| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress | 100 Hooper St | rooftop adiabatic cooler installation w/ slab penetrations for piping to suite 15; replace glazing w/ mech louvers; modify mezzanine guardrail for gates. | $269,000 | |
| Sep 15, 2026 | In progress | 100 Hooper St | Cochran Inc Dba Cochran Electric Co Inc | replacing 1 bi-directional amplifier and 1 battery back-up unit for emergency responder radio communications system. | $20,000 |
| Jun 22, 2026 | In progress | 100 Hooper St | Paganini Electric Corp(See Signatories) | 1/fl- install of (n) electronic lab equipment for suite 15. install (n) branch electrical circuits and receptacles. (e) panel to be used. | $58,500 |
| Apr 14, 2026 | Completed | 100 Hooper St | Arrow Sign Company | install non-electric double faced sign "san francisco brewing co" | $10,000 |
| Feb 10, 2026 | In progress | 100 Hooper St | Geo M Robinson & Co | 4/fl- ti 202601143793- relocate and add fire sprinklers on level 4 due to (n) wall and ceiling configurations. relocate (1) ssu, add (2) ssu, demo 1 ssp | $4,200 |
| Jan 14, 2026 | Completed | 100 Hooper St | Devcon Construction | t.i. to establish a separate tenant space on the 4th floor of 100 hooper st. work includes new non-structural partition, new doors, exit signage, ceiling adjustments, & floor refinishing. no exterior work, structural modifications or improvments outside of 4th floor proposed in this scope of work. | $175,000 |
| Oct 7, 2025 | In progress | 100 Hooper St | Seamless Fire Protection Llc | demo 3" piping and in-rack sprinklers (10} | $5,000 |
| Sep 5, 2025 | Completed | 100 Hooper St | Siemens Industry, Inc. | floor 1; fire only work for fire alarm detection system at suite 35 and 50; no ref pa#. addition are 2 air-sampling detectors, 2 power supplies, 1 annunicator, 4 modules, and 8 speaker/strobes | $24,000 |
| Jan 25, 2023 | Completed | 100 Hooper St | Siemens Industry, Inc. | 1/f: work for bmo & break room remodel areas 1; (4) speaker/strobes are added, and (1) speaker/strobe is relocated. ref bpa#202209212874 | $4,325 |
| Nov 17, 2022 | Completed | 100 Hooper St | R L H Fire Protection Inc | add 2 pendent fire sprinklers on the 1st fl. t.i. 2022-0921-2874 | $1,000 |
| Sep 21, 2022 | Completed | 100 Hooper St | Gci, Inc | g/f: buildout of ancillary bmd & break room. scope to demo non-structural interior wall, update kitchenette, door replacement, finishes, lighting, and mep. | $100,000 |
| May 10, 2022 | Completed | 100 Hooper St | Thomas Swan Sign Co Inc | install (1) non-illuminated double faced projecting sign: "rapid robotics" | $3,500 |
| Dec 16, 2021 | Never finaled | 100 Hooper St | Cochran Inc Dba Cochran Electric Co Inc | reprogram freq. per ccsf dt boa mgmt form v1.4. replace (e) donor antenna with new gamma nv panel antenna. retest with a grid testper ab2.1.2019. addendum g for signal strength and minimum daq of 3 or better. coordinate boa radio/freq. interference compliance and donor antenna positioning with ccsf | $12,000 |
| Dec 14, 2021 | Completed | 100 Hooper St | Thomas Swan Sign Co Inc | install non illuminated projecting sign | $3,500 |
| Dec 2, 2021 | Completed | 100 Hooper St | Siemens Industry, Inc. | fire only work for unit 15" remodel,1 duct detector & 1 speaker/strobe are added as well as the relocations of 1 duct detector,3 speaker /strobes, & 1 strobe,reference permit appl#202108196721 | $3,200 |
| Nov 3, 2021 | Never finaled | 100 Hooper St | Gci, Inc | suite #15: revision to room #809 - extg storage to private office. ref app#202108196721 | |
| Sep 16, 2021 | Completed | 100 Hooper St | Gci, Inc | suite 15: mechanical and electrical: 1 new fan coil unit , relocate 1 existing fan coil, 1 new exhaust fan, suction lines, duct distributors and grilles | $100,000 |
