Permit GraphShortlistSan Francisco building permits since 2000

Peter Pfau

License
C21794
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C21794 at the Board for Professional Engineers
Listed as
architect, authorized agent-others, designer, engineer
Firm
Pfau Long Architecture
Based in
San Francisco
On San Francisco permits
Oct 2001 to Nov 2026

54 permits since 2000 (architect on 50 permits, engineer on 2 permits, authorized agent-others on 1 permit, designer on 1 permit): 32 completed, 5 in progress, 13 never finaled, 4 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Palisade Builders Inc (5), Plant Construction Co, Lp (5), Cbre Gws Licential Llc. (2), Charles Pankow Builders Ltd (2), Dpr Construction A (2), Hathaway Dinwiddie Co. (2), Singular Builders (2), Skyline Capital Builders Llc (2), Skyline Construction (2), Ventana 76 (2), A M Rocca Inc., Bluewater Environmentl Svc Inc, Dpr Construction, Guzman - Suffolk Jv Llc, Leaf Communications Inc, Mizen Construction Inc, Robison Nieri White Construction, Swinerton Builders, T R E Construction And Management Inc, Truebeck Construction
Architects
Edgar Lopez
Engineers
Alan Charles Burr (2), Adam Nieman, Alan C. Burr, Christopher James Wood, Michael Gemmill, Michael Gemmill, Thomas Brenoic, Zack Kardon

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 2, 2026In progress
filed Nov 2026, not yet issued
3175 17th Stproposed compaction grouting ot densify potentially liquifiable soils and reduce earthquake induced settlement and related loss of foundation support. ref#: 202511179769.
Details
Permit
202611020254

proposed compaction grouting ot densify potentially liquifiable soils and reduce earthquake induced settlement and related loss of foundation support. ref#: 202511179769.

Open the permit page

$100,000
Dec 26, 2025In progress
issued Jul 2026
3153 17th StSingular Buildersalteration and change of use of an (e) 14,320sf. building with an 5,684sf addition for dance studios and support spaces. new 3rd lv performance space and 1,508sf rooftop terrace (590sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between the two
Details
Permit
202512262714
Permit issued
Jul 24, 2026

alteration and change of use of an (e) 14,320sf. building with an 5,684sf addition for dance studios and support spaces. new 3rd lv performance space and 1,508sf rooftop terrace (590sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between the two

Open the permit page

$105
Dec 9, 2025In progress
issued Jul 2026
3175 17th StSingular Builderschange of use of an existing 14,320 sf, builing with an 5,684 sf addition of dance studios and support spaces. a new 3rd level performance space and a 1,508 sf rooftop terrace (590 sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between 2 buildings.
Details
Permit
202511179769
Permit issued
Jul 24, 2026

change of use of an existing 14,320 sf, builing with an 5,684 sf addition of dance studios and support spaces. a new 3rd level performance space and a 1,508 sf rooftop terrace (590 sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between 2 buildings.

Open the permit page

$7,273,634
May 29, 2025In progress
issued Jun 2025
1060 Key AvCbre Gws Licential Llc.interior demo work per ab-017
Details
Permit
202505297525
Permit issued
Jun 16, 2025

interior demo work per ab-017

Open the permit page

$5,000
Jan 21, 2025In progress
issued Jun 2025
1060 Key AvCbre Gws Licential Llc.voluntary seismic upgrade at hope and peace buildings and patch/repair of affected areas. it will also provide accessibility improvements at the main entrance of the hope building.
Details
Permit
202412317586
Permit issued
Jun 18, 2025

voluntary seismic upgrade at hope and peace buildings and patch/repair of affected areas. it will also provide accessibility improvements at the main entrance of the hope building.

Open the permit page

$4,260,000
Oct 18, 2024Completed
final sign-off Mar 2025
200 Rhode Island StSkyline Constructionrevision to bpa# 201910023333: to designate 12,333 gsf of office and 3035 gsf retail on first floor; designate 21,317 gsf to pdr on second floor.
Details
Permit
202410183314
Permit issued
Oct 25, 2024
Final sign-off
Mar 21, 2025

revision to bpa# 201910023333: to designate 12,333 gsf of office and 3035 gsf retail on first floor; designate 21,317 gsf to pdr on second floor.

