Block 1107, lot 008
2800 Turk Bl
60 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 24, 2026 | In progress | 2800 Turk Bl | to obtain final inspection for work approved under pa# 200504281143, 200506074421, 200512029409. all work is complete. | ||
| Feb 4, 2026 | Completed | 2500 Turk Bl | Preston Pipelines Inc | to obtain a final inspection for work approved under pa# 202008131707 (sffd only). all work complete. | |
| Feb 4, 2026 | In progress | 2500 Turk Bl | Preston Pipelines Inc | to obtain a final inspection for work approved under pa# 201809281804 (sffd only). all work complete. | |
| Feb 4, 2026 | Completed | 2500 Turk Bl | Preston Pipelines Inc | to obtain a final inspection for work approved under pa# 201808131706 (sffd only). all work complete. | |
| Feb 4, 2026 | In progress | 2500 Turk Bl | Preston Pipelines Inc | to obtain a final inspection for work approved under pa# 201802284073 (sffd only). all work complete. | |
| Dec 22, 2025 | In progress | 2500 Turk Bl | to obtain final inspection for work approved under pa# 201808147321. all work is complete. | ||
| Dec 15, 2025 | Completed | 2800 Turk Bl | Cahill Contractors Llc. | to obtain final insepction for work approved under pa# 201705025403, 201707121634, 201802020272. | |
| Sep 26, 2025 | Completed | 2800 Turk Bl | Cahill Contractors Llc. | to obtain final inspection for work approved under pa# 2016-1220-5404 & 2017-1127-4843. all work is complete. | |
| Dec 2, 2022 | Completed | 330 Parker Av | Fire Alarm System Services | record decibel testing of audible devices in sleeping area to ensure code compliant sound pressure levels. 330 parker av usf lone mountain north. | |
| Oct 21, 2022 | Completed | 2600 Turk Bl | Fire Alarm System Services | 2600 turk usf loyola house. record decibel testing of audible devices in sleeping areas to ensure code compliant sound pressure levels. | $2,000 |
| Jun 1, 2022 | Completed | 2500 Turk Bl | Fire Alarm System Services | install celllar transmitter to replace pots lines at lone mountain east. note on above: these are 2 interconnected buildings the stories of occupancy are 4 east and 5 west with 1 basement each. | $4,000 |
| May 25, 2022 | Completed | 2600 Turk Bl | Fire Alarm System Services | install celllar transmitter to replace pots lines at loyola house. | $4,000 |
| May 24, 2022 | Completed | 401 Anza St | Fire Alarm System Services | install celllar transmitter to replace pots lines at loyola village. | $4,000 |
| May 23, 2022 | Completed | 330 Parker Av | Fire Alarm System Services | install celllar transmitter to replace pots lines at lone mountain north | $4,000 |
| Mar 31, 2022 | Completed | 330 Parker Av | Allied Fire Protection | voluntary fire sprinkler system (18 total) at the usf recycling + waste facility. water supply is from (e) fire pump in adjacent building. ref pa# 201810153184. | $18,000 |
| Feb 8, 2022 | Completed | 330 Parker Av | Guzman - Suffolk Jv Llc | construct manufactured roof truss system for new recycling facility. roof framing per bpa 201810153184 | $50,000 |
| Dec 23, 2021 | Completed | 330 Parker Av | Fire Alarm System Services | add modules for 1 valvo tamper and 1 water flow. add 1 horn strobe. | $3,000 |
| Oct 25, 2021 | Completed | 330 Parker Av | Malcolm International Llc | voluntary structural remedial work to private elevated roadway/via duct in-kind. all work to be performed out doors | $3,000,000 |
| Jun 29, 2021 | Completed | 330 Parker Av | Guzman - Suffolk Jv Llc | revision to issued pa# 201810153184. "structural only". value engineering to reduce construction cost. | |
| Oct 27, 2020 | Completed | 2800 Turk Bl | Fire Alarm System Services | add 6 pulls, 12 output modules, 5 input modukes, 3 smokes, 1 duct smoke, 21 horn strobes, 2 strobes. | $24,000 |
| Sep 12, 2020 | Completed | 2800 Turk Bl | 7 evacuation signs | $1,750 | |
| Sep 8, 2020 | Completed | 2800 Turk Bl | Westates Mechanical Corporation Inc | tie into new sprinkler overhead from another building | $5,000 |
