Nishkian Menninger
- Listed as
- architect, engineer
- Based in
- San Francisco
- On San Francisco permits
- Jan 2006 to Apr 2021
23 permits since 2000 (engineer on 22 permits, architect on 1 permit): 18 completed, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 29, 2021 | Completed final sign-off Jan 2022 | 201 03rd St | revision to pa# 202009204566. removing 2 beams from original plan.Details
revision to pa# 202009204566. removing 2 beams from original plan. | ||
| Apr 8, 2021 | Completed final sign-off Mar 2023 | 1798 Great Hy | 7revision to pa 201903084772. soft story upgrades.Details
7revision to pa 201903084772. soft story upgrades. | $45,000 | |
| Nov 20, 2020 | Completed final sign-off Feb 2021 | 525 Market St | Skyline Construction | revision to pa# 201912270746. to add structural detail for handrail.Details
revision to pa# 201912270746. to add structural detail for handrail. | |
| Sep 20, 2020 | Completed final sign-off Jan 2022 | 201 03rd St | Clune Construction Company L P | infill a staircase opening from the 4th to 5th floor. maher n/a.Details
infill a staircase opening from the 4th to 5th floor. maher n/a. | $500,000 |
| Sep 17, 2019 | Never finaled issued Oct 2019, no final | 525 Market St | Skyline Construction | 35th and 36th floors - modifications to existing ti convenience steel stair between 35th and 36th floor. work include demo, (n) glass railings and gypsum board headers). maher n/aDetails
35th and 36th floors - modifications to existing ti convenience steel stair between 35th and 36th floor. work include demo, (n) glass railings and gypsum board headers). maher n/a | $200,000 |
| Aug 29, 2019 | Expired or cancelled withdrawn Jan 2024 | 100 Hooper St | tenant improvement to allow vacant pdr space suite #3 to alter 11,180sqft of demised space to accomodate modular commercial kitchens for the delivery made to order. maher naDetails
tenant improvement to allow vacant pdr space suite #3 to alter 11,180sqft of demised space to accomodate modular commercial kitchens for the delivery made to order. maher na | $1,300,000 | |
| Apr 5, 2018 | Expired or cancelled expired Nov 2025 | 2171 03rd St | Build Group Inc. | tower crane erection for construction of a 109 units condo building in dispatch. to perform work for 9 month. ref pa# 2013/06/21/0213.Details
tower crane erection for construction of a 109 units condo building in dispatch. to perform work for 9 month. ref pa# 2013/06/21/0213. | $500,000 |
| Dec 13, 2017 | Completed final sign-off Sep 2019 | 1395 22nd St | Build Group Inc. | erect tower crane #1 & operate tower crane (potain md 485) ref site permit #201512145054-s. maher naDetails
erect tower crane #1 & operate tower crane (potain md 485) ref site permit #201512145054-s. maher na | $500,000 |
| Dec 8, 2017 | Completed final sign-off May 2018 | 525 Market St | Novo Construction Inc | revision to pa 2017-1011-0885 (30th fl) and 2017-1011-0882 (31st fl) to call out stair opening, revise corridor dimension at wall adjacent stair opening. structural calculations for stairs, millwork, elevations and doorsDetails
revision to pa 2017-1011-0885 (30th fl) and 2017-1011-0882 (31st fl) to call out stair opening, revise corridor dimension at wall adjacent stair opening. structural calculations for stairs, millwork, elevations and doors | $60,000 |
| Dec 8, 2017 | Completed final sign-off Dec 2017 | 1801 Scott St | Narrowback Construction Co. | revision to pa 2013-1122-2590, alternate rebar detail as approved by structural engineer and requested by building inspectorDetails
revision to pa 2013-1122-2590, alternate rebar detail as approved by structural engineer and requested by building inspector | |
| Nov 13, 2017 | Completed final sign-off Feb 2019 | 525 Market St | Swinerton Builders | 12th floor - full floor t.i. including demo, drywall, ceilings, finishes. electrical, mechanical & plumbing.Details
12th floor - full floor t.i. including demo, drywall, ceilings, finishes. electrical, mechanical & plumbing. | $3,438,699 |
| Nov 1, 2017 | Completed final sign-off Sep 2019 | 510 Townsend St | Principal Builders Inc. | revision to approved pa #201708033839 to conforporate a 2" depressed slab at the 4th fl in leiu of slab pour back. maher naDetails