Open the permit page

May 3, 2023Expired or cancelled
cancelled Jan 2026
680 Indiana StT R E Construction And Management Incfor leasing office provide 3/4" conduit w/ 3x #10 wire for mini slip unit. provide disconnect & whip fro condenser, (1) 2 20 amp circuit breaker in (e) panel. condenser unit to be mounted on exterior. indoor slit unit to be mounted inside leasing office
Details
Permit
202305037040

for leasing office provide 3/4" conduit w/ 3x #10 wire for mini slip unit. provide disconnect & whip fro condenser, (1) 2 20 amp circuit breaker in (e) panel. condenser unit to be mounted on exterior. indoor slit unit to be mounted inside leasing office

Open the permit page

$33,000
Dec 2, 2022Never finaled
filed Dec 2022, never issued
490 Brannan StDpr Construction Ademolition and complete removal of existing billboard structure. billboard number referenced are 2509,541387 and 1546,541389.
Details
Permit
202212027614

demolition and complete removal of existing billboard structure. billboard number referenced are 2509,541387 and 1546,541389.

Open the permit page

$10,000
Dec 1, 2022Completed
final sign-off Mar 2025
200 Rhode Island StSkyline Capital Builders Llcrevision to bpa#201910023333 fabricate a transom window to match adjacent, transom windows. steel tube crossmember to match the roll up door. new manual rolup door 11' x 14'-7" to match (e) frames @ other bays
Details
Permit
202212017471
Permit issued
Dec 16, 2022
Final sign-off
Mar 21, 2025

revision to bpa#201910023333 fabricate a transom window to match adjacent, transom windows. steel tube crossmember to match the roll up door. new manual rolup door 11' x 14'-7" to match (e) frames @ other bays

Open the permit page

Nov 22, 2022Never finaled
filed Nov 2022, never issued
490 Brannan StDpr Construction Ademolish a 1 story retail-bank bldg type 3-b.
Details
Permit
202211227013

demolish a 1 story retail-bank bldg type 3-b.

Open the permit page

$150,000
Jun 17, 2022Never finaled
issued Jan 2023, no final
200 Rhode Island StSkyline Capital Builders Llcnew roof top patio built on top of the (e) 5-story bldg portion of the site. roof deck consist of pedestal pavers and planters with seating area. ref 201910023333 for c + s approvals and roof deck entitlements as a deffered submittal.
Details
Permit
202206176573
Permit issued
Jan 17, 2023

new roof top patio built on top of the (e) 5-story bldg portion of the site. roof deck consist of pedestal pavers and planters with seating area. ref 201910023333 for c + s approvals and roof deck entitlements as a deffered submittal.

Open the permit page

$500,000
Feb 9, 2022Never finaled
issued Jun 2022, no final
899 Howard StPlant Construction Co, Lpcp-zoc case no 2015009140fa: convert 2nd & 3rd fl of the (e)bldg from retail to office use,to create a ground fl office lobby in total 46,388 sf of retail space will be converted to office with two new elevators service. the office levles above(n) restroom on the 2nd & 3rd flrs.
Details
Permit
202202097660
Permit issued
Jun 27, 2022

cp-zoc case no 2015009140fa: convert 2nd & 3rd fl of the (e)bldg from retail to office use,to create a ground fl office lobby in total 46,388 sf of retail space will be converted to office with two new elevators service. the office levles above(n) restroom on the 2nd & 3rd flrs.

Open the permit page

$3,000,000
Feb 9, 2022Never finaled
issued Aug 2022, no final
899 Howard StPlant Construction Co, Lpaddition of a 4,415 sf indoor office amnity space & additional unclosed rooftop amenity space approved per planning commission motion #2015-0091 to establish 70,881 sf of additional office use at 875-899 howard
Details
Permit
202202097666
Permit issued
Aug 24, 2022

addition of a 4,415 sf indoor office amnity space & additional unclosed rooftop amenity space approved per planning commission motion #2015-0091 to establish 70,881 sf of additional office use at 875-899 howard

