Block 3574, lot 085
3250 18th St
- City’s use
- Commercial Misc
- Built
- 1900
- Stories
- 2
- Rooms
- 2 bathrooms
- Building
- 14,570 sq ft
- Lot
- 18,330 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2025 | Completed final sign-off Jan 2026 | 3250 18th St | Edison Fire Extinguisher Company Inc | ul300 fire system installationDetails
ul300 fire system installation | $3,950 |
| Oct 13, 2021 | Completed final sign-off Nov 2021 | 3250 18th St | revision to pa 2021-0309-6215 for alternate fire rating detail at skirtDetails
revision to pa 2021-0309-6215 for alternate fire rating detail at skirt | ||
| May 4, 2021 | Completed final sign-off Dec 2021 | 3250 18th St | San Francisco Fire Protection | add-on to existing like for like system due to 3 new portable bldg. install new power supply panel, smoke & heat detectors, notification devices & pull station at every exit in new portable classrooms. new devices will be tied in to existing panel. #2020-0505-7301, #2021-0304-6215Details
add-on to existing like for like system due to 3 new portable bldg. install new power supply panel, smoke & heat detectors, notification devices & pull station at every exit in new portable classrooms. new devices will be tied in to existing panel. #2020-0505-7301, #2021-0304-6215 | $6,600 |
| Mar 9, 2021 | Completed final sign-off Nov 2021 | 3250 18th St | place 3 relocatable classroom buildings in the school yard of existing school and connect to existing utilities.Details
place 3 relocatable classroom buildings in the school yard of existing school and connect to existing utilities. | $125,000 | |
| Sep 4, 2020 | Completed final sign-off Oct 2020 | 3250 18th St | San Francisco Fire Protection | as built ref pa# 202005057301. remove 3 11ov fire bells from plans. not exist.Details
as built ref pa# 202005057301. remove 3 11ov fire bells from plans. not exist. | $7,000 |
| May 5, 2020 | Completed final sign-off Oct 2020 | 3250 18th St | San Francisco Fire Protection | phase 1 like for like system replacement with new control panel, smoke detector and 4 pull station at the same location, install radio communicator to monitor the entire system. install monitor modules to tie in existing flow and tamper switches to new panel.Details
phase 1 like for like system replacement with new control panel, smoke detector and 4 pull station at the same location, install radio communicator to monitor the entire system. install monitor modules to tie in existing flow and tamper switches to new panel. | $12,000 |
| May 5, 2020 | Completed final sign-off Oct 2020 | 3250 18th St | Pribuss Engineering Inc | fire sprinkler tenant improvement to accomodate e walls per fire inspector comments, add 5 upright sprinklersDetails
fire sprinkler tenant improvement to accomodate e walls per fire inspector comments, add 5 upright sprinklers | |
| Sep 13, 2019 | Never finaled filed Sep 2019, never issued | 3250 18th St | renovation of existing school bldg, including new elevator.Details
renovation of existing school bldg, including new elevator. | $7,578,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- San Francisco Fire Protection (3), Edison Fire Extinguisher Company Inc, Pribuss Engineering Inc
- Architects
- Peter Pfau (2)
- Engineers
- Adam Nieman
- Designers
- Edison Fire Extinguisher
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.