| Apr 9, 2026 | In progress issued Apr 2026 | 235 Pine St | M-23 Mechanical System | safe off controls vavs and ddc controls. reconfigure duct work to match new partition plan. furnish and install galvanized steel duct distribution. furnish and install grilles, registers, diffusers. carry controls subcontractor to provide, install, and commision ddc controls. air balance. provide | $231,650 |
| Feb 9, 2026 | Completed final sign-off Mar 2026 | 235 Pine St | Anderson, Rowe & Buckley, Inc. | 45 heads ref pa 202512262785 | $22,660 |
| Dec 26, 2025 | In progress issued Feb 2026 | 235 Pine St | ti at 7th floor: ti of an office area. installing modular wall panel system 8.0" tall with intergrated low voltage | $200,000 | |
| May 5, 2023 | Completed final sign-off May 2023 | 235 Pine St | Golden Gate Fire Protection Inc | fire sprinklers relocate 32 pendent sprinklers and relocate 26 uprights on the 18th fl, ste 1800. ref 202301301010. | $31,900 |
| Apr 18, 2023 | Completed final sign-off Aug 2024 | 235 Pine St | Rossi Builders Inc. | suite 1800: rebalance existing boxes ref 202301301010. elec/plumbing under sep cover | $15,000 |
| Apr 7, 2023 | Completed final sign-off Mar 2024 | 235 Pine St | Johnson Controls Fire | 18/f: modify existing fire alarm system, provide 7 speaker strobes as shown on drawings, all new wiring to be class b. ref pa# 202301301010. | $3,500 |
| Apr 6, 2023 | Completed final sign-off Aug 2024 | 235 Pine St | E. J. Weber Elect.Co Inc | suite 1800 - title 24 compliant electrical drwgs ref pa 2023-0130-1010 | $108,000 |
| Jan 30, 2023 | Completed final sign-off Aug 2024 | 235 Pine St | Rossi Builders Inc. | demo and construction of non load bearing partitions, e modifications t oceiling grid and tile reswitching. new doors, frames, new millwork, new sinks, new finishes. ste 1800 | $750,000 |
| Dec 14, 2020 | Never finaled issued Feb 2021, no final | 235 Pine St | Matrix Hg Inc | hvac modifications to support interior tenant improvements. ref pa# 202008061204. | $71,280 |
| Nov 17, 2020 | Never finaled issued Nov 2020, no final | 235 Pine St | C B F Inc | 17/f: electrical buildout including (45) plugs, (55) light fixtures and controls. reference t.i pa# 202008061204. | $118,651 |
| Nov 5, 2020 | Never finaled issued Nov 2020, no final | 235 Pine St | R L H Fire Protection Inc | fire sprinkler permit. relocate 9, and 7 and delete 1 sprinkler on the 17th floor. t.i. # 2020-0806-1204 | $5,500 |
| Oct 29, 2020 | Never finaled issued Dec 2020, no final | 235 Pine St | Johnson Controls Fire | alter existing fire alarm system, 17th floor, (n) 7 strobes, (1) (n) speaker, relocate (5) existing speakers. ref to ti building permit 2020-0806-1204. | $12,000 |
| Sep 28, 2020 | Expired or cancelled cancelled Jul 2023 | 235 Pine St | Johnson Controls Fire | elevator fire alarm system modernization . | $1,500 |
| Aug 6, 2020 | Completed final sign-off Aug 2021 | 235 Pine St | Bevilacqua & Sons | 17th fl, ti - minor demo of (e) partitions & addition of entrance door. (n) construction to include interior partitions, minor work with (e) ceiling tiles, (n) doors, minor addition to (e) mech systems, (n) break area, (n) light fixtures & additions to (e) elec fixtures & equipment | $500,000 |
| Mar 26, 2019 | Completed final sign-off May 2019 | 235 Pine St | Bevilacqua & Sons | ste 1225 - this project involves modification of an existing tenant improvement to include additional gypsum board layer to non-load bearing partitions, new base, new sound boots and new caulking for soundproof | $103,000 |
| Mar 26, 2019 | Completed final sign-off Oct 2019 | 235 Pine St | Mcclure Electric Inc | suite 1500: title 24 lighting only reference # 2019-0110-0026 | |
| Feb 28, 2019 | Completed final sign-off Mar 2019 | 235 Pine St | Johnson Controls Fire | fire alarm ti on 15th fl, ste 1500 - install 2 new speaker appliances and 1 new stroe appliance. ref pa 2019-0110-0026 | $1,600 |
| Feb 15, 2019 | Completed final sign-off May 2019 | 235 Pine St | Mcclure Electric Inc | ref pa# 201812077743; title 24 lighting only, n/a maher | |
| Feb 8, 2019 | Never finaled issued Feb 2019, no final | 235 Pine St | R L H Fire Protection Inc | 15th floor: fire sprinkoler permit. relocate 4 and add 1 sprinkler on the 15th floor. t. i. 201901100026. n/a for maher | $5,076 |
| Feb 4, 2019 | Completed final sign-off Oct 2019 | 235 Pine St | Matrix Hg Inc | 15th floor: ductwork modifications to support interior t.i. ref app#201901100026. n/a for maher | $17,768 |
| Jan 18, 2019 | Completed final sign-off Feb 2019 | 235 Pine St | R L H Fire Protection Inc | 1st fl - fire sprinkler - relocate 8, add 1 and delete 1 sprinkler. ref pa 2018-1207-7743 | $2,500 |
| Jan 10, 2019 | Completed final sign-off Oct 2019 | 235 Pine St | Bevilacqua & Sons | suite 1500 -modification of an (e) ti to include selective demo & construction of non load bearing partitions, new office doors and glazing, new millwork and new finishes maher na | $300,000 |
| Jan 7, 2019 | Never finaled issued Jan 2019, no final | 235 Pine St | Johnson Controls Fire | suite 100. fire alarm tenant improvement at 1st flr. install 2 new strobes & 4 new speaker / strobes, demo 4 (e) appliances | $3,200 |
| Jan 2, 2019 | Completed final sign-off Jul 2019 | 235 Pine St | Matrix Hg Inc | ste 100: duct work modifications to support interior tenant improvement | $20,000 |
| Dec 21, 2018 | Never finaled issued Dec 2018, no final | 235 Pine St | Johnson Controls Fire | suite 1400. fire alarm tenant improvement | $6,500 |
| Dec 7, 2018 | Completed final sign-off May 2019 | 235 Pine St | Bevilacqua & Sons | ste 100. modification of (e) ti - selective demo and construction of non load bearing partitions, new light fixtures and switching, new office doors and frames, new power and new finishes | $170,000 |
| Nov 28, 2018 | Completed final sign-off Feb 2019 | 235 Pine St | Golden Gate Fire Protection Inc | fire sprinkler relocate 32 pendent on the 14th flr. relocate 2 upright ref 201810163347 maher na | $17,850 |
| Oct 16, 2018 | Completed final sign-off Apr 2019 | 235 Pine St | Principal Builders Inc. | ti on the 14th fl to include new non-structural partitions, new or revised hvac, electrical and plumbing. n/a for maher. | $780,000 |