| Sep 16, 2021 | Never finaled | 100 Hooper St | Gci, Inc | 1/f: structural conference room ceiling framing, ref bpa#202108196721 | |
| Aug 30, 2021 | Completed | 100 Hooper St | R L H Fire Protection Inc | fire sprinkler permit add (5) pendent spinklers on the 1st fl. & mezzanine. ref pa 202108196721. | $1,000 |
| Aug 19, 2021 | Completed | 100 Hooper St | Gci, Inc | suite 15 - 1st flr: new partition walls, new lighting & new feature screen wall. mep/fire alarm/sprinklers deferred permits. ref pa 202011138886 & 201906113160. | $150,000 |
| Jul 13, 2021 | Completed | 100 Hooper St | Gci, Inc | suite 15 only: commercial interior demo only. to comply with ab-017. | $10,000 |
| Jun 7, 2021 | Completed | 100 Hooper St | Siemens Industry, Inc. | fire only work to add a 2-way communications system at the floor 1 lobby area. no ref. permit application number. | $2,000 |
| May 17, 2021 | Completed | 100 Hooper St | Gci, Inc | demo of portion of (e) curtain wall. new roll up door at (e) breezeway. ref pa 2020-1209-0608 | $125,000 |
| Apr 21, 2021 | Completed | 100 Hooper St | Siemens Industry, Inc. | fire work only for the "unit 3" remodel on floor 1; additions are 7 duct detectors, 3 modules, 14 speaker/strobes, and 3 strobes. ref. permit app #2020-1209-0608 | $23,400 |
| Mar 16, 2021 | Completed | 100 Hooper St | Siemens Industry, Inc. | fire only work for the "unit 8" remodel on floor 1; additions are 1 smoke detector, 8 duct detectors, 1 module, 8 speaker/strobes, and 1 strobe. ref permit app# 2020 113 8886 | |
| Mar 10, 2021 | Completed | 100 Hooper St | R L H Fire Protection Inc | ti upgrade of the existing fire sprinkler system. 1 additional upright sprinklers. 2 additional pendent sprinklers. 2 relocated upright sprinklers. | $1,400 |
| Mar 10, 2021 | Completed | 100 Hooper St | R L H Fire Protection Inc | ti upgrade of the existing fire sprinkler system 2 additional pendent sprinklers. 3 relocated upright sprinklers. 5 additional upright sprinklers. rbp # 2020-1113-8886 | $2,700 |
| Mar 5, 2021 | Expired or cancelled | 100 Hooper St | Gci, Inc | unit #3: mechanical- (7)(n) fan coil units. (1)(n) louver. (1)(n) exhaust fan. (1)(n) condensing unit. (2)(n) branch selector boxes. new electrical, power & data. ref pa# 202012090608. | |
| Feb 4, 2021 | Completed | 100 Hooper St | R L H Fire Protection Inc | t/i upgrade of the existing fire sprinkler; 51 additional upright sprinklers. | $15,300 |
| Feb 1, 2021 | Completed | 100 Hooper St | Gci, Inc | unit 8: mech - 7 new fan coiles, 1 outside air, 2 new exhaust fan, 1 new condension unit, 2 new branch selector boxes. electrical-lighting, paper & signal. ref pa 202011138886. maher n/a. | $400,000 |
| Jan 11, 2021 | Completed | 110 Hooper St | Siemens Industry, Inc. | fire alarm as-built for the "adobe" remodel on floor 4; revisions to the f.a. matrix for kitchen area fan decrease upon alarm. original permit app # 2018 1019 3635 for the fire alarm work. | |
| Dec 9, 2020 | Completed | 100 Hooper St | Gci, Inc | suite 3. spec suite build-out incl construct of rated & non-rated partitions, conference rms, meeting rms, electr rm, breakrm and lighting. mezzanine pa 202009305592. | $1,000,000 |
| Dec 3, 2020 | Completed | 100 Hooper St | Siemens Industry, Inc. | addition of 2 strobes, per sffd inspection, for the "seven stills" space on floor 1; no ref. permit application number. | $1,100 |
| Nov 13, 2020 | Completed | 100 Hooper St | Gci, Inc | unit 8: spec suite build out including construction of rated and non-rated walls, conference & meeting rooms, electrical room, break room, & lighting. (e) mezz, lift & stairs approved under pa 201906113160. | $1,000,000 |