Open the permit page

$3,000,000
Feb 9, 2022Never finaled
issued May 2022, no final
899 Howard StPlant Construction Co, Lpexterior renovation of an (e) 3-story structure known as 899 howard demolition of (e) cement plaster cladding, glass block & concrete infill panels. installation of a new aluminum & glass curtain wall system with integrated metal cladding sunscrees & canopies per planning dept case no 2015-009141ofa
Details
Permit
202202097653
Permit issued
May 6, 2022

exterior renovation of an (e) 3-story structure known as 899 howard demolition of (e) cement plaster cladding, glass block & concrete infill panels. installation of a new aluminum & glass curtain wall system with integrated metal cladding sunscrees & canopies per planning dept case no 2015-009141ofa

Open the permit page

$9,000,000
Nov 15, 2021Never finaled
issued Jun 2023, no final
899 Howard StPlant Construction Co, Lpall floors: ab-017 demo interior partitions, demolish all mep equipment back to trunklines or mpoe, patch and repair rated conditions as necessary, remove selected vertical circulation and retain all interior rated conditions, and comply with pid complaint # 2021182084.
Details
Permit
202111152354
Permit issued
Jun 23, 2023

all floors: ab-017 demo interior partitions, demolish all mep equipment back to trunklines or mpoe, patch and repair rated conditions as necessary, remove selected vertical circulation and retain all interior rated conditions, and comply with pid complaint # 2021182084.

Open the permit page

$877,988
Mar 9, 2021Completed
final sign-off Nov 2021
3250 18th Stplace 3 relocatable classroom buildings in the school yard of existing school and connect to existing utilities.
Details
Permit
202103096215
Permit issued
Sep 8, 2021
Final sign-off
Nov 18, 2021

place 3 relocatable classroom buildings in the school yard of existing school and connect to existing utilities.

Open the permit page

$125,000
Nov 19, 2020Never finaled
issued Jan 2021, no final
885 Folsom StGuzman - Suffolk Jv Llcinterior partition to renovate (e) office spaces & restrooms. addition of kitchenette, ramps & entry doors. installation of salvaged skylights in (e) openings. m.e.p. & structural under separate . .............................................................
Details
Permit
202011199331
Permit issued
Jan 14, 2021

interior partition to renovate (e) office spaces & restrooms. addition of kitchenette, ramps & entry doors. installation of salvaged skylights in (e) openings. m.e.p. & structural under separate . .............................................................

Open the permit page

$250,000
Sep 17, 2020Completed
final sign-off Apr 2021
1 De Haro StHathaway Dinwiddie Co.revision to pa# 201710121125 s3. revision is limited to include access hatch added to top of elevator shaft. added to provide access to a smoke detector mounted in the elevator shaft.
Details
Permit
202009174395
Permit issued
Oct 6, 2020
Final sign-off
Apr 7, 2021

revision to pa# 201710121125 s3. revision is limited to include access hatch added to top of elevator shaft. added to provide access to a smoke detector mounted in the elevator shaft.

Open the permit page

Jun 4, 2020Never finaled
filed Jun 2020, never issued
2800 03rd Stto erect a 6 stories, type 1b, factory and low-hazard storage bldg.**comply w/ maher ord# 155-13, route to dph**
Details
Permit
202006048142

to erect a 6 stories, type 1b, factory and low-hazard storage bldg.**comply w/ maher ord# 155-13, route to dph**

Open the permit page

$90,000,000
Oct 2, 2019Completed
final sign-off Jun 2025
200 Rhode Island StSkyline Constructionpriority project: core & shell alteration & integration of (3) structures (on same lot) ada upgrades, preservation of 5-story building & removal of non-historic features. (n) entry lobby on rhode island street @ old loading dock. other facade abd rooftop changes compatible with historic character.
Details
Permit
201910023333
Permit issued
Dec 30, 2021
Final sign-off
Jun 24, 2025

priority project: core & shell alteration & integration of (3) structures (on same lot) ada upgrades, preservation of 5-story building & removal of non-historic features. (n) entry lobby on rhode island street @ old loading dock. other facade abd rooftop changes compatible with historic character.

Open the permit page

$5,000,000
Sep 13, 2019Never finaled
filed Sep 2019, never issued
3250 18th Strenovation of existing school bldg, including new elevator.
Details
Permit
201909131555

renovation of existing school bldg, including new elevator.