| Jun 26, 2018 | Completed final sign-off Sep 2018 | 235 Pine St | Bevilacqua & Sons | 22nd flr: suite 2200 - modifications to (e) ti to include entry doors maher na | $40,000 |
| Jun 8, 2018 | Never finaled issued Jun 2018, no final | 235 Pine St | Mcclure Electric Inc | ref pa# 201804196744; title 24 lighting only | |
| Jun 1, 2018 | Completed final sign-off Oct 2018 | 235 Pine St | Bevilacqua & Sons | suite 700: the extent of the mechanical work for this project includes: the modification of (e) hvac systems to match new arch layout. the replacement of 1 vav box wit ne box. air balance | $32,500 |
| May 31, 2018 | Completed final sign-off Jul 2018 | 235 Pine St | Bevilacqua & Sons | unit 1275: this projects involves selective demo of non-load bearing partitions, doors and sidelights | $4,000 |
| May 18, 2018 | Completed final sign-off Jun 2018 | 235 Pine St | Johnson Controls Fire | fire alarm ti to 7th fl suite 700: install (2) new strobe notification appliances and (2) new speaker/strobes notification appliances. maher na | $2,000 |
| May 9, 2018 | Completed final sign-off Jun 2018 | 235 Pine St | R L H Fire Protection Inc | 7th flr - fire sprinkler permi relocate 1 and add 2 pendent sprinklers on the 7th flr ref 201804196744 maher na | $3,000 |
| May 3, 2018 | Completed final sign-off Jun 2018 | 235 Pine St | Johnson Controls Fire | suite 2300: revision to existing fire alarm ti permit #20171214503. install (1) new addressable in-duct smoke detector, (7) new speaker/strobes. relocate (2) existing speaker/strobes, (7) existing smoke detectors. ref pa #201710302665. | $500 |
| May 3, 2018 | Completed final sign-off Oct 2018 | 235 Pine St | Matrix Hg Inc | revision to pa 2017-1220-6999 add 1 water cooled air condition unit for it room. n/a for maher. | $17,400 |
| Apr 23, 2018 | Never finaled issued May 2018, no final | 235 Pine St | Mcclure Electric Inc | title 24 lighting only - ref pa 2018-0319-3992 | |
| Apr 19, 2018 | Completed final sign-off Jul 2018 | 235 Pine St | Bevilacqua & Sons | suite 1225: modifications of an existing ti to include selective demolition and construction of non-load bearing partitions, new office door & glazing, new millwork & finishes. maher na. | $120,000 |
| Apr 19, 2018 | Completed final sign-off Oct 2018 | 235 Pine St | Bevilacqua & Sons | arch ti suite 700: modificaiton of existing ti to include selective demo & construction of non-load bearing partitions, relocation of light fixtures, new office doors & frames, & reuse of existing material if applicable. ~785 sq ft maher na mep/fire under separate permits. | $180,000 |
| Apr 12, 2018 | Never finaled issued Apr 2018, no final | 235 Pine St | Pribuss Engineering Inc | 23rd floor: fire sprinkler as built revision to app#201711093582. relocated sprinklers = 52 and added sprinklers = 7 n/a for maher. arch app#201710302665 | $4,112 |
| Apr 6, 2018 | Never finaled issued Apr 2018, no final | 235 Pine St | Bevilacqua & Sons | ste 1200 - modification of existing hvac systems to match new architectural layout. the addition of 2 new vav boxes with controls. air balance. ref pa 2018-0302-2706 | $20,000 |
| Mar 30, 2018 | Completed final sign-off Oct 2018 | 235 Pine St | Bevilacqua & Sons | revision to 201803193992 to revise rating pf partition | |
| Mar 30, 2018 | Completed final sign-off Apr 2018 | 235 Pine St | Johnson Controls Fire | 12th floor: fire alarm t.i. to suite #1200. remove and relocate, 2 extg ceiling mount speaker/strobe appliances. n/a for maher | $3,600 |
| Mar 23, 2018 | Never finaled issued Mar 2018, no final | 235 Pine St | Mcclure Electric Inc | suite 1200: title_24 electrical and new emergency lighting. | |
| Mar 20, 2018 | Completed final sign-off Apr 2018 | 235 Pine St | R L H Fire Protection Inc | 12th flr - fire sprinkler - relocate 3 add 1 and delete 1 pendent sprinlkers. new bracing calcs. ref 201803022706 maher na | $2,000 |
| Mar 19, 2018 | Completed final sign-off Oct 2018 | 235 Pine St | Bevilacqua & Sons | revision to 201710302665, existing permit set to include new office doors, frames, additional millwork reswitching of light fixtures. | $270,000 |
| Mar 9, 2018 | Never finaled issued Mar 2018, no final | 235 Pine St | Johnson Controls Fire | fire alarm ti on 20th floor. install 1 new speaker/strobe in (n) nursing room. n/a for maher. | $5,600 |
| Mar 2, 2018 | Never finaled issued Mar 2018, no final | 235 Pine St | Bevilacqua & Sons | ste 1200 - modification of existing tenant improvements to include selective demo and construction of non-load bearing partitions, relocation of two light fixtures and new switching, new office doors and frames, new power and new finishes | $95,000 |
| Feb 22, 2018 | Never finaled issued Feb 2018, no final | 235 Pine St | Mcclure Electric Inc | revision to 201711224655, title 24 lighting only, arch revision 201710302663, added 2 offices with a ttl of 6 new 2x2 | |
| Feb 6, 2018 | Expired or cancelled cancelled Jan 2026 | 235 Pine St | project involves demo and removal on non load bearing partitions, existing celing grid and tile, light fixtures, office doors, and frames, millwork, elec, mech, data plumbing and finishes maher not req per ab-017 | $89,500 | |
| Jan 26, 2018 | Completed final sign-off Apr 2018 | 235 Pine St | Bevilacqua & Sons | revision to pa #201710302663, to include new partitions, doors, glazing, new ceiling/lighting and finishes. 22nd fl. maher n/a | $10,000 |
| Dec 20, 2017 | Completed final sign-off Oct 2018 | 235 Pine St | Matrix Hg Inc | 23rd flr:replace terminal boxes, ducting and air outlets in the hvac system maher na ref 201710302165 | $110,339 |
| Dec 20, 2017 | Completed final sign-off May 2018 | 235 Pine St | Matrix Hg Inc | 22nd flr:replace terminal boxes, ducting and air outlets in the hvac system maher na ref 201710302663 | $98,400 |
| Dec 5, 2017 | Never finaled issued Dec 2017, no final | 235 Pine St | Mcclure Electric Inc | suite 1225 - title 24 lighting only ref 2017-0817-5101; n/a maher | |
| Nov 22, 2017 | Never finaled issued Nov 2017, no final | 235 Pine St | Mcclure Electric Inc | 23rd fl: title 24 lighting only. reference #201710302665. maher na | |