| Nov 3, 2020 | Completed | 100 Hooper St | Gci, Inc | fire sprinkler revisions - per pre-app meeting w/jon corbett to comply w/client request for lithium-ion battery storage. | |
| Nov 3, 2020 | Completed | 100 Hooper St | Gci, Inc | build out new mezzanine; replace ex. branchlines for esfr protection; (21) 22.4k heads at 35 psi each; add (10) in rack sprinklers @ 12'-0 aff (fire sprinkler revisions per pre-app meeting w/jon corbett to comply w/client request for lithium-ion battery storage, unit #1) | |
| Nov 3, 2020 | Never finaled | 100 Hooper St | Gci, Inc | fire sprinkler revisions - per pre-app meeting w/jon corbett to comply w/client request for lithium-ion battery storage. | |
| Oct 24, 2020 | Completed | 110 Hooper St | Bcci Construction Company | 4th floor: mechanical permit to show as-built changes. | |
| Oct 22, 2020 | Completed | 100 Hooper St | Siemens Industry, Inc. | fire only addition of a serial annunciator at the level 1 lobby of the south building; no ref. permit app number. | $845 |
| Sep 30, 2020 | Completed | 100 Hooper St | Gci, Inc | suite #3: construction of mezzanine, accessible lift, stairs in existing core and shell building. | $150,000 |
| Sep 28, 2020 | Never finaled | 100 Hooper St | Paganini Electric Corp(See Signatories) | unit #8: addition of lighting below a new mezzanine (201906113160) within an exisitng space. connect new light fixtures to existing panel. | $40,000 |
| Sep 26, 2020 | Completed | 100 Hooper St | Gci, Inc | rev to 201908158968: suites 1, 2 & 6: rev to document 1-hr walls at adjacent spaces. | |
| Aug 22, 2020 | Completed | 100 Hooper St | R L H Fire Protection Inc | unit #8: upgrade if existing fire sprinkler system. 37 additional upright sprinklers. 1 deleted upright sprinkler. | $11,100 |
| May 22, 2020 | Completed | 100 Hooper St | Siemens Industry, Inc. | 1/f, unit 8: addition of (2) speaker/strobes to provide coverage for (e). no associated bpa. | $1,270 |
| Mar 11, 2020 | In progress | 100 Hooper St | Seamless Fire Protection Llc | unit #1,2, & 4: fire sprinkler for f-1 use | $100,000 |
| Feb 10, 2020 | Completed | 100 Hooper St | Siemens Industry, Inc. | 1st fl - fire alarm addition of 19 smoke detectors to provide full coverage for the level 1 and mezzanine areas for the "ample" remodel.and 5 beam dectors. ref # 201908158968 | $15,850 |
| Feb 3, 2020 | Completed | 110 Hooper St | Bcci Construction Company | 4th floor: construciton of full height partition and double doors. mep defferred. | $170,000 |
| Dec 27, 2019 | Never finaled | 100 Hooper St | Seamless Fire Protection Llc, Gci, Inc | ref permit # 2019-1030-5956. fire protection system for suite 2. | $10,000 |
| Dec 23, 2019 | Completed | 100 Hooper St | Gci, Inc | suite 4 - revision to permit #201901291477. to clarify co2 system per sffd request. maher na. | |
| Dec 10, 2019 | Completed | 100 Hooper St | Siemens Industry, Inc. | ref pa# 201908158968; 1st fl. fire alarm work for the "ample" remodel on floor 1- south building, additions are 1 smoke detector, 9 duct detectors, 1 module, 1 strobe power supply, and 7 speaker/strobes n/a maher | $27,780 |
| Dec 10, 2019 | Completed | 110 Hooper St | Siemens Industry, Inc. | ref pa# 201908158968; 1st fl. fire alarm work for the "ample" remodel on floor 1- north building, additions are 1 smoke detector, 8 duct detectors, 1 strobe power supply, and 17 speaker/strobes n/a maher | $25,690 |
| Dec 3, 2019 | Expired or cancelled | 100 Hooper St | unit 2 - build out new mezzanine. increase high bay area density to extra hazard group ii 40/2500 sq ft add 710 upright sprinklers ref pa 2019-0815-8968 | $20,000 | |