Open the permit page

$7,578,000
Sep 13, 2019Never finaled
filed Sep 2019, never issued
741 South Van Ness Avseismic improvement to existing school. building & addition of elevator. outdoor to be developed.
Details
Permit
201909131543

seismic improvement to existing school. building & addition of elevator. outdoor to be developed.

Open the permit page

$8,878,000
Jul 29, 2019Completed
final sign-off Jun 2022
200 Rhode Island StA M Rocca Inc.interior soft demo per ab-017
Details
Permit
201907297241
Permit issued
Aug 16, 2019
Final sign-off
Jun 2, 2022

interior soft demo per ab-017

Open the permit page

$15,000
May 14, 2019Completed
final sign-off May 2019
1960 Bryant StMizen Construction Incpartial compliance with nov 201947091; demo or tenant unpermitted work. electrical demo under separate permit
Details
Permit
201905140509
Permit issued
May 15, 2019
Final sign-off
May 30, 2019

partial compliance with nov 201947091; demo or tenant unpermitted work. electrical demo under separate permit

Open the permit page

$34,900
May 1, 2019Completed
final sign-off Mar 2021
260 Valencia Stde-commission commercial kitchen. remove sinks and cap gas line. revert building to last legal use established by pa 2808208 in which the r-1 residential use was legally coverted to b-2 office use. building occupancy & use shall remain as; b-occupancy/office use only.
Details
Permit
201905019412
Permit issued
Dec 21, 2020
Final sign-off
Mar 5, 2021

de-commission commercial kitchen. remove sinks and cap gas line. revert building to last legal use established by pa 2808208 in which the r-1 residential use was legally coverted to b-2 office use. building occupancy & use shall remain as; b-occupancy/office use only.

Open the permit page

$7,500
Mar 22, 2019Expired or cancelled
withdrawn Jan 2020
1960 Bryant Stadministrative permit to document land use as training & skill development center w/o any school accreditation; music/sound testing room/acoustic labratory; office per plans; light fabrication focused on wood working and assembling. no construction. comply w/ nov#20185361,201847593,20180018.
Details
Permit
201903225983

administrative permit to document land use as training & skill development center w/o any school accreditation; music/sound testing room/acoustic labratory; office per plans; light fabrication focused on wood working and assembling. no construction. comply w/ nov#20185361,201847593,20180018.

Open the permit page

Oct 12, 2017Completed
final sign-off Aug 2022
1 De Haro StHathaway Dinwiddie Co.build sit in two lots, 003 &004. erect (n) 4-story commercial/office building. building is on (2) lots. need address change before issuance. 11/20/18: new building sit on two lots, 3800/003 & 3800/004. wf
Details
Permit
201710121125
Permit issued
Dec 5, 2018
Final sign-off
Aug 8, 2022

build sit in two lots, 003 &004. erect (n) 4-story commercial/office building. building is on (2) lots. need address change before issuance. 11/20/18: new building sit on two lots, 3800/003 & 3800/004. wf

Open the permit page

$25,000,000
Jun 12, 2017Completed
final sign-off May 2018
1031 Balboa StVentana 76renovation of (e) 2 story (above garage) sfd including interior modifications, (e) window replacement, new back stair & deck. less than 50 cu yds of soil is being removed.
Details
Permit
201706129065
Permit issued
Jul 7, 2017
Final sign-off
May 11, 2018

renovation of (e) 2 story (above garage) sfd including interior modifications, (e) window replacement, new back stair & deck. less than 50 cu yds of soil is being removed.

Open the permit page

$400,000
Feb 9, 2017Completed
final sign-off Sep 2017
2558 Mission StPlant Construction Co, Lpscope of work limited to 2,034 sq ft of interior construction for common core elements for any potential ground floor use. work includes new construction of mechanical platform, ceiling & floor infills at (e) entry door to make accessible. no exterior work, mep, life safety under spearate permit.
Details
Permit
201702099060
Permit issued
Mar 2, 2017
Final sign-off
Sep 22, 2017

scope of work limited to 2,034 sq ft of interior construction for common core elements for any potential ground floor use. work includes new construction of mechanical platform, ceiling & floor infills at (e) entry door to make accessible. no exterior work, mep, life safety under spearate permit.

