | $100,000 |
| Jan 13, 2021 | Expired or cancelled cancelled Jan 2026 | 2 Folsom St | Swinerton Builders | new security access turnstiles in lobbyDetails
new security access turnstiles in lobby | $300,000 |
| Oct 2, 2020 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | floors 35/36/37: rev to pa201908158959/201908158962/201908239717 at column in breakroom at grdlines b|f to add intumescent paint for 2-hour rating. maher n/aDetails
floors 35/36/37: rev to pa201908158959/201908158962/201908239717 at column in breakroom at grdlines b|f to add intumescent paint for 2-hour rating. maher n/a | |
| Sep 1, 2020 | Completed final sign-off Jun 2021 | 101 02nd St | Skyline Construction | 17/f: new non-structural partitions, office front glazing system, acoustical grid & tile and byp board ceilings, light fixtures, mikllwork, restroom finishes/partitions/fixtures & overall finishes. mep included.Details
17/f: new non-structural partitions, office front glazing system, acoustical grid & tile and byp board ceilings, light fixtures, mikllwork, restroom finishes/partitions/fixtures & overall finishes. mep included. | |
| Feb 21, 2020 | Completed final sign-off Jun 2021 | 101 02nd St | Skyline Construction | revisiion to pa#201911126952 for 19/f - reinstate card readers at elevator lobbies. two-way comm defered pa#202002194773.Details
revisiion to pa#201911126952 for 19/f - reinstate card readers at elevator lobbies. two-way comm defered pa#202002194773. | |
| Feb 3, 2020 | Completed final sign-off Jun 2020 | 110 Hooper St | Bcci Construction Company | 4th floor: construciton of full height partition and double doors. mep defferred.Details
4th floor: construciton of full height partition and double doors. mep defferred. | $170,000 |
| Dec 27, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 23nd floor: t.i on 23nd floor to include demolition, new non-load bearing partition. mechanical, electrical and plumbing ceiling lighting and finishes.Details
23nd floor: t.i on 23nd floor to include demolition, new non-load bearing partition. mechanical, electrical and plumbing ceiling lighting and finishes. | $1,500,000 |
| Dec 27, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 19th fl: base bldg elevator shaft modification, restroom and minor ti, to include demolition, structural modification to core shaft wall, new-load bearing partitions. maher naDetails
19th fl: base bldg elevator shaft modification, restroom and minor ti, to include demolition, structural modification to core shaft wall, new-load bearing partitions. maher na | $250,000 |
| Dec 27, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 22nd floor: t.i on 22nd floor to include demolition, new non-load bearing partition. mechanical, electrical and plumbing ceiling lighting and finihes.Details
22nd floor: t.i on 22nd floor to include demolition, new non-load bearing partition. mechanical, electrical and plumbing ceiling lighting and finihes. | $1,500,000 |
| Dec 13, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | revision to permit 201908239711: modifications to 3 gender neutral restrooms, and add shower to 2 gender neutral restrooms.Details
revision to permit 201908239711: modifications to 3 gender neutral restrooms, and add shower to 2 gender neutral restrooms. | |
| Dec 13, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | revision to permit 201908239717: modifications to one gender neutral restroom.Details
revision to permit 201908239717: modifications to one gender neutral restroom. | |
| Dec 13, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | revision to permit 201908158962; modifications to change shower to mother's room, and change a mother's room to storage.Details
revision to permit 201908158962; modifications to change shower to mother's room, and change a mother's room to storage. | |
| Dec 11, 2019 | Never finaled issued Feb 2020, no final | 250 Howard St | Webcor Construction Lp | update smoke control report. add smoke damper (fsds) to floor 4-10 per updated smoke control report maher not reqDetails
update smoke control report. add smoke damper (fsds) to floor 4-10 per updated smoke control report maher not req | $2,000 |
| Nov 25, 2019 | Never finaled issued Dec 2019, no final | 55 Green St | Dome Construction Corp | ti of level 5 office space. improvement include non-structural partitions, doors, ceilings, lighting & finishes. electrical & mechicanl system are withing the socpe of work. maher naDetails