| Dec 3, 2019 | Completed | 100 Hooper St | Seamless Fire Protection Llc | unit 1 - add 9 upright build out new mezzanine - replace existing branch lines for esfr protection, (18) 22.4k pendent and (21) upright heads @ 35 psi each. ref pa 2019-0815-8968 | $20,000 |
| Dec 3, 2019 | Completed | 100 Hooper St | Seamless Fire Protection Llc | unit 6 - build out new mezzanine. increase high bay area density to extra hazard group ii 40/2500 sq ft add 66 upright sprinklers ref pa 2019-0815-8968 | $20,000 |
| Nov 25, 2019 | Completed | 100 Hooper St | Gci, Inc | 1st fl - electrical power distribution, branch poiwer, new lighting controls ti. pdr use pursuant to planning code 102 with accessory office. category "g" per approved pdr map/robotic manufacture. ref pa 2019-0815-8968 | $750,000 |
| Nov 13, 2019 | Never finaled | 100 Hooper St | street space | ||
| Nov 12, 2019 | Completed | 100 Hooper St | Gci, Inc | revision to 201910174753 per elec plan add 2 fsps and 3 fan coil unit | |
| Oct 30, 2019 | Completed | 100 Hooper St | Gci, Inc | revision to pa# 201908158968; updated electrical rm. with 1 hr rating & relocate compressor room | $1,000 |
| Oct 22, 2019 | Completed | 100 Hooper St | Certified Fire And Safety | install ul 300 ansul fire system to protect 2 kitchen hood, cooking equipment and 1 airmaid bleedair duct pollution control unit. ref 201901291477 | $5,000 |
| Oct 21, 2019 | Completed | 100 Hooper St | Gci, Inc | proposed new curb cut mid-block on hooper st. frontage for dpw review. ref pa 2019-0815-8968 | |
| Oct 17, 2019 | Completed | 100 Hooper St | Gci, Inc | 1/f, mezz: mechanical only ref t.i. pa201908158968. maher n/a. | $152,000 |
| Sep 25, 2019 | Completed | 100 Hooper St | Siemens Industry, Inc. | 1st & roof level - fire alarm work for the removal of door holders; add the addition of a weatherproof speaker/strobe on floor 1 and roof level | $1,270 |
| Aug 29, 2019 | Expired or cancelled | 100 Hooper St | tenant improvement to allow vacant pdr space suite #3 to alter 11,180sqft of demised space to accomodate modular commercial kitchens for the delivery made to order. maher na | $1,300,000 | |
| Aug 22, 2019 | Completed | 100 Hooper St | Gci, Inc | revision to app#201906042400. revised lift layout and relocated stairs. n/a for maher | $1,000 |
| Aug 15, 2019 | Completed | 100 Hooper St | Gci, Inc | ste 1,2 & 6 - commercial tenant improvement including construction of non-structural partitoins; exterior door alterations, lighting, cabinetry & finishes. ample for use pursuant to planning code section 102 w/accessory office, gategory g per approved pdr use map-robotics manufacturing | $2,000,000 |
| Jul 3, 2019 | Never finaled | 100 Hooper St | street space | ||
| Jun 28, 2019 | Expired or cancelled | 100 Hooper St | construction of 3,640 sq ft of mezzanine floor structure. t.i. under seperate permit suite #3. n/a for maher | $152,880 | |
| Jun 19, 2019 | Never finaled | 100 Hooper St | street space | ||
| Jun 18, 2019 | In progress | 100 Hooper St | street space | ||
| Jun 11, 2019 | Completed | 100 Hooper St | Gci, Inc | unit 8: construction of new mezzanine level, accessible lift, stairs in (e) core and shell building. maher n/a. | $150,000 |
| Jun 4, 2019 | Completed | 100 Hooper St | unit 2: construction of mezzanine, accessible lift & stairs in (e) core & shell building n/a maher | $165,000 | |
| Jun 4, 2019 | Completed | 100 Hooper St | Gci, Inc | unit 6 - construction of mazzanine, accessible lift & stairs in (e) core & shell building n/a maher | $180,000 |
| May 30, 2019 | Never finaled | 100 Hooper St | Siemens Industry, Inc. | fire alarm work for the 7 stills phase 2 remodel on floor 1, addition s are 4 smoke detectors, 2 duct detectors, 3 modules, 26 speaker strobes, 6 strobes ref 201901291477 maher not req | $26,970 |