Open the permit page

$50,000
Oct 25, 2016Completed
final sign-off Jan 2017
875 Howard StSwinerton Buildersinterior non-strucutral demolition of interior finishes in accordance with the sf building code ab-17. scope of work includes the proper removal of interior non-load bearing walls, doors, casework, and mep
Details
Permit
201610251108
Permit issued
Nov 3, 2016
Final sign-off
Jan 18, 2017

interior non-strucutral demolition of interior finishes in accordance with the sf building code ab-17. scope of work includes the proper removal of interior non-load bearing walls, doors, casework, and mep

Open the permit page

$125,000
Oct 7, 2016Completed
final sign-off Aug 2017
680 Indiana StPalisade Builders Increvision to 201312244992 s3: relocate fdc along indiana st. this permit removes fdc at strs plaza formerly a public right of way per street improvement permit no 14ie-0978
Details
Permit
201610079844
Permit issued
Oct 24, 2016
Final sign-off
Aug 28, 2017

revision to 201312244992 s3: relocate fdc along indiana st. this permit removes fdc at strs plaza formerly a public right of way per street improvement permit no 14ie-0978

Open the permit page

Aug 16, 2016Completed
final sign-off Oct 2017
680 Indiana StPalisade Builders Increvision to pa 2013-1224-4992 (s3) clarification of non-combustile assemblies at gas appliances on community roof deck. includes roof deck layout identifying extent of non-combustible pads over roofing assembly, details for roof and counter top framing at gas and bbq and fireplaces. drawing set also
Details
Permit
201608165079
Permit issued
Sep 8, 2016
Final sign-off
Oct 3, 2017

revision to pa 2013-1224-4992 (s3) clarification of non-combustile assemblies at gas appliances on community roof deck. includes roof deck layout identifying extent of non-combustible pads over roofing assembly, details for roof and counter top framing at gas and bbq and fireplaces. drawing set also

Open the permit page

Jul 5, 2016Completed
final sign-off Aug 2017
680 Indiana StPalisade Builders Increvision to ref pa 2013 1224 4992 s3. change flr and roof assemblies of the bay windows and juliet balconies at 680 indiana st. to non-ventilated assemblies, closed cell spray foam that will be used to fill any air gaps in the floors and roofs, including sleeper space. maher ord 155-13/n.a.
Details
Permit
201607051569
Permit issued
Aug 5, 2016
Final sign-off
Aug 25, 2017

revision to ref pa 2013 1224 4992 s3. change flr and roof assemblies of the bay windows and juliet balconies at 680 indiana st. to non-ventilated assemblies, closed cell spray foam that will be used to fill any air gaps in the floors and roofs, including sleeper space. maher ord 155-13/n.a.

Open the permit page

Jun 16, 2016Expired or cancelled
cancelled Nov 2022
899 Howard Stinterior addition of (2)(n) elevators, restrooms & janitor's closet on the 2nd & 3rd fl, removal of an escalator from 1st thru 3rd fl, infill of the floor opening.
Details
Permit
201606160179

interior addition of (2)(n) elevators, restrooms & janitor's closet on the 2nd & 3rd fl, removal of an escalator from 1st thru 3rd fl, infill of the floor opening.

Open the permit page

$1,100,000
Aug 21, 2015Completed
final sign-off Feb 2016
270 Brannan StCharles Pankow Builders Ltdrevision to arch/mep/landscaping addendum pa# 201312174402 s-3, changes to exterior wall detali assemblies and exterior waterproofing details. n/a ordinance #155-13
Details
Permit
201508214972
Permit issued
Aug 21, 2015
Final sign-off
Feb 19, 2016

revision to arch/mep/landscaping addendum pa# 201312174402 s-3, changes to exterior wall detali assemblies and exterior waterproofing details. n/a ordinance #155-13

Open the permit page

May 21, 2015Never finaled
issued Aug 2015, no final
100 Hooper Stremove asphalt topping for soils testing. removal of existing shipping storage containers.
Details
Permit
201505216922
Permit issued
Aug 10, 2015

remove asphalt topping for soils testing. removal of existing shipping storage containers.

