Edgar Lopez
- Listed as
- architect
- On San Francisco permits
- May 2015 to Nov 2019
3 permits since 2000 (architect on 3 permits): 3 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 26, 2019 | Completed final sign-off Sep 2022 | 60 Walter St | add a new adu per ordinance 162-16. scope of work includes adding a shower, kitchenette, replace (2) windows, new fire sprinkler at ground level.Details
add a new adu per ordinance 162-16. scope of work includes adding a shower, kitchenette, replace (2) windows, new fire sprinkler at ground level. | $20,000 | |
| May 1, 2019 | Completed final sign-off Mar 2021 | 260 Valencia St | de-commission commercial kitchen. remove sinks and cap gas line. revert building to last legal use established by pa 2808208 in which the r-1 residential use was legally coverted to b-2 office use. building occupancy & use shall remain as; b-occupancy/office use only.Details
de-commission commercial kitchen. remove sinks and cap gas line. revert building to last legal use established by pa 2808208 in which the r-1 residential use was legally coverted to b-2 office use. building occupancy & use shall remain as; b-occupancy/office use only. | $7,500 | |
| May 22, 2015 | Completed final sign-off Aug 2016 | 24 Henry St | Hong Lee Construction Co Inc | interior remodel of 3rd fl including remodel bathrooms & add bathroom,elec, and plumbing. legalize storage at 1st fl and remove tub/toilet. add fireplace 3rd fl, add skylightDetails
interior remodel of 3rd fl including remodel bathrooms & add bathroom,elec, and plumbing. legalize storage at 1st fl and remove tub/toilet. add fireplace 3rd fl, add skylight | $48,000 |