| May 22, 2019 | Completed | 100 Hooper St | R L H Fire Protection Inc | ti upgrade e fire sprinkler system 25 additional pendent sprinklers, 10 relocate upright sprinklers, 50 additional upright sprinklers ref 201810052399 | $24,500 |
| Apr 26, 2019 | Never finaled | 100 Hooper St | street space | ||
| Apr 8, 2019 | Completed | 100 Hooper St | Thomas Swan Sign Co Inc | 1 non-electric projecting double faced sign (arc) | $5,000 |
| Mar 22, 2019 | Completed | 100 Hooper St | Gci, Inc | minor structural revisions to approved structural permit # 201810294430. including dimensional framing updates. | |
| Mar 22, 2019 | Completed | 100 Hooper St | Gci, Inc | mep reference 201901291477; mechanical new fan coils kitchen exhaust fan, exhaust fans, new fire smoke dampers, lighting power and signal plumbing | $900,000 |
| Feb 27, 2019 | Completed | 110 Hooper St | Bcci Construction Company | roof deck - revisionto previously approved arch pa #201712196925. install stainless steel sheet liner underneath paver w/gas grille. no visual changes. | $5,000 |
| Jan 29, 2019 | Completed | 100 Hooper St | Gci, Inc | suite 4, "seven stills" - tenant build-out of restaurant and brewery space, restrooms, partitions, non-structural partitions, lighting & finishes. phase 1 pa 201810152399 | $1,500,000 |
| Jan 23, 2019 | Never finaled | 100 Hooper St | street space | ||
| Jan 9, 2019 | Never finaled | 100 Hooper St | street space | ||
| Dec 5, 2018 | Completed | 100 Hooper St | Siemens Industry, Inc. | fire alarm work for the "seven stills" remodel on 1st fl; additions are 3 duct detectors & 3 speaker/strobes. ref pa #201810052399. | $6,655 |
| Nov 30, 2018 | Completed | 100 Hooper St | Gci, Inc | suite 4: mechanical fan coil units new outside air, ductwork. deference per app#201810052399 | $55,000 |
| Nov 26, 2018 | Completed | 100 Hooper St | R L H Fire Protection Inc | suite #100: t.i. upgrade of the extg fire sprinkler system. 2 additional pendent sprinklers. 2 relocate upright sprinklers, 2 additional upright sprinklers. ref appl#201810052399. n/a for maher | $1,600 |
| Nov 20, 2018 | Never finaled | 100 Hooper St | Gci, Inc | revision to pa #201810052399. for sffd approval of a-2 assembly space only. suite 4 | |
| Nov 15, 2018 | Completed | 110 Hooper St | Siemens Industry, Inc. | roof: fire alarm work for the roof deck remodel; additions are 1 dutc detectors, 2 modules, and 4 weatheproof speaker/strobes. ref pa201712196925. maher n/a. | $5,120 |
| Nov 8, 2018 | Never finaled | 100 Hooper St | street space | ||
| Nov 5, 2018 | Never finaled | 100 Hooper St | Siemens Industry, Inc. | fire alarm for lobby and mezzanine . 1st flr - 2 smk dets, 11 duct dets, 1 storbe power supply and 21 speaker/strobes ref 201805240118 maher na | $33,600 |
| Oct 29, 2018 | Completed | 100 Hooper St | Gci, Inc | suite 4. construction of steel mezzanine, accessible lift and stairs at (e) core and shell building (pa# 2014-1020-9377). storm water drain rerouted. maher n/a | $161,000 |
| Oct 19, 2018 | Never finaled | 110 Hooper St | Siemens Industry, Inc. | fire alarm work for the "adobe" remodel on floor 4; additions are 2 smoke detectors, 7 duct detectors, 9 modules, 9 strobe powder supplies, 3 speakers, and 96 speaker/strobes. ref pa #201712186746. maher na | $82,800 |
| Oct 5, 2018 | Completed | 100 Hooper St | Gci, Inc | suite 4: construction of temporary non structural partitions, doors, lighting for phase 1, 1500sf of production distribution and repair with accessary retail. n/a for maher | $50,000 |