Open the permit page

$50,000
Jan 6, 2015Never finaled
issued Sep 2015, no final
680 Indiana StPalisade Builders Increvised site permit for pa# 201312244992-s. increase number of dwellint units to 55. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201501065055
Permit issued
Sep 30, 2015

revised site permit for pa# 201312244992-s. increase number of dwellint units to 55. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$50,000
Oct 20, 2014Completed
final sign-off Jul 2020
100 Hooper StDpr Constructionerect a four story office and retail commercial building. compliance w/ ordinance 155-13 is not required.
Details
Permit
201410209377
Permit issued
Dec 17, 2015
Final sign-off
Jul 17, 2020

erect a four story office and retail commercial building. compliance w/ ordinance 155-13 is not required.

Open the permit page

$52,500,000
Jun 25, 2014Completed
final sign-off Jul 2018
199 Museum Wyprimarily interior renovation. construct geology exhibit. new zoology exhibit. renovate live animal exhibit,science lab,multipurpose room,3 bathrooms,lobby,concession & office area. install elevator. accessibility upgrades. new sprinkler at bsmt level.
Details
Permit
201406259468
Permit issued
Jul 8, 2015
Final sign-off
Jul 17, 2018

primarily interior renovation. construct geology exhibit. new zoology exhibit. renovate live animal exhibit,science lab,multipurpose room,3 bathrooms,lobby,concession & office area. install elevator. accessibility upgrades. new sprinkler at bsmt level.

Open the permit page

$3,500,000
Dec 24, 2013Completed
final sign-off May 2019
680 Indiana StPalisade Builders Inc, Leaf Communications Incto erect 5 stories of 51 dwelling units with assembly/parking
Details
Permit
201312244992
Permit issued
Dec 24, 2014
Final sign-off
May 20, 2019

to erect 5 stories of 51 dwelling units with assembly/parking

Open the permit page

$12,000,000
Dec 17, 2013Completed
final sign-off Jun 2017
270 Brannan StCharles Pankow Builders Ltdto erect 7 stories, 1 basement, office, parking, assembly building.
Details
Permit
201312174402
Permit issued
Apr 25, 2014
Final sign-off
Jun 7, 2017

to erect 7 stories, 1 basement, office, parking, assembly building.

Open the permit page

$32,000,000
Jun 6, 2013Completed
final sign-off Dec 2013
654 Mission Stground floor minor tenant improvement - demo of non-structural partitions, addition of new partitions, doors side lights, adjustment to lighting & mechanical.
Details
Permit
201306068863
Permit issued
Jul 19, 2013
Final sign-off
Dec 11, 2013

ground floor minor tenant improvement - demo of non-structural partitions, addition of new partitions, doors side lights, adjustment to lighting & mechanical.

Open the permit page

$64,756
Jul 16, 2012Completed
final sign-off Sep 2013
275 Brannan StTruebeck Constructioncore and shell renovation of existing office building. facade work and interior upgrades. new egress stairs to roof. new roof deck. sprinklers, standpipe, fire alarm permits separate
Details
Permit
201207164925
Permit issued
Nov 19, 2012
Final sign-off
Sep 13, 2013

core and shell renovation of existing office building. facade work and interior upgrades. new egress stairs to roof. new roof deck. sprinklers, standpipe, fire alarm permits separate

Open the permit page

$2,500,000
May 4, 2012Completed
final sign-off Sep 2013
275 Brannan Ststructural strengthening of existing umb per sfbc ch 16c & interior demolition. building or area of int. demo & structural strengthening to remain vacant until full accessibility compliance is provided. subsequent tenant improvement permit showing full accessibility to be filed per sfbc ab-017.
Details
Permit
201205049845
Permit issued
Jul 16, 2012
Final sign-off
Sep 13, 2013

structural strengthening of existing umb per sfbc ch 16c & interior demolition. building or area of int. demo & structural strengthening to remain vacant until full accessibility compliance is provided. subsequent tenant improvement permit showing full accessibility to be filed per sfbc ab-017.