ti of level 5 office space. improvement include non-structural partitions, doors, ceilings, lighting & finishes. electrical & mechicanl system are withing the socpe of work. maher na | $2,700,000 |
| Nov 20, 2019 | Completed final sign-off Nov 2021 | 250 Howard St | Webcor Construction Lp | 43/f: new non-structural partions, acoustical gride & tile and gyp board ceilings, light fixtures, millwork and finishes. no change in use, exit stairs, egress pat, elevator. maher n/a.Details
43/f: new non-structural partions, acoustical gride & tile and gyp board ceilings, light fixtures, millwork and finishes. no change in use, exit stairs, egress pat, elevator. maher n/a. | $1,500,000 |
| Nov 12, 2019 | Completed final sign-off Jun 2021 | 101 02nd St | Skyline Construction | new non-structural partitons office front glazing system, accustical grid & tile & gyp board ceilings, light fixutes, millwork, restroom finishes, partion fixtures includes mep on the 19th fl. no changes to use exit stairs, egress path, elevator fire sprinkler & life safetyDetails
new non-structural partitons office front glazing system, accustical grid & tile & gyp board ceilings, light fixutes, millwork, restroom finishes, partion fixtures includes mep on the 19th fl. no changes to use exit stairs, egress path, elevator fire sprinkler & life safety | $8,250,000 |
| Oct 24, 2019 | Never finaled issued Nov 2020, no final | 250 Howard St | Webcor Construction Lp | 28/f: rev to pa201904299214 to replace (e) landscaping with new landscaping. install new free standing trellis. maher n/a.Details
28/f: rev to pa201904299214 to replace (e) landscaping with new landscaping. install new free standing trellis. maher n/a. | $10,000 |
| Oct 22, 2019 | Completed final sign-off Nov 2021 | 250 Howard St | Webcor Construction Lp | replace (e) card readers with (n) card readers, add new card readers n/a maherDetails
replace (e) card readers with (n) card readers, add new card readers n/a maher | $5,000 |
| Oct 22, 2019 | Completed final sign-off Nov 2021 | 250 Howard St | Webcor Construction Lp | replace (e) card readers with (n) card readers, add new card readers n/a maherDetails
replace (e) card readers with (n) card readers, add new card readers n/a maher | $5,000 |
| Oct 15, 2019 | Never finaled issued Dec 2019, no final | 250 Howard St | Webcor Construction Lp | 37/f: construction new non structural partitions, acoustical grid tile and gyp bd ceilings, light fixtures, millwork, finishesDetails
37/f: construction new non structural partitions, acoustical grid tile and gyp bd ceilings, light fixtures, millwork, finishes | $1,500,000 |
| Oct 10, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 42nd flr - construction of new non structural partitions, acoutstical grid and tile and gyp board ceilings, lighting fixtures, millwork and finishes.Details
42nd flr - construction of new non structural partitions, acoutstical grid and tile and gyp board ceilings, lighting fixtures, millwork and finishes. | $1,500,000 |
| Oct 10, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 38th flr - construction of new non structural partitions, acoustical grid and tile gyp board ceiling, lighting, fixtures, millwork and finishes. maher not req.Details
38th flr - construction of new non structural partitions, acoustical grid and tile gyp board ceiling, lighting, fixtures, millwork and finishes. maher not req. | $1,500,000 |
| Oct 9, 2019 | Completed final sign-off Dec 2021 | 250 Howard St | Webcor Construction Lp | 40th floor: construction of new non structural partitions, acoustical grid tile and gyp board ceilings, light fixtures, millwork, and finishes. n/a for maherDetails
40th floor: construction of new non structural partitions, acoustical grid tile and gyp board ceilings, light fixtures, millwork, and finishes. n/a for maher | $1,500,000 |
| Oct 9, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 41st floor: construction of new non structural partitions, acoustical grid tile and gyp board ceilings, light fixtures, millwork, and finishes. n/a for maherDetails
41st floor: construction of new non structural partitions, acoustical grid tile and gyp board ceilings, light fixtures, millwork, and finishes. n/a for maher | $1,500,000 |
| Oct 9, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 36th fl - construction of new non structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishesDetails
36th fl - construction of new non structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishes | $1,500,000 |
