Lin Vinh Tran
- Listed as
- engineer
- Firm
- Vision Consulting Svcs
- On San Francisco permits
- Aug 2016 to Dec 2025
10 permits since 2000 (engineer on 10 permits): 6 completed, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 3, 2025 | Completed final sign-off Jun 2026 | 255 California St | Novo Construction Inc | tenant improvement on the 7th fl. demolition of existing light fixtures, new demising walls, new interior partions, dropped ceiling, light power & finishes, mep includeDetails
tenant improvement on the 7th fl. demolition of existing light fixtures, new demising walls, new interior partions, dropped ceiling, light power & finishes, mep include | $1,200,000 |
| Sep 26, 2024 | Completed final sign-off Mar 2026 | 255 California St | Novo Construction Inc | 11th fl- ti 134 sqft of total floor area. (n) walls, power, lighting & finishesDetails
11th fl- ti 134 sqft of total floor area. (n) walls, power, lighting & finishes | $835,050 |
| Sep 26, 2024 | Completed final sign-off Dec 2025 | 255 California St | Novo Construction Inc | 9th fl- ti 11,1134 sqft of total floor area. (n) walls, power, lighting & finishesDetails
9th fl- ti 11,1134 sqft of total floor area. (n) walls, power, lighting & finishes | $835,050 |
| Aug 19, 2024 | Completed final sign-off Mar 2026 | 255 California St | Novo Construction Inc | early start soft demolition work to space on 5th, 7th, 9th, 11th floor. 34136 sqft of the combine floor areas. scope includes non-strucutral demolition per ab-017, including interior non-load bearing walls, ceiling and finishes.Details
early start soft demolition work to space on 5th, 7th, 9th, 11th floor. 34136 sqft of the combine floor areas. scope includes non-strucutral demolition per ab-017, including interior non-load bearing walls, ceiling and finishes. | $190,000 |
| Jul 18, 2022 | Completed final sign-off Mar 2023 | 901 Market St | Skyline Construction | 4/flr restroom, corridor and elevator lobby renovation on approx 3018 sqft includes floor and wall finishes, power, lighting. etc.Details
4/flr restroom, corridor and elevator lobby renovation on approx 3018 sqft includes floor and wall finishes, power, lighting. etc. | $22,000 |
| Jun 10, 2022 | Expired or cancelled cancelled Jan 2026 | 595 Buckingham Wy | ste 561: tenant improvement work on 1074 sqft of the total floor area. new wall, power, lighting and finishes.Details
ste 561: tenant improvement work on 1074 sqft of the total floor area. new wall, power, lighting and finishes. | $166,157 | |
| Dec 20, 2017 | Completed final sign-off Apr 2018 | 901 Market St | Commercial Interior Builders Inc | 3rd fl: adding partitions to create conference rooms on the 3rd fl. ti to include walls, power, ceiling, lighting, new finishes, doors and millwork.Details
3rd fl: adding partitions to create conference rooms on the 3rd fl. ti to include walls, power, ceiling, lighting, new finishes, doors and millwork. | $100,000 |
| Dec 12, 2017 | Never finaled issued Jan 2018, no final | 901 Market St | Commercial Interior Builders Inc | 3/f- remodel existing bathroom for ada compliances. n/a ordinance #155-13Details
3/f- remodel existing bathroom for ada compliances. n/a ordinance #155-13 | $5,000 |
| Aug 24, 2016 | Never finaled issued Aug 2016, no final | 235 Pine St | Peacock Construction | 20th floor - revision to pa #201607122162 - adjust zoning plan. ductwork, & air distribution & provide wshp as shown. n/a maher ordinanceDetails
20th floor - revision to pa #201607122162 - adjust zoning plan. ductwork, & air distribution & provide wshp as shown. n/a maher ordinance | |
| Aug 22, 2016 | Never finaled issued Aug 2016, no final | 235 Pine St | Peacock Construction | 19th floor - revision to permit # 2016-0711-1985. revised title 24 calc. revised vav box schedule, zoning diagram, duct layout & pipe layout.Details
19th floor - revision to permit # 2016-0711-1985. revised title 24 calc. revised vav box schedule, zoning diagram, duct layout & pipe layout. |