| Nov 22, 2017 | Completed final sign-off Dec 2017 | 235 Pine St | R L H Fire Protection Inc | fire sprinkler relocate 11, add 3 delete 2 pendent sprinklers on the 12th fl; t.i. ref pa#201708175101 | $4,000 |
| Nov 22, 2017 | Never finaled issued Nov 2017, no final | 235 Pine St | Mcclure Electric Inc | 22nd fl: title 24 lighting only. reference #201710302663. maher na | |
| Nov 21, 2017 | Completed final sign-off Mar 2018 | 235 Pine St | Johnson Controls Fire | tenant improvement to 22nd flr. #2200, 9 new notification appliances, 4 new smoke sensor heads, 1 new in duct smoke sensor, 1 new relay for fsd control, 2 new door holders, slavage and reinstall 7 smoke sensors in plenum ref 201710302663 maher not req | $13,800 |
| Nov 21, 2017 | Completed final sign-off Oct 2018 | 235 Pine St | Johnson Controls Fire | suite: 2300: tenant improvement to 23rd fl 6 new notification appliances. 1 new induct smoke sensor. salvage and reinstall 2 speaker/strobes. salvage and reinstall 7 smoke sensors in plenum | $11,300 |
| Nov 9, 2017 | Completed final sign-off Mar 2018 | 235 Pine St | Pribuss Engineering Inc | 22nd floor suite 2200 fire sprinkler t.i. ref pa #201710302663 - 47 relcoates & 2 adds. total: 49 heads. n/a maher ordinance | $25,349 |
| Nov 9, 2017 | Never finaled issued Nov 2017, no final | 235 Pine St | Pribuss Engineering Inc | 23rd floor suite 2300 fire sprinkler t.i. ref pa #201710302665 - 48 relcoates & 4 adds. total: 52 heads. n/a maher ordinance | $26,900 |
| Nov 8, 2017 | Completed final sign-off Feb 2018 | 235 Pine St | Johnson Controls Fire | fire alarm ti to 12th floor, suites 1200 & 1225 - seven new speakers/strobes appliances. ref pa 2017-0817-5101, mech pa 201710100767. maher n/a | $10,100 |
| Oct 30, 2017 | Completed final sign-off Apr 2018 | 235 Pine St | Bevilacqua & Sons | 22nd floor: modification of an extg t.i. to include selective demolition and construction of partitions, new ceiling tile+grid, new light fixtures, switching, new office doors and frames, new millwork sink and new finishes. n/a for maher. | $575,000 |
| Oct 30, 2017 | Completed final sign-off Oct 2018 | 235 Pine St | Bevilacqua & Sons | 23rd floor: modification of an extg t.i. to include construction of partitions, new ceiling tile+grid, new light fixtures, switching, new office doors and frames, new millwork sink and new finishes. n/a for maher. | $540,000 |
| Oct 24, 2017 | Never finaled issued Oct 2017, no final | 235 Pine St | Mcclure Electric Inc | suite 1200: title 24 only for pa 2017-0817-5101 | |
| Oct 10, 2017 | Never finaled issued Oct 2017, no final | 235 Pine St | Bevilacqua & Sons | 12th floor, ste. 1200 & 1225: the modification of existing hvac systems to match new architectural layout. the addition of 3 new vav boxes with controls. the replacement of 6 vav boxes w/new of eqval size including controls air balance. ref #2017-08-17-5101. maher n/a | $88,616 |
| Oct 5, 2017 | Completed final sign-off Oct 2017 | 235 Pine St | R L H Fire Protection Inc | f/s: relocate 16 pendent sprinklers on the 12 fl. suite 1200 only, suite 1225 not in scope. ref pa #201708175101. maher na | $3,500 |
| Aug 29, 2017 | Completed final sign-off Dec 2017 | 235 Pine St | Mcclure Electric Inc | suite 1475, 14th floor - title 24 lighting compliance. ref # 201707121661. n/a maher ordinance | |
| Aug 29, 2017 | Completed final sign-off Oct 2017 | 235 Pine St | Mcclure Electric Inc | suite 1850, 18th floor - title 24 lighting compliance. ref # 201707121663. n/a maher ordinance | |
| Aug 28, 2017 | Never finaled issued Aug 2017, no final | 235 Pine St | R L H Fire Protection Inc | 18/f- fire sprinkler permit, relocate 3 and add 1 pendent sprinkler. t.i. pa#201707121663. n/a ordinance #155-13 | $1,500 |
| Aug 28, 2017 | Completed final sign-off Sep 2017 | 235 Pine St | Johnson Controls Fire | ti 18th fl, ste 1850 as per approved drawings 2017-0712-1663. re-program existing facu to accommodate the system change. 3 multi-candela speaker/strobe, ceiling mount, white, fire, clear lines | $13,000 |
| Aug 18, 2017 | Completed final sign-off Sep 2017 | 235 Pine St | Bevilacqua & Sons | 18th floor suite 1850 -the modification of existing hvac systems to match new architectural layout. the addition of one vav box with ddc controls. air balance. ref pa #201707121663. n/a maher ordinance | $17,600 |
| Aug 18, 2017 | Completed final sign-off Sep 2017 | 235 Pine St | Johnson Controls Fire | 14th floor suite 1475 - for tenant improvement consist of adding (4) ceiling mount speaker/strobes as shown on plans. ref t.i. #201707121661, n/a maher ordinance | $2,400 |
| Aug 17, 2017 | Never finaled issued Sep 2017, no final | 235 Pine St | Bevilacqua & Sons | suite 1200 & 1225 this project involves modification of existing tenant improvements to include selective demo and constructionof non-load bearing partitions, new ceiling grid & tile, new lights fixture, new switching, new office doors & frames, new millwork and new sink and new finishes | $325,431 |
| Jul 27, 2017 | Completed final sign-off Nov 2017 | 235 Pine St | Bevilacqua & Sons | suite #1475: the modification of existing hvac systems to match new arch layout. the replacement of 5 vav boxes with (n) vav boxes + ddc controls. air balance. maher na | $39,850 |
| Jul 26, 2017 | Completed final sign-off Sep 2017 | 235 Pine St | R L H Fire Protection Inc | 14th floor fire suite 1475 sprinkler permit - relcoate 14 & delete 1 pendent sprinkler. ref t.i. #201707121661. n/a maher ordinance | $3,000 |
| Jul 14, 2017 | Never finaled issued Jul 2017, no final | 235 Pine St | Mcclure Electric Inc | #1250- title 24 only ref pa 2017-0623-0205. maher na | |
| Jul 13, 2017 | Completed final sign-off Jul 2017 | 235 Pine St | R L H Fire Protection Inc | fire sprinkler relocate 7 pendent sprinklers on the 12th fl | $1,500 |
| Jul 12, 2017 | Completed final sign-off Nov 2017 | 235 Pine St | Bevilacqua & Sons | suite 1475: t.i. to include selective demo and construction of non-load bearing partitions, new ceiling grid & tile, new light fixtures and new switches, new office doors and frames, salvage & reuse of (e) selective materials if practicable, new millwork and new sink and new finishes. | $110,123 |
