Guzman - Suffolk Jv Llc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2019 to Mar 2025
- Last 24 months
- 1 permit filed
12 permits since 2000: 11 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 10, 2025 | Completed final sign-off Jul 2025 | 68 Haight St | administrative change to scope of work description under pa# 2023-1130-1718 to include work in the building for seismic reinforcement of foundation & building structure. building upgrades to include code compliant ada accessibility. no work in this permit.Details
administrative change to scope of work description under pa# 2023-1130-1718 to include work in the building for seismic reinforcement of foundation & building structure. building upgrades to include code compliant ada accessibility. no work in this permit. | |
| Jul 9, 2024 | Completed final sign-off Sep 2024 | 68 Haight St | remove (1) window on east wall and infill, not visible from street. remove (1) window on south wall and infill at rear. install 2 hr duct wrap around (e) exhaust duct up to roof.Details
remove (1) window on east wall and infill, not visible from street. remove (1) window on south wall and infill at rear. install 2 hr duct wrap around (e) exhaust duct up to roof. | $11,500 |
| Jan 30, 2024 | Completed final sign-off Feb 2025 | 68 Haight St | comply with nov#202302977. repair foundation wall in the basement of the bldg including addition of foundation footings, installation new concrete wall at basement & upgrades to wood structure including new posts, beams and addition phase 2 work simpson strong wall system in support of #202311301718Details
comply with nov#202302977. repair foundation wall in the basement of the bldg including addition of foundation footings, installation new concrete wall at basement & upgrades to wood structure including new posts, beams and addition phase 2 work simpson strong wall system in support of #202311301718 | $155,000 |
| Jan 12, 2024 | Completed final sign-off Sep 2025 | 600 07th St | add fire damper to duct ag gr fl. change door to 90 min rated and wall to 2 hour at roof levelDetails
add fire damper to duct ag gr fl. change door to 90 min rated and wall to 2 hour at roof level | $10,000 |
| Nov 30, 2023 | Completed final sign-off Jul 2025 | 68 Haight St | to comply with nov#202302977. includes: repair foundation wall in the basement of the bldg including addition of foundation footings, installation new concrete wall at basement lv and upgrades to the wood structure including new posts, beams and addition of simpson strong wall sys.Details
to comply with nov#202302977. includes: repair foundation wall in the basement of the bldg including addition of foundation footings, installation new concrete wall at basement lv and upgrades to the wood structure including new posts, beams and addition of simpson strong wall sys. | $1,600,000 |
| Nov 28, 2023 | Completed final sign-off Jun 2025 | 68 Haight St | emergency temporary shoring required to support building for emergency structural repair per nov 202302977Details
emergency temporary shoring required to support building for emergency structural repair per nov 202302977 | $100,000 |
| Feb 8, 2022 | Completed final sign-off Dec 2022 | 330 Parker Av | construct manufactured roof truss system for new recycling facility. roof framing per bpa 201810153184Details
construct manufactured roof truss system for new recycling facility. roof framing per bpa 201810153184 | $50,000 |
| Jun 29, 2021 | Completed final sign-off Dec 2022 | 330 Parker Av | revision to issued pa# 201810153184. "structural only". value engineering to reduce construction cost.Details
revision to issued pa# 201810153184. "structural only". value engineering to reduce construction cost. | |
| Nov 19, 2020 | Never finaled issued Jan 2021, no final | 885 Folsom St | interior partition to renovate (e) office spaces & restrooms. addition of kitchenette, ramps & entry doors. installation of salvaged skylights in (e) openings. m.e.p. & structural under separate . .............................................................Details
interior partition to renovate (e) office spaces & restrooms. addition of kitchenette, ramps & entry doors. installation of salvaged skylights in (e) openings. m.e.p. & structural under separate . ............................................................. | $250,000 |
| Oct 19, 2020 | Completed final sign-off Sep 2025 | 600 07th St | to erect a 8-story, type 1b, mixed use bldg with 221 residential unit, no basement. **comply to maher, route to dph**Details
to erect a 8-story, type 1b, mixed use bldg with 221 residential unit, no basement. **comply to maher, route to dph** | $82,127,000 |
| Dec 31, 2019 | Completed final sign-off Jun 2021 | 1950 Mission St | tenant interior improvements. early care and education center/child care center.Details
tenant interior improvements. early care and education center/child care center. | $185,000 |
| Nov 14, 2019 | Completed final sign-off Dec 2025 | 78 Haight St | to erect 8 stories, 1 basement, type i-b, 63 residential units with child development center & office building. (r-2,e,b) 100% affordable studios & 1 bedroom apartments for low-income households and transition aged youth (tay)Details
to erect 8 stories, 1 basement, type i-b, 63 residential units with child development center & office building. (r-2,e,b) 100% affordable studios & 1 bedroom apartments for low-income households and transition aged youth (tay) | $13,500,000 |