| Oct 4, 2018 | Completed | 100 Hooper St | Anderson, Rowe & Buckley, Inc. | g/f: fire sprinkler system for t.i. relocate 1 sprinkler, add 57 sprinklers, changeout 4 sprinklers. ref t.i. 201805048216.maher n/a. | $30,000 |
| Sep 13, 2018 | Expired or cancelled | 100 Hooper St | replace existing double swing doors with new sliding doors at existing building bridges - 4 doors on each fl. 2-4 (12 total) | $72,000 | |
| Sep 13, 2018 | Completed | 100 Hooper St | Siemens Industry, Inc. | 4th floor/roof: fire alarm work for the adobe. additions are the 2 smoke detectors, 7 duct detectors, 5 modules, 2 strobe power supplies, 3 speakers, 102 speaker/strobes, and 2 strobes. ref app#201712186750. n/a for maher | $85,870 |
| Sep 11, 2018 | Never finaled | 100 Hooper St | street space | ||
| Sep 5, 2018 | Never finaled | 100 Hooper St | street space | ||
| Aug 30, 2018 | Never finaled | 100 Hooper St | Vkk Signmakers Inc. | install decorative material in stariways for fitness well being | $2,450 |
| Aug 30, 2018 | Never finaled | 110 Hooper St | Vkk Signmakers Inc. | install decorative material in stariwells for fitness well being | $2,450 |
| Aug 16, 2018 | Completed | 100 Hooper St | Siemens Industry, Inc. | fire alarm work for the "adode" remodel on floor 3; additions are 2 smoke detectors; 6 duct detectors, 2 strobe power supplies, 5 speakers and 104 speaker/strobes. ref pa 2017-1218-7459. n/a for maher. | $83,050 |
| Aug 16, 2018 | Completed | 110 Hooper St | Siemens Industry, Inc. | fire alarm work for the "adode" remodel on floor 3; additions are 3 smoke detectors; 4 duct detectors, 2 strobe power supplies, 4 speakers and 116 speaker/strobes. ref pa 2017-1218-6745. n/a for maher. | $83,050 |
| Aug 15, 2018 | Completed | 100 Hooper St | Siemens Industry, Inc. | fire alarm work for the "adobe" remodel on floor 2 and partial remodel on floor 1; additions are 2 smoke detectors, 6 duct detectors, 3 speakers, 100 speakers/strobes, and 2 strobe power supplies. ref pa 2017-1218-6744 | $79,250 |
| Aug 15, 2018 | Completed | 110 Hooper St | Siemens Industry, Inc. | fire alarm work for the "adobe" remodel on floor 2 and partial remodel on floor 1; additions are 2 smoke detectors, 4 duct detectors, 3 speakers, 120 speakers/strobes, and 2 strobe power supplies. ref pa 2017-1218-6748 | $88,760 |
| Jun 26, 2018 | Expired or cancelled | 100 Hooper St | approved pre app letters for accessible lift rev. to 201805048216- was not signed when submitted- all details on first plan. maher na 2 way communication, fire alarm and sprinklesr separate permits | ||
| Jun 26, 2018 | Completed | 110 Hooper St | Edison Fire Extinguisher Company Inc | ul300 fire system maher na | $10,000 |
| May 24, 2018 | Completed | 100 Hooper St | Gci, Inc | first floor ti for spec space.construction of mezzanine, accesible with lift & stairs in existing core & shell. n/a maher | $150,000 |
| May 18, 2018 | Never finaled | 100 Hooper St | street space permit | ||
| May 14, 2018 | Never finaled | 100 Hooper St | street space | ||
| May 4, 2018 | Completed | 100 Hooper St | Gci, Inc | suite 7: construction of mezzanine, accessible lift and stairs in extg core and shell | $500,000 |
| May 4, 2018 | Completed | 100 Hooper St | Gci, Inc | suite 7: commercial t.i. includes construction of non-structural partitions ceiling, lighting, mechanical and electrical as well as casework and finishes. n/a for maher | $968,250 |
| Apr 26, 2018 | Completed | 110 Hooper St | Bcci Construction Company | 4th flr - mep to support approved arch ti including 12 hoods, installed in employee cafeteria kitchen. kitchen design with 4 hood zones. ul300 suppression systems on seprate permit. no fire smoke dampers in scope of work. ref 201712186746 maher na | $1,445,000 |