revision to approved pa #201708033839 to conforporate a 2" depressed slab at the 4th fl in leiu of slab pour back. maher na | |
| Oct 4, 2017 | Completed final sign-off Sep 2019 | 1395 22nd St | Build Group Inc. | erect 1 tower crane and operate tower crane (potain md560). ref building site permit pa #201512145054 s. maher naDetails
erect 1 tower crane and operate tower crane (potain md560). ref building site permit pa #201512145054 s. maher na | $500,000 |
| Aug 18, 2017 | Completed final sign-off Jun 2020 | 150 Hooper St | Dpr Construction | rev to superstructure addendum pa#201410239755-s2: changes to roof p1 slab for new mep equipment changes. changes to misc details. add elevator guardrail support & roof top davitts.Details
rev to superstructure addendum pa#201410239755-s2: changes to roof p1 slab for new mep equipment changes. changes to misc details. add elevator guardrail support & roof top davitts. | $10,000 |
| Mar 20, 2017 | Expired or cancelled cancelled Jan 2026 | 150 Hooper St | revision to superstructure addendum 201410239755 s2. add and remove detail notes, add concrete beam elevations, rvise eolevator pit depth, have all changes reflected throughout setDetails
revision to superstructure addendum 201410239755 s2. add and remove detail notes, add concrete beam elevations, rvise eolevator pit depth, have all changes reflected throughout set | ||
| Aug 5, 2016 | Completed final sign-off Apr 2017 | 405 Howard St | Sc Builders, Inc | 3/f- rev.to pa#201606109611, atrium to be made "not occupied",new structural infill below new restrooms, minor mep. finish, power, ceiling and millwork revisions.removed 12 fsds associated w/ previous multi zone occupancy. n/a ordinance #155-13Details
3/f- rev.to pa#201606109611, atrium to be made "not occupied",new structural infill below new restrooms, minor mep. finish, power, ceiling and millwork revisions.removed 12 fsds associated w/ previous multi zone occupancy. n/a ordinance #155-13 | $90,000 |
| Mar 19, 2015 | Completed final sign-off Jan 2016 | 505 Howard St | Skyline Construction | structural work for new steel beams and posts to support operable partitions. n/a ordinance #155-13 reference permit # 2015-0128-6855Details
structural work for new steel beams and posts to support operable partitions. n/a ordinance #155-13 reference permit # 2015-0128-6855 | $5,000 |
| Aug 19, 2014 | Completed final sign-off Jul 2015 | 405 Howard St | Gci, Inc | 1st, 2nd & 3rd floors: voluntary structural upgrade. n/a ordinance #155-13Details
1st, 2nd & 3rd floors: voluntary structural upgrade. n/a ordinance #155-13 | $75,000 |
| Aug 1, 2012 | Completed final sign-off Mar 2014 | 505 Howard St | temporary tower crane for construction approved under pa #200610316514 s1Details
temporary tower crane for construction approved under pa #200610316514 s1 | $115,000 | |
| Dec 20, 2011 | Completed final sign-off Jun 2013 | 1595 Pacific Av | Ross Douglas Construction | structural revisions to approved pa #200711148042-s1 per field conditions & contractor coordination.Details
structural revisions to approved pa #200711148042-s1 per field conditions & contractor coordination. | |
| Apr 28, 2009 | Completed final sign-off Mar 2010 | 251 32nd Av | Alpha Construction & Engineering Inc. | revision to pa #200802296002s1, keep exsiting foundation and introdue brace wall along south and north walls.Details
revision to pa #200802296002s1, keep exsiting foundation and introdue brace wall along south and north walls. | |
| Jun 22, 2007 | Completed final sign-off May 2008 | 244 California St | repair and replace existing structural sidewalk. no additional work.Details
repair and replace existing structural sidewalk. no additional work. | $68,000 | |
| Jan 23, 2006 | Never finaled issued Mar 2006, no final | 724 Van Ness Av | proposed change for concrete driving aisle in garage level 2 from slab-on-grade to structured concrete slab under const. & revision to pa# 2002/05/02/5568 's'.Details
proposed change for concrete driving aisle in garage level 2 from slab-on-grade to structured concrete slab under const. & revision to pa# 2002/05/02/5568 's'. | $40,000 |