Open the permit page

$525,000
Mar 16, 2012Completed
final sign-off Apr 2013
275 Brannan StBluewater Environmentl Svc Incabatement of asbestos & lead materials in interior of non-occupied bldg. select non-structural demolition per ab-017
Details
Permit
201203166247
Permit issued
Mar 19, 2012
Final sign-off
Apr 18, 2013

abatement of asbestos & lead materials in interior of non-occupied bldg. select non-structural demolition per ab-017

Open the permit page

$40,000
Apr 13, 2010Completed
final sign-off Nov 2011
45 Raycliff TrVentana 76structural upgrade of foundation for single family home.
Details
Permit
201004130157
Permit issued
Apr 26, 2010
Final sign-off
Nov 22, 2011

structural upgrade of foundation for single family home.

Open the permit page

$74,000
Jun 11, 2008Completed
final sign-off Oct 2008
2750 Jackson Stinterior non-structural renovations to areas on 1st, 2nd and 3rd floors
Details
Permit
200806114162
Permit issued
Jun 13, 2008
Final sign-off
Oct 28, 2008

interior non-structural renovations to areas on 1st, 2nd and 3rd floors

Open the permit page

$390,000
Jun 10, 2008Completed
final sign-off Oct 2008
2750 Jackson Stinstallation of structural supports for safety barrier netting on (2) rooftop playfields.
Details
Permit
200806104097
Permit issued
Jun 24, 2008
Final sign-off
Oct 31, 2008

installation of structural supports for safety barrier netting on (2) rooftop playfields.

Open the permit page

$104,550
Jun 20, 2007Completed
final sign-off Aug 2008
250 Valencia Stexcavation in vacant bldg for new work to be approved under app #2006/10/27/6270s no excavation greater than 5 feet.
Details
Permit
200706204557
Permit issued
Jul 16, 2007
Final sign-off
Aug 27, 2008

excavation in vacant bldg for new work to be approved under app #2006/10/27/6270s no excavation greater than 5 feet.

Open the permit page

$76,000
Apr 11, 2007Completed
final sign-off Aug 2008
250 Valencia Stinterior non-structural demolition of mechanical & electrical system and non bearing partitions. asbestos abatement. removal of 1/f flooring & rat-proofing on partial floor for soil mitigation work.
Details
Permit
200704118538
Permit issued
Apr 11, 2007
Final sign-off
Aug 27, 2008

interior non-structural demolition of mechanical & electrical system and non bearing partitions. asbestos abatement. removal of 1/f flooring & rat-proofing on partial floor for soil mitigation work.

Open the permit page

$135,000
Oct 27, 2006Completed
final sign-off Nov 2009
250 Valencia Stadaptive remodel of extg levi strauss manufacturing plant. change of use to elementry school. site permit
Details
Permit
200610276270
Permit issued
Aug 9, 2007
Final sign-off
Nov 10, 2009

adaptive remodel of extg levi strauss manufacturing plant. change of use to elementry school. site permit

Open the permit page

$11,500,000
Nov 4, 2005Completed
final sign-off May 2007
131 Cherry StRobison Nieri White Constructionstructural design changes. change in engineer of record.existing pa# 2003/09/30/6144.changes in roof & floor framings.
Details
Permit
200511047412
Permit issued
Dec 5, 2005
Final sign-off
May 24, 2007

structural design changes. change in engineer of record.existing pa# 2003/09/30/6144.changes in roof & floor framings.

Open the permit page

May 11, 2005Completed
final sign-off May 2006
2706 Union Stinterior remodel od comdominium : includes (e) kitchen, addition of new bathroom & remodel to (e)
Details
Permit
200505112078
Permit issued
May 11, 2005
Final sign-off
May 8, 2006

interior remodel od comdominium : includes (e) kitchen, addition of new bathroom & remodel to (e)

Open the permit page

$50,000
Oct 16, 2001Expired or cancelled
expired Jul 2003
2830 20th Strevise to appln #200110050081 substitute plans in entirety to clarify prop line prot wrk scope in
Details
Permit
200110160916
Permit issued
Oct 16, 2001

revise to appln #200110050081 substitute plans in entirety to clarify prop line prot wrk scope in

Open the permit page

$500