| Apr 25, 2018 | Completed | 100 Hooper St | Dpr Construction | revision to 201410209377s3 correct measurement and egress to match field conditions maher not req | |
| Apr 13, 2018 | Never finaled | 110 Hooper St | Bcci Construction Company | roof - electrical for light fixtures, power outlets. ref pa 2017-1216-6925 | $25,000 |
| Apr 12, 2018 | Never finaled | 110 Hooper St | Bcci Construction Company | 3rd fl - structural for battery cabinets in idf room. ref pa 2017-1218-6745 | |
| Apr 12, 2018 | Never finaled | 100 Hooper St | Bcci Construction Company | 2nd floor - modify approved architectural to change it rooms to equipment rooms. also add smoke curtains at elevators. ref pa 2017-1218-6744 | |
| Apr 12, 2018 | Never finaled | 100 Hooper St | Bcci Construction Company | 3rd fl - structural for battery cabinets in idf room. ref pa 2017-1218-6745 | |
| Apr 12, 2018 | Never finaled | 110 Hooper St | Bcci Construction Company | 2nd fl - modify approved architectural to change it rooms to equipment rooms. also add smoke curtains at elevators. ref pa 2017-1218-6748 | |
| Apr 3, 2018 | Never finaled | 100 Hooper St | street space | ||
| Mar 28, 2018 | Completed | 100 Hooper St | Ayoob & Peery Plumbing Co Inc | 4th flr ti - add 198 and relocate 56 sprinklers to conform with the new ceiling/wall layout ref 201712186750 | $99,900 |
| Mar 28, 2018 | Completed | 110 Hooper St | Ayoob & Peery Plumbing Co Inc | 1st & 2nd flr ti - add 190 and relocate 75 sprinklers to conform with the new ceiling/wall layout ref 201712186748 | $117,825 |
| Mar 28, 2018 | Completed | 110 Hooper St | Ayoob & Peery Plumbing Co Inc | 4th flr ti - add 234 and relocate 66 sprinklers to conform with the new ceiling/wall layout ref 201712186746 | $120,525 |
| Mar 28, 2018 | Completed | 110 Hooper St | Ayoob & Peery Plumbing Co Inc | 3rd flr ti - add 187 and relocate 74 sprinklers to conform with the new ceiling/wall layout ref 201712186745 | $112,725 |
| Mar 28, 2018 | Completed | 100 Hooper St | Ayoob & Peery Plumbing Co Inc | 3rd flr ti - add 192 and relocate 68 sprinklers to conform with the new ceiling/wall layout ref 201712186749 | $114,150 |
| Mar 28, 2018 | Completed | 100 Hooper St | Ayoob & Peery Plumbing Co Inc | 1st & 2nd flr ti - add 178 and relocate 71 sprinklers to conform with the new ceiling/wall layout ref 201712186744 | $105,375 |
| Mar 16, 2018 | Completed | 100 Hooper St | Dpr Construction Inc | revision to 201410209377 s3. update fuel port fill location add detail of fuel kill post wall construction, correct egress schedule door width typo, and correct keynotes for ele. show upgraded panel schedule & include sign notes for generator per sffd comments on fuel oil generator addendum maher n | |
| Mar 8, 2018 | Completed | 100 Hooper St | Vkk Signmakers Inc. | install 3 identical single faced wall mounted electric signs; n/a maher | $60,000 |
| Mar 2, 2018 | Expired or cancelled | 110 Hooper St | Bcci Construction Company | revision to 201712186749 3rd flr - change it room to storage room | |
| Mar 1, 2018 | Never finaled | 100 Hooper St | Bcci Construction Company | 3rd fl - mep to support approved architectural ref pa 2017-1218-6745 | $1,420,000 |
| Feb 22, 2018 | Never finaled | 100 Hooper St | Bcci Construction Company | 4th floor south - mep to suppor approved architectural ti ref #20171286750. maher na | $1,420,000 |
| Feb 16, 2018 | Never finaled | 100 Hooper St | Bcci Construction Company | 3rd fl - mep to support approved architectural. ref #201712186749. maher na | $1,420,000 |
| Feb 15, 2018 | Never finaled | 100 Hooper St | Bcci Construction Company | 1st & 2nd flr - mep to support ti 201712186744 maher na | $1,429,345 |
| Feb 14, 2018 | Never finaled | 100 Hooper St | street space | ||