| Aug 22, 2020 | Completed | 2800 Turk Bl | Aaa Restaurant Fire Control/Dba Aaa Fire | furnish and install 4 pyro chem fire systems in the main kitchen area on the ground floor. | $6,500 |
| Aug 13, 2020 | Never finaled | 2500 Turk Bl | Devcon Construction | (west building): revision to pa# 201611303820-s4 (sprinkler). no sprinklers will be installed in the elevator pits for this student housing project. | |
| Aug 13, 2020 | Completed | 2500 Turk Bl | Devcon Construction | (east building): revision to pa# 201611303815-s4 (sprinkler). no sprinklers will be installed in the elevator pits for this student housing project. | |
| Jul 24, 2020 | Never finaled | 2500 Turk Bl | street space | ||
| Jul 23, 2020 | Completed | 2800 Turk Bl | Cahill Contractors Llc. | design anchorages for the project equipment such as refrigeration equipment, broilers, stoves, wire shelving and hood supports. | |
| Mar 9, 2020 | Completed | 2800 Turk Bl | Cahill Contractors Llc. | rev to pa# 201710110911. corrected (reduced) the fresh ventilation rate at the dinning. this is pdated on the t-24. changed the ventilation @ the pavilion from natural to mech & no longer use skylights for ventilation, instead added 3 supply fans by duct heaters. | $50,000 |
| Feb 10, 2020 | Never finaled | 2500 Turk Bl | street space | ||
| Nov 15, 2019 | Completed | 2500 Turk Bl | administrative permit for pa# 2016/11/30/1815-s. permanently assign address for the east building as "2500 turk boulevard". | ||
| Nov 15, 2019 | Never finaled | 2550 Turk Bl | administrative permit for pa# 2016/11/30/1820-s. permanently assign new address for the west building as "2550 turk boulevard". | ||
| Nov 15, 2019 | Completed | 2800 Turk Bl | Westates Mechanical Corporation Inc | provide a fire protection system on the dining commons level of the (e) lone mountailn building and in the newly constructed pavillion building, all (e) stand pipes and controls beyond area of work are to remain (37) new pendent heads, (93) new upright heads, (3) ne side heads | $84,000 |
| Aug 13, 2019 | Completed | 2800 Turk Bl | Cahill Contractors Llc., Devcon Construction | rev to 201710110911.accom prop arch layout-new openings will add to (e)concrete wall w/remain portion wall strengthened by inc thickens of wall&infill(e)opening by casting new concrete against (e)wall&tying 2 walls together via epoxy dowels. | $75,000 |
| Mar 29, 2019 | Never finaled | 2500 Turk Bl | street space only | ||
| Oct 15, 2018 | Completed | 330 Parker Av | erect 1-story, type 2-b, no basement, no dwelling unit, recycling & waste facility bldg. | $350,000 | |
| Aug 3, 2018 | Never finaled | 2500 Turk Bl | street space | ||
| Jun 22, 2018 | Completed | 2500 Turk Bl | Devcon Construction | design of a temp shoring & permanent retaining wall system for the lone mountain sobrato hall project @ usf. the excavation with cuts upt o 28 ft. will be shored using temp & permanent tieback soldier beams. ref pa# 2016/11/30/3815-s (east bldg) & pa# 2016/11/30/3820-s (west bldg) | $909,000 |
| Jun 22, 2018 | Completed | 2500 Turk Bl | Devcon Construction | design of a temp shoring & permanent retaining wall system for the lone mountain sobrato hall project @ usf. the excavation with cuts upt o 28 ft. will be shored using temp & permanent tieback soldier beams. ref pa# 2016/11/30/3815-s (east bldg) & pa# 2016/11/30/3820-s (west bldg) | $1,980,000 |
| Jun 20, 2018 | Completed | 2500 Turk Bl | grub & removal of vegetation, trees & debris. removal of ac & concrete. removal of fencing & light poles & cap utilities. ref 201611303815s & 201611303820s, 201804095853 demo. exclude excavation & grading work. | $280,000 | |
| Apr 9, 2018 | Completed | 2500 Turk Bl | Devcon Construction | demolition of a type 4, 1-story maintenance building for usf campus. | $20,000 |
| Feb 2, 2018 | Never finaled | 2800 Turk Bl | Cahill Const Service Inc | replacement of 205 windows to west, tower, chapel wings & main. phase ii. max. u factor not to exceed 0.32. like for like | $722,000 |