| Jul 12, 2017 | Completed final sign-off Sep 2017 | 235 Pine St | Bevilacqua & Sons | suite 1850: t.i. to include construction of non-load bearing partitions, new light fixtures and new switching, new office doors and frames, salvage & reuse of (e) selective materials if practicable, new millwork and new sink and new finishes. n/a maher ordinance | $110,711 |
| Jul 11, 2017 | Completed final sign-off Aug 2017 | 235 Pine St | Tulley Mechanical, Inc | 12th floor suite 1250 - modification to existing hvac. ref #201706230205. n/a maher ordinance | $5,000 |
| Jun 23, 2017 | Completed final sign-off Aug 2017 | 235 Pine St | Bevilacqua & Sons | 12th floor suite 1250 - this project involves modification of an (e) t.i. to include construction of non-load bearing partitions, new light fixtures & switching, new office doors & frames, salvage & reuse of (e) selected materials if practicable. n/a maher ordinance | $51,250 |
| Jun 20, 2017 | Completed final sign-off Jul 2017 | 235 Pine St | Johnson Controls Fire | 21st flr: fire alarm ti - 201704275026: 2 new speakers/strobes. maher na | $2,800 |
| Jun 20, 2017 | Completed final sign-off Jul 2017 | 235 Pine St | Johnson Controls Fire | 14th flr: fire alarm ti 201610120034 - 2 smoke detectors & 2 relay modules. maher na | $3,500 |
| Jun 19, 2017 | Never finaled issued Jun 2017, no final | 235 Pine St | Mcclure Electric Inc | suite 2150 - title 24 only ref 201704275026. maher na | |
| May 26, 2017 | Never finaled issued Jun 2017, no final | 235 Pine St | Mcclure Electric Inc | 21st floor - title 24 lighting only, ref 201702270143. maher na | |
| May 26, 2017 | Never finaled issued May 2017, no final | 235 Pine St | Mcclure Electric Inc | title 24 only. ref 201710120034. maher na | |
| May 26, 2017 | Completed final sign-off Sep 2017 | 235 Pine St | Bevilacqua & Sons | add of 1 return grille with duct & fsd to match new arch layout. these is no new mech equip being installed within project scope. the supply grille to be connected for future ti project ti. | $5,100 |
| May 26, 2017 | Completed final sign-off Aug 2017 | 235 Pine St | Bevilacqua & Sons | modification of (e) hvac system to match new arch layout. add 4 new vav boxes with new duct work & dcc controls. air balance | $40,000 |
| May 17, 2017 | Completed final sign-off Jun 2017 | 235 Pine St | R L H Fire Protection Inc | 21st floor: relocate 6 and add 1 pendent sprinklers. t.i. app#201704275026 | $7,600 |
| May 17, 2017 | Completed final sign-off Jul 2017 | 235 Pine St | R L H Fire Protection Inc | 14th floor: relocate 8 pendent sprinklers. t.i. app#201610120034 n/a for maher. | $4,270 |
| May 12, 2017 | Completed final sign-off Jun 2017 | 235 Pine St | Johnson Controls Fire | 21st floor:fire alarm t.i.: 10 smoke detectors, 1 duct smoke detector, 1 relay, 4 door holders, & 10 notification appliances. ref app#201702270143 | $17,000 |
| May 9, 2017 | Never finaled issued May 2017, no final | 235 Pine St | Mcclure Electric Inc | title 24 lighting only ref 201703222090 | |
| May 9, 2017 | Completed final sign-off Jul 2017 | 235 Pine St | Johnson Controls Fire | fire alarm system ti, 24th fl. 2 new duct smoke detectors, 2 new relays, relocate and reinstall 4 existing notification appliance. ref 201703222090 | $5,200 |
| Apr 27, 2017 | Completed final sign-off Aug 2017 | 235 Pine St | Bevilacqua & Sons | 21st floor, ste 2150 ti (n) non-structural partitions, ceilings, millwork and finishes. all new or revised meps, life safety/sprinkler work under separate permit (bldg fully sprinklered) | $115,000 |
| Apr 20, 2017 | Never finaled issued Apr 2017, no final | 235 Pine St | Bevilacqua & Sons | mechanical work includes modification of existing hvac systems to match new architectural layout. addition of 3 vav boxes with new duct work and ddc controls. air balance. n/a maher | $151,770 |
| Apr 20, 2017 | Never finaled issued Apr 2017, no final | 235 Pine St | Bevilacqua & Sons | 24th floor: duct distribution modified per new space plan. 11 new vav boxes being added. 1 new transfer fan is being added. (2) new heat pumps added. (2) new fsds added; n/a maher | $258,000 |
| Apr 18, 2017 | Completed final sign-off Jul 2017 | 235 Pine St | R L H Fire Protection Inc | fire sprinkler relocate 36 add 7 delete 2 pendent sprinklers. relocate 9 and add 1 upright on the 24th fl. 201703222090; n/a maher | $15,000 |
| Apr 14, 2017 | Completed final sign-off Jun 2017 | 235 Pine St | Johnson Controls Fire | ref to app#: 2017-03-24-2269. 1 new duct smoke sensor, 1 new smoke sensor with relay at extg fsd's in floor 7 corridor. | $1,200 |
| Apr 7, 2017 | Completed final sign-off Oct 2017 | 235 Pine St | Mcclure Electric Inc | 13th floor: title 24 lighting only. ref 201702219797. maher not req | $100 |
| Apr 3, 2017 | Never finaled issued Apr 2017, no final | 235 Pine St | Bevilacqua & Sons | the modification of (e) hvac systems to match new architectural layout. the replacement of 16 vav boxes with new vav boxes of equal size and configuration. the addition of 1 new vav box with 7th floor: new controls. air balance | $120,000 |
| Apr 3, 2017 | Completed final sign-off May 2017 | 235 Pine St | Bevilacqua & Sons | 13th floor - the modification of (e) hvac systems to match new architectural layout. air balance. maher na | $20,000 |
| Mar 31, 2017 | Completed final sign-off May 2017 | 235 Pine St | R L H Fire Protection Inc | 21st floor fire sprinkler permit - relocat 13, add 1, delete 47 pendent sprinklers, install 41 upright sprinklers, t.i. pa#201702270143. n/a ordinance #155-13 | $12,000 |
| Mar 28, 2017 | Completed final sign-off Oct 2017 | 235 Pine St | Mcclure Electric Inc | 23rd floor: title 24 lighting only ref 201608245912, no emergency lighting. maher not req | $100 |
| Mar 24, 2017 | Completed final sign-off Jun 2017 | 235 Pine St | Johnson Controls Fire | fire alarm ti to 7 th fl, (9) new speaker/strobes; ref bpa#201702068732 | $7,500 |
| Mar 24, 2017 | Completed final sign-off Apr 2017 | 235 Pine St | Johnson Controls Fire | fire alarm ti to 13th fl 1 strobe, 1 speaker/strobe ref 201702219797 | $2,500 |
| Mar 24, 2017 | Completed final sign-off Jun 2017 | 235 Pine St | Johnson Controls Fire | fire alarm ti 1 new strobe ref 201702068732 maher not req | $1,000 |