| Oct 9, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 39th fl - construction of new non structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishesDetails
39th fl - construction of new non structural partitions, acoustical grid & tile and gyp board ceilings, light fixtures, millwork and finishes | $1,500,000 |
| Sep 27, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 34th fl - construction of new non structural partitions, acoustical grid and tile & gyp board ceilings, light fixture, millwork and finishesDetails
34th fl - construction of new non structural partitions, acoustical grid and tile & gyp board ceilings, light fixture, millwork and finishes | $1,500,000 |
| Sep 27, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 35th fl: consturction of new non-structural partitions, acoustical grid & tile and gyp. board ceilings, light fixtures, millwork & finishes. maher naDetails
35th fl: consturction of new non-structural partitions, acoustical grid & tile and gyp. board ceilings, light fixtures, millwork & finishes. maher na | $1,500,000 |
| Sep 27, 2019 | Completed final sign-off Nov 2021 | 250 Howard St | Webcor Construction Lp | 33rd fl - construction of new non structural partitions, acoustical grid and tile & gyp board ceilings, light fixture, millwork and finishesDetails
33rd fl - construction of new non structural partitions, acoustical grid and tile & gyp board ceilings, light fixture, millwork and finishes | $1,500,000 |
| Sep 25, 2019 | Completed final sign-off Jul 2021 | 250 Howard St | Webcor Construction Lp | 29th floor: construction of new non-structural partitions, acoustical grid and tile and gyp board ceiling, light fixtures, mill work.Details
29th floor: construction of new non-structural partitions, acoustical grid and tile and gyp board ceiling, light fixtures, mill work. | $1,500,000 |
| Sep 17, 2019 | Never finaled issued Oct 2019, no final | 525 Market St | Skyline Construction | 35th and 36th floors - modifications to existing ti convenience steel stair between 35th and 36th floor. work include demo, (n) glass railings and gypsum board headers). maher n/aDetails
35th and 36th floors - modifications to existing ti convenience steel stair between 35th and 36th floor. work include demo, (n) glass railings and gypsum board headers). maher n/a | $200,000 |
| Sep 16, 2019 | Never finaled issued Oct 2019, no final | 55 Green St | Dome Construction Corp | for public health review only of pantry support and catered lunches for employees. see ref pa#2019-0722-6512 for scope of work.Details
for public health review only of pantry support and catered lunches for employees. see ref pa#2019-0722-6512 for scope of work. | |
| Aug 23, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 38th fl - full ti demo, new partitions (n0n-load bearing), mechanical, plumbing, electrical, ceiling and lighting, floor finishes and furnishingsDetails
38th fl - full ti demo, new partitions (n0n-load bearing), mechanical, plumbing, electrical, ceiling and lighting, floor finishes and furnishings | $1,500,000 |
| Aug 23, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 37th fl - full ti demo, new partitions (n0n-load bearing), mechanical, plumbing, electrical, ceiling and lighting, floor finishes and furnishingsDetails
37th fl - full ti demo, new partitions (n0n-load bearing), mechanical, plumbing, electrical, ceiling and lighting, floor finishes and furnishings | $1,500,000 |
| Aug 15, 2019 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | 35th flr - ti demo, new non load bearing partitions, mech, plm, ele, ceiling and lighting , floors, finishes and furnishingsDetails
35th flr - ti demo, new non load bearing partitions, mech, plm, ele, ceiling and lighting , floors, finishes and furnishings | $1,500,000 |
| Jul 22, 2019 | Never finaled issued Aug 2019, no final | 55 Green St | Dome Construction Corp | ti - ground floor office space. improvements include non structural partitions, doors, lighting and arch finished. new ele & mech systems, new plmDetails
ti - ground floor office space. improvements include non structural partitions, doors, lighting and arch finished. new ele & mech systems, new plm | $2,730,000 |
| Jun 3, 2019 | Never finaled issued Jun 2019, no final | 55 Green St | Dome Construction Corp | tenant improvement of level 2 office space. improvements include non structural partitions, doors, ceilings, lighting, arch finishes. elec, mechDetails
tenant improvement of level 2 office space. improvements include non structural partitions, doors, ceilings, lighting, arch finishes. elec, mech | $1,329,100 |