James Mergens
- Listed as
- architect, engineer
- Firm
- Cps, Inc.
- Based in
- Pleasant Hill
- On San Francisco permits
- Aug 2007 to May 2017
8 permits since 2000 (architect on 5 permits, engineer on 3 permits): 6 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 24, 2017 | Never finaled issued Oct 2017, no final | 222 Stanyan St | Northern Services, Inc. | installation of new hot water boilers, co-generation micro turbines and the related equipment to convert the koret complex bldgs from a steam heating system to a hot water heating systemDetails
installation of new hot water boilers, co-generation micro turbines and the related equipment to convert the koret complex bldgs from a steam heating system to a hot water heating system | $1,700,000 |
| Dec 20, 2016 | Expired or cancelled expired Jan 2026 | 2800 Turk Bl | Cahill Contractors Llc. | replace 2 steam boilers with 2 new hot water boilers. install 2 microturbine units. install new hot water distribution piping throughout bldg. replace radiator steam coils with hot water coils in (e) radiator enclosure. misc arch finish repairs. no work outside bldg except for piping on top of roof.Details
replace 2 steam boilers with 2 new hot water boilers. install 2 microturbine units. install new hot water distribution piping throughout bldg. replace radiator steam coils with hot water coils in (e) radiator enclosure. misc arch finish repairs. no work outside bldg except for piping on top of roof. | $3,000,000 |
| Oct 12, 2016 | Completed final sign-off Sep 2017 | 235 Pine St | Bevilacqua & Sons | 14th floor: modification of extg elevator lobby to include selective demolition and construction of non-load bearing partitions, new ceiling grid and tiles, light fixtures and new switches, new doors and frames and new finishes. n/a for maherDetails
14th floor: modification of extg elevator lobby to include selective demolition and construction of non-load bearing partitions, new ceiling grid and tiles, light fixtures and new switches, new doors and frames and new finishes. n/a for maher | $51,250 |
| Oct 12, 2016 | Completed final sign-off Feb 2017 | 1 Lombard St | Skyline Construction | suite 303: modification & expansion of extg t.i. to include selective demo & construction of non-load bearing partitions, nw light fixtures including re-switching, nw storage & entry doors/fames, salvage & reuse of extg selectied materials if practicable, millwork & nw sink & finishes. n/a for maherDetails
suite 303: modification & expansion of extg t.i. to include selective demo & construction of non-load bearing partitions, nw light fixtures including re-switching, nw storage & entry doors/fames, salvage & reuse of extg selectied materials if practicable, millwork & nw sink & finishes. n/a for maher | $380,000 |
| Feb 17, 2016 | Completed final sign-off Jun 2016 | 731 Market St | Dome Construction Corp | ste 400: selective demolition of partitions, new ceiling, light fixtures, doors and frames, millworks, sinks, finishes and accessible restrooms. mep/life safety deferred.Details
ste 400: selective demolition of partitions, new ceiling, light fixtures, doors and frames, millworks, sinks, finishes and accessible restrooms. mep/life safety deferred. | $544,000 |
| Jun 18, 2014 | Completed final sign-off Aug 2015 | 180 Montgomery St | Bevilacqua & Sons | 5th floor: modification of an extg t.i. modification to include construction of non-load bearing partitions, new clg grid and tile, lighting fixtures office doors and frames, millwork, new sink and finishes.Details
5th floor: modification of an extg t.i. modification to include construction of non-load bearing partitions, new clg grid and tile, lighting fixtures office doors and frames, millwork, new sink and finishes. | $400,000 |
| Dec 17, 2013 | Completed final sign-off Jul 2014 | 731 Market St | Peacock Construction Inc | this work is limited to the addition of one maintenance room including new partitions, doors, and lighting.this work introduces new bldg service space part of the cold shell build out of the basement level.electrical work is defffered submittal.Details
this work is limited to the addition of one maintenance room including new partitions, doors, and lighting.this work introduces new bldg service space part of the cold shell build out of the basement level.electrical work is defffered submittal. | $15,000 |
| Aug 31, 2007 | Completed final sign-off May 2008 | 282 02nd St | Novo Construction Inc | 1st floor - interior demo non-structural walls. ada compliance under t.i. permit.Details
1st floor - interior demo non-structural walls. ada compliance under t.i. permit. | $25,000 |