| Nov 27, 2017 | Expired or cancelled | 2800 Turk Bl | Cahill Const Service Inc | accessibility upgrades consisting of the removal of an (e) non-compliant ramp on the 1st fl along with corridor and adjacent office plan re-configurations to accomodate new ramp length, fire under separate permit(s) | $400,000 |
| Oct 11, 2017 | Completed | 2800 Turk Bl | Cahill Contractors Llc. | interior renovation of (e)dinning hall within (e)education bldg; include partitions, cooler boxes, food service equip, storefront windows & doors, & mep. erect new dining hall pavilion & covered pedestrian walking | $4,431,584 |
| Jul 12, 2017 | Never finaled | 2800 Turk Bl | Cahill Contractors Llc. | revision to pa#201612205404, minor change to 480v feeder. | |
| May 2, 2017 | Never finaled | 2800 Turk Bl | Cahill Contractors Llc. | replacement of 186 windows at east wing only - phase 1 (n) windows - max u-factor =0.32 | $655,000 |
| Dec 20, 2016 | Expired or cancelled | 2800 Turk Bl | Cahill Contractors Llc. | replace 2 steam boilers with 2 new hot water boilers. install 2 microturbine units. install new hot water distribution piping throughout bldg. replace radiator steam coils with hot water coils in (e) radiator enclosure. misc arch finish repairs. no work outside bldg except for piping on top of roof. | $3,000,000 |
| Nov 30, 2016 | Completed | 2500 Turk Bl | Devcon Construction, B F P Fire Protection | (east building) to erect 4 stories with 1 basement, type va building, 84 units student residence hall with amenity office. (r-2,b,a-3,s-2) | $38,000,000 |
| Nov 30, 2016 | Completed | 2500 Turk Bl | Devcon Construction, B F P Fire Protection | (west building) to erect 5 stories, no basement with 1 level type i-a over 4 levels type 5-a, 71 units student residence hall with amenity office. (r-2,b,a-3,s-2) | $34,000,000 |
| Jul 14, 2015 | Completed | 2800 Turk Bl | Western Roofing Service | reroofing | $3,000 |
| May 31, 2013 | Expired or cancelled | 2500 Turk Bl | to demolish 1 story storage building | ||
| May 31, 2013 | Expired or cancelled | 2500 Turk Bl | to demolish 1 story building | ||
| Dec 9, 2011 | Never finaled | 2800 Turk Bl | Red Hawk Fire & Security Ca Llc | 1st floor-fire alarm t,i-lone mountain-10 wall mount horns | $4,839 |
| Feb 26, 2009 | Completed | 2800 Turk Bl | Schikore Construction | to obtain final inspection for work approved under pa 200603086241 all work is complete | |
| Nov 20, 2007 | Completed | 330 Parker Av | Paganini Electric Corp(See Signatories) | as built drawings for fire alarm system referencing to application #200706113499 per fire marshall's request. add 8 duct dectectors, add 8 control relays for fsd control, and remove 3 horn strobes in lobbies on floor 4 to 6. | $15,000 |
| Jun 11, 2007 | Completed | 330 Parker Av | Paganini Electric Corp(See Signatories) | 4 addressable dual action pull stations, 10 smoke detectors, 4 control relays, 8 pilot relays, 4 circuit controllers, 5 monitor modules, 24 horn/strobe combinations for lobby and ada room fire alarm modifications. | $15,000 |
| Jun 6, 2007 | Completed | 2800 Turk Bl | R L H Fire Protection Inc | t/i upgrade on (e) fire sprinkler system, lowe mountain-usf porm's lobby & restroom. 4/f 25 relocate, 5 add, 12 deletes, 5/f 25 relocate, 5 add, 12 deletes, 6/f 25 relocate 5 add, 12 delete, 7/f 26 relocate, 2 add, 10 delete. | $23,600 |
| Feb 12, 2007 | Completed | 2800 Turk Bl | Diversified Fire Products | emergency panel replacement for usf-lone mountain, panel replacemnet-fire alarm system. | $79,155 |
| Jan 17, 2007 | Completed | 2800 Turk Bl | renovation of existing building on floors 4 through 7 of bathroom and dorm rooms | $1,000,000 | |
| May 16, 2006 | Completed | 2800 Turk Bl | renovation of extg elevator lobby areas to floors 4 through 7. to correct extg lobby/elevator code infranction | $350,000 | |
| Mar 8, 2006 | Expired or cancelled | 2800 Turk Bl | remove (e) glass entry & construct new entry colamade. ref to previous pa# 2005/08/10/9898 for title 24 access complete dated: 09/21/05. | $500,000 |