| Feb 9, 2018 | Never finaled | 110 Hooper St | Bcci Construction Company | 1st & 2nd floors mep to support approved architectural t.i. ref app#201712186748. n/a for maher | $1,445,000 |
| Dec 19, 2017 | Never finaled | 110 Hooper St | Bcci Construction Company | roof deck: 2936 sf of (e) roof to become new patio area. install pavers, pathway, lighting & seating. mep, fire alarm seperate permits. | $75,000 |
| Dec 18, 2017 | Never finaled | 110 Hooper St | Bcci Construction Company | 1stfloor ti build outs. 1st flr lobby elevator, secured bike storage area, secured grease inteceptor and 2nd flr f1 office space improvements. mep deffered. n/a for maher. reduced parking by 15 spots (13 for additional parking & 2 spots for grease interceptor), standard spots only. | $1,974,902 |
| Dec 18, 2017 | Completed | 110 Hooper St | Bcci Construction Company | 4th floor ti build outs. 4th flr cafe coffee bar & level 4 office space, mep deferred | $2,579,200 |
| Dec 18, 2017 | Never finaled | 100 Hooper St | Bcci Construction Company | 1st & 2nd floor ti build outs. 1st flr lobby access to elevators and 2nd flr office space | $1,947,035 |
| Dec 18, 2017 | Never finaled | 100 Hooper St | Bcci Construction Company | 3rd floor ti build out of 3rd floor office space, mep deferred. maher na | $1,918,280 |
| Dec 18, 2017 | Never finaled | 100 Hooper St | Bcci Construction Company | 4th floor ti build out of wellness center and office space. mep deferred. maher na | $2,124,038 |
| Dec 18, 2017 | Never finaled | 100 Hooper St | Bcci Construction Company | 3rd floor ti build out of 3rd floor office space, mep deferred. maher na | $1,918,280 |
| Dec 5, 2017 | Never finaled | 100 Hooper St | street space | ||
| Dec 1, 2017 | Completed | 100 Hooper St | Arrow Sign Company | install non illuminated projecting sign on bldg exterior. n/a for maher. | $8,000 |
| Nov 6, 2017 | Completed | 100 Hooper St | Dpr Construction Inc | evacuation signage for 100 hooper fire permit only. n/a for maher | $2,000 |
| Oct 25, 2017 | Completed | 100 Hooper St | Dpr Construction | ref 201410209377 s3, add outdoor rated access panel at elevator penthouse | $1,000 |
| Sep 5, 2017 | Completed | 100 Hooper St | Dpr Construction | revision to 201410209377,s3 changes to doors and door schedules (interior) | |
| Aug 11, 2017 | Completed | 100 Hooper St | Dpr Construction | revision to app#201410209377 s2. revise 4th floor - reinforce for 100# sq. foot live load in lieu of 80# per sq. foot. revise steel frame for penthouse at roof level. n/a maher | |
| May 23, 2017 | Never finaled | 100 Hooper St | Dpr Construction Inc | street space | |
| May 17, 2017 | In progress | 100 Hooper St | street space | ||
| Mar 20, 2017 | Expired or cancelled | 100 Hooper St | revision to foundation 201410209377 s1. various pile info blocks have updated cutoff and or cap type infor some pile types have been updated ban extension types, dimensions updated , new 2 pile cap design apopted and reinforcing cage lengths updated | ||
| Mar 20, 2017 | Completed | 100 Hooper St | Dpr Construction | revision to superstructure addendum 201410209377 s2. add new notes and details, revise pile cap details, add locations for cmu walls, hss posts, lateral bracing locations, add 14" wall above roof level for penthouse framing and have all changes reflected through set | |
| Jan 23, 2017 | Never finaled | 110 Hooper St | per pa #201410209377, add address to rear building at 100 hooper street at block 3808, lot 015 as; 110 hooper street | ||
| Oct 20, 2014 | Completed | 100 Hooper St | Dpr Construction | erect a four story office and retail commercial building. compliance w/ ordinance 155-13 is not required. | $52,500,000 |