| Mar 22, 2017 | Completed final sign-off Aug 2017 | 235 Pine St | Bevilacqua & Sons | existing tenant improvement to include selective demo and construction of partitions, new ceiling grid and tile, new light fixtures and switching,new office doors, frames, millwork, sink, and new finishes | $500,000 |
| Mar 10, 2017 | Completed final sign-off Mar 2017 | 235 Pine St | R L H Fire Protection Inc | 7/f- fire sprinkler permit, relocate 50, add 7 and delete 8 pendent sprinklers. t.i. pa#201702068732. n/a ordinance #155-13 | $14,000 |
| Mar 10, 2017 | Never finaled issued Mar 2017, no final | 235 Pine St | Mcclure Electric Inc | 7th flr: title 24 lighting only. ref 2017-0206-8732 maher na | $1,000 |
| Mar 10, 2017 | Completed final sign-off Mar 2017 | 235 Pine St | R L H Fire Protection Inc | 13/f- fire sprinkler permit, relocate 6, add 1 pendent and 2 uprights sprinklers. t.i. pa#201702219797. n/a ordinance #155-13 | $3,500 |
| Feb 28, 2017 | Completed final sign-off Jun 2017 | 235 Pine St | Peacock Construction | 19th & 20th floors: evac maps; maher na | |
| Feb 27, 2017 | Completed final sign-off Jun 2017 | 235 Pine St | Bevilacqua & Sons | 21st floor ti includes demo of non-structural partitions and doors, build back new non-structural partitions etc. all new or revised mep, life safety and sprinklers will be design build and submitted separately. | $360,000 |
| Feb 21, 2017 | Completed final sign-off May 2017 | 235 Pine St | Bevilacqua & Sons | 13/f -modification of (e) ti to include select demo & construction of non-load bearing partitions, new ceiling & tile, new light fixtures & switching new door & frame, salvage & reuse of (e) material if practical. maher ord 155-13 na | $100,000 |
| Feb 6, 2017 | Completed final sign-off Jun 2017 | 235 Pine St | Bevilacqua & Sons | 7th floor: suites 700/750: modification of extg suite to include selective demolition and construction of non-load bearing partitions, new ceiling grid and tiles, light fixtures and nw switching, nw doors & frames & new finishes. n/a for maher. mep/life safety deferred. | $300,000 |
| Jan 31, 2017 | Completed final sign-off Feb 2017 | 235 Pine St | Johnson Controls Fire | 23rd flr: as built record drawings for app 201610170468 maher na | |
| Jan 18, 2017 | Completed final sign-off Mar 2017 | 235 Pine St | Johnson Controls Fire | as built record drawing for app 201609076966 | |
| Jan 18, 2017 | Completed final sign-off Mar 2017 | 235 Pine St | Johnson Controls Fire | as built record drawing for 201609076931 | |
| Jan 6, 2017 | Completed final sign-off Jan 2017 | 235 Pine St | Johnson Controls Fire | 12th floor suite 1250 t.i.i consist of adding (4) speaker/strobes. ref pa #201611223312. n/a maher ordinance | $2,500 |
| Jan 6, 2017 | Completed final sign-off Jan 2017 | 235 Pine St | Johnson Controls Fire | 8th floor suite 850 t.i.i consist of adding (3) speaker/strobes. ref pa #201611223311. n/a maher ordinance | $2,000 |
| Jan 4, 2017 | Completed final sign-off Jan 2017 | 235 Pine St | R L H Fire Protection Inc | fire sprinkler permit on 12th floor-suite #1250: relocate 11 pendent sprinklers, add 1 pendent. n/a for maher. ref app#201611223312 | $3,800 |
| Jan 4, 2017 | Completed final sign-off Mar 2017 | 235 Pine St | R L H Fire Protection Inc | fire sprinkler permit on 8th floor-suite #850: relocate 6 pendent to upright sprinklers, relocate 2 pendent sprinklers, add 1 pendent sprinklers, delete 2 pendents, add 5 upright sprinklers. n/a for maher. ref app#201611223311 | $7,933 |
| Dec 22, 2016 | Completed final sign-off Mar 2017 | 235 Pine St | Bevilacqua & Sons | revision to 201611223312 modification of (e) hvac system to match new arch layout. the replacement of 6 vav box with new vav box & ddc controls. air balance suite 1250 maher na | $24,000 |
| Dec 22, 2016 | Completed final sign-off Mar 2017 | 235 Pine St | Bevilacqua & Sons | suite 850 revision to 201611223311 maher na modifiication of (e) hvac system to match new arch layout. the replacement of 6 vav box with new vav box & ddc controls. air balance | $24,000 |
| Dec 13, 2016 | Completed final sign-off Oct 2017 | 235 Pine St | Mcclure Electric Inc | suite 850 -title 24 for lighting, ref pa 2016-1122-3311. maher na | |
| Dec 13, 2016 | Completed final sign-off Oct 2017 | 235 Pine St | Mcclure Electric Inc | suite 1250 - title 24 for lighting, ref pa 2016-1122-3312. maher na | |
| Nov 22, 2016 | Completed final sign-off Mar 2017 | 235 Pine St | Bevilacqua & Sons | 12th flr, suite 1250: modification of (e) ti to include selective demo and const of non load bearing partitions, new ceiling grid & tile, new light fixtures and switches, new office doors & frames, salvage & reuse of (e) selected materials if applicable, millwork & new sink and new finishes maher na | $105,823 |
| Nov 22, 2016 | Completed final sign-off Mar 2017 | 235 Pine St | Bevilacqua & Sons | 8th flr, suite 850: modification of (e) ti to include selective demo and const of non load bearing partitions, new ceiling grid & tile, new light fixtures and switches, new office doors and frames, salvage & reuse of (e) selected materials if applicable, millwork & new sink and new finishes maher na | $154,523 |
| Oct 17, 2016 | Completed final sign-off Jan 2017 | 235 Pine St | Johnson Controls Fire | 23rd floor fire alarm tenant improvement - (2) new smoke detectors, (2) new in-duct smoke detectors, (2) speaker/strobes. ref #2016-0712-2162. n/a maher ordinance | $5,500 |
| Oct 12, 2016 | Completed final sign-off Sep 2017 | 235 Pine St | Bevilacqua & Sons | 14th floor: modification of extg elevator lobby to include selective demolition and construction of non-load bearing partitions, new ceiling grid and tiles, light fixtures and new switches, new doors and frames and new finishes. n/a for maher | $51,250 |
| Sep 23, 2016 | Completed final sign-off Oct 2016 | 235 Pine St | Golden Gate Fire Protection Inc | 19th & 20th flr: fire sprinkler - relocate 2 upright sprinkler on 19th. reloacte 91 pendent sprinklers. relocate 98 pendent sprinklers on the 20th ti 201512175423 - 19th and 201512175425- 20th maher na | $48,705 |
| Sep 7, 2016 | Completed final sign-off Mar 2017 | 235 Pine St | Johnson Controls Fire | 20th floor fire alarm tenant improvement - 4 new smoke detectors, 2 duct smoke detectors, 1 relay, 10 speaker/strobes, 4 door holds. ref pa #201607122162. n/a maher ordinance | $12,500 |
| Sep 7, 2016 | Completed final sign-off Mar 2017 | 235 Pine St | Johnson Controls Fire | 19th fl fire alarm ti - 4 new smoke detectors, 3 duct smoke detectors, 1 relay, 12 speaker/strobes, 4 door holds. ref #201607111985. maher not req | $13,500 |
| Sep 6, 2016 | Completed final sign-off Oct 2016 | 235 Pine St | R L H Fire Protection Inc | 23rd flr: fire sprinklers. relocate 3 ti 201608245912 maher na | $609 |
| Aug 31, 2016 | Completed final sign-off May 2017 | 235 Pine St | Bevilacqua & Sons | 23/f lobby- mechanical for elevator lobby modifications. ref app#201608245912. | $3,000 |
| Aug 24, 2016 | Completed final sign-off May 2017 | 235 Pine St | Bevilacqua & Sons | modification of extg elevator lobby to include selective demolition and construction of non-load bearing walls, new ceiling grid and tiles, light fixtures and switches, new doors, frames and finishes. n/a for maher. | $95,843 |
| Aug 24, 2016 | Never finaled issued Aug 2016, no final | 235 Pine St | Peacock Construction | 20th floor - revision to pa #201607122162 - adjust zoning plan. ductwork, & air distribution & provide wshp as shown. n/a maher ordinance | |
| Aug 22, 2016 | Never finaled issued Aug 2016, no final | 235 Pine St | Peacock Construction | 19th floor - revision to permit # 2016-0711-1985. revised title 24 calc. revised vav box schedule, zoning diagram, duct layout & pipe layout. | |
| Jul 12, 2016 | Never finaled issued Aug 2016, no final | 235 Pine St | Peacock Construction | complete interior ti that includes minor demo, new partition walls, doors & hardware, millwork, finishes inclusive of new ceiling system, selected specialties, equipment, and furnishing as shown on drawings. voice & data cabling to idf closet and downstream to work stations, private offices, | $619,200 |
| Jul 11, 2016 | Never finaled issued Aug 2016, no final | 235 Pine St | Peacock Construction | 19th flr: ti involves minor demo. new partition walls, doors & hardware, millwork, finishes inclusive of new ceiling system, selected specialities, equipt and furnishings , voice & data cabling to idf closet and downstream to work stations, private offices, conference & mtg rooms. maher na | $619,200 |
| Mar 18, 2016 | Expired or cancelled cancelled Jan 2026 | 235 Pine St | 21st floor - modification of exisitng elevator lobby, incl demo & construction of non-load bearing partitions, existing modifications to ceiling grid & tile, fixtures, switching, doors & frames, finishes. barrier removal at restrooms. | $40,000 | |
| Mar 18, 2016 | Completed final sign-off Jan 2017 | 235 Pine St | Bevilacqua & Sons | floor 19 thru 24 - project involves demo & removal of existing dumbwaiter shaft & equipment & structural slab infill. n/a maher ordinance | $17,500 |
| Feb 26, 2016 | Never finaled issued Feb 2016, no final | 235 Pine St | Johnson Controls Fire | demo all tenant space devices and appliances from vacant floor 19th through 24th. core devices and appliances are existing to remain. ref pa 2015-1217-5423, 2015-1217-5425, 2015-1217-5426, 2015-1217-5427, 2015-1217-5428, 2015-1217-5429. maher na | $12,000 |
| Jan 6, 2016 | Expired or cancelled cancelled Jan 2026 | 235 Pine St | Bevilacqua & Sons | interior office remodel of existing office space. demolish existing walls, new non-structural interior partitions, new millwork, new ceiling at private offices, new electrical. rework existing mechanical. electrical, plumbing, fire/life safety deferred. maher na | $750,000 |
| Dec 30, 2015 | Never finaled issued Jan 2016, no final | 235 Pine St | Johnson Controls Fire | 13th floor: t.i. as built drawings consist of adding 4 monitor modules for the won door. n/a for maher. construction plan 201508194740. ref original: app#201510169940 | |
| Dec 17, 2015 | Completed final sign-off May 2017 | 235 Pine St | Bevilacqua & Sons | 23rd floor - project involves demolition & removal of non-load bearing partitions, existing ceiling grid & tiles, light fixtures, office doors & frames, millwork, plumbing & finishes per ab-017. n/a maher ordinance all existing fsd's and mechanical duct mains to remain in place per architect | $31,000 |
| Dec 17, 2015 | Completed final sign-off Jan 2017 | 235 Pine St | Bevilacqua & Sons | 21st floor - project involves demolition & removal of non-load bearing partitions, existing ceiling grid & tiles, light fixtures, office doors & frames, millwork, plumbing & finishes per ab-017. n/a maher ordinance all fsd's and mechanical duct mains to remain per architect | $31,000 |
| Dec 17, 2015 | Completed final sign-off Jan 2017 | 235 Pine St | Bevilacqua & Sons | 22nd floor - project involves demolition & removal of non-load bearing partitions, existing ceiling grid & tiles, light fixtures, office doors & frames, millwork, plumbing & finishes per ab-017. n/a maher ordinance all existing fsd's and mechanical duct mains to remain per architect | $31,000 |
| Dec 17, 2015 | Completed final sign-off Jan 2017 | 235 Pine St | Bevilacqua & Sons | 19th floor - project involves demolition & removal of non-load bearing partitions, existing ceiling grid & tiles, light fixtures, office doors & frames, millwork, plumbing & finishes per ab-017. n/a maher ordinanceall existing fsd's and mechanical duct mains to remain per parchitect. | $31,000 |
| Dec 17, 2015 | Completed final sign-off Jan 2017 | 235 Pine St | Bevilacqua & Sons | 24th floor - project involves demolition & removal of non-load bearing partitions, existing ceiling grid & tiles, light fixtures, office doors & frames, millwork, plumbing & finishes per ab-017. n/a maher ordinance | $31,000 |
| Dec 17, 2015 | Completed final sign-off Jan 2017 | 235 Pine St | Bevilacqua & Sons | 20th floor - project involves demolition & removal of non-load bearing partitions, existing ceiling grid & tiles, light fixtures, office doors & frames, millwork, plumbing & finishes per ab-017. n/a maher ordinance all existing fsd's and mechanical duct mains to remain per architect | $31,000 |
| Dec 11, 2015 | Completed final sign-off Jan 2016 | 235 Pine St | Bevilacqua & Sons | 11th floor: demolition of non-load bearing partitions office doors and frames as well as associated electrical, data and finishes. per ab-017. | $3,000 |
| Oct 16, 2015 | Completed final sign-off Jan 2016 | 235 Pine St | Johnson Controls Fire | 13th floor: ti - providing 7 new speaker/strobes, 2 smoke detectors, 2 relays and 4 door holders - by others maher na | $9,000 |
| Oct 5, 2015 | Completed final sign-off Apr 2016 | 235 Pine St | Tulley Mechanical, Inc | 13th floor: ref pa 2015 0819 4740: modify low pressure ducting,install ducts downstream of vav's. install ddc controls. maher na | $112,000 |
| Sep 4, 2015 | Completed final sign-off Oct 2015 | 235 Pine St | R L H Fire Protection Inc | 13th floor fire sprinkler permit - relocate 18, add 2 and delete 12 pendents. relocate 31 and add 2 uprights on the 13th floor. ti 2015-0819-4740 | $27,242 |
| Aug 19, 2015 | Completed final sign-off Apr 2016 | 235 Pine St | Bevilacqua & Sons | 13th floor: interior remodel of exst'g tenant space. new interior partitions, new millwork, lighting, new ceiling. new fire rated 's' doors and won-door partition at elevator lobby per pre-app agreement. mechanical, sprinklers, fire alarm under sep. permits. | $700,000 |
| Jul 2, 2015 | Completed final sign-off Aug 2015 | 235 Pine St | Johnson Controls Fire | fire alarm. tenant improvement to 1st floor. remove one existing speaker/strobe, relocate one existing speaker/strobe, install one new speaker/strobe. compliance with maher ordinance no 155-13. | $3,500 |
| Jul 2, 2015 | Never finaled issued Jul 2015, no final | 235 Pine St | Johnson Controls Fire | fire alarm. tenant improvement to basement. remove one existing speaker/strobe. maher n/a | $3,500 |
| Jun 12, 2015 | Completed final sign-off Jan 2016 | 235 Pine St | Bevilacqua & Sons | suite #100: selective demolition and t.i. of non load bearing partitions. modification of ceiling/grid, tile, light fixtures, switches, doors frames and hardware, millwork, sink and finishes. maher n/a. | $100,000 |
| Jun 12, 2015 | Completed final sign-off Nov 2015 | 235 Pine St | Bevilacqua & Sons | basement: selective demolition and construction of non load bearing partitions, ceiling grid tile and lighting, doors, frames and hardware and finishes. maher n/a. | $25,000 |
| May 28, 2015 | Completed final sign-off Jun 2015 | 235 Pine St | Pribuss Engineering Inc | basement: fire sprinklers - relocate 11. maher na | $5,661 |
| May 28, 2015 | Completed final sign-off Jun 2015 | 235 Pine St | Pribuss Engineering Inc | 1st flr/suite 100: fire sprinklers - relocate 7, add 1. maher na | $4,117 |
| Feb 4, 2015 | Completed final sign-off Apr 2016 | 235 Pine St | Bevilacqua & Sons | 13th flr: demolition of existing non-structual interior partitions, doors/frames/hardware, millwork, finishes, mechanical, electrical and plumbing; maher n/a | $66,478 |
| Dec 23, 2014 | Expired or cancelled cancelled Jan 2026 | 235 Pine St | 18th fl: demolition of existing non structural interior partitions, doors, frames, hardware finishes, and electrical. construction of non structural partitions, doors, frames, hardware finishes, elec. fire sprinkler and life safety under deferred submittal. | $28,000 | |
| Oct 17, 2014 | Expired or cancelled cancelled Jan 2026 | 235 Pine St | minor interior office remodel. demo of existing interior non structural partitions, new interior partitons and office glazing. new paint and carpet. no new electrical, plumbing. no mech maher not req. | $25,000 | |
| Mar 21, 2014 | Completed final sign-off Mar 2014 | 235 Pine St | Johnson Controls Fire | 16/f: provide & install new (4) speaker, (3) strobes, (1) smoke detector, (2) duct detectors & (1) relay. na ordinance #155-13. t.i. 2013.1106.1248 | $10,000 |
| Mar 10, 2014 | Completed final sign-off Mar 2014 | 235 Pine St | Golden Gate Fire Protection Inc | 16th floor:relocate 13 pendant sprinklers. t.i. app#201311061248. compliance w/ maher ordinance does not apply. | $6,695 |
| Nov 6, 2013 | Completed final sign-off Apr 2014 | 235 Pine St | Novo Construction Inc | demolition of extg non -structural interior partitions, doors, frames, hardware, millwork, finishes, mechanical, electrical, & plmg. construction of non structural partitions, door, frames, hardware, millwork, drywall, finishes, mech, elect, & plmg. fire sprnkr & life safety is design bldg by g.c. | $500,000 |
| Jul 25, 2013 | Completed final sign-off Aug 2013 | 235 Pine St | Simplexgrinnell Lp. | 11th floor-modify (e) fire alarm system-7 new notification devices, relocate 2 & demo 3 | $6,000 |
| Jul 1, 2013 | Completed final sign-off Aug 2013 | 235 Pine St | Ward Alan Emery Construction Inc. | 11th floor-suite #1175-demo non structural wall, electrical, (e) grid. lights to remain. construction of non structural partition doors, finishes, hardware, millwork & drywall; separate permit for sprinkler. | $126,023 |
| Mar 30, 2012 | Completed final sign-off Apr 2012 | 235 Pine St | Simplexgrinnell Lp. | t.i. of 18th floor consist of the following. remove and comer extg 7 strobes. remove and replace extg 6 ceiling mount speaker with new speaker/strobes. provide and install new 2 ceiling mount speaker/strobes. | $7,000 |
| Mar 26, 2012 | Completed final sign-off May 2012 | 235 Pine St | Ward Alan Emery Construction Inc. | suite 1825, interior demolition of extg partitions, new paint, carpet. rework extg electrical. | $20,000 |
| Dec 20, 2011 | Never finaled issued Dec 2011, no final | 235 Pine St | Simplex Grinnell | 6th floor t.i.: deleted 1 smoke detector and revised battery calculations for as built record drawings. original app 201112019886 | |
| Dec 9, 2011 | Completed final sign-off Dec 2011 | 235 Pine St | Simplex Grinnell | tenant improvment of 10th fl. remove and cover old existing ceiling mount speaker strobes. new 4 ceiling mount speaker strobes. new 2 ceiling mount strobes | $5,000 |
| Dec 8, 2011 | Completed final sign-off Jan 2012 | 235 Pine St | Pribuss Engineering Inc | fire sprinkler t.i. add 1 spinkler, relocate 2 sprinklers. | $1,544 |
| Dec 1, 2011 | Never finaled issued Dec 2011, no final | 235 Pine St | Simplex Grinnell | 6th floor t.i.: remvoe & cover existing ceiling mount speaker/strobes, provide & install (2) smoke detectors, (9) ceiling mount speaker/strobes, (4) ceiling mount speakers, (1) relay iam, (1) relay. | $7,000 |
| Nov 30, 2011 | Completed final sign-off Jan 2012 | 235 Pine St | Anderson, Rowe & Buckley, Inc. | 6th floor-(e) fire sprinkler system t.i.-2 added sprinklers & 3 relocated sprinklers | $2,500 |
| Nov 18, 2011 | Completed final sign-off Feb 2012 | 235 Pine St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade-relocate 13 pendent sprinkler heads. upgrade branch line restraints | $6,695 |
| Nov 10, 2011 | Completed final sign-off Jan 2012 | 235 Pine St | Simplex Grinnell | t.i. of 10th floor fire alarm system. remove and cover extg ceiling mount speaker/strobes. intall new one smoke detectors, 14 speaker/strobes and 2 duct detectors. | $9,000 |
| Nov 9, 2011 | Completed final sign-off Mar 2012 | 235 Pine St | Hathaway Dinwiddie Co. | suite 1050:interior tenant remodel new millwork, new ceiling height partitions. extg ceiling to remain. mech, elec,& plmbg to be design build. | $85,000 |
| Oct 18, 2011 | Completed final sign-off Nov 2011 | 235 Pine St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade, relocate 1 pendant sprinkler head, add 1 sprinkle head. | $1,030 |
| Oct 11, 2011 | Completed final sign-off Feb 2012 | 235 Pine St | Ward Alan Emery Construction Inc. | 10th floor ste 1000 - interior tenant improvement & demolish existing partitions, ine interior partitions, millwork, new carpet & paint, reworking existing doors, lighting & existing mechanical. | $350,000 |
| Oct 5, 2011 | Never finaled issued Nov 2011, no final | 235 Pine St | Skyline Construction | interior office ti on the 6th fl. new millwork. new movable partition at conerefnce room. demo of 2 interior non-struc. partitions. existing ceiling, lighting and elec. to remain. restroom modifications | $137,500 |
| Oct 5, 2011 | Completed final sign-off Dec 2011 | 235 Pine St | Peacock Construction Inc | interior tenant remodel. new ceiling height partition (non-structural), new paint and new power receticle. re-working existing sprinkers, exisitng ceiling and lighting to remain. | $30,000 |
| Sep 21, 2011 | Completed final sign-off Oct 2011 | 235 Pine St | Pribuss Engineering Inc | 17th floor-fire sprinkler ti with calculations-. relocate 23. add 11. total heads 34. | $17,500 |
| Sep 16, 2011 | Completed final sign-off Feb 2012 | 235 Pine St | Simplex Grinnell | tenant improvement of 17th floor. remove and cover existing speakers, strobes. install 1 smoke detectors, 2 door holders, 9 speaker/strobes, 2 duct detectors | $8,000 |
| Aug 22, 2011 | Completed final sign-off Jan 2012 | 235 Pine St | Hathaway Dinwiddie Co. | improvements for 17th. flr. tenant space @ 235 pine t. for use as an arch. off. work incl. minor demo fo (e) walls & relocation of entrance doors. (n) constr. to incl. int. partitions relocation of clg. tilesm, (n) doors, minor additions to mech. systems, (n) kit. area, lights & other elec. fixt. & | $380,000 |
| Aug 12, 2011 | Completed final sign-off Sep 2011 | 235 Pine St | Simplex Grinnell | add (1) speaker/strobe multicandela wall ount for break room on 19th floor ---fire alarm tenant improvement | $2,000 |
| Aug 5, 2011 | Never finaled issued Dec 2011, no final | 235 Pine St | Metropolitan Electrical Construction | install 1 e-911 omni antenna pursuant to fcc & homeland security on roof top structure, one gps antenna, 2 equipment cabinets. | $5,000 |
| Apr 1, 2011 | Completed final sign-off Aug 2011 | 235 Pine St | Ward Alan Emery Construction Inc. | office ti on the 19th fl incl. existing millwork and relocate sink to new location. all new and revised hvac, electrical, plbg and ls will be design build as determined and or necessary under separate permit. building fully sprinklered | $6,500 |
| Feb 22, 2011 | Expired or cancelled withdrawn May 2011 | 235 Pine St | 19th fl. ti install existing millwork and sink, new or revised hvac, elec, plumbing, life safety, sprinklers design/build separate permit. building fully sprinklered | $6,500 | |
| Jan 24, 2011 | Completed final sign-off Feb 2011 | 235 Pine St | Simplex Grinnell | 12th floor-t.i; addition of 1 nac power supply, remove & replace (e) initiationf notification devices with new | $5,000 |
| Jan 13, 2011 | Completed final sign-off Feb 2011 | 235 Pine St | R L H Fire Protection Inc | 14th floor ste #1400 fire sprinkler permit - relcoate 3 heads & add 2 heads; total 5 heads. | $3,500 |
| Dec 15, 2010 | Completed final sign-off Feb 2011 | 235 Pine St | Peacock Construction Inc | modification of interior walls, relocation of lighting, new power and data (to be submitted as a deffered submittal) and new finishes. alter existing restrooms. relocate soap and seatcover dispenser and install new signage. | $100,000 |
| May 18, 2010 | Completed final sign-off Sep 2010 | 235 Pine St | Peacock Construction Inc | 16th floor t.i. included th ebldg of a new non-structural partition. all new or revised. hvac, electrical, plumbing & life safety work will be design build & submitted under separate permit.( building fully sprinklered). | $37,750 |
| Apr 22, 2010 | Completed final sign-off May 2010 | 235 Pine St | Simplex Grinnell | fire alarm tenant improvement to suite 1100. scope includes one (1) new ceiling mounted speaker/strobe and relocate two speaker strobes. ref. appl.#2010/0412/0076. | $1,000 |
| Apr 12, 2010 | Completed final sign-off May 2010 | 235 Pine St | Ward Alan Emery Construction Inc. | 11th. flr. remodel to include demolition of one office and construction of one new non-rated wall and door. | $25,000 |
| Jan 8, 2010 | Completed final sign-off Feb 2010 | 235 Pine St | Ayoob & Peery Plumbing Co Inc | 12th floor-relocate fire sprinkler head per tenant improv. 1-head relocated. | $350 |
| Jan 7, 2010 | Expired or cancelled cancelled Jan 2026 | 235 Pine St | first floor main lobby electrical work to include replacement of existing light fixtures. | $20,000 | |
| Dec 21, 2009 | Completed final sign-off Mar 2010 | 235 Pine St | Peacock Construction Inc | 12th floor.suite 1250/1275-construction of one non-rated demising partition. relocation of (e) power, parch 9e) finishes